About this file
This is a bid contract document and invitation for bids issued by the Dallas Housing Authority (DHA) for the renovation of the 2nd and 3rd floors of DHA Headquarters located at 3939 N. Hampton Road, Dallas, Texas 75212. The project scope includes selective interior demolition, interior build-back, architectural finishes, ceiling and lighting modifications, MEP/low voltage system coordination, and restroom upgrades. Specific deliverables include removal of existing flooring, partitions, and ceiling systems; installation of new carpet tile (Mohawk Group Metallic Path in Charcoal Spark), luxury vinyl tile, and rubber base throughout designated spaces; full wall repainting in Sherwin Williams Drift of Mist; replacement of ceiling grid and acoustical tiles; and complete renovation of the 3rd floor executive bathroom including fixtures and finishes. The project encompasses approximately 11,656 GSF on Floor 2 and 8,782 GSF on Floor 3. The pre-bid conference is scheduled for May 18, 2026 at 10:00 a.m. at the project location. Bids must be submitted electronically through the DHA online portal (https://dhantx.bonfirehub.com/portal/?tab=openOpportunities) by 2:00 p.m. Central Time on May 28, 2026, with bid opening at 2:15 p.m. the same day. Bid documents are available for download beginning May 5, 2026. Questions should be directed to Kenneth Duke at (214) 915-8452, Monday through Thursday 8:00 a.m. to 5:30 p.m., and Friday 8:00 a.m. to 12:00 p.m.
The contractor is responsible for design, engineering, and coordination of all mechanical, electrical, plumbing, fire protection, fire alarm, and data/telecommunications systems not provided by the architect. The project requires compliance with 2021 IBC, IFC, IMC, IPC, NEC codes and NFPA 13 standards, with work phased to maintain full building operations and life safety systems throughout construction. The contractor must provide temporary partitions, dust control, noise mitigation, and daily housekeeping while maintaining access to occupied areas. Two add alternates are included: Alternate 1 for full executive restroom upgrade and Alternate 2 for wall covering in the boardroom. The project is subject to federal labor standards including Davis-Bacon wage requirements and HUD Form 4010 conditions. Required submittals include bid bonds, non-collusive affidavits, conflict of interest questionnaires, insurance documentation, Section 3 certifications, and M/WBE participation forms. No specific contract award date or term duration is stated in the provided documentation; closeout requirements include as-built drawings, warranty documentation, system testing and commissioning reports, and turnover of attic stock and salvaged materials to DHA.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ 2026-19 Impact Fee Studies.pdf | ||
| 2026-19 Disaster Debris Removal Notice.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID CONTRACT DOCUMENTS
AND
SPECIFICATIONS
(Project # IFB-2026-19)
Bid due Date and Time
Bids due online at https://dhantx.bonfirehub.com/portal/?tab=openOpportunities
May 28, 2026 at 2:00 PM
Bid Opening: 2:15 P.M. on May 28, 2026 The Dallas Housing Authority, Procurement Department, 3939 N. Hampton Road, Dallas, Texas 75212
DHA Headquarters – 2nd & 3rd Floor Renovation
Pre-Bid Conference: May 18, 2026 10:00 a.m.
3939 N. Hampton Rd. Dallas, Texas 75212
Yes Amendments and Additions to General Conditions
Special Conditions -
HUD Form 4010 Federal Labor Standards -
Supplementary Conditions of the Contract -
Davis-Bacon -
Additional HUD Required Forms 50071 & SF-LLL Yes e s
Bid Packet Index
Return with Bid
Invitation for Bids -
Technical Specifications/General Requirements…Forms 01010 -
Instructions To Bidders for Contracts -
Representations, Certifications, and Other Statements Yes
Bid Form Yes
Bid Bond Yes
Non-Collusive Affidavit Yes
Conflict of Interest Questionnaire Yes
Insurance Yes
INSURANCE REQUIREMENT AFFIDAVIT - JUN 18 2008 Yes
PROFILE FORM 02-24-09 Yes
Insurance Affidavit Yes
Certification of Bidder Regarding Equal Employment Opportunity Yes
Letter of Assurance “A”, “B” and “C” Yes
Minority Business Enterprise Participation Yes
Notice Regarding M/WBE’s Equal Opportunity Yes
Section 3 Clause
What Section 3 Requires of Recipients -
Section 3 Business Utilization Form Yes
Section 3 Contractor Certification of Efforts Form Yes
Sample Contract
Performance Bond Form -
Payment Bond Form -
Certificate as to Corporate Principal II Yes
Contractor Certification of Compliance State of Texas 2271 and 2274 Yes
General Conditions
The Dallas Housing Authority ● 3939 N. Hampton Road ● Dallas, TX 75212 ● Phone: 214-951-8429 ● Fax: 214-224-4953
INVITATION FOR BID
For
(RFQ-2026-19)
DHA Housing Solutions for North Texas is soliciting bids from qualified companies to Renovate 2nd & 3rd floors of DHA’s Headquarters located at 3939 N. Hampton, Dallas, Texas 75212.
Bid documents for this IFB may be downloaded from DHA’s Website:
https://dhantx.bonfirehub.com/portal/?tab=openOpportunities beginning May 5, 2026.
Bid documents must be submitted to DHA electronically through the online portal at Website: https://dhantx.bonfirehub.com/portal/?tab=openOpportunities by 2:00 p.m. Central Time on May 28, 2026. Mailed or delivered responses including Facsimile transmission and emails will not be accepted.
For more information, call Kenneth Duke (214) 915-8452 between the hours of 8:00 a.m. to 5:30 p.m. Monday through Thursday and 8:00 a.m. to 12:00 p.m. on Friday.
Questions can be submitted through the online portal at Website:
https://dhantx.bonfirehub.com/portal/?tab=openOpportunities.
DHA RESERVES THE RIGHT TO REJECT ANY AND ALL PROPOSALS OR TO
WAIVE ANY INFORMALITIES IN THE PROPOSALS. DHA WILL NOT DISCRIMINATE
ON THE BASIS OF RACE, COLOR, NATIONAL ORIGIN, RELIGION, SEX,
DISABILITY, FAMILIAL STATUS, OR AGE. EQUAL HOUSING OPPORTUNITY.
Scope of Work
3939 N. Hampton Road, Dallas, TX
1. Project Overview
This project consists of the interior renovation of Floor 2 and Floor 3 at DHA Headquarters.
Work includes selective demolition, interior build-back, finishes, ceiling modifications, and coordination of all building systems to support the new layout.
No exterior work, site work, or building-wide upgrades are included unless specifically noted.
2. General Requirements
Contractor to field verify all existing conditions prior to construction
Maintain full building operations, egress paths, and life safety systems at all times
Provide phasing plan coordinated with DHA staff occupancy
Provide temporary barriers, dust control, and noise mitigation between occupied and construction areas
Maintain daily housekeeping and safe work conditions
Coordinate all work with City of Dallas permitting and inspections as necessary
3. Demolition Scope
Contractor shall perform selective demolition as indicated on demolition plans, including:
Interior Demolition
Remove existing:
o Carpet, LVT, rubber base, and wood flooring o Ceiling tiles and grid o Selected Partitions, doors, frames, sidelights, and glazing systems o Glass block walls and vertical blinds
In walls selected for demolition, existing electrical outlets (and data) to be removed back to junction boxes.
Remove miscellaneous:
o Power poles and select equipment
Coordination Requirements
Owner to remove furniture unless otherwise coordinated
Salvage and store items identified by DHA
Protect and maintain all active systems during demolition
System Coordination
Contractor responsible for:
o Disconnecting, relocating, and protecting all electrical, data, fire alarm, and security devices o Maintaining system integrity throughout construction
4. Architectural / Build-Back Scope
Partitions & Doors
Install new metal stud and gypsum board partitions per plans
Provide blocking for wall-mounted items
Install doors, frames, and hardware as needed (reuse where applicable)
Coordinate demountable glass partitions (NIC but fully coordinated by GC)
Finishes
Flooring:
o Carpet tile (offices and admin areas) See Plans o LVT (corridors, open office, common areas) See Plans o Rubber flooring (fitness areas) See Plans
Base:
o 4” rubber base throughout
Walls:
o Full repaint (Sherwin Williams “Drift of Mist” or approved equal) o Repair all damaged sheetrock and textures o Remove loat out architectural elements in existing common area walls
Ceilings:
o Replace ceiling grid and tiles o Replace only damaged tiles in areas to remain
Install transition strips at all flooring changes
Changes to A1.1
Floor 2 Private Office- (2L01) to receive Carpet Tile: C1-MOHAWK GROUP
METALLIC PATH 12BY36 - BT43112" X 36" TILE COLOR: 979 CHARCOLE
SPARK
Floor 2 Clerk Office - (2M18) to receive Carpet Tile: C1-MOHAWK GROUP
METALLIC PATH 12BY36 - BT43112" X 36" TILE COLOR: 979 CHARCOLE
SPARK
Floor 2 Admin Assistant Office- (2M07) to receive Carpet Tile: C1-MOHAWK GROUP
METALLIC PATH 12BY36 - BT43112" X 36" TILE COLOR: 979 CHARCOLE
SPARK
Floor 2 Staff Lounge- (2B212) to receive Carpet Tile: C1-MOHAWK GROUP
METALLIC PATH 12BY36 - BT43112" X 36" TILE COLOR: 979 CHARCOLE
SPARK
Floor 2 Open Office- (2B209) ) to receive Carpet Tile: C1-MOHAWK GROUP
METALLIC PATH 12BY36 - BT43112" X 36" TILE COLOR: 979 CHARCOLE
SPARK
Floor 2 Large Training Room- (2B206) to receive Carpet Tile: C1-MOHAWK GROUP
METALLIC PATH 12BY36 - BT43112" X 36" TILE COLOR: 979 CHARCOLE
SPARK
Floor 2 Small Training Room- (2B208) to receive Carpet Tile: C1-MOHAWK GROUP
METALLIC PATH 12BY36 - BT43112" X 36" TILE COLOR: 979 CHARCOLE
SPARK
Floor 2 Training Room Hallways- to receive Carpet Tile: C1-MOHAWK GROUP
METALLIC PATH 12BY36 - BT43112" X 36" TILE COLOR: 979 CHARCOLE
SPARK
Restrooms 2A07 & 2A08 Remove from scope of work. NIC.
Changes to A1.3
Floor 3 Office (3P07) to have LVT1: MOHAWK GROUP 18" X 36" COLOR: TBD
Restrooms 3A06 & 3A05 Remove from scope of work. NIC.
Additional Finish Scope
Information Technology Offices (Plan Coordinates: B4-B6,A8-A6) to have all finishes updated according to provided Plan Attachment A
Horizontal Architectural Elements in Common Area Walls to be removed and repaired and not just floated over.
5. Restroom Scope-
Remove/Replace All Fixtures & Finishes in 3rd Floor Executive bathroom only.
Scope to include: floor tile, wall tile, millwork, sink/toilet fixtures, shutoffs/supplies, mirror, lighting and hardware. Hardware package to be released as addendum.
6. Ceiling & Lighting Scope
Replace grid and ACT within the second and third floor scopes of work except hard lid ceilings, Restrooms and Second Floor Breakroom (Plan Coordinates: B1-B2,A8-A6).
Coordinate:
o Removal of NON- LED lighting fixtures o Add Additional Downlights and lay-in fixtures per plan
Relocate devices and maintain uniform ceiling layout
7. MEP / Low Voltage
Per drawings, all MEP, fire alarm, and low-voltage systems are contractor responsibility, including:
Design and engineering of modifications
Relocation of:
o HVAC controls o Electrical devices o Fire alarm devices o Data/IT infrastructure
Testing, commissioning, and AHJ approvals
Contractor shall provide complete, operational, code-compliant systems.
8. Life Safety & Code Compliance
Maintain compliance with:
o 2021 IBC, IFC, IMC, IPC, NEC o NFPA 13 and applicable standards o Texas Accessibility Standards (TAS) within scope
Maintain:
o Required egress widths and travel distances o Fire-rated assemblies where applicable
Coordinate all inspections with AHJ
9. Phasing & Occupied Building Requirements
Work to be completed in phases coordinated with DHA operations
Maintain:
o Access to offices, restrooms, and corridors o Fire alarm and life safety systems active at all times
Provide:
o Temporary partitions and barriers o Off-hours work as needed
10. Add Alternates
Alternate 1: Full Executive restroom upgrade including finishes, fixtures, ceilings, and cabinetry
Alternate 2: N/A
11. Closeout Requirements
Final cleaning and punch list completion
Provide:
o As-built drawings o Warranty documentation o System testing and commissioning reports
Turn over all attic stock and salvaged materials to DHA
D H A 2 n d & 3 r d F l o o r R e m o d e l | 1
D H A 2 n d & 3 r d F l o o r R e m o d e l | 2
D H A 2 n d & 3 r d F l o o r R e m o d e l | 3
D H A 2 n d & 3 r d F l o o r R e m o d e l | 4
D H A 2 n d & 3 r d F l o o r R e m o d e l | 5
D H A 2 n d & 3 r d F l o o r R e m o d e l | 6
D H A 2 n d & 3 r d F l o o r R e m o d e l | 7
D H A 2 n d & 3 r d F l o o r R e m o d e l | 8
D H A 2 n d & 3 r d F l o o r R e m o d e l | 9
D H A 2 n d & 3 r d F l o o r R e m o d e l | 10
D H A 2 n d & 3 r d F l o o r R e m o d e l | 11
D H A 2 n d & 3 r d F l o o r R e m o d e l | 12
D H A 2 n d & 3 r d F l o o r R e m o d e l | 13
D H A 2 n d & 3 r d F l o o r R e m o d e l | 14
D H A 2 n d & 3 r d F l o o r R e m o d e l | 15
D H A 2 n d & 3 r d F l o o r R e m o d e l | 16
D H A 2 n d & 3 r d F l o o r R e m o d e l | 17
D H A 2 n d & 3 r d F l o o r R e m o d e l | 18
D H A 2 n d & 3 r d F l o o r R e m o d e l | 19
D H A 2 n d & 3 r d F l o o r R e m o d e l | 20
D H A 2 n d & 3 r d F l o o r R e m o d e l | 21
D H A 2 n d & 3 r d F l o o r R e m o d e l | 22
D H A 2 n d & 3 r d F l o o r R e m o d e l | 23
D H A 2 n d & 3 r d F l o o r R e m o d e l | 24
D H A 2 n d & 3 r d F l o o r R e m o d e l | 25
Photo Descriptions:
1) 3rd Floor Reception Existing
2) 3rd Floor Office (Typical)
3) 3rd Floor Meeting Room Existing
4) 3rd Floor Meeting Room Existing
5) 3rd Floor Boardroom Entrance
6) 3rd Floor Boardroom
7) 3rd Floor Boardroom
8) Architectural Joint w/ Corner Guard
9) Architectural Joint w/ Corner Guard
10) Elevator Flooring
11) 2nd Floor Existing Meeting Room
12) 2nd Floor Existing Meeting Room
13) 2nd Floor Facing IT Office/ Training Rooms
14) 2nd Floor Facing IT Office/ Training Rooms
15) 2nd Floor Facing IT Office/ Modular Desk to be installed
16) 2nd Floor Expansion Transition
17) 2nd Floor Common Area
18) 2nd Floor Common Area
19) 2nd Floor Lobby Ceiling
20) 2nd Floor Lobby Ceiling
21) 2nd Floor Lobby Ceiling
22) 3rd Floor Wall
23) Elevator Ceiling tiles
24) 3rd Floor Hard Lid Ceiling Overlooking Lobby
Not In Scope
INFORMATION TECHNOLOGY- 2nd FLOOR
PLAN ATTACHMENT A
ALIGN
VICINITY MAP
DALLAS HOUSING
AUTHORITY
HEADQUARTERS
MOUNTED
NOMINAL
NOT IN CONTRACT
ON CENTER (EACH WAY)
OPPOSITE HAND
REFERENCE
REQUIRED
ROUGH OPENING
SIMILAR
TOP OF
TYPICAL
WITH
WIND BRACE
WORKING POINT
A.F.F.
B.O.
C.J.
CLR
DIA.
DN
E.J.
EQ.
F.F.
F.V.
GA.
M.O.
MAX.
MIN.
ABOVE FINISH FLOOR
BOTTOM OF
CONTROL JOINT
CLEAR
DIAMETER
DOWN
EXPANSION JOINT
EQUAL
FINISH FLOOR
FIELD VERIFY
GAUGE
MASONRY OPENING
MAXIMUM
MINIMUM
MNTD.
NOM.
N.I.C.
O.C.(E.W.)
O.H.
RE:
REQ./REQD
R.O.
SIM.
T.O.
TYP.
W/ W.B.
W.P.
ARCHITECTURAL ABBREVIATIONS
OWNER DALLAS HOUSING AUTHORITY
3939 N. HAMPTON ROAD
DALLAS, TEXAS, 75212
214.951.8316
BROWN REYNOLDS WATFORD ARCHITECTS, INC.
3535 TRAVIS STREET, SUITE 250
DALLAS, TEXAS 75204
214.528.8704
ARCHITECT
SCALE1 TITLE
PLAN TRUE
NORTH ARROWS
SYMBOL LEGEND
A1
1"
BUILDING SECTION
WALL SECTION
DETAIL BUBBLE
TEMPERED GLASS
DOOR NUMBER
REVISIONS
WINDOW TYPE
KEYNOTE
WALL TYPE
ARTIFICIAL PROPERTY
LINE / LIMITS OF
CONSTRUCTION
BUILDING SETBACK
LINE/EASEMENT
EXISTING SPOT
GRADE
REVISED SPOT GRADE
FACE OF FINISH
DIMENSIONING
EXTERIOR ELEVATION
INTERIOR ELEVATION
ROOM NAME
DESIGNATION
& NUMBER
ALIGN
1A5.12
3111.10
A2.1 1
SHEET NUMBER
A
A1.2
A3.1
A2.1
1/A1.1
DETAIL NUMBER
SHEET TYPE DESIGNATOR
A1.1
DISCIPLINE DESIGNATOR
SHEET NUMBER
REFERENCES:
SHEET NUMBERING:
MATCH LINE
NEW CONSTRUCTION
NEW FIRE RATED
CONSTRUCTION
WORKING POINT,
CONTROL OR DATUM
POINT
COLUMN DESIGNATION
REVISED CONTOURS
EXISTING CONTOURS
VIEW TITLE
EXISTING WALL TO
REMAIN
CEILING FINISH
WALL FINISH
BASE FINISH
FLOOR FINISH
C101B
ROOM NAME
ALL SITE AND BUILDING AREA TABULATIONS SHOWN ARE FOR
OWNER AND GOVERNING AUTHORITY REFERENCES ONLY.
CONTRACTOR IS RESPONSIBLE FOR MAKING THEIR OWN QUANTITY
AND AREA CALCULATIONS.
AREA TABULATION
ADD ALTERNATE 1:
PROVIDE NEW FLOOR, NEW TILE, REPAINT WALLS, NEW CABINET, AND
FIXTURES, NEW CEILING AS INDICATED IN A1.3 / 2
ADD ALTERNATE 2:
PROVIDE WALL COVERING IN BOARD ROOM AS INDICATED IN A1.3 / 1
BID ALTERNATES
IN
TE
R
IM
R
EV
IE
W
D
O C
U M
EN
TS
N O
T
FO
R R
EG
U
LA
TO
R Y
AP
PR
O
VA
L, PE
R
M
IT
TI
N
G , O
R C
O N
ST
R
U C
TI
N
C
A
IG
S . R
EY
N
O
LD
S
TX
R
EG
. N O
. 9
BR
W
P
RO
JE
C
T N
U M
BE
R
BR
O
W N
R
EY
N O
LD
S
W A
TF
O
RD
A
RC
H
IT
EC
TS
, I
N C
D
RA
W N
B Y
D A
TE
C H
EC
KE
D B
Y
C O
PY
RI
G H
T
M L, C R
M K
FE
BR
U A
RY
4, TITLE SHEET AND
DRAWING INDEX
.0
G1.1
DALLAS HOUSING AUTHORITY
BRW PROJECT NO.: 220104.00
2ND & 3RD FLOOR RENOVATION
3939 N. HAMPTON ROAD
DALLAS, TX 75212
FEBRUARY 12,2026
N . H
A M
PT
O
N R
O A
D D
A
LL
A S, T X
D A
LL
A
S H
O U
SI
N
G A
U
TH
O R
IT
Y
2N D
R D
F
LO
O R
R
EN
O V
A
TI
O N
G1.1 TITLE SHEET AND DRAWING INDEX
G1.2 CODE ANALYSIS & WALL TYPES
G1.3 LIFE SAFETY PLANS
D1.1 SECOND FLOOR DEMOLITION PLAN
D1.2 THIRD FLOOR DEMOLITION PLAN
D6.1 SECOND FLOOR DEMOLITION REFLECTED CEILING PLAN
D6.2 THIRD FLOOR DEMOLITION REFLECTED CEILING PLAN
A1.0 TYPICAL ACCESSIBILITY DETAILS
A1.1 SECOND FLOOR PLAN
A1.3 THIRD FLOOR PLAN
A6.1 SECOND FLOOR REFLECTED CEILING PLAN
INDEX OF DRAWINGS
N O
RE
V
IS
IO
N
D A
TE
GENERAL NOTES – CONSULTANT SCOPE EXCLUSIONS & CONTRACTOR RESPONSIBILITIES
ARCHITECT’S SCOPE OF SERVICES
THE ARCHITECT IS NOT PROVIDING MECHANICAL, ELECTRICAL, PLUMBING, STRUCTURAL, CIVIL, FIRE PROTECTION, FIRE ALARM, DATA/TELECOMMUNICATIONS, SECURITY, AUDIO-VISUAL, ACOUSTICAL, COMMISSIONING, SUSTAINABILITY, ENVIRONMENTAL, OR OTHER SPECIALTY ENGINEERING OR CONSULTING SERVICES FOR THIS PROJECT UNLESS EXPLICITLY STATED OTHERWISE IN THE CONTRACT DOCUMENTS. NO DESIGN, SIZING, ROUTING, CALCULATIONS, SPECIFICATIONS, PERFORMANCE CRITERIA, SYSTEM SEQUENCING, OR CODE ANALYSIS FOR THESE SYSTEMS ARE INCLUDED IN THE ARCHITECT ’S SCOPE OF WORK.
REFERENCE-ONLY INFORMATION
ANY INFORMATION RELATED TO MECHANICAL, ELECTRICAL, PLUMBING, STRUCTURAL, FIRE PROTECTION, FIRE ALARM, DATA, LOW-VOLTAGE, TECHNOLOGY, OR OTHER SPECIALTY SYSTEMS SHOWN ON THE ARCHITECTURAL DRAWINGS IS BASED ON AVAILABLE AS-BUILT DOCUMENTATION, LIMITED VISUAL FIELD OBSERVATION, OR OWNER-PROVIDED INFORMATION AND IS SHOWN FOR REFERENCE AND GENERAL COORDINATION ONLY. THE ARCHITECT MAKES NO REPRESENTATION OR WARRANTY REGARDING THE ACCURACY, COMPLETENESS, CAPACITY, PERFORMANCE, CONSTRUCTABILITY, OR CODE COMPLIANCE OF SUCH INFORMATION.
CONTRACTOR DESIGN, ENGINEERING, AND COORDINATION RESPONSIBILITY
THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR THE DESIGN, ENGINEERING, DETAILING, COORDINATION, INSTALLATION, PERMITTING, INSPECTION, TESTING, AND APPROVAL OF ALL SYSTEMS NOT DESIGNED BY THE ARCHITECT, INCLUDING BUT NOT LIMITED TO: MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, FIRE ALARM, AND DATA/TELECOMMUNICATIONS SYSTEMS. STRUCTURAL FRAMING MODIFICATIONS, SUPPLEMENTAL STEEL, ANCHORS, EMBEDS, EQUIPMENT SUPPORTS, AND SEISMIC BRACING. TECHNOLOGY SYSTEMS INCLUDING AUDIO-VISUAL, ACCESS CONTROL, SECURITY, CCTV, DAS, WI-FI, PAGING, AND MASS NOTIFICATION
THE GENERAL CONTRACTOR SHALL COORDINATE ALL SUCH SYSTEMS WITH THE ARCHITECTURAL WORK, EXISTING BUILDING INFRASTRUCTURE, OWNER REQUIREMENTS, AND ALL APPLICABLE CODES AND AUTHORITY HAVING JURISDICTION
(AHJ) REGULATIONS.
COMMISSIONING, TESTING, AND SYSTEM PERFORMANCE
COMMISSIONING, TESTING, BALANCING, START-UP, PROGRAMMING, INTEGRATION, VERIFICATION, AND PERFORMANCE VALIDATION OF ALL MECHANICAL, ELECTRICAL, FIRE PROTECTION, FIRE ALARM, STRUCTURAL, TECHNOLOGY, AND LOW- VOLTAGE SYSTEMS—INCLUDING BUT NOT LIMITED TO HVAC COMMISSIONING, FIRE ALARM TESTING, SPRINKLER ACCEPTANCE TESTING, SYSTEM TIE-INS, AND EQUIPMENT PERFORMANCE —IS NOT INCLUDED IN THE ARCHITECT’S SCOPE OF WORK AND IS THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND THEIR SUBCONTRACTORS.
FIRE ALARM, FIRE PROTECTION, AND LIFE SAFETY SYSTEMS
FIRE ALARM DEVICES, NOTIFICATION APPLIANCES (INCLUDING STROBES, HORNS, SPEAKERS), MONITORING, PROGRAMMING, SEQUENCING, CAUSE-AND-EFFECT, AND CONNECTION TO EXISTING FIRE ALARM SYSTEMS ARE NOT DESIGNED OR DETAILED BY THE ARCHITECT. FIRE SPRINKLER LAYOUT, HYDRAULIC CALCULATIONS, SYSTEM MODIFICATIONS, FIRE PUMPS, STANDPIPES, AND BACKFLOW PREVENTERS ARE ALSO EXCLUDED. THE GENERAL CONTRACTOR SHALL COORDINATE DIRECTLY WITH THE OWNER, SPECIALTY CONTRACTORS, AND AHJ TO PROVIDE COMPLETE, OPERATIONAL, AND CODE-COMPLIANT SYSTEMS. THE ARCHITECT ASSUMES NO RESPONSIBILITY FOR SYSTEM LAYOUT, COVERAGE, AUDIBILITY, VISIBILITY, HYDRAULIC PERFORMANCE, OR ACCEPTANCE.
STRUCTURAL AND EXISTING CONDITIONS
THE ARCHITECT DOES NOT PROVIDE STRUCTURAL ENGINEERING SERVICES. EVALUATION OF EXISTING STRUCTURAL SYSTEMS, LOAD CAPACITY, VIBRATION, DEFLECTION, OR CONSTRUCTABILITY IS EXCLUDED. TEMPORARY SHORING, BRACING, SEQUENCING, AND MEANS AND METHODS ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND RESOLVE CONFLICTS WITHOUT RELIANCE ON THE ARCHITECT
FOR ENGINEERING SOLUTIONS.
ENVIRONMENTAL, HAZARDOUS MATERIALS,
THE ARCHITECT IS NOT RESPONSIBLE FOR HAZARDOUS MATERIALS SURVEYS, TESTING, ABATEMENT DESIGN, ENVIRONMENTAL REMEDIATION, MOLD, ASBESTOS, LEAD, INDOOR AIR QUALITY TESTING, GEOTECHNICAL INVESTIGATIONS, SURVEYING, SCANNING, OR CONCEALED CONDITIONS. DISCOVERY AND MITIGATION OF SUCH CONDITIONS ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND OWNER.
SUSTAINABILITY, ENERGY, ACOUSTICS, AND PERFORMANCE CRITERIA
THE ARCHITECT IS NOT PROVIDING ENERGY MODELING, COMMISSIONING AUTHORITY SERVICES, LEED/WELL OR OTHER SUSTAINABILITY CERTIFICATIONS, ACOUSTIC MODELING, SOUND TRANSMISSION PERFORMANCE ANALYSIS, VIBRATION CONTROL DESIGN, OR POST-OCCUPANCY PERFORMANCE VALIDATION UNLESS SPECIFICALLY STATED OTHERWISE.
REQUESTS FOR INFORMATION (RFIS)
RFIS REQUESTING DESIGN DIRECTION, ENGINEERING SOLUTIONS, SYSTEM SIZING, ROUTING, SEQUENCING, PERFORMANCE CRITERIA, EQUIPMENT SELECTION, OR CODE INTERPRETATION RELATED TO EXCLUDED DISCIPLINES ARE OUTSIDE THE ARCHITECT’S SCOPE OF SERVICES AND MAY BE RETURNED WITHOUT RESPONSE OR REDIRECTED TO THE GENERAL CONTRACTOR FOR RESOLUTION.
SUBMITTALS – GENERAL
THE ARCHITECT WILL NOT REVIEW, APPROVE, OR TAKE RESPONSIBILITY FOR SUBMITTALS, SHOP DRAWINGS, PRODUCT DATA, CALCULATIONS, OR DELEGATED DESIGN DOCUMENTS FOR WORK THAT IS OUTSIDE THE ARCHITECT ’S CONTRACTED SCOPE OF SERVICES, WHETHER SUCH WORK IS OWNER-DIRECTED, CONTRACTOR-PROVIDED, OR REQUIRED FOR COORDINATION WITH EXISTING SYSTEMS. THIS INCLUDES, BUT IS NOT LIMITED TO, SUBMITTALS ASSOCIATED WITH: MECHANICAL, ELECTRICAL, PLUMBING, FIRE ALARM, FIRE PROTECTION, DATA/TELECOMMUNICATIONS, SECURITY, COMMISSIONING, TESTING, BALANCING, AND SYSTEM INTEGRATION. SITE WORK, UTILITIES, PAVING, STRIPING, SIGNAGE, AND EXTERIOR IMPROVEMENTS. WORK REQUIRED BY CODE, AUTHORITY HAVING JURISDICTION, OR FIELD CONDITIONS THAT IS NOT SHOWN IN THE CONTRACT DOCUMENTS.
SUBMITTALS FOR EXCLUDED SCOPE SHALL BE REVIEWED AND APPROVED BY THE OWNER, CONTRACTOR, OR THE RESPONSIBLE DESIGN PROFESSIONAL, AS APPLICABLE. ANY REVIEW BY THE ARCHITECT OF EXCLUDED-SCOPE SUBMITTALS, IF REQUESTED, SHALL BE FOR RECORD ONLY AND SHALL NOT CONSTITUTE APPROVAL OF DESIGN INTENT, CODE COMPLIANCE, SYSTEM PERFORMANCE, MEANS AND METHODS, OR CONSTRUCTABILITY.
COST, SCHEDULE, AND MEANS AND METHODS
THE ARCHITECT IS NOT RESPONSIBLE FOR CONSTRUCTION COST ESTIMATING, CONTRACTOR SCHEDULING, SEQUENCING, LOGISTICS, SAFETY PLANNING, OR MEANS AND METHODS OF CONSTRUCTION. THESE RESPONSIBILITIES REMAIN
SOLELY WITH THE GENERAL CONTRACTOR.
SCOPE LIMITATION CLARIFICATION
THE ARCHITECT’S SERVICES ARE LIMITED TO THOSE EXPRESSLY IDENTIFIED IN THE CONTRACT DOCUMENTS. ANY DISCIPLINE, SYSTEM, ANALYSIS, TESTING, COMMISSIONING, OR COORDINATION NOT SPECIFICALLY IDENTIFIED AS PART OF THE ARCHITECT’S SCOPE SHALL BE PROVIDED BY OTHERS AND IS NOT THE RESPONSIBILITY OF THE ARCHITECT.
OWNER RESPONSIBILITIES – ACCESSIBILITY COMPLIANCE (TAS)
DISPROPORTIONALITY ANALYSIS (TAS – 20 PERCENT RULE)
DETERMINATION OF WHETHER ACCESSIBILITY UPGRADES ARE REQUIRED BEYOND THE LIMITS OF THE RENOVATION —INCLUDING PERFORMANCE OF ANY 20 PERCENT (20%) DISPROPORTIONALITY ANALYSIS UNDER THE TEXAS ACCESSIBILITY STANDARDS (TAS)—IS THE SOLE RESPONSIBILITY OF THE OWNER. THE ARCHITECT IS NOT RESPONSIBLE FOR PERFORMING, DOCUMENTING, OR CERTIFYING DISPROPORTIONALITY ANALYSES.
FUNDING, AUTHORIZATION, AND EXECUTION OF ACCESSIBILITY UPGRADES
IF ACCESSIBILITY UPGRADES BEYOND THE LIMITS OF WORK ARE REQUIRED AS A RESULT OF TAS, IBC CHAPTER 34, OR IEBC PROVISIONS: FUNDING AND AUTHORIZATION FOR SUCH UPGRADES SHALL BE PROVIDED BY THE OWNER. DESIGN, COORDINATION, AND CONSTRUCTION OF APPROVED UPGRADES SHALL BE PROVIDED BY THE GENERAL CONTRACTOR UNDER THE CONTRACT, UNLESS OTHERWISE DIRECTED BY THE OWNER THROUGH A WRITTEN MODIFICATION. THE ARCHITECT SHALL NOT BE RESPONSIBLE FOR IDENTIFYING, DESIGNING, OR DETAILING SUCH UPGRADES UNLESS ADDITIONAL SERVICES ARE AUTHORIZED IN WRITING.
SCOPE CLARIFICATION RELATED TO ACCESSIBILITY REVIEWS
ANY ACCESSIBILITY-RELATED REVIEWS, COMMENTS, OR DETERMINATIONS BY THE TEXAS DEPARTMENT OF LICENSING AND REGULATION (TDLR), AUTHORITY HAVING JURISDICTION (AHJ), OR OWNER ’S ACCESSIBILITY CONSULTANT THAT EXTEND BEYOND THE DEFINED INTERIOR RENOVATION SCOPE SHALL BE ADDRESSED BY THE OWNER AND GENERAL CONTRACTOR. THE ARCHITECT ’S RESPONSIBILITY IS LIMITED TO THE AREAS OF WORK EXPRESSLY INCLUDED IN THE
CONTRACT DOCUMENTS.
IBC CHAPTER 10
SECTION 1004 TABLE 1004.1.2 MAXIMUM FLOOR AREA ALLOWANCES PER OCCUPANT
ASSEMBLY UNCONCENTRATED 15 NET SF
BUSINESS AREAS 150 GROSS SF
ACCESSORY STORAGE AREAS 300 GROSS SF
EXERCISE AREAS 50 NET SF
OCCUPANCY LOAD MIXED OCCUPANCY - SEE OCCUPANCY PLAN
TOTAL OCCUPANY LOAD 405 OCCUPANTS
LEVEL TWO - GROUP B
MAXIMUM TRAVEL DISTANCE FOR B: 300'
MAXIMUM COMMON PATH OF TRAVEL FOR B: 100'
MAXIMUM DEAD END CORRIDOR FOR B: 50'
OCCUPANT LOAD: 245
LEVEL THREE - GROUP B
MAXIMUM TRAVEL DISTANCE FOR B: 300'
MAXIMUM COMMON PATH OF TRAVEL FOR B: 100'
MAXIMUM DEAD END CORRIDOR FOR B: 50'
OCCUPANT LOAD: 162
COMMON PATH OF EGRESS TRAVEL (CPET) PER TABLE 1006.2.1
A OCCUPANCY WITH SPRINKLER SYSTEM 75 FT MAXIMUM ALLOWABLE
B OCCUPANCY WITH SPRINKLER SYSTEM 100 FT MAXIMUM ALLOWABLE
S OCCUPANCY WITH SPRINKLER SYSTEM 100 FT MAXIMUM ALLOWABLE
MEANS OF EGRESS WIDTH PER IBC SECTION 1005
EGRESS CAPACITY FACTOR: 0.2 PER OCCUPANT
PER 1009.3 MIN REQUIRED BETWEEN HANDRAILS = 48"
LEVEL THREE: 103 OCCUPANTS X 0.2 = 21" REQUIRED / 68" PROVIDED
APPLICABLE BUILDING CODES
DESCRIPTION OF PROJECT
THIS PROJECT INVOLVES RENOVATION OF LEVEL TWO AND THREE AT THE DALLAS HOUSING
AUTHORITY HEADQUARTERS.
NO SITE WORK, EXTERIOR MODIFICATIONS, PARKING RECONFIGURATION, OR BUILDING-
WIDE ACCESSIBILITY UPGRADES ARE INCLUDED UNLESS SPECIFICALLY IDENTIFIED IN THE
CONTRACT DOCUMENTS.
USE AND OCCUPANCY
CLASSIFICATION
IBC CHAPTER 3 / NFPA CHAPTER 3
2021 IBC 2016 NFPA
ASSEMBLY GROUP A-2 OCCUPANCY ASSEMBLY OCCUPANCY
BUSINESS GROUP B OCCUPANCY BUSINESS OCCUPANCY
STORAGE GROUP S-1 OCCUPANCY STORAGE OCCUPANCY
SPECIAL DETAILED
REQUIREMENTS BASED ON USE
AND OCCUPANCY
IBC CHAPTER 4 / NFPA CHAPTER 20
GENERAL BUILDING
HEIGHTS AND AREAS
MIXED USE AND OCCUPANCY
IBC CHAPTER 5
NON-SEPARATED OCCUPANCIES PER 508.3
ALLOWABLE AREA CALCULATION BASED ON MOST
RESTRICTIVE
ASSEMBLY A-2 Aa = At + (NS X If)
Aa = 28,500 + (9,500 X 0.75) = 35,625 SF
LEVEL THREE: 8,182 SF < 35,625 SF
FIRE RESISTIVE REQUIREMENTS
FOR BUILDING ELEMENTS
IBC CHAPTER 6
CONSTRUCTION TYPE PER TABLE 601 TYPE II B
STRUCTURAL FRAME 0
BEARING WALLS 0
NON-BEARING WALLS INTERIOR 0
ROOF CONSTRUCTION 0
EXTERIOR WALLS PER TABLE 602
FIRE SEPERATION DISTANCE >30 0
IBC CHAPTER 5
ALLOWABLE BUILDING HEIGHT & STORIES TABLES 503.4 & 504.4
A-2 OCCUPANCY 75 FEET / 3 STORIES
B OCCUPANCY 75 FEET / 4 STORIES
S-1 OCCUPANCY 75 FEET / 5 STORIES
ALLOWABLE AREA PER TABLE 506.2
CONSTRUCTION TYPE TYPE IIB
AUTOMATIC SPRINKLER SYSTEM PROVIDED
FRONTAGE INCREASE: NA
A-2 28,500 SF
B 69,000 SF
S-1 52,500 SF
FIRE RESISTIVE RATED
CONSTRUCTION
IBC CHAPTER 7
SECTION 704: STRUCTURAL MEMBERS: NOT REQUIRED
SECTION 705: EXTERIOR WALLS: NOT REQUIRED
SECTION 705: EXTERIOR OPENING PROTECTION NO LIMIT FOR
UNPROTECTED OPENINGS
SECTION 706: FIRE WALLS: NOT APPLICABLE
SECTION 707: FIRE BARRIERS: PROVIDED
SECTION 708: FIRE PARTITIONS: NOT APPLICABLE
SECTION 709: SMOKE BARRIERS: PROVIDED
SECTION 710: SMOKE PARTITIONS: PROVIDED
SECTION 713: SHAFT ENCLOSURES: NOT APPLICABLE
INTERIOR FINISHES
IBC CHAPTER 8
INTERIOR WALL AND CEILING FINISH REQUREMENTS BY
OCCUPANCY / SPRINKLERED PER TABLE 803.11:
EXIT ENCLOSURES AND PASSAGEWAYS
GROUP A3: CLASS B
BROUP B: CLASS B
GROUP S: CLASS C
CORRIDORS
GROUP A3: CLASS B
GROUP B: CLASS C
GROUP S: CLASS C
ROOMS AND ENCLOSED SPACES
GROUP A3: CLASS C
GROUP B: CLASS C
GROUP S: CLASS C
INTERIOR FLOOR FINISH PER 804.4.2
GROUPS A, B, E & S CLASS II
MEANS OF EGRESS
PLUMBING FIXTURES CALCULATION
BUILDING: 2021 INTERNATIONAL BUILDING CODE WITH DALLAS AMENDMENTS
MECHANICAL: 2021 INTERNATIONAL MECHANICAL CODE WITH DALLAS AMENDMENTS
PLUMBING: 2021 INTERNATIONAL PLUMBING CODE WITH DALLAS AMENDMENTS
ELECTRICAL: 2020 NATIONAL ELECTRIC CODE WITH DALLAS AMENDMENTS
FIRE: 2021 INTERNATIONAL FIRE CODE WITH DALLAS AMENDMENTS
LIFE SAFETY: 2021 INTERNATIONAL BUILDING CODE WITH DALLAS AMENDMENTS
ACCESSIBILITY: 2012 TEXAS ARCHITECTURAL BARRIER STANDARDS
ENERGY: 2021 INTERNATIONAL ENERGY CONSERVATION CODE WITH DALLAS
AMENDMENTS
OTHER: NFPA 13 - STANDARD FOR THE INSTALLATION OF SPRINKER SYSTEMS -
2016 EDITION, ASHRAE 62.1 - 2013, ASHRAE 90.1 - 2013
SCOPE OF WORK: SECOND AND THIRD FLOOR RENOVATION
NUMBER OF FLOORS: 3
CONSTRUCTION TYPE: TYPE IIB
OCCUPANCY CLASSIFICATION: A-2, B
SPRINKLERED YES
TOTAL BUILDING AREA: 29,060 GSF
LEVEL 01: 12,363 GSF (NOT IN SCOPE)
LEVEL 02: 11,656 GSF
LEVEL 03: 8,782 GSF
OCCUPANCY OCC.
LOAD RATIO MEN
WATER CLOSETS LAVATORIES DRINKING FOUNTAINS SERVICE
SINKS
TOTAL REQUIRED
TOTAL
M 142 W 142
BUSINESS
N/A
ASSEMBLY
1 PER 75 1 PER 75 1 PER 500
1 PER 100
1 PER 200
TOTAL
M 35 W 35
1 PER 25
<50
1 PER 50
>50
0.5
RATIO
1 PER 25
<50
1 PER 50
>50
0.5
WOMEN
N/ATOTAL PROVIDED
RATIO
1 PER 40
<80
1 PER 50
>80
MEN
0.1
WOMEN
0.1
RATIO TOTAL
N/A
N/A
0.1
N/A
N/A
GENERAL NOTE: BASED ON THE PLUMBING FIXTURES CALCULATION THE CURRENT BUILDING IS DEFICIENT IN THE FOLLOWING FIXTURES IS UNKNOWN. THIS SCOPE OF WORK IS TO BE COMPLETED BY THE OWNER AT THE OWNER EXPENSE. TO BRING THE
BUILDING UP TO THE CURRENT FIXTURE CALCULATIONS.
OCCUPANCY LEGEND
ASSEMBLY UNCONCENTRATED
BUSINESS
STORAGE
1030 SF
ASSEMBLY
UNCONCENTRATED
8972 SF
BUSINESS
106 SF
STORAGE
17380 SF
BUSINESS
77 SF
STORAGE
104 SF
STORAGE
145 SF
STORAGE
882 SF
EXERCISE
OCCUPANCY LEGEND
ASSEMBLY UNCONCENTRATED
BUSINESS
EXERCISE
STORAGE
85 SF
STORAGE730 SF
ASSEMBLY
UNCONCENTRATED
NOT TO SCALE
PARTITION TYPES
A3
A
K
A4
A1
K3
K4
PLAN VIEW
SERIES
NONCOMBUSTIBLE
6" AT 16" O.C. 7 1/4"
PLAN VIEW
SERIES
NOTESPTN
TYPE STUD PART
WIDTH
3 5/8" AT 16" O.C. 4 7/8" 40
3 5/8" AT 16" O.C. 4 7/8"
NOTESPTN
TYPE STUD PART
WIDTH
(@ WALL TILE)
(@ WALL TILE)
3 5/8" AT 16" O.C. 4 1/4"
1. EXTEND GYPSUM BOARD 6" ABOVE ACOUSTICAL CEILING TILE OR STOP AT
GYPSUM BOARD CEILING UNLESS NOTED OTHERWISE (ACOUSTICAL INSULATION
REQUIREMENTS DO NOT APPLY UNLESS INDICATED ABOVE)
3 5/8" AT 16" O.C. 4 1/4"
NON COMBUSTIBLE
TO DECK
TO DECK
6" ABOVE
CEILING
PART
HEIGHT
PART
HEIGHT
6" ABOVE
CEILING
TO DECK
3 5/8" METAL STUDS (20 GAUGE
MINIMUM) AT 16" O.C.
5/8" GYPSUM BOARD (TYPE X)
5/8" CEMENTITIOUS BACKER BOARD
3 5/8" METAL STUDS (20 GAUGE
MINIMUM) AT 16" O.C.
5/8" GYPSUM BOARD (TYPE X)
5/8" CEMENTITIOUS BACKER BOARD
GENERAL NOTES:
A. PARTITIONS SHALL BE TYPE "A1" UNLESS OTHERWISE NOTED.
B. ALL ELEMENTS OF ACOUSTICALLY RATED PARTITIONS SHALL EXTEND TO ROOF OR FLOOR DECK ABOVE AND ALL JOINTS AND PENETRATIONS OF ACOUSTICALLY RATED PARTITIONS SHALL BE FILLED
AND SEALED.
C. PENETRATIONS IN RATED PARTITIONS AND CONNECTIONS OF THE PARTITIONS TO OTHER PORTIONS OF THE WORK SHALL BE IN ACCORDANCE WITH MANUFACTURERS' RECOMMENDED DETAILS AND IN
COMPLIANCE WITH APPLICABLE TESTING AGENCY REQUIREMENTS.
D. WHERE A CLEAR DIMENSION OR OPENING IS REQUIRED OR NOTED, MEASURE DIMENSION TO FACE
OF PARTITION FINISH
E. INSTALL BLOCKING OR BACKER MATERIAL FOR ATTACHMENT/MOUNTING OF WALL HUNG ITEMS OR
EQUIPMENT DESCRIBED IN THE DOCUMENTS.
F. PROVIDE CEMENTITIOUS BACKER BOARD AT AREAS THAT ARE SCHEDULED TO RECEIVE CERAMIC
TILE FINISH AND AT AREAS REQUIRED BY CODE.
G. INSTALLATION OF GYPSUM BOARD, BACKER BOARD, AND BASE BOARD SHALL CONFORM TO
REQUIREMENTS FOR FIRE RATINGS AND ACOUSTICAL RATINGS.
H. TYPICAL FLOOR PLAN DIMENSIONS OF PARTITIONS ARE TO THE NOMINAL FINISH FACE OF GYPSUM
BOARD.
J. WHERE PARTITIONS AND/OR FURRING MEET, MAINTAIN A FLUSH SURFACE ON THE SIDE WHERE THE
FINISH IS STRAIGHT OR CONTINUOUS UNLESS OTHERWISE NOTED.
L. PROVIDE STUD BRACING AT 4' - 0" O.C. STAGGERED IN ALTERNATING DIRECTIONS. BRACING SHALL
ATTACH TO STUDS 1' - 0" MAX. ABOVE CEILING.
STC
RATING
FIRE
RATING
1 HOUR
1/2" (SEE BELOW)
PARTITION WIDTH
STC
RATING
FIRE
RATING
FIRE RATING
AVAILABLE WITH UL
ASSEMBLY U465
WHERE NOTED.
N/A
N/A 1X GYB. BD.
LAYERS
K1 2 1/2" AT 16" O.C. 3 1/8" 6" ABOVE
CEILING N/A
6" METAL STUDS (20 GAUGE
MINIMUM) AT 16" O.C.
IN
TE
R
IM
R
EV
C
U M
EN
TS
N O
T
FO
R R
EG
U
LA
TO
R Y
AP
PR
O
M
IT
TI
N
G , O
R C
O N
ST
R
U C
TI
A
IG
S . R
EY
N
O
LD
S
TX
R
EG
. N O
. 9
BR
W
P
RO
JE
C
T N
U M
BE
R
C O
PY
RI
G H
T
BR
O W
N R
EY
N
O
LD
S W
A
TF
O
RD
A
RC
H
IT
EC
TS
, I N
C
D
RA
W N
B Y
D A
TE
C H
EC
KE
D B
Y M
L, C
R
M K
FE
BR
U A
RY
4, CODE ANALYSIS &
WALL TYPES
.0
N . H
A M
PT
O
N R
O A
D D
A
LL
A S, T X
D A
LL
A
S H
O U
SI
N
G A
U
TH
O R
IT
Y
2N D
R D
F
LO
O R
R
EN
O V
A
TI
O N
G1.2
OCCUPANCY SCHEDULE 2021 IBC (AREA)
NAME AREA FUNCTION OF SPACE
OCCUPANT
LOAD FACTOR OCCUPANT
SECOND F.F.
ASSEMBLY
UNCONCENTRATED
730 SF Assembly - Unconcenrated (Net) 15 SF 49
BUSINESS 17380 SF Business area (Gross) 100 SF 174 EXERCISE 882 SF Exercise Rooms (Gross) 50 SF 18 STORAGE 412 SF Storage (Gross) 300 SF 4
THIRD F.F.
ASSEMBLY
UNCONCENTRATED
1030 SF Assembly - Unconcenrated (Net) 15 SF 69
BUSINESS 8972 SF Business area (Gross) 100 SF 90 STORAGE 106 SF Storage (Gross) 300 SF 1
GRAND TOTAL 29511 SF 405
0' 1' 2'
1/16" = 1'-0"2 THIRD FLOOR OCCUPANCY PLAN
0' 1' 2'
1/16" = 1'-0"1 SECOND FLOOR OCCUPANCY PLAN
N O
RE
V
IS
IO
N
D A
TE
CORRIDOR
SS
320 OCC.
(MAX)
320 OCC.
(MAX)
EX
IS
TI
N
G
EX
IS
TI
N
G
EX
IS
TI
N
G
EX
IS
TI
N
G
BOARD
ROOM
3A09
OFFICE
3N03
OFFICE
3N06
OFFICE
3N08
OFFICE
3A27
OFFICE
3N10
OFFICE
3P05
OFFICE
3P07OFFICE
3P08
OFFICE
3P15
STORAGE
3P17
OFFICE
3P16
OFFICE
3A26
OFFICE
3M01
CORRIDOR
3M03
CONF. ROOM
2M04
OPEN OFFICE
2M11
CORRIDOR
3M04
OFFICE
3P10
WOMEN
3A05
MEN
3A06
30' - 4"
CPET
OCCUPANCY SUMMARY
OCCUPANCY LOAD CALCULATIONS:
EGRESS WIDTH CALCULATIONS:
THIRD FLOOR:
ASSEMBLY UNCONCENTRATED: 69
BUSINESS: 92
ACCESSORY: 1
THIRD FLOOR TOTAL: 162
PROVIDED EGRESS WIDTH (IN.)
THIRD FLOOR: 34"
REQUIRED EGRESS WIDTH (IN.):
SECOND FLOOR: (103" X 0.2) 34"
SECOND FLOOR:
ASSEMBLY UNCONCENTRATED: 49
BUSINESS: 179
EXERCISE: 18
STORAGE: 4
SECOND FLOOR TOTAL: 245
DESCRIPTIONPATTERN
LIFE SAFETY LEGEND
FEC
1 HOUR FIRE RATED CONSTRUCTION
COMMON PATH OF TRAVEL (CPET)
EXIT ACCESS TRAVEL DISTANCE (EATD)
EXISTING SEMI- RECESSED FIRE EXTINGUISHER
CABINET AND FIRE EXTINGUISHER, ABC 10 U.N.O.
EXISTING SPACES
PATH OF EGRESS
S SMOKE DOOR COMPLY WITH UL1784 &
"S" ON LABEL
MAX. OCCUPANCY EXIT WIDTH
ALL SITE AND BUILDING AREA TABULATIONS SHOWN ARE FOR
OWNER AND GOVERNING AUTHORITY REFERENCES ONLY.
CONTRACTOR IS RESPONSIBLE FOR MAKING THEIR OWN QUANTITY
AND AREA CALCULATIONS.
AREA TABULATION
65' - 9"
CPET
320 OCC.
(MAX)
320 OCC.
(MAX)
320 OCC.
(MAX)
50' - 8"
CPET
EX
IS
TI
N
G
EX
IS
TI
N
G
EX
IS
TI
N
G
SECURE FILES
2M05A
ASSIST. DIR.
2M16
DIRECTOR
2M09
ADMIN
ASSIST.
2M07
FILES
2M05
DIRECTOR
2L10
PERSONNEL
ASSIST.
2L08
FILES &
COPIES
2L07
OFFICE
2B230
INFO /
INTERVIEW
2L06
TRAIN
COORD.
2L09
RISK MGR
2L09
MEETING RM.
2M21
BUDGET
OFFICER
2M20
CLERK
2M18
SUPPLY
2M13
CLERK
2M12
STORAGE
2M10
ACCOUNTANT
2M08
TRAINING
ROOM
2B206
FITNESS
ROOM
2B10
OPEN OFFICE
2B209
OFFICE
2B210
PRIVATE
OFFICE
2L01
OFFICE
2B211
STAFF
LOUNGE
2B212
ELEVATOR
LOBBY
2A01
WAITING
LOBBY
2B213
CORRIDOR
2M00
STORAGE
2M111
TRAINING
ROOM
2B208
35' - 9"
CPET
EXISTING
EX
IS
TI
N
G
OFFICE
2B211
STAFF MEN
2B04
STAFF
WOMEN
2B05
STOR.
2A04
MEN
2A07
WOMEN
2A08
WAITING
LOBBY
2B213
STORAGE
2M112
IN
TE
R
IM
R
EV
C
U M
EN
TS
N O
T
FO
R R
EG
U
LA
TO
R Y
AP
PR
O
M
IT
TI
N
G , O
R C
O N
ST
R
U C
TI
A
IG
S . R
EY
N
O
LD
S
TX
R
EG
. N O
. 9
BR
W
P
RO
JE
C
T N
U M
BE
R
C O
PY
RI
G H
T
BR
O W
N R
EY
N
O
LD
S W
A
TF
O
RD
A
RC
H
IT
EC
TS
, I N
C
D
RA
W N
B Y
D A
TE
C H
EC
KE
D B
Y M
L, C
R
M K
FE
BR
U A
RY
4, LIFE SAFETY PLANS
.0
N . H
A M
PT
O
N R
O A
D D
A
LL
A S, T X
D A
LL
A
S H
O U
SI
N
G A
U
TH
O R
IT
Y
2N D
R D
F
LO
O R
R
EN
O V
A
TI
O N
G1.3
0' 4' 8' 16'
PLAN
NORTH
TRUE
NORTH
3/32" = 1'-0"2 THIRD FLOOR LIFE SAFETY PLAN
0' 4' 8' 16'
PLAN
NORTH
TRUE
NORTH
3/32" = 1'-0"1 SECOND FLOOR PLAN
N O
RE
V
IS
IO
N
D
WATER CLOSET SIDE WALL GRAB BAR SANITARY NAPKIN
DISPOSAL
MARKERBOARD / TACKBOARD MOP RACK SIGNAGE
FLUSH VALVE ON
OPEN SIDE AT
ACCESSIBLE STALL
C .O
. F
LU
SH
M
A X.
T O
T.
O
. S
EA
T
M
IN
M
A X.
M A
X.
M
IN
BLOCKING AS
REQUIRED
AS SPECIFIED
B .O
. F R
A M
E 2'
0"
6'
0"
B .O
. L O
W
ES
T C
H A
R A
C
4'
0"
M
IN
. T O
FINISH FLOOR
WATER CLOSET AND
REAR WALL GRAB BAR
M A
X.
M
IN
12" MIN. 24" MIN.
12" MAX.
42" MIN.
54" MIN.
18" MAX.
16" MIN.
WALL MOUNTED
FIRE EXTINGUISHER
FIRE EXTINGUISHER
CABINET
4'
0" M
A X.
T.
O
. H A
N D
LE
4'
0"
M A
X.
B .O
. H
IG
H
ES
T C
H A
R A
C
TE
R 5'
0"
M A
X.
T
O
MIN.
9"
36" MIN.
T.
O
. O
PE
N D
EC
K
M A
X.
BABY CHANGING STATION
RECESSED FIRE
VALVE CABINET
4'
0"
O
PE
R A
B
LE
P A
R T
M A
X.
T
O H
IG
H
ES
T
TOILET SEAT
COVER DISPENSER
13 1/2" MIN.
A C
C
ES
SI
B
LE
U
R
IN
A L
M A
X.
A
T
URINAL
O
PE
R A
B
LE
P A
R T
TO
H
IG
H
ES
T
SANITARY NAPKIN
DISPENSER
IF
P R
O
JE
C
TI
O N
FR
O
M W
A
LL
COAT HOOK
M A
X.
N O
N -A
C C
ES
SI
B
LE
M A
X.
A
T
SEMI-RECESSED TOWEL
DISPENSER / WASTE
RECEPTACLE
SOAP DISH
O
PE
R A
B
LE
P A
R T
M A
X.
T
O H
IG
H
ES
T
O
PE
R A
B
LE
P A
R T
M A
X.
T
O H
IG
H
ES
T
O
PE
R A
B
LE
P A
R T
M A
X.
T
O H
IG
H
ES
T
4'
0" M
A X.
SURFACE MOUNTED
TOWEL DISPENSER
SOAP
DISPENSER
FINISH FLOOR
C
LE
A R
M
IN
JUMBO ROLL
TOILET PAPER
DISPENSER
9" MAX.
7" MIN.
C
LE
A R
1/
2" M
IN
TOILET PAPER
DISPENSER
9" MAX.
7" MIN.
TO
O
U
TL
ET
M
IN
M
A X.
TO
O
U
TL
ET
M
IN
M
A X.
C
LE
A R
1/
2" M
IN
9" MAX.
7" MIN.
C
LE
A R
1/
2" M
IN
TO
O
U
TL
ET
M
IN
M
A X.
DUAL TOILET
PAPER DISPENSER
PROVIDE MIN. ONE ACCESSIBLE
URINAL PER RESTROOM U.N.O. USE
MANUFACTURER RECOMMENDED
STANDARD MOUNTING HEIGHT AT
NON-ACCESSIBLE FIXTURES.
M
IN
M A
X.
C
LE
A R
1/
2" M
IN
C
LE
A R
M
IN
ALT. MOUNTING
12" CLEAR ABOVE
GRAB BAR
MOUNT SIGN AT THE LATCH SIDE OF DOOR.
AT DOUBLE DOORS MOUNT SIGN ON
INACTIVE LEAF OR TO RIGHT HAND SIDE OF
DOOR IF BOTH LEAVES ARE ACTIVE. MOUNT
SIGNS AT NEAREST ADJACENT WALL IF
THERE IS NO WALL SPACE OR NO CLEAR
FLOOR SPACE TO THE SIDE OF THE DOOR
24" MAX.
20" MIN.
M A
X.
M
IN
ACCESSIBLE
CHANGING BENCH
18" MIN. CLEAR FLOOR SPACE
CENTERED ON
TACTILE CHARACTERS
CL
SIGNAGE
M
IN
CL
42" MIN. C
LE
A R
M
IN
CLEAR
30" MIN.
ACCESSIBLE CHANGING
BENCH PLAN
O
PE
R A
B
LE
P A
R T
TO
H
IG
H
ES
T
PROVIDE MIN. ONE ACCESSIBLE
HAND DRYER PER RESTROOM
MOUNT NON-ACCESSIBLE HAND
DRYERS AS FOLLOWS:
3'-8" WOMEN'S RESTROOM, TYP.
3'-10" MEN'S RESTROOM, TYP.
HAND DRYER
CL
BLOCKING AS
REQUIRED
C
LE
A R
1/
2" M
IN
C
LE
A R
M
IN
. CL CL CL
M
IN
9"
PARTITION
TOE CLEARANCE AT
TOILET PARTITION
OUTSIDE STALL
6" MIN. CLEAR
ELECTRIC WATER COOLER
(HIGH-LOW ACCESSIBLE)
15" MIN. 5" MAX.
C
LE
A R
M
IN
TO
O
U
TL
ET
M
A X.
T O
O U
TL
ET
M
IN
M
A X.
PROVIDE CANE DETECTION APRON
AT HIGH FOUNTAIN WHERE
DRINKING FOUNTAINS ARE
LOCATED IN THE PATH OF TRAVEL
LAVATORY MIRROR ABOVE
LAVATORY
20" MAX.
M A
X.
T.
O
. R
EF
LE
C
TI
VE
S U
R
FA
C E
M
IN
SU
R
FA
C
E
M A
X.
B
.O . R
EF
LE
C
TI
VE
9" M
IN
MIN.
8"
M
IN
KNEE CLEARANCE
6" MAX TOE SPACE
BEYOND AVAILABLE
25" MAX.
17" MIN.
KNEE
CLEARANCE
MIN.
11"
PIPE WRAP
FULL LENGTH
MIRROR
SU
R
FA
C
E
M A
X.
B
.O . R
EF
LE
C
TI
VE
TOE
CLEARANCE
FINISH FLOOR
ARROW INDICATES PRIMARY DIRECTION OF
APPROACH
(A
M
IN
(Y
M
IN
(X)
�36" MIN.
48" MIN.
12" MIN.
IF DOOR HAS BOTH
CLOSER AND LATCH48
M
IN
M
IN
. 18"
MIN.
PULL SIDE
PUSH SIDE
(Y
M
IN
(A
M
IN
24"
MIN.
24"
MIN.
FRONT APPROACHES -
MANUAL SWINGING DOORS AND GATES
HINGE SIDE APPROACHES -
MANUAL SWINGING DOORS AND GATES
X = 42" MIN. IF Y = 54" MIN.
A = 48" MIN. IF DOOR HAS BOTH CLOSER AND
LATCH
LATCH SIDE APPROACHES -
MANUAL SWINGING DOORS AND
GATES
Y = 54" MIN. IF DOOR HAS CLOSER
A = 48" MIN. IF DOOR HAS CLOSER
DOORS IN SERIES
NOTE: ALL DOORS SHALL COMPLY WITH ACCESIBLE DIMENSION
MINIMUM REQUIREMENTS INDICATED BELOW
22" MIN.
PULL SIDE
PUSH SIDE
PULL SIDE
PUSH SIDE
MIN.
3' - 0"
X
FORWARD APPROACH
MIN.
5' - 0"
X
PARALLEL APPROACH
(a) elevation
C
LE
A R
M
IN
8" MIN.
9" M
IN
. C
LE
A
R
11" MIN.
(b) plan
25" MAX.
M
IN
48" MIN.
CLEAR
EQ
EQ
(b) plan
17" MIN - 25" MAX.
M
IN
48" MIN.
CLEAR
EQ
EQ
(a) elevation
9"
�6" MAX
X
" 80
M
IN
H
EA
D C
LE
R
A N
C E
4" MAX.
12" MAX. 12" MAX.
0"
M A
X.
X > 12"
X > 12"
C
LE
A R
A N
C E
M
IN
X
M A
X
PROVIDE CANE DETECTION
UNDER OPEN STAIRS OR
OTHER OVERHEAD
OBSTRUCTIONS
M
IN
M
A X.
UNOBSTRUCTED
FORWARD REACH
20" MAX. X >20" - 25" MAX.
M A
X.
M A
X.
OBSTRUCTED HIGH
FORWARD REACH
OBSTRUCTED HIGH
FORWARD REACH
M
IN
M A
X.
10" MAX.
UNOBSTRUCTED
SIDE REACH
M A
X.
M A
X.
10" MAX.
M A
X.
M A
X.
X > 10" - 24" MAX.
OBSTRUCTED
SIDE REACH
OBSTRUCTED
SIDE REACH
IN
TE
R
IM
R
EV
C
U M
EN
TS
N O
T
FO
R R
EG
U
LA
TO
R Y
AP
PR
O
M
IT
TI
N
G , O
R C
O N
ST
R
U C
TI
A
IG
S . R
EY
N
O
LD
S
TX
R
EG
. N O
. 9
BR
W
P
RO
JE
C
T N
U M
BE
R
C O
PY
RI
G H
T
BR
O W
N R
EY
N
O
LD
S W
A
TF
O
RD
A
RC
H
IT
EC
TS
, I N
C
D
RA
W N
B Y
D A
TE
C H
EC
KE
D B
Y M
L, C
R
M K
FE
BR
U A
RY
4, TYPICAL ACCESSIBILITY
DETAILS
.0
N . H
A M
PT
O
N R
O A
D D
A
LL
A S, T X
D A
LL
A
S H
O U
SI
N
G A
U
TH
O R
IT
Y
2N D
R D
F
LO
O R
R
EN
O V
A
TI
O N
A1.0
TYPICAL MOUNTING HEIGHTS
DOOR CLEARANCE REQUIREMENTS
MANEUVERING CLEARANCE
KNEE CLEARANCETOE CLEARANCE
LIMITS OF PROTRUDING OBJECTS
POST MOUNTED OBJECTS AT WALKING SURFACES
CANE DETECTION RAILS
ADULT REACH RANGES
N O
RE
V
IS
IO
N
D
A6
B3
A1
B1
A2A3A4
B2
A7A8
B4
A5
SECURE FILES
2M05A
ASSIST. DIR.
2M16
DIRECTOR
2M09
ADMIN
ASSIST.
2M07FILES
2M05
ELEC.
2M05B
DIRECTOR
2L10
PERSONNEL
ASSIST.
2L08
FILES &
COPIES
2L07
INFO /
INTERVIEW
2L06
TRAIN
COORD.
2L09
RISK MGR
2L09
MEETING RM.
2M21
BUDGET
OFFICER
2M20
CLERK
2M18
SUPPLY
2M13
CLERK
2M12
STORAGE
2M10
ACCOUNTANT
2M08
JAN.
2B02
ELEC.
2B03
STAFF MEN
2B04
STAFF
WOMEN
2B05
WOMEN
2A08
MEN
2A07
ELEVATOR 1
ELEVATOR 2
STOR.
2A04
ARCHIVES
2B07
LG. SUPPLY
STOR.
2KB
CREDIT
UNION
2B09
LOBBY
2A06
D1
D2
D1
D2 D1
D2D2D2D2D2 D1
D2 D2 D2
D1
D2 D2 D2 D2 D2
D2
D2
D1
D1
D1
D1
D1
D1
D1
D2
D2
D3
D3
D4 D3
D4
D6
D6
D5
D6
D6
D6
D6
D6
D5 D5 D5 D5 D5D5
D5
D5
D5
D5D5D5D5D5D5
D5
D5D5 D5 D5
D5
D5
D5
D5
D5
D8
D6
D9
D9
D9
D10
D11
PRIVATE
OFFICE
2L01
D13 D13
D13
D13
D13
D13 D13
D13
D13
D14
D14
D14 D14
S
OFFICES
CONFERENCE R.
STORAGE
2M111
STORAGE
2M112
OFFICE
2B211
OFFICE
2B230
D2
D5
OFFICE
2B210
DEMO FLOOR PLAN KEYNOTES:
D1. REMOVE EXISTING LUXURY VINYL TILE AND RUBBER BASE. PREPARE SUBSTRATE FOR NEW SCHEDULED FLOORING.
D2. REMOVE EXISTING CARPET AND RUBBER BASE. PREPARE SUBSTRATE FOR NEW SCHEDULED FLOORING.
D3. REMOVE EXISTING PARTITIONS, DOORS, DOOR FRAMES, SIDELITES, AND HARDWARE AS SHOWN IN SCOPE AREA. TURN DOORS AND ITS ASSOCIATED COMPONENTS OVER TO OWNER FOR STORAGE, SHOULD THEY BE KEPT, CONFIRM WITH OWNER.
D4. REMOVE GLASSBLOCK PARTITIONS.
D5. ALL FURNITURE AND EQUIPMENT TO BE REMOVED BY OWNER. IF ANY EXISTING FURNITURE IS IN PLACE WHEN CONSTRUCTION COMMENCES GC TO COORDINATE REMOVAL WITH OWNER.
D6. REMOVE ALL SIGNAGE, BULLETIN BOARDS, MARKER BOARDS, ETC. AND STORE DURING CONSTRUCTION. CONFIRM WITH OWNER ON WHICH ITEMS ARE TO BE RE-INSTALLED.
D7. COORDINATE REMOVAL OF EXISTING LIGHT SWITCHES, THERMOSTATS, AND FIRE ALARM DEVICES LOCATED ON WALLS SCHEDULED FOR DEMOLITION. RELOCATION, REINSTALLATION, AND FINAL PLACEMENT OF ALL DEVICES SHALL BE DETERMINED AND COORDINATED BY THE CONTRACTOR UNDER THEIR SCOPE OF WORK, IN COMPLIANCE WITH APPLICABLE CODES AND OWNER REQUIREMENTS.
D8. REMOVE EXISTING POWER POLE AND ALL ASSOCIATED ELECTRICAL COMPONENTS. ELECTRICAL DISCONNECTION, TERMINATION, AND CIRCUIT MANAGEMENT SHALL BE PERFORMED BY THE CONTRACTOR IN ACCORDANCE WITH APPLICABLE CODES AND
STANDARDS.
D9. CAREFULLY REMOVE AND PROTECT EXISTING WALL-MOUNTED ELECTRICAL, DATA, FIRE ALARM, SECURITY, AND TECHNOLOGY DEVICES LOCATED WITHIN DEMOLISHED WALLS AS REQUIRED FOR CONTRACTOR-PERFORMED SYSTEM MODIFICATIONS AND REINSTALLATION. CONTRACTOR SHALL SECURE ALL WIRING AND PROTECT SYSTEMS ABOVE CEILING DURING CONSTRUCTION. DESIGN, RELOCATION, REPROGRAMMING, AND REINSTALLATION OF ALL SYSTEMS ARE CONTRACTOR RESPONSIBILITY.
D10. REMOVE VERTICAL BLINDS INSTALLED AT GLASS BLOCK WALL.
D11. REMOVE SURFACE MOUNTED DOOR STOP, MARKER BOARDS, AND PROJECTION SCREEN. CONFIRM WITH OWNER IF MARKER BOARDS AND PROJECTION SCREEN ARE TO BE REINSTALLED DURING CONSTRUCTION.
D12. REMOVE HUMIDIFIER.
D13 - REMOVE ALL EXISTING PARTITIONS, DOORS, FRAMES, FINISHES, MILLWORK, AND ALL ARCHITECTURAL ELEMENTS WITHIN THE ROOM AS SHOWN. PREPARE ALL SUBSTRATES FOR NEW SCHEDULED FINISHES. COORDINATE WITH OWNER IF ANY OF THE ITEMS NEEDS
TO BE RETURNED.
D14 - REMOVE REPLACE EXISTING RESTROOM SHOWER HEADS AND EXISTING INSET, BATTERY-OPERATED SOAP DISPENSERS.
THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL MATERIALS NOT SELECTED BY OWNER TO BE RETAINED.
THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL MATERIALS NOT SELECTED BY OWNER TO BE RETAINED.
WHERE EXISTING PLUMBING PIPING IS TO BE REMOVED OR CAPPED BELOW FLOOR, PATCH FLOOR WITH HIGH STRENGTH NON-SHRINK GROUT PRIOR TO RECEIVING NEW FLOOR FINISH.
PATCH AND REPAIR WALL, FLOOR AND CEILING FINISHES TO MATCH EXISTING AT MEP, FIRE ALARM OR TECHNOLOGY SYSTEM WORK.
ALL CORRIDORS AND EXITS ARE TO REMAIN OPERATIONAL AND CLEAR OF DEBRIS.
ALL AFFECTED AREAS SHALL BE RETURNED TO SAFE AND CLEAN CONDITION BEFORE START OF NEW WORK DAY.
THE CONTRACTOR SHALL PROVIDE TEMPORARY PARTITION WALLS AND CEILINGS THAT ARE TO ENCLOSE ALL OPENINGS BETWEEN CONSTRUCTION SPACES AND OCCUPIED SPACES IN ORDER TO MITIGATE NOISE AND DUST.
CONTRACTOR TO MAINTAIN FIRE DEPARTMENT ACCESS AS REQUIRED BY THE CITY.
ENVIRONMENTAL ABATEMENT SHALL BE PERFORMED UNDER SPERATE CONTRACT BY THE OWNER'S ADATEMENT CONTRACTOR. COORDINATE DEMOLITION ACTIVITIES WITH HAZARDOUS MATERIALS REPORT AND ADATEMENT WORK BY OTHERS AS APPLICABLE.
CONTRACTOR TO FIELD VERIFY LOCATION OF ANY EXISTING STRUCTURAL COLUMNS AND/OR LOAD-BEARING WALLS AND NOTIFY ARCHITECT OF ANY CONFLICTS PRIOR TO DEMOLITION.
EXERCISE CARE NOT TO DAMAGE EXISTING INTERIOR CONSTRUCTION OR FINISHES AS MUCH AS POSSIBLE.
PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS OF ALL BUILDING SYSTEMS, INCLUDING BUT NOT LIMITED TO ELECTRICAL, FIRE ALARM, SECURITY, AND TECHNOLOGY SYSTEMS, AND SHALL COORDINATE REQUIRED MODIFICATIONS UNDER THEIR SCOPE OF WORK. ANY REPORTS OR DOCUMENTATION REQUIRED BY THE OWNER SHALL BE PREPARED BY THE CONTRACTOR. THE ARCHITECT IS NOT RESPONSIBLE FOR SYSTEM VERIFICATION, EVALUATION, OR PERFORMANCE.
DEMOLITION NOTES RELATED TO MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, FIRE ALARM, AND TECHNOLOGY SYSTEMS ARE PROVIDED FOR GENERAL COORDINATION ONLY. DESIGN, ENGINEERING, RELOCATION, RECONNECTION, TESTING, AND CODE
COMPLIANCE OF THESE SYSTEMS ARE CONTRACTOR RESPONSIBILITIES.
PHASING LEGEND
DESCRIPTIONPATTERN
PHASE ll (COORDINATE WITH OWNER )
PHASE l (COORDINATE WITH OWNER )
FLOOR PLAN NOTES
1. PARTITIONS SHALL BE "A1" UNLESS OTHERWISE NOTED
2. ALL ELEMENTS OF ARCHITECTURALLY DESIGNATED
ACOUSTIC PARTITIONS SHALL EXTEND TO ROOF OR FLOOR
DECK ABOVE. ALL JOINTS AND PENETRATIONS SHALL BE
SEALED TO LIMIT AIRBORNE SOUND TRANSMISSION. NO
FIELD TESTING OR PERFORMANCE CERTIFICATION IS
PROVIDED BY THE ARCHITECT.
3.FIRE-RATED PARTITIONS, SHAFTS, AND ASSEMBLIES
SHOWN ON THE DRAWINGS ARE BASED ON AVAILABLE AS-
BUILT DOCUMENTATION AND ARE PROVIDED FOR
REFERENCE ONLY. VERIFICATION, MODIFICATION,
UPGRADING, OR CONSTRUCTION OF FIRE-RATED
PARTITIONS AND RELATED ASSEMBLIES IS NOT INCLUDED IN
THE ARCHITECT’S SCOPE OF WORK AND IS NOT PART OF
THIS PROJECT SCOPE, UNLESS SPECIFICALLY IDENTIFIED
OTHERWISE IN THE CONTRACT DOCUMENTS.
4. WHERE A CLEAR DIMENSION OR OPENING IS REQUIRED
OR NOTED, MEASURE DIMENSION TO FACE OF PARTITION
FINISH
5. INSTALL BLOCKING OR BACKER MATERIAL FOR
ATTACHMENT MOUNTING OF WALL HUNG ITEMS OR
EQUIPMENT DESCRIBED IN THE DOCUMENTS.
6. INSTALLATION OF GYPSUM BOARD, BACKER BOARD, AND
BASE SHALL CONFORM TO LISTED ASSEMBLY
REQUIREMENTS WHERE RATINGS ARE INDICATED. THE
ARCHITECT DOES NOT PROVIDE FIRE-RESISTANCE OR
ACOUSTICAL PERFORMANCE ANALYSIS, TESTING, OR
CERTIFICATION.
7. INSTALLATION OF GYPSUM BOARD, BACKER BOARD AND
BASE BOARD SHALL CONFORM TO REQUIREMENTS FOR FIRE
RATINGS AND ACOUSTICAL RATINGS.
8. TYPICAL FLOOR PLAN DIMENSIONS OF PARTITIONS ARE TO
THE NOMINAL FINISH FACE OF THE GYPSUM BOARD
9. WHERE PARTITIONS AND/OR FURRING MEET, MAINTAIN A
FLUSH SURFACE ON THE SIDE WHERE THE FINISH IS
STRAIGHT OR CONTINUOUS UNLESS OTHERWISE NOTED.
10. PROVIDE STUD BRACING AT 4'-0" O.C. STAGGERED IN
ALTERNATING DIRECTIONS. BRACING SHALL ATTACH TO
STUDS 1'-0" MAX. ABOVE CEILING.
11. PARTITION TYPES AND DETAILS ARE PROVIDED FOR
ARCHITECTURAL COORDINATION. FIRE-RESISTANCE AND
ACOUSTICAL RATINGS, WHERE NOTED, ARE BASED ON
REFERENCED ASSEMBLIES. VERIFICATION OF
CONSTRUCTABILITY, PENETRATIONS, AND COMPLIANCE
WITH APPLICABLE CODES IS CONTRACTOR RESPONSIBILITY.
12. PAINT ALL WALLS(P1). FINISH TO MATCH EXISTING
BUILDING STANDARDS. SUBMIT ALL FINISH SAMPLES TO
OWNER FOR APPROVAL PRIOR TO PRODUCT ORDERING.
1.
2.
3.
4.
5.
6.
REMOVE ALL WINDOW COVERINGS AND PATCH
HOLES AS NEEDED
EXPANSION JOINTS TO BE FILLED AND SMOOTHED
PRIOR TO PAINTING
REPAIR ALL DAMAGED SHEETROCK
REMOVE WOOD FLOOR TO BE REPLACED WITH
CARPET
REPAIR OR REPLACE ANY DROP CEILING GRID AT
AREAS WHERE WALLS ARE BEING REMOVED
REMOVE EXISTING BATTERY-OPERATED SOAP
DISPENSERS THROUGHOUT BUILDING
GENERAL DEMOLITION
NOTES:
DESCRIPTIONPATTERN
EXISTING TO REMAIN (OUT OF SCOPE)
EXISTING TO BE REMOVED
1 HOUR FIRE RATED WALL
DEMO. PLAN LEGEND
REMOVE EXISTING DOOR
(COORDINATE WITH SCHOOL FOR
RETENTION)
EXISTING TO REMAIN
IN
TE
R
IM
R
EV
C
U M
EN
TS
N O
T
FO
R R
EG
U
LA
TO
R Y
AP
PR
O
M
IT
TI
N
G , O
R C
O N
ST
R
U C
TI
A
IG
S . R
EY
N
O
LD
S
TX
R
EG
. N O
. 9
BR
W
P
RO
JE
C
T N
U M
BE
R
C O
PY
RI
G H
T
BR
O W
N R
EY
N
O
LD
S W
A
TF
O
RD
A
RC
H
IT
EC
TS
, I N
C
D
RA
W N
B Y
D A
TE
C H
EC
KE
D B
Y M
L, C
R
M K
FE
BR
U A
RY
4, SECOND FLOOR
DEMOLITION PLAN
.0
N . H
A M
PT
O
N R
O A
D D
A
LL
A S, T X
D A
LL
A
S H
O U
SI
N
G A
U
TH
O R
IT
Y
2N D
R D
F
LO
O R
R
EN
O V
A
TI
O N
D1.1 0' 4' 8' 16'
PLAN
NORTH
TRUE
NORTH
1/8" = 1'-0"1 SECOND FLOOR DEMOLITION PLAN
N O
RE
V
IS
IO
N
D
K
J
A6
B3
B1
B2
A7
B5
B6
A8
B4
A5
BOARD
ROOM
3A09
CORRIDOR
MEN
3A06
WOMEN
3A05
ELEVATOR 1
ELEVATOR 2
OFFICE
3N06
OFFICE
3N03
OFFICE
3N08
OFFICE
3N10
R.R 3P13
Room 3P12
OFFICE
3P15
OFFICE
3P08
OFFICE
3P06
OFFICE
3P05
STORAGE
3P17
OFFICE
3P16
REMOVE
UNDER
CABINET
REFRIG.
REMOVE
SINK
REMOVE
EXISTING GLASS
BLOCK
D1
D1 D1
D1
D1
D1
D1
D1
D1
D1.1
D1D1
D2
D3
D3
D12
D3
D1 D1D1
D1 D1
D1
D1
D1
D1
D1
D1
D1.1
D1.1
D1 ADD ALTERNATE
D14
D14
OFFICE
3A26
OFFICE
OFFICE STORAGE
OPEN OFFICE
2M11
DEMO FLOOR PLAN
KEYNOTES:
D1. REMOVE EXISTING LUXURY VINYL TILE AND RUBBER BASE.
PREPARE SUBSTRATE FOR NEW SCHEDULED FLOORING.
D1.1 REMOVE EXISTING LUXURY VINYL TILE PREPARE SUBSTRATE
FOR NEW SCHEDULED FLOORING. EXISTING WOOD BASE BOARD
TO BE REMAINED AND PROTECTED THROUGHOUT THE
CONSTRUCTION
D2. REMOVE EXISTING CARPET AND RUBBER BASE. PREPARE
SUBSTRATE FOR NEW SCHEDULED FLOORING.
D3. REMOVE EXISTING PARTITIONS, DOORS, DOOR FRAMES,
SIDELITES, AND HARDWARE AS SHOWN IN SCOPE AREA. TURN
DOORS AND ITS ASSOCIATED COMPONENTS OVER TO OWNER
FOR STORAGE, SHOULD THEY BE KEPT, CONFIRM WITH OWNER.
D4. REMOVE GLASSBLOCK PARTITIONS.
D5. ALL FURNITURE AND EQUIPMENT TO BE REMOVED BY OWNER.
IF ANY EXISTING FURNITURE IS IN PLACE WHEN CONSTRUCTION
COMMENCES GC TO COORDINATE REMOVAL WITH OWNER.
D6. REMOVE ALL SIGNAGE, BULLETIN BOARDS, MARKER BOARDS,
ETC. AND STORE DURING CONSTRUCTION. CONFIRM WITH
OWNER ON WHICH ITEMS ARE TO BE RE-INSTALLED.
D7. COORDINATE REMOVAL OF EXISTING LIGHT SWITCHES,
THERMOSTATS, AND FIRE ALARM DEVICES LOCATED ON ALL
WALLS BEING REMOVED. CONFIRM NEW LOCATION WITH OWNER.
D8. REMOVE EXISTING POWER POLE AND ALL ASSOCIATED
ELECTRICAL COMPONENTS. TERMINATE CIRCUIT AT ELECTRICAL
BOX.
D9. CAREFULLY REMOVE AND SALVAGE EXISTING ALL WALL
(SURFACE OR RECESSED MOUNTED) ELECTRICAL AND DATA
DEVICES, LIGHT SWITCHES, THERMOSTATS, FIRE ALARM
STROBES, SECURITY, ETC. LOCATED WITHIN DEMOLISHED WALLS
TO BE RELOCATED DURING CONSTRUCTION. CONTRACTOR SHALL
SECURE WIRING AND PROTECT ABOVE CEILING DURING
CONSTRUCTION.
D10. REMOVE VERTICAL BLINDS INSTALLED AT GLASS BLOCK
WALL.
D11. REMOVE SURFACE MOUNTED DOOR STOP, MARKER
BOARDS, AND PROJECTION SCREEN. CONFIRM WITH OWNER IF
MARKER BOARDS AND PROJECTION SCREEN ARE TO BE
REINSTALLED DURING CONSTRUCTION.
D12. REMOVE HUMIDIFIER.
D13 - REMOVE ALL EXISTING PARTITIONS, DOORS, FRAMES,
FINISHES, MILLWORK, AND ALL ARCHITECTURAL ELEMENTS
WITHIN THE ROOM AS SHOWN. PREPARE ALL SUBSTRATES FOR
NEW SCHEDULED FINISHES. COORDINATE WITH OWNER IF ANY OF
THE ITEMS NEEDS TO BE RETURNED.
D14 - REMOVE ALL EXISTING RESTROOM FINISHES INCLUDING
FLOORING, WALL TILE, BASE, CEILING, FIXTURES, ACCESSORIES,
AND MILLWORK AS SHOWN. COORDINATE DISCONNECTION OF ALL
PLUMBING FIXTURES WITH APPROPRIATE TRADES. PREPARE ALL
SUBSTRATES FOR NEW SCHEDULED FINISHES AND FIXTURES.
THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL
MATERIALS NOT SELECTED BY OWNER TO BE RETAINED.
THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL
MATERIALS NOT SELECTED BY OWNER TO BE RETAINED.
WHERE EXISTING PLUMBING PIPING IS TO BE REMOVED OR
CAPPED BELOW FLOOR, PATCH FLOOR WITH HIGH STRENGTH
NON-SHRINK GROUT PRIOR TO RECEIVING NEW FLOOR FINISH.
PATCH AND REPAIR WALL, FLOOR AND CEILING FINISHES TO
MATCH EXISTING AT MEP, FIRE ALARM OR TECHNOLOGY SYSTEM
WORK.
ALL CORRIDORS AND EXITS ARE TO REMAIN OPERATIONAL AND
CLEAR OF DEBRIS.
ALL AFFECTED AREAS SHALL BE RETURNED TO SAFE AND CLEAN
CONDITION BEFORE START OF NEW WORK DAY.
THE CONTRACTOR SHALL PROVIDE TEMPORARY PARTITION
WALLS AND CEILINGS THAT ARE TO ENCLOSE ALL OPENINGS
BETWEEN CONSTRUCTION SPACES AND OCCUPIED SPACES IN
ORDER TO MITIGATE NOISE AND DUST.
CONTRACTOR TO MAINTAIN FIRE DEPARTMENT ACCESS AS
REQUIRED BY THE CITY.
ENVIRONMENTAL ABATEMENT SHALL BE PERFORMED UNDER
SPERATE CONTRACT BY THE OWNER'S ADATEMENT
CONTRACTOR. COORDINATE DEMOLITION ACTIVITIES WITH
HAZARDOUS MATERIALS REPORT AND ADATEMENT WORK BY
OTHERS AS APPLICABLE.
CONTRACTOR TO FIELD VERIFY LOCATION OF ANY EXISTING
STRUCTURAL COLUMNS AND/OR LOAD-BEARING WALLS AND
NOTIFY ARCHITECT OF ANY CONFLICTS PRIOR TO DEMOLITION.
EXERCISE CARE NOT TO DAMAGE EXISTING INTERIOR
CONSTRUCTION OR FINISHES AS MUCH AS POSSIBLE.
THE CONTRACTOR SHALL AUDIT ALL EXISTING SYSTEMS
INCLUDING SECURITY, FIRE ALARM, AND ANY OTHER SYSTEMS
AND PROVIDE A WRITTEN REPORT TO THE OWNER BEFORE START
OF CONSTRUCTION.
1.
2.
3.
4.
5.
6.
REMOVE ALL WINDOW COVERINGS AND PATCH
HOLES AS NEEDED
EXPANSION JOINTS TO BE FILLED AND SMOOTHED
PRIOR TO PAINTING
REPAIR ALL DAMAGED SHEETROCK
REMOVE WOOD FLOOR TO BE REPLACED WITH
CARPET
REPAIR OR REPLACE ANY DROP CEILING GRID AT
AREAS WHERE WALLS ARE BEING REMOVED
REMOVE EXISTING BATTERY-OPERATED SOAP
DISPENSERS THROUGHOUT BUILDING
GENERAL DEMOLITION
NOTES:
PHASING LEGEND
DESCRIPTIONPATTERN
PHASE ll (COORDINATE WITH OWNER )
PHASE l (COORDINATE WITH OWNER )
DESCRIPTIONPATTERN
EXISTING TO REMAIN (OUT OF SCOPE)
EXISTING TO BE REMOVED
1 HOUR FIRE RATED WALL
DEMO. PLAN LEGEND
REMOVE EXISTING DOOR
(COORDINATE WITH SCHOOL FOR
RETENTION)
EXISTING TO REMAIN
IN
TE
R
IM
R
EV
C
U M
EN
TS
N O
T
FO
R R
EG
U
LA
TO
R Y
AP
PR
O
M
IT
TI
N
G , O
R C
O N
ST
R
U C
TI
A
IG
S . R
EY
N
O
LD
S
TX
R
EG
. N O
. 9
BR
W
P
RO
JE
C
T N
U M
BE
R
C O
PY
RI
G H
T
BR
O W
N…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .