IFB 26-005 PSF ST 84 Tenant Imp Proj.pdf
PDF 765 KB Posted
- Attached to
- Station 84 Tenant Improvement Project
- Solicitation number
- IFB 26-005
- Issued by
- King County, Washington
About this file
This is an Invitation for Bid (IFB) document for the Station 84 Tenant Improvement Project issued by the State of Washington. The project encompasses comprehensive interior renovations to multiple facility areas including the dorm, dining, office, exercise room, bunkers, and apparatus bay, along with the installation of a fire sprinkler system and associated riser room throughout the entire facility. Site work includes installation of a new gate, new pavement striping, a new concrete slab at the existing driveway, a new trench drain system, and a new back patio. The IFB solicits bids from qualified contractors to complete all work as specified in the project scope of work and supporting documentation.
The document establishes the bidding requirements, evaluation criteria, and contract terms for this tenant improvement and infrastructure project. Bidders are required to submit proposals in accordance with the specifications and conditions outlined in the IFB package. The successful bidder will be responsible for completing all renovation and site work to the standards defined in the project documents. Contract award and project timeline details, including bid submission deadlines, bid opening dates, and project completion schedules, are governed by the terms specified within the full IFB documentation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
FOR
PUGET SOUND REGIONAL FIRE AUTHORITY
STATION 84 TENANT IMPROVEMENT PROJECT
16855 194TH AVE SE
Renton, Washington 98058
July 17, 2026
Owner: Puget Sound Regional Fire Authority 20811 84th Avenue S.
Kent, Washington Contact: Rosa Dua
(253) 856-4468
Architect: Broderick Architects 55 South Atlantic Street, Suite 301 Seattle, Washington 98134 Contact: Kevin Broderick
(206) 682-7525
BIDDER’S NAME ______________________
KING COUNTY, WASHINGTON
SPECIAL PROVISIONS
FOR
STATION 84 TENANT IMPROVEMENT PROJECT
BIDS MUST BE RECEIVED
BY 10:00 A.M. ON August 18, 2026
BIDS MUST BE MAILED OR HAND DELIVERED TO:
20811 84th Avenue S.
KENT, WASHINGTON 98032
ATTENTION: Rosa Dua Procurement Specialist
Puget Sound Regional Fire Authority July 16, 2026
Station 84 Tenant Improvement Project
TOC-1
TABLE OF CONTENTS
NUMBER TITLE NO. OF PAGES
Over Leaf Table of Contents
DIVISION 00 BIDDING REQUIREMENTS, CONTRACT FORMS, AND CONDITIONS OF THE
CONTRACT
KENT FIRE DEPARTMENT BID PACKAGE
Instructions to Bidders Exhibit A – Public Works Contract Exhibit B - Statement of Bidder's Qualification Exhibit C – Bid Proposal Form Exhibit D - Combined Affidavit & Cert. Form: Non-Collusion, Minimum Wage Exhibit E – Certification of Compliance with Wage Payment Statutes Exhibit F - General Conditions Exhibit G – King County Prevailing Wage Rates
DIVISION 01 - GENERAL REQUIREMENTS
01 1000 SUMMARY
01 3000 ADMINISTRATIVE REQUIREMENTS
01 4000 QUALITY REQUIREMENTS
01 4216 DEFINITIONS
01 6000 PRODUCT REQUIREMENTS
01 7000 EXECUTION AND CLOSEOUT REQUIREMENTS
01 7800 CLOSEOUT SUBMITALS
01 7900 DEMOSTRATION TRAINING
DIVISION 02 - EXISTING CONDITIONS
02 4100 DEMOLITION
DIVISION 03 - CONCRETE
03 3000 CAST-IN-PLACE CONCRETE
03 3511 CONCRETE FLOOR FINISHES
DIVISION 05 - METALS
05 5000 METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 1000 ROUGH CARPENTRY
06 2000 FINISH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 2100 THERMAL INSULATION
07 8400 FIRESTOPPING
07 9200 JOINT SEALANT
DIVISION 08 - OPENINGS
08 1113 HOLLOW METAL DOORS AND FRAMES
TOC-2
08 1213 HOLLOW METAL FRAMES
08 1416 FLUSH WOOD DOORS
08 3323 OVERHEAD DOORS
08 5413 FIBERGLASS WINDOWS
08 7000 DOOR HARDWARE
08 8000 GLAZING
DIVISION 09 - FINISHES
09 2116 GYPSUM BOARD ASSEMBLIES
09 3000 TILING
09 6566 RESILIENT ATHLETIC FLOORING
09 7733 GLASS FIBER REINFORCED PLASTIC PANELS
09 7800 INTERIOR WALL PANELING
09 9113 EXTERIOR PAINTING
09 9123 INTERIOR PAINTING
DIVISION 10 - SPECIALTIES
10 1423 PANEL SIGNAGE
DIVISION 12 - FURNISHINGS
12 3600 COUNTERTOPS
DIVISION 22 - PLUMBING
22 0500 COMMON WORK RESULTS FOR PLUMBING
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
23 0500 COMMON WORK RESULTS FOR HVAC
DIVISION 26 - ELECTRICAL
26 0500 GENERAL ELECTRICAL PROVISIONS
26 0511 ELECTRICAL CONNECTIONS FOR EQUIPMENT
26 0512 ELECTRICAL DEMOLITION
26 0519 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS
26 0526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 0532 OUTLET BOXES FOR ELECTRICAL SYSTEMS
26 0533 RACEWAY SYSTEMS
26 0548 VIBRATION ISOLATION AND SEISMIC CONTROL FOR ELECTRICAL SYSTEMS 5
26 0553 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 0573 OVERCURRENT PROTECTIVE DEVICE SHORT-CIRCUIT COORDINATION
26 0810 ELECTRICAL TESTING
26 2200 LOW VOLTAGE TRANSFORMERS
26 2416 PANELBOARDS
26 2726 WIRING DEVICES
26 2813 OVERCURRENT PROTECTIVE DEVICES
26 2816 DISCONNECT SWITCHES AND ENCLOSED CIRCUIT BREAKERS
26 2913 MOTOR CONTROLLERS
26 3213 PACKAGED ENGINE GENERATOR
26 3600 TRANSFER SWITCHES
26 5100 LIGHTING
26 9300 LIGHTING CONTROLS
DIVISION 27 - COMMUNICATIONS
TOC-3
27 1100 TELECOMMUNICATIONS SYSTEM
27 4133 TV DISTRIBUTION SYSTEM
27 5116 FAST ALERTING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 1300 ACCESS CONTROL SYSTEM
28 3111 FIRE ALARM SYSTEM
DIVISION 31 - EARTHWORK
31 1000 SITE CLEARING
31 2316 EXCAVATION
31 2316.13 TRENCHING
31 2323 FILL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 1313 CONCRETE PAVING
32 1723 PAVEMENT MARKINGS
32 3113 CHAIN LINK FENCES AND GATES
DIVISION 33 - UTILITIES
33 4236 STORMWATER TRENCH DRAINS – LANDSCAPE DRAINS
ATTACHMENT A - PLYMOVENT EXHAUST REMOVAL SYSTEM
LIST OF DRAWINGS
TITLE ............................................................................ Sheet # Title Sheet .......................................................................... A0.1 Site Plan ............................................................................ A0.2 Exiting Plan ........................................................................ CS.2 Cover Sheet & Water Plan ....................................................... C1.0 Water Details ...................................................................... C1.1 Details .............................................................................. C1.2 TESC Plan ........................................................................... C2.0 TESC Details ........................................................................ C2.1 Demolition Plan ................................................................... A1.1 Proposed Floor Plan ............................................................... A2.1 Dimension Plan .................................................................... A2.2 Sections & Door Schedule ........................................................ A3.1 Assemblies ......................................................................... A3.2 Reflected Ceiling Plan ............................................................ A4.1 Finish Plan .......................................................................... A5.1 Enlarged Floor Plan, Interior Elevations ....................................... A6.1 Enlarged Floor Plan, Interior Elevations Restrooms .......................... A6.2 Details ............................................................................... A7.1 Details Cont. ....................................................................... A7.2 Exterior Elevations ................................................................ A8.1 General Notes, Legend, Sheet Index and Abbreviations ................... M001 Schedules Sheet .................................................................. M002 Schedules and Calculations Sheet ............................................. M003
TOC-4
Calculations Sheet ............................................................... M004 Level 1 Mechanical Demo Plan ............................................... MD201 Roof Mechanical Demo Plan .................................................. MD202 Level 1 Mechanical HVAC Plan ................................................. M201 Level 1 Mechanical Piping Plan .............................................. MP201 Roof Mechanical HVAC Plan .................................................... M202 Details Sheet ....................................................................... M501 Piping Diagram ................................................................... M601 Piping Diagram ................................................................... M602 Plymovent Exhaust Layout ...................................................PL-M0.1 General Notes, Legend, Sheet Index and Abbreviations ................... P001 Schedules Sheet .................................................................. P002 Calculations Sheet ............................................................... P003 Foundation Plumbing Demo Plan .............................................. PD200 Level 1 Plumbing Demo Plan .................................................. PD201 Foundation Plumbing Plan ...................................................... P200 Level 1 Plumbing Plan ........................................................... P201 Details Sheet ....................................................................... P501 Electrical Legend and Drawing Index .......................................... E0.1 Electrical Abbreviations and General Notes ................................... E0.2 Telecom Rough-In Schedules .................................................... E0.3 Electrical Schedules .............................................................. E0.4 NREC ................................................................................. E0.5 Demolition Power Floor Plan .................................................. ED2.1 Demolition Light Floor Plan .................................................... ED3.1 Power Floor Plan .................................................................. E2.1 Lighting Floor Plan ................................................................ E3.1 Mechanical Power Floor Plan .................................................... E4.1 Data /Comm Floor Plan .......................................................... E5.1 Alerting Floor Plan ................................................................ E6.1 Fire Alarm Floor Plan ............................................................. E7.1 Electrical Details .................................................................. E8.1 Electrical Details .................................................................. E8.2 Electrical Details .................................................................. E8.3 Riser Diagram and Panel Schedules ............................................ E9.1 JMARC System Design ........................................................... J-E0.1 JMARC Alerting Layout ......................................................... J-E0.1
END OF TABLE OF CONTENTS
Station 84 Tenant Improvement Project Instructions to Bidders-1
Puget Sound Regional Fire Authority Project: Station 84 Tenant Improvement Project
INSTRUCTIONS TO BIDDERS
Puget Sound Regional Fire Authority “Owner” is a Washington municipal corporation. The Owner is seeking sealed bids for an approximate 3,030 square foot tenant improvement project as more specifically described below “Bids.”
All Contractors submitting a Bid shall comply with the following requirements and such requirements shall be part of the contract to perform the work.
1. Identification of Owner.
Puget Sound Regional Fire Authority “Owner” is the entity issuing this invitation for bids.
Owner is a municipal corporation and a political subdivision of the State of Washington.
Owner mailing address is: Puget Sound Regional Fire Authority Attn: Rosa Dua, Procurement Specialist 20811 84th Ave S., Suite 110 Kent, WA 98032
The business telephone number is: (253) 856-4300
Owner representative for all matters relating to this invitation for bids is Rosa Dua, Procurement Specialist.
2. Definitions. The following terms shall have the meaning set forth below when used in this instrument:
2.1. Project: Station 84 Tenant Improvement Project. This project involves interior renovations to the dorm, dining, office, exercise room, bunkers and apparatus bay, as well as installing a fire sprinkler system and riser room for the entire facility.
Site work includes installation of new gate, new striping, new concrete slab at existing driveway, new trench drain and new back patio for Station 84. The Contract will be with the Puget Sound Regional Fire Authority
2.2. Bidder. Any person or entity that submits a qualified bid in response to the invitation for Bids by Owner .
2.3. Bid or Bid Proposal. Any Bid submitted to Owner in response to the invitation for Bids issued by Owner that complies with the bid requirements.
2.4. Owner or Owner. Puget Sound Regional Fire Authority
2.5. Contractor. The bidder awarded a contract by the Owner.
2.6. Estimated Project Cost. The Project is estimated to cost $1,600,000.00
Station 84 Tenant Improvement Project Instructions to Bidders-2
2.7. Contract Documents. The Contract Documents are identified as Follows:
2.7.1. Contract Form: The successful Bidder shall execute the form of Agreement attached as Exhibit A.
2.7.2. Statement of Qualifications. See Exhibit B.
2.7.3. Bid Form. See Exhibit C.
2.7.4. Minimum Wage/Non Collusion Affidavit. See Exhibit D.
2.7.5. Public Works Certifications. See Exhibit E.
2.7.6. General Conditions. See Exhibit F
2.7.7. Prevailing Wage Rates. See Exhibit G.
2.7.8. Performance Bond Form. See Exhibit H.
2.7.9. Bid Bond Form. See Exhibit I.
2.7.10. Drawings. Drawings available from Broderick Architects.
3. Invitation for Bids. Owner will accept sealed Bid Proposals for the Project as follows:
3.1. Time. Bid Proposals must be received by Owner by 10:00 AM on August 18, 2026
3.2. Place. Bid Proposals must be delivered to:
Puget Sound Regional Fire Authority Attn: Rosa Dua, Procurement Specialist 20811 84th Ave S., Suite 110 Kent, WA 98032
3.3. Bid Opening. Bids will be opened at 10:15 AM. on August 18, 2026, at 20811 84th Ave S., Suite 110, Kent Washington 98032. Owner reserves the right to postpone the date and time for Bid opening. Notification to Bidders will be by addenda. Subject to Paragraph 4, the RFA will award a contract within 90 days of bid opening.
4. Acceptance - Rejection of Bids. Owner reserves the right to reject any or all Bids, to waive minor irregularities in any Bids or in the bidding procedure, and to accept any Bid presented which meets or exceeds these specifications and which the Board of Commissioners of Owner deems to be in the best interest of Owner .
5. Examination of Documents and Site of Work. Before submitting a Bid, each Bidder shall review the Scope of Work and shall visit the site of the work. A mandatory site visit will be held in August 4, 2026 and August 6, 2026 at 9:00a.m. to 10:30a.m.to allow prospective bidders the opportunity to examine the existing facility conditions, utilities, access points, and any constraints relevant to the scope of work. Because this project involves a complete
Station 84 Tenant Improvement Project Instructions to Bidders-3 remodel of an existing facility, attendance is required to ensure all bidders have a uniform understanding of the work environment and existing conditions. Bids will be considered non-responsive and rejected if the bidder fails to attend and sign in. Each Bidder shall fully inform the Owner/Architect prior to bidding as to existing conditions and limitations under which the work is to be performed, and shall include in the Bid a sum to cover the cost of items necessary to perform the work as set forth in the Plans, Project Specifications and Contract. No allowance will be made to a Bidder because of lack of such examination or knowledge. The submission of a Bid will be considered as conclusive evidence that the Bidder has made such examination.
6. Inquiries/Addenda/Document Interpretations. If any person contemplating submitting a Bid for construction of the work is in doubt as to the true meaning of any part of the proposed Contract Documents, or finds discrepancies in or omissions from any part of the proposed Contract Documents, the prospective Bidder may submit to Owner a written request for interpretation in accordance with the following:
6.1. Questions must be sent to Rosa Dua, Puget Sound Fire and Robert McMartin, Puget Sound Fire via email: rdua@pugetsoundfire.org and rmcmartin@pugetsoundfire.org.
6.2. Addenda will be issued during the bidding period. All Addenda become part of the Contract Documents. Include resultant costs in the Bid Price.
6.3. Final Addendum, if any, will be issued on August 12, 2026 No further requests for information or clarification can be addressed after the Final Addendum.
6.4. Interpretation or correction of proposed Contract Documents will be made only by addendum and will be mailed or delivered to each general contract Bidder of record.
Owner will not be responsible for any other explanations or interpretations of the proposed Contract Documents.
7. Contents of Bid Proposal. All Bid Proposals shall contain or be accompanied by the following:
7.1. Proposal. A written proposal to construct the tenant improvement in the plans and specifications in accordance with the instructions to Bidders submitted on the Bid Form contained in the Bid Documents.
7.2. Price. The total Bid price in the manner specified in the Bid Form. State applicable sales tax separately.
7.3. Qualification of Bidder. Satisfactory evidence of the Bidder's qualifications as described in Paragraphs 17 and 18 and as set forth on the Statement of Qualifications form as set forth in the Exhibits.
7.4. Authority. The Bid must be signed by an authorized representative of the Bidder in the manner specified in the Bid Form. The Bidder shall provide with the Bid Proposal, proof of such representative's authority to contractually bind the Bidder.
7.5. Subcontractor List. Include the names of any subcontractors and a copy of the listed subcontractors’ Contractors License for the State of Washington and a copy of their L&I certificate of coverage or Extraterritorial Certificate. If the bid exceeds mailto:rdua@pugetsoundfire.org
Station 84 Tenant Improvement Project Instructions to Bidders-4
$1,000,000 the bidder must comply with the subcontractor listing requirements contained in RCW 39.30.060.
7.6. Bid Bond. The Bidder shall provide with its Bid Proposal a bid bond or certified check payable to Owner in the amount of 5% of the total Bid amount.
8. Certifications/Affidavits. Signed copies of the Minimum Wage/Non Collusion Affidavit and Public Works Certifications as set forth in the Exhibits.
9. Bid Marking. All Bidders must submit one copy of the executed offer on the Bid Forms provided, signed and sealed in a closed opaque envelope, clearly identified with Bidder’s name, project name and Owner ’s name on the outside.
10. Withdrawal/Modification of Bids. A Bidder may, without prejudice to the Bidder, withdraw, modify, or correct a proposal after it has been deposited with Owner, provided the request is filed with Owner, in writing, before the time set for opening the Bid Proposals. The original proposal, as modified by such writing, shall be considered as a proposal submitted by the Bidder.
11. Material Considerations. Each of the requirements contained in this document are material and the failure of a Bidder to comply with each requirement will constitute grounds for the rejection of the Bid in the discretion of the Board of Commissioners.
12. Errors and Discrepancies. Minor items of work or material omitted from the original description and scope of work, but inferable from information shown or obviously necessary for proper completion and operation of the work with accepted good practice shall be provided and/or performed by the Contractor at no additional cost to Owner.
13. Irregular Proposals. A Proposal will be considered irregular and may be rejected if:
13.1. The authorized Proposal form furnished by the Owner is not used;
13.2. The completed Proposal form contains any unauthorized additions, deletions, alternate Bids, or conditions;
13.3. The Bidder adds provisions reserving the right to reject or accept the award, or enter into the Contract;
13.4. A price per unit cannot be determined from the Bid Proposal;
13.5. The Proposal form is not properly executed;
13.6. The Bidder fails to submit or properly complete a Subcontractor list, if applicable;
13.7. The Bid Proposal does not constitute a definite and unqualified offer to meet the material terms of the Bid invitation; or
13.8. More than one Proposal is submitted for the same project from a Bidder under the same or different names.
13.9. The Proposal does not include a unit price for every Bid item;
Station 84 Tenant Improvement Project Instructions to Bidders-5
13.10. Any of the unit prices are excessively unbalanced (either above or below the amount of a reasonable Bid) to the potential detriment of the Owner;
13.11. Receipt of Addenda is not acknowledged;
13.12. Other discrepancies, additions, omissions, deletions or conditions as determined in the sole discretion of the Owner.
14. Offer Irrevocable - Time Period. All Bid Proposals shall be deemed to be offers to enter into a contract and shall be irrevocable for a period of thirty (30) calendar days from the date of opening of the Bids.
15. Execution of Contract. The successful Bidder shall, within ten (10) calendar days after receiving Notice of Award, execute the Contract included in the Contract Documents.
16. Proof of Competency of Bidder. It is the intent of the Owner to award a contract to the low responsible bidder. Before award, the Bidder must meet the following Bidder responsibility criteria to be considered a responsible Bidder. The Bidder may be required by the Owner to submit documentation demonstrating compliance with the criteria. The Bidder must:
16.1. At the time of Bid submittal, have a current certificate of registration in compliance with chapter 18.27 RCW proof of which must be submitted with the Bid Proposal;
16.2. Have a current Washington State unified business identifier number;
16.3. Have industrial insurance coverage for the Bidder’s employees working in
Washington as required in Title 51 RCW; an employment security number as required in Title 50 RCW; and a state excise tax registration number as required in Title 82 RCW; and
16.4. Not be disqualified from bidding on any public works contract under RCW
39.06.010 or 39.12.065(3).
16.5. Within the three-year period immediately preceding the date of the bid solicitation, not have been determined by a final and binding citation and notice of assessment issued by the department of labor and industries or through a civil judgment entered by a court of limited or general jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of chapter 49.46, 49.48, or 49.52 RCW.
16.6. Comply with the Public Works Training requirements required by RCW 34.04.350.
17. Supplemental Contractor Responsibility Criteria. In addition to the mandatory Contractor responsibility criteria referenced above, all Contractors must also meet the following relevant supplemental Contractor responsibility criteria applicable to the Project.
Contractors shall submit the required documentation to the Owner with Contractor’s Proposal:
17.1. The Contractor shall have acted as general contractor for and successfully completed three (3) projects of a similar size and scope as required by the contract documents for this project within the last eight years. For the purposes of meeting
Station 84 Tenant Improvement Project Instructions to Bidders-6 this criteria, the Owner has determined that “similar size and scope to this project” means publicly bid site work, drainage and paving construction projects.
17.2. In evaluating whether the projects were “successfully completed,” the Owner may check Contractor’s references for the previous projects and may evaluate the Owner’s assessment of the Contractor performance, including but not limited to the following areas:
17.2.1. Quality control;
17.2.2. Safety record;
17.2.3. Timeliness of performance;
17.2.4. Use of skilled personnel;
17.2.5. Management of subcontractors;
17.2.6. Availability of and use of appropriate equipment;
17.2.7. Compliance with contract documents;
17.2.8. Management of submittals process, construction schedule, change orders, and close-out.
17.3. Documentation: Contractors must complete Section 8 of Exhibit B and shall include on a supplemental statement in support of Exhibit B the following information about each project listed:
17.3.1. Owner’s name and contact information for the Owner’s representative;
17.3.2. Awarded contract amount;
17.3.3. Final contract amount;
17.3.4. A description of the scope of the project and how the project is similar to this project;
17.3.5. The Contractor’s assessment of its performance of each project, including but not limited to the following:
17.3.5.1. Quality control;
17.3.5.2. Safety record;
17.3.5.3. Timeliness of performance;
17.3.5.4. Use of skilled personnel;
17.3.5.5. Management of subcontractors;
Station 84 Tenant Improvement Project Instructions to Bidders-7
17.3.5.6. Availability of and use of appropriate equipment;
17.3.5.7. Compliance with contract documents;
17.3.5.8. Management of submittals process and change orders.
17.4. Procedure to Request Modification of Supplemental Contractor
Responsibility Criteria. During the bidding period, but not later than five (5) business days before the bid submittal deadline, a potential Contractor may request that the Owner modify the supplemental Contractor responsibility criteria. The Owner shall evaluate any such requests, and if a decision is made by the Owner in its sole discretion to modify the criteria, such modification shall be communicated to all Contractors and plan holders via the issuance of an addendum to the bidding documents. If the Owner determines not to modify the supplemental criteria, the Owner shall notify the requesting Contractor of its decision in writing.
17.5. Appeal of Determination that Contractor does not meet Responsibility Criteria: If the Owner determines that the low Bidder does not meet the Contractor responsibility criteria set forth in this section and is therefore not a responsible Bidder, the Owner shall notify the Contractor in writing with the reasons for its determination. If the Contractor disagrees with this determination, it may appeal the determination within 24 hours of receipt of the Owner’s determination by presenting additional information in writing to the Owner. The Owner will consider the additional information before issuing its final determination in writing. If the final determination affirms that the low Bidder is not responsible, the Owner will not execute a contract with any other Contractor until two (2) business days after the low Bidder determined to be not responsible has received written notice of the final determination. For the purposes of this subsection, the date of the Owner's transmission of the Owner's determination(s) by facsimile or electronic mail to the Contractor at the facsimile number or e-mail address provided by the Contractor in its bid shall constitute the date of receipt by the Contractor of the written notices provided for herein.
18. Construction Time. The agreement will include a stipulation that the work be completed in a period of 180 calendar days following receipt of Owner 's Notice to Proceed. Owner requires that the work of this contract be completed as quickly as possible. Consideration will be given to time of completion when reviewing the submitted Bids.
19. Guaranty. The Contractor shall and does hereby guarantee for a period of one (1) year from date of acceptance by the Owner all materials, workmanship and equipment installed under this contract to be as specified and of a good quality. Should any defect develop due to faulty material or workmanship within the guarantee period, the Contractor shall correct the defect and make good all damages that may have been caused by the defect. This work shall be done promptly and without cost to Owner and at the entire expense of the Contractor. The Contractor shall provide to Owner all manufacturer warranties at the completion of the work.
Station 84 Tenant Improvement Project Instructions to Bidders-8
20. Bonds. Prior to signing the Contract, Owner will require the successful Bidder to secure and post a Payment and Performance Bond, each in the amount of 100% of the contract sum, and each in a form acceptable to Owner and substantially in the form included in the Contract Documents. Such bonds shall be issued by surety licensed to business in the State of Washington acceptable to Owner. Costs of such bonds shall be included in the Bid price.
21. Proof of Insurance and Bonds. At or prior to delivery of the signed contract, the Bidder to whom the contract is awarded shall deliver to Owner applicable Certificates of Insurance and such Labor and Materials Payment Bond and Performance Bond as are required by Owner.
22. Approval of Bonds and Insurance. Bonds and Certificates of Insurance shall be approved by Owner before the successful Bidder may proceed with the work. Failure or refusal to provide Bonds or Certificates of Insurance in a form satisfactory to Owner shall subject the successful Bidder to loss of time from the allowable construction period equal to the time delay in furnishing the required material.
23. Prevailing Wages. The Contractor shall pay prevailing wages as currently published by the Washington State Department of Labor and Industries and shall comply with chapters RCW 39.12 and RCW 49.28. A Notice of Intent to Pay Prevailing Wages and prevailing wage rates for the Project must be posted for the benefit of workers. At the conclusion of the Contract, the Contractor and its subcontractors shall submit Affidavits of Wages Paid to the Department of Labor and Industries for certification by the director. Final payment on the Contract shall be withheld until certification by the director has been received by Owner that the prevailing wage requirements of the law have been satisfied. The Contractor hereby certifies that it has not been cited for two violations within the last five
(5) years, and is thus not prohibited from bidding on public works contracts. The Contractor further assures Owner that it will use no sub-contractor who is thus prohibited.
24. Use of Apprentices. If the Bid for the project is over $2,000,000, pursuant to RCW 39.04.320, the Contractor shall provide that 15% of all hours needed to complete the project are apprentice hours. The 15% of hours can be provided totally in one trade or can be distributed to all trades. Monthly reports will be filed with the Owner documenting how this requirement will be met. The $2,000,000 threshold shall be reduced to $1,500,000 on July 1, 2026 and to $1,000,000 on July 1, 2028
25. Retained Percentage. Owner shall withhold a sum not to exceed 5% of each payment of the contract price in accordance with chapter 60.28 RCW. Prior to any payment to the Contractor by Owner, the Contractor shall advise Owner of the manner in which the Contractor wishes such funds held in accordance with the Contract Documents. Such funds shall be retained, held and released in accordance with the statutory requirements.
26. Laws and Regulations. The Bidders attention is directed to the fact that all applicable State laws, municipal ordinances, and rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the Contract throughout, and they shall be deemed to be included in the Contract the same as though written out in full therein. Bidders are advised that if successful, they will be required to meet all applicable
Station 84 Tenant Improvement Project Instructions to Bidders-9 federal, state, and local laws pertaining to permits, licenses, fees and taxes, as well as laws pertaining to employment and wages. Bidders are responsible for determining the extent and applicability of such laws. All equipment and products included in the Bid shall be in compliance with current codes and standards for the specific type of equipment. Current codes shall supersede errors in specification.
27. Public Records. All submitted bids shall become the property of Owner and are subject to Washington State Open Records Law and available for public viewing after the submittal deadline.
Public Works Contract 1
EXHIBIT A CONTRACT FORM
PUBLIC WORKS CONTRACT
This Contract is entered into between Puget Sound Regional Fire Authority, a municipal corporation, referred to as "Owner", and __________________, referred to as “Contractor."
In consideration of the following terms and conditions and those contained in the documents incorporated by reference and made a part of this Contract, the parties agree as follows:
1. THE PROJECT
1.1. The Contractor shall perform all work and furnish all tools, materials, labor and equipment for the Owner and all work associated with the project entitled: Station 84 Tenant Improvement.
1.2. The Project shall be performed in accordance with this Public Works Contract and the following Contract Documents: Owner Specifications Exhibit 1, Contractor’s Proposal, Exhibit 2 and all other forms and documents referenced in such documents which are hereby referred to as the Contract Documents and by this reference are made a part of this Contract.
1.3.The Contract Documents shall be read together. Unless otherwise specified in this Agreement. In the event that any of the terms of Contract Documents conflict with each other, the following shall be the order of precedence:
1.3.1. The terms of this Document entitled “Public Works Contract” shall take precedence over the terms of Exhibits 1, and 2. The terms of Exhibit 1 shall take precedence over the terms of Exhibit 2. Any conflicts in the contract documents shall be brought to the attention of the Owner.
1.4. The Contractor shall start work within 10 calendar days after the date of the written Notice to Proceed and be substantially completed within 180 calendar days and fully completed within an additional 10 calendar days. The Contractor shall provide and bear all expense of all equipment, work, and labor of any sort whatsoever that may be required for the materials and for constructing and completing the Project provided for in this Contract, except for those noted in the specifications to be furnished by the Owner and installed by Contractor.
1.5. The Contractor shall provide and bear all expense of all equipment, work, and labor of any sort whatsoever that may be required for the transfer of materials and for constructing and completing the Project provided for in the Contract Documents and every part thereof, except as mentioned in the specifications to be furnished by the Owner.
Public Works Contract 2
1.6. Owner agrees to use its best efforts to allow Contractor full access and use of the premises as necessary for Contractor to perform the work required to complete the Project with minimal interruption or interference from Owner’s personnel and activities.
1.7. The Contractor shall guarantee the materials and work for a period of one year after completion of the Project.
1.8. The Contractor is responsible for complying with all Federal, State, and local regulations affecting the Project including but not limited to Chapter 70.86 RCW, Chapter 296-305 WAC and Chapter 294-24WAC.
2. COMPENSATION
2.1. The Contractor shall provide monthly statements which shall indicate the percentage of completion of each portion of the Project as of the end of the period covered by the statement.
2.2. Statements received by the 10th day of the month and approved by the Owner will be processed for payment the same month.
2.3. The Owner's representative shall determine the amounts owing to the Contractor based on observations at the site and on evaluations of Contractor's statements and shall issue to the Owner certification for payment.
2.4. All progress payments shall be subject to withholding of the retained percentage as provided herein.
2.5. Washington State Sales Tax shall be separately stated on each statement submitted by the Contractor.
3. CONTRACT SUM
3.1. 3.1. The Owner shall pay the Contractor for the full performance of the Contract the sum of $_________, which includes Alternates_______. This amount shall be paid through monthly statements as provided in Article 2.
3.2. Final payment constituting the entire unpaid balance of the Contract sum, subject to the withholding of retained percentage as provided herein, shall be made by the Owner to the Contractor when:
3.2.1. The Project has been completed and approved and accepted by the Owner.
3.2.2. A final statement has been submitted to the Owner by the Contractor.
Public Works Contract 3
4. SUBCONTRACTOR RESPONSIBILITY (RCW 39.06.020)
4.1. The Contractor shall include the language of this section in each of its first tier subcontracts and shall require each of its subcontractors to include the same language of this section in each of subcontractor’s subcontracts adjusting only as necessary the terms used for the contracting parties. On request of the Owner, the Contractor shall promptly provide documentation to the Owner demonstrating that each subcontractor meets the subcontractor responsibility criteria below. The requirements of this section apply to all subcontractors regardless of tier.
4.2. At the time of subcontract execution, the Contractor shall verify that each of its first tier subcontractors meets the following bidder responsibility criteria:
4.2.1. Meet the responsibility criteria listed in RCW 39.04.350(1) and possesses an electrical contractor license, if required by chapter 19.28 RCW, an elevator contractor license, if required by chapter 70.87 RCW, or a plumbing contractor license, if required by chapter 18.106 RCW
4.2.2. Have a current Washington State unified business identifier number;
4.2.3. Have industrial insurance coverage for the subcontractor’s employees working in Washington as required in Title 51 RCW; an employment security Department number as required in Title 50 RCW; a state excise tax registration number as required in Title 82 RCW; an electrical contractor license, if required by Chapter 19.28 RCW; an elevator contractor license, if required by Chapter 70.87 RCW; and
4.2.4. Not be disqualified from bidding on any public works contract under RCW
39.06.010 or 39.12.065(3).
4.2.5. Within the three-year period immediately preceding the date of the bid solicitation, not have been determined by a final and binding citation and notice of assessment issued by the department of labor and industries or through a civil judgment entered by a court of limited or general jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of chapter 49.46, 49.48, or 49.52 RCW.
5. INDEMNIFICATION AND HOLD HARMLESS
5.1. The Contractor shall indemnify, defend and save the Owner and its commissioners, officers, employees and agents harmless from any and all claims and risks and losses, damages, demands, suits, judgments and attorney’s fees or other expenses of any kind on account of or relating to injury to or death of any and all persons or on account of all property damage of any kind, or in any manner connected with the work performed under this Contract, or caused in whole or in part by the Contractor, a subcontractor or their property, employees or agents during performance of the work or at any time before final acceptance, except only for those losses resulting from the sole
Public Works Contract 4 negligence of the Owner with regard to activities within the Contractor’s scope of work
5.2. Should a court of competent jurisdiction determine that this Contract is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the Owner, its members, officers, employees and agents, the Contractor’s liability hereunder shall be only to the extent of the Contractor’s negligence. It is further specifically and expressly understood that the indemnification provided herein constitutes Contractor’s waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification.
This waiver has been mutually negotiated by the parties.
5.3. In an arbitration or lawsuit with respect to this hold harmless provision, the Contractor shall prepare and defend that lawsuit at its own cost and expense. If judgment is rendered or settlement made requiring payment of damages by the Owner, its officers, agents, employees and volunteers, the Contractor shall pay the same.
6. INSURANCE
6.1. The Contractor shall obtain the insurance described in this section from insurers approved by the State Insurance Commissioner pursuant to RCW Title 48. The insurance must be provided by an insurer with a rating of A-VII or higher in the A.M.
Best’s Key Rating Guide. The Owner reserves the right to approve or reject the insurance provided, based on the insurer (including financial condition), terms and coverage, the Certificate of Insurance, and/or endorsements.
6.2. The Contractor shall keep this insurance in force during the term of the Contract and for thirty (30) days after the Physical Completion date, unless otherwise indicated in Section 7.3.
6.3. If any insurance policy is written on a claims made form, its retroactive date, and that of all subsequent renewals, shall be no later than the effective date of this Contract.
The policy shall state that coverage is claims made, and state the retroactive date.
Claims-made form coverage shall be maintained by the Contractor for a minimum of 36 months following the Final Completion or earlier termination of this Contract, and the Contractor shall annually provide the Owner with proof of renewal. If renewal of the claims made form of coverage becomes unavailable, or economically prohibitive, the Contractor shall purchase an extended reporting period (“tail”) or execute another form of guarantee acceptable to the Owner to assure financial responsibility for liability for services performed.
6.4. The Contractor’s Automobile Liability, Commercial General Liability and Builders Risk insurance policies are to contain, or be endorsed to contain that they shall be primary insurance as respect the Owner. Any insurance, self-insurance, or self-insured pool coverage maintained by the Owner shall be excess of the Contractor’s insurance and shall not contribute with it.
Public Works Contract 5
6.5. The Contractor and the Owner waive all rights against each other, any of their Subcontractors, Sub-subcontractors, agents and employees, each of the other, for damages caused by Fire or other perils to the extent covered by Builders Risk insurance or other property insurance obtained pursuant to the Insurance Requirements Section of this Contract or other property insurance applicable to the work. The policies shall provide such waivers by endorsement or otherwise.
6.6. Failure on the part of the Contractor to maintain the insurance as required shall constitute a material breach of contract, upon which the Owner may, after giving five business days’ notice to the Contractor to correct the breach, immediately terminate the Contract or, at its discretion, procure or renew such insurance and pay any and all premiums in connection therewith, with any sums so expended to be repaid to the Owner on demand, or at the sole discretion of the Owner, offset against funds due the Contractor from the Owner.
6.7. The Contractor’s maintenance of insurance, its scope of coverage and limits as required herein shall not be construed to limit the liability of the Contractor to the coverage provided by such insurance, or otherwise limit the Owner’s recourse to any remedy available at law or in equity. All deductibles and self-insured retentions must be disclosed and are subject to approval by the Owner. The cost of any claim payments falling within the deductible shall be the responsibility of the Contractor.
6.8. The Contractor shall provide the Owner and all Additional Insureds with written notice of any policy cancellation, within two business days of their receipt of such notice.
6.9. The Contractor shall not begin work under the Contract until the required insurance has been obtained and approved by the Owner.
6.10. All costs for insurance shall be incidental to and included in the unit or lump sum prices of the contract and no additional payment will be made.
6.11. All insurance policies, with the exception of Workers Compensation, shall name the following listed entities as additional insured(s):
6.11.1. The Owner and its officers, elected officials, employees, agents, and volunteers;
6.11.2. The above-listed entities shall be additional insured(s) for the full available limits of liability maintained by the Contractor, whether primary, excess, contingent or otherwise, irrespective of whether such limits maintained by the Contractor are greater than those required by this Contract, and irrespective of whether the Certificate of Insurance provided by the Contractor describes limits lower than those maintained by the Contractor.
6.12. The Contractor shall furnish the Owner with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsements, evidencing the Automobile Liability and Commercial General Liability insurance of the Contractor before commencement of the work. Before any
Public Works Contract 6 exposure to loss may occur, the Contractor shall file with the Owner a copy of the Builders Risk insurance policy that includes all applicable conditions, exclusions, definitions, terms and endorsements related to this project. Upon request by the Owner, the Contractor shall furnish certified copies of all required insurance policies, including endorsements, required in this Contract and evidence of all subcontractors’ coverage.
6.13. The Contractor shall cause each and every Subcontractor to provide insurance coverage that complies with all applicable requirements of the Contractor-provided insurance as set forth herein, except the Contractor shall have sole responsibility for determining the limits of coverage required to be obtained by Subcontractors. The Contractor shall ensure that the Owner is an additional insured on each and every Subcontractor’s Commercial General liability insurance policy using an endorsement as least as broad as ISO CG 20 10 10 01 for ongoing operations and CG 20 37 10 01 for completed operations.
6.14. The Contractor shall assume full responsibility for all loss or damage from any cause whatsoever to any tools, Contractor’s employee owned tools, machinery, equipment, or motor vehicles owned or rented by the Contractor, or the Contractor’s agents, suppliers, contractors or subcontractors as well as to any temporary structures, scaffolding and protective fences.
7. TYPES OF INSURANCE REQUIREMENTS
7.1. The Contractor’s required insurance shall be of the types and coverage as stated below:
7.1.1. Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be at least as broad as Insurance Services Office (ISO) form CA 00 01.
7.1.2. Commercial General Liability insurance shall be at least as broad as ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products-completed operations, stop gap liability, personal injury and advertising injury, and liability assumed under an insured contract. The Commercial General Liability insurance shall be endorsed to provide a per project general aggregate limit using ISO form CG 25 03 05 09 or an endorsement providing at least as broad coverage. There shall be no exclusion for liability arising from explosion, collapse or underground property damage. The Owner shall be named as an additional insured under the Contractor’s Commercial General Liability insurance policy with respect to the work performed for the Owner using ISO Additional Insured endorsement CG 20 10 10 01 and Additional Insured-Completed Operations endorsement CG 20 37 10 01 or substitute endorsements providing at least as broad coverage.
7.1.3. Workers’ Compensation coverage as required by the Industrial Insurance laws of the State of Washington.
Public Works Contract 7
7.1.4. Builders Risk insurance covering interests of the Owner, the Contractor, Subcontractors, and Sub-subcontractors in the work. Builders Risk insurance shall be on a special perils policy form and shall insure against the perils of Fire and extended coverage and physical loss or damage including flood, earthquake, theft, vandalism, malicious mischief, and collapse. The Builders Risk insurance shall include coverage for temporary buildings, debris removal, and damage to materials in transit or stored off-site. This Builders Risk insurance covering the work will have a deductible of $5,000 for each occurrence, which will be the responsibility of the Contractor. Higher deductibles for flood and earthquake perils may be accepted by the Owner upon written request by the Contractor and written acceptance by the Owner.
Any increased deductibles accepted by the Owner will remain the responsibility of the Contractor. The Builders Risk insurance shall be maintained until the Owner has granted substantial completion of the project.
An installation floater may be acceptable in lieu of Builders Risk for renovation projects only if approved in writing by the Owner.
8. MINIMUM AMOUNTS OF INSURANCE
8.1. The Contractor shall maintain the following insurance limits:
8.1.1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident.
8.1.2. Commercial General Liability insurance shall be written with limits no less than $2,000,000 each occurrence, $2,000,000 general aggregate and $2,000,000 products-completed operations aggregate limit.
8.1.3. Builders Risk insurance shall be written in the amount of the completed value of the project with no coinsurance provisions.
8.1.4. If the Contractor maintains higher insurance limits than the minimums shown above, the Owner shall be insured for the full available limits of Commercial General and Excess or Umbrella liability maintained by the Contractor, irrespective of whether such limits maintained by the Contractor are greater than those required by this Contract or whether any certificate of insurance furnished to the Owner evidences limits of liability lower than those maintained by the Contractor.
9. CHANGE ORDERS
9.1. The Owner reserves the right to make, at any time during the Project, such changes in quantities and such alterations in the Project as are necessary to satisfactorily complete the project. Such changes in quantities and alterations shall not invalidate the contract nor release the surety, and the Contractor agrees to perform the work as altered. Among others, these changes and alterations may include:
9.1.1. Deleting any part of the Project, Public Works Contract 8
9.1.2. Increasing or decreasing quantities The bid quantities listed for unit bid items are approximate and are for the purposes of bidding only. Overruns or underruns in these bid items shall not be cause for adjustment in the unit prices.
9.1.3. Altering specifications, designs, or both,
9.1.4. Altering…