This is a project manual and bid package from the Virginia Department of Transportation (VDOT) for the Lockwood Building Renovation project (Project Code: 501-18040-007, IFB #159314) located at 9120 Lockwood Blvd., Mechanicsville, VA. The project involves the partial interior renovation of a 4-story, 160,000 square foot administration office building, including demolition, patching, interior partitions, acoustical ceilings, finishes, sprinkler system modifications, mechanical, plumbing, electrical, lighting, and related work. Sealed bids are due March 3, 2025 at 2:00 PM through eVA, with a public bid opening via teleconference on March 4, 2025. An optional pre-bid conference will be held on February 11, 2025 at 10:00 AM at the project site. The Time for Completion is 120 consecutive calendar days from the Notice to Proceed for Substantial Completion, with Final Completion required within 30 days thereafter.

The project requires a 5% bid bond and both payment and performance bonds for the awarded contractor. The contract will be awarded on a lump sum basis to the lowest responsive and responsible bidder, with the Total Base Bid Amount including any properly submitted modifications plus successive Additive Bid Items as the Owner chooses to award. The project is subject to Virginia Prevailing Wage rates as determined by the Department of Labor and Industry. The contractor must submit a Small Business Procurement Plan with their bid indicating their proposed percentage of small business participation. All bidders must be registered in eVA and licensed by Virginia's Department of Professional and Occupational Regulation.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOCKWOOD BUILDING

RENOVATION

Project Code: 501-18040-007

IFB # 159314

January 24, 2025

Architecture Engineering Planning 10201 Fairfax Blvd. Suite 225

Fairfax, Virginia 22030

7032412202

VIRGINIA DEPARTMENT OF TRANSPORTATION

MECHANICSVILLE, VIRGINIA

LOCKWOOD BUILDING RENOVATION

Project No. 501-18040-007

IFB # 159314

TABLE OF CONTENTS

BIDDING INFORMATION

Notice of Invitation for Bid (IFB) DGS-30-256 Vendor eVA Registration Requirements (known quantities) DGS-30-384 Instructions to Bidders DGS-30-055 (CO-7a) Prevailing Wage Determination from DOLI Prebid Question Form DGS-30-272 Bid Form DGS-30-220

GENERAL CONDITIONS

General Conditions of the Construction Contract DGS-30-054 (CO-7) Supplemental General Conditions DGS-30-376

SPECIAL TERMS & CONDITIONS

Small Business Subcontracting Plan Capital Outlay Vendor Qualification Certification Form Security Access Requirements

1-24-2025

LOCKWOOD BUILDING RENOVATION PROJECT NO. 501-18040-007

ii

FORMS

The following forms are applicable to this project and can be viewed or downloaded at the DGS Forms Center or by contacting the Procurement Officer. The URL is http://forms.dgs.virginia.gov

Contract Between Owner and Contractor DGS-30-064 (CO-9) Workers’ Compensation Certificate of Coverage DGS-30-076 (CO-9a) Notice to Proceed DGS-30-072 (CO-9.2) Standard Performance Bond DGS-30-084 (CO-10) Standard Labor & Material Payment Bond DGS-30-088 (CO10.1) Standard Bid Bond DGS-30-090 (CO-10.2) Contract Change Order DGS-30-092 (CO-11) General Contractor Estimate for Change Order DGS-30-200 (GC-1) Subcontractor Estimate for Change Order DGS-30-204 (SC-1) Sub-Subcontractor Estimate for Change Order DGS-30-208 (SS-1) Schedule of Values and Certificate for Payment DGS-30-104 (CO-12) Commonwealth of Virginia Affidavit of Payment of Claims DGS-30-108 (CO-13) Certificate of Completion by Architect/Engineer or Project Manager DGS-30-112 (CO-13.1) Architect/Engineer’s Certificate of Substantial Completion DGS-30-116 (CO-13.1a) Final Report of Structural Special Inspections DGS-30-120 (CO-13.1b) Certificate of Partial or Substantial Completion by Agency PM DGS-30-128 (CO-13.1c) Certificate of Completion by Contractor DGS-30-136 (CO-13.2) Certificate of Partial or Substantial Completion by Contractor DGS-30-140 (CO-13.2a) Checklist for Beneficial Occupancy DGS-30-152 (CO-13.3b) Checklist for Substantial Completion Inspection DGS-30-151 (CO-13.3s) Document Checklist for Final Completion DGS-30-153 (CO-13.3f) Submittal Register Format DGS-30-364

LIST OF DRAWINGS

Cover Sheet T001 Partial First Floor Life Safety Plan LS101 Partial First Floor Life Safety Plan LS102 Partial First Floor Fire Rated Construction LS103 Partial First Floor Fire Rated Construction LS104 Partial Second Floor Life Safety Plan LS105 Partial Second Floor Life Safety Plan LS106 Partial Third Floor Life Safety Plan LS107 Partial Third Floor Life Safety Plan LS108 Partial Fourth Floor Life Safety Plan LS109 Partial Fourth Floor Life Safety Plan LS110 UL Design Details LS111 UL Design Details LS112 UL Design Details LS113 UL Design Details LS114 Original Building Life Safety Plans LS115 iii

First Floor Part “A” Demolition Plan A101 First Floor Part “B” Demolition Plan A102 First Floor Part “C” Demolition Plan A103 Second Floor Part “A” Demolition Plan A104 Second Floor Part “B” Demolition Plan A105 Third Floor Part “A” Demolition Plan A106 Third Floor Part “B” Demolition Plan A107 Fourth Floor Part “A” Demolition Plan A108 Fourth Floor Part “B” Demolition Plan A109 First Floor Part “A” Reflected Ceiling Demolition Plan A110 First Floor Part “B” Reflected Ceiling Demolition Plan A111 First Floor Part “C” Reflected Ceiling Demolition Plan A112 Second Floor Part “A” Reflected Ceiling Demolition Plan A113 Second Floor Part “B” Reflected Ceiling Demolition Plan A114 Third Floor Part “A” Reflected Ceiling Demolition Plan A115 Third Floor Part “B” Reflected Ceiling Demolition Plan A116 Fourth Floor Part “A” Reflected Ceiling Demolition Plan A117 Fourth Floor Part “B” Reflected Ceiling Demolition Plan A118 First Floor Part “A” Floor Plan A119 First Floor Part “B” Floor Plan A120 First Floor Part “C” Floor Plan A121 Second Floor Part “A” Floor Plan A122 Second Floor Part “B” Floor Plan A123 Third Floor Part “A” Floor Plan A124 Third Floor Part “B” Floor Plan A125 Fourth Floor Part “A” Floor Plan A126 Fourth Floor Part “B” Floor Plan A127 First Floor Part “A” Reflected Ceiling Plan A128 First Floor Part “B” Reflected Ceiling Plan A129 First Floor Part “C” Reflected Ceiling Plan A130 Second Floor Part “A” Reflected Ceiling Plan A131 Second Floor Part “B” Reflected Ceiling Plan A132 Third Floor Part “A” Reflected Ceiling Plan A133 Third Floor Part “B” Reflected Ceiling Plan A134 Fourth Floor Part “A” Reflected Ceiling Plan A135 Fourth Floor Part “B” Reflected Ceiling Plan A136 Door Schedule, Finish Schedule and Fixture Counts A601 Partition Types and Details A602 Accessible Routes to Unisex Restrooms A603 Sprinkler Cover Sheet SP001 Sprinkler First Floor Demolition Plan Part Plan SP101 Sprinkler Second Through Fourth Floor Demolition Part Plans SP102 Sprinkler First Floor New Work Part Plan SP201 Sprinkler Second Through Fourth Floor New Work Part Plans SP202 iv

Plumbing Cover Sheet P001 Plumbing First Floor Demolition and New Work Part Plans P201 Plumbing Fourth Floor New Work Part Plan P202 Plumbing Demolition and New Work Riser Diagrams P302 Mechanical Cover Sheet M001 Mechanical First Floor Demolition and New Work Ventilation Plans M002 Mechanical Second Floor Demolition and New Work Ventilation Plans M003 Mechanical Third Floor Demolition and New Work Ventilation Plans M004 Mechanical Fourth Floor Demolition and New Work Ventilation Plans M005 Mechanical First Floor Demolition Part Plan M101 Mechanical First Floor Demolition Part Plan M102 Mechanical Second Floor Demolition Plan – Part A (Information Only) M103 Mechanical Second Floor Demolition Plan – Part B M104 Mechanical Third Floor Demolition Plan – Part A M105 Mechanical Third Floor Demolition Plan – Part B M106 Mechanical Fourth Floor Demolition Plan – Part A M107 Mechanical Fourth Floor Demolition Plan – Part B M108 Mechanical First Floor New Work Part Plan M201 Mechanical First Floor New Work Part Plan M202 Mechanical Second Floor New Work Plan – Part A M203 Mechanical Second Floor New Work Plan – Part B M204 Mechanical Third Floor New Work Plan – Part A M205 Mechanical Third Floor New Work Plan – Part B M206 Mechanical Fourth Floor New Work Plan – Part A M207 Mechanical Fourth Floor New Work Plan - Part B M208 Mechanical Diagrams M501 Mechanical New Equipment Schedules M601 Mechanical Existing Equipment Schedules M602 Mechanical Ventilation Schedules M603 Electrical Cover Sheet E001 Electrical Overall Plans E002 Electrical Overall Plans E002 Electrical Site Plan E010 Demolition Lighting First Floor Plan – Part A E101 Demolition Lighting First Floor Plan – Part B E102 Demolition Lighting Second Floor Plan – Part A E103 Demolition Lighting Second Floor Plan – Part B E104 Demolition Lighting Third Floor Plan – Part A E105 Demolition Lighting Third Floor Plan – Part B E106 Demolition Lighting Fourth Floor Plan – Part A E107 Demolition Lighting Fourth Floor Plan – Part B E108 Demolition Power First Floor Plan – Part A E109 Demolition Power First Floor Plan – Part B E110 Demolition Power Second Floor Plan – Part A E111 v

Demolition Power Second Floor Plan – Part B E112 Demolition Power Third Floor Plan – Part A E113 Demolition Power Third Floor Plan – Part B E114 Demolition Power Fourth Floor Plan – Part A E115 Demolition Power Fourth Floor Plan – Part B E116 Lighting First Floor Plan – Part A E201 Lighting First Floor Plan – Part B E202 Lighting Second Floor Plan – Part A E203 Lighting Second Floor Plan – Part B E204 Lighting Third Floor Plan – Part A E205 Lighting Third Floor Plan – Part B E206 Lighting Fourth Floor Plan – Part A E207 Lighting Fourth Floor Plan – Part B E208 Power First Floor Plan – Part A E209 Power First Floor Plan – Part B E210 Power Second Floor Plan – Part A E211 Power Second Floor Plan - Part B E212 Power Third Floor Plan – Part A E213 Power Third Floor Plan – Part B E214 Power Fourth Floor Plan – Part A E215 Power Fourth Floor Plan – Part B E216 First Floor Part “A” Emergency/Egress Photometric Plan E301 First Floor Part “B” Emergency/Egress Photometric Plan E302 Second Floor Part “B” Emergency/Egress Photometric Plan E303 Third Floor Emergency/Egress Photometric Plan E304 Electrical Partial First Floor Lighting Plan E401 Electrical Details E501 Electrical Details E502 Electrical Riser Diagram E601 Electrical Riser Diagram and Schedules E602 Electrical Schedules E603 Electrical Schedules E604 Electrical Schedules E605 Electrical Schedules E606 Fire Alarm Cover Sheet FA001 Demolition Fire Alarm First Floor Plan – Part A FA101 Demolition Fire Alarm First Floor Plan – Part B FA102 Demolition Fire Alarm Second Floor Plan – Part A FA103 Demolition Fire Alarm Second Floor Plan – Part B FA104 Demolition Fire Alarm Third Floor Plan – Part A FA105 Demolition Fire Alarm Third Floor Plan – Part B FA106 Demolition Fire Alarm Fourth Floor Plan – Part A FA107 Demolition Fire Alarm Fourth Floor Plan – Part B FA108 Fire Alarm First Floor Plan – Part A FA201 vi

Fire Alarm First Floor Plan – Part B FA202 Fire Alarm Second Floor Plan – Part A FA203 Fire Alarm Second Floor Plan – Part B FA204 Fire Alarm Third Floor Plan – Part A FA205 Fire Alarm Third Floor Plan – Part B FA206 Fire Alarm Fourth Floor Plan – Part A FA207 Fire Alarm Fourth Floor Plan – Part B FA208

SPECIFICATIONS

DIVISION 1 GENERAL REQUIREMENTS

010000 Special Conditions 011000 Summary 013000 Submittals 013100 Project Management and Coordination 013200 Construction Progress Documentation 013300 Submittal Procedures 014000 Quality Requirements 014200 References 014250 Testing and Inspection Services 015000 Temporary Facilities and Controls 016000 Product Requirements 017360 Cutting and Patching 017700 Closeout Procedures 017823 Operation and Maintenance Data 017839 Project Record Documents 019113 General Commissioning Requirements

DIVISION 2 EXISTING CONDITIONS

024119 Selective Demolition

DIVISION 3 CONCRETE

Not Used

DIVISION 4 MASONRY

vii

DIVISION 5 METALS

DIVISION 6 WOOD, PLASTICS AND COMPOSITES

061000 Rough Carpentry

DIVISION 7 THERMAL AND MOISTURE

078413 Penetration Firestopping 079200 Joint Sealants

DIVISION 8 OPENINGS

081416 Flush Wood Doors 084113 Aluminum-Framed Storefronts 087100 Door Hardware

DIVISION 9 FINISHES

092216 Non-Structural Metal Framing 092900 Gypsum Board 095113 Acoustical Panel Ceilings 096513 Resilient Base and Accessories 099124 Interior Painting

DIVISION 10 SPECIALTIES

DIVISION 11 EQUIPMENT

DIVISION 12 FURNISHINGS

viii

DIVISION 13 SPECIAL CONSTRUCTION

DIVISION 14 CONVEYING EQUIPMENT

DIVISION 21 FIRE SUPPRESSION

211000 Water-Based Fire-Suppression Systems

DIVISION 22 PLUMBING

220500 Common Work Results for Plumbing

220523 General-Duty Valves for Plumbing Piping 220529 Hangers and Supports for Plumbing Piping and Equipment 230553 Identification for HVAC Piping and Equipment 220719 Plumbing Piping Insulation 221116 Domestic Water Piping 221119 Domestic Water Piping Specialties 221316 Sanitary Drain and Vent Piping 221319 Sanitary Waste Piping Specialties

221319.13 Sanitary Drains

224200 Commercial Plumbing Fixtures

DIVISION 23 HEATING, VENTILATING AND AIR CONDITIONING

230500 Common Work Results for HVAC 230548 Vibration Controls for HVAC 230553 Identification for HVAC Piping and Equipment 230593 Testing, Adjusting, and Balancing for HVAC 230713 Duct Insulation 230800 Commissioning of HVAC 230923 Direct Digital Control (DDC) System for HVAC 233113 Metal Ducts 233300 Air Duct Accessories 233346 Flexible Ducts 233600 Air Terminal Units

233713.13 Air Diffusers

ix

DIVISION 26 ELECTRICAL

260519 Low-Voltage Electrical Power Conductors and Cables 260526 Grounding and Bonding for Electrical Systems 260529 Hangers and Supports for Electrical Systems 260533 Raceways and Boxes for Electrical Systems 260544 Sleeves and Sleeve Seals for Electrical Systems 260553 Identification for Electrical Systems 260923 Lighting Control Devices 262213 Low-Voltage Distribution Transformer 262416 Panelboards 262726 Wiring Devices 262816 Enclosed Switches and Circuit Breakers 265119 LED Interior Lighting 265213 Emergency and Exit Lighting

DIVISION 27 COMMUNICATIONS

DIVISION 28 ELECTRONIC SAFETY AND SECURITY

283111 Digital, addressable fire alarm system

DIVISION 31 EARTHWORK

DIVISION 32 EXTERIOR IMPROVEMENTS

DIVISION 33 UTILITIES

DIVISION 41 MATERIAL PROCESSING AND HANDLING EQUIPMENT

x

END OF TABLE OF CONTENTS

DGS-30-256

(Rev. 07/21)

NOTICE OF

INVITATION FOR BIDS (IFB)

IFB 159314

Project Code: 501-18040-007

Lockwood Building Renovation

Sealed bids are invited for the partial interior renovation of the Administration Office Building, Project Code 501-18040-007, at the VDOT Lockwood Facility located at 9120 Lockwood Blvd., Mechanicsville, VA 23116. The project is generally described as the partial interior renovation of the 4-story, approximately 160,000 square feet, administration office building. The work includes demolition, patching, interior partitions, acoustical ceilings, finishes, sprinkler system modifications, mechanical, plumbing, electrical, lighting, and other appurtenances in accordance with the construction documents.

Sealed bids will be received electronically through eVA. To submit an online bid, please refer to the online bidding instructions at: https://www.youtube.com/watch?v=KSxcAkOekW0. If Bidder encounters any problem in entering responses into eVA, they must contact eVA Customer Care to place a ticket. eVA Customer Care Hours are from 8:15am to 5:00pm

The deadline for submitting bids is 2:00 P.M. sharp, as determined by the Bid Officer, on

(March 3, 2025).

A public bid opening via teleconference will be hosted by a VDOT representative. The bids will be opened publicly and read aloud beginning 2:00 PM on March 4, 2025. The conference can be accessed with the below information:

Microsoft Teams

Join the meeting now

Meeting ID: 234 890 350 44

Passcode: fb7CF7Mt

Dial in by phone

+1 434-230-0065,,181886797# United States, South Hill

Find a local number

Phone conference ID: 181 886 797#

Join on a video conferencing device

Tenant key: commonwealthofvirginia@m.webex.com

Video ID: 115 367 100 8

A five percent (5%) bid bond is required to accompany this bid. When required bid shall be accompanied by a Commonwealth of Virginia Standard Bid Bond, Form CO-10.2, payable to the Owner as obligee in an amount equal to five percent (5%) of the amount of the bid. Failure to submit the bid bond on the Commonwealth of Virginia Standard Bid Bond, Form CO-10.2 will result in the bid being considered non-responsive. (When bid bonds are requested, the awarded contractor will be required to furnish Performance and Payment Bond.)

https://www.youtube.com/watch?v=KSxcAkOekW0 https://eva.virginia.gov/get-help-customer-care.html https://teams.microsoft.com/l/meetup-join/19%3ameeting_YWZkYTRiMjUtMGM0MC00MWRmLTljYjctNzcyMDFmYjlmOWE1%40thread.v2/0?context=%7b%22Tid%22%3a%22620ae5a9-4ec1-4fa0-8641-5d9f386c7309%22%2c%22Oid%22%3a%22cf899d61-b1ec-4916-aeae-f81e9f97449b%22%7d tel:+14342300065,,181886797 https://dialin.teams.microsoft.com/69fbdf03-a314-4206-b210-d4d007632545?id=181886797

DGS-30-256

(Rev. 07/21) eVA Vendor Registration: The bidder or offeror shall be a registered vendor in eVA. See the attached eVA Vendor Registration Requirements.

Procedures for submitting a bid, claiming an error, withdrawal of bids and other pertinent information are contained in the Instructions to Bidders, which is part of the Invitation for Bids.

Withdrawal due to error in bid shall be permitted in accord with Section 9 of the Instructions to

Bidders and § 2.2-4330, Code of Virginia. The Owner reserves the right to reject any or all bids.

An OPTIONAL pre-bid conference will be held at the VDOT Lockwood Office Facility located at 9120 Lockwood Blvd., Mechanicsville VA, 23116 at 10:00a.m., on February 11, 2025 followed by a site visit. Ms. Stephanie Stein of Gauthier Alvarado Associates (A/E Project

Manager) and Mr. Matt Fitzgerald of VDOT (Central Office Facilities Manager) will be conducting the showing. Attendance shall be optional for those submitting a bid. This is not a mandatory project showing, however, potential bidders are encouraged to visit the site of the proposed work. The submission of a bid will be considered as conclusive evidence that the bidder has made such examination and/or is satisfied as to the conditions to be encountered in performing the work.

The contract shall be awarded on a lump sum basis as follows: the Total Base Bid Amount including any properly submitted and received bid modifications plus such successive

Additive Bid Items as the Owner in its discretion decides to award in the manner set forth in

Paragraph 12 of the Instructions to Bidders. ‘Notice of Award’ or ‘Notice of Intent to Award’ will be posted on eVA, Virginia Department of General Services’ central electronic procurement website, at https://eva.virginia.gov

Contractor registration is required in accordance with Section 54.1-1103 of the Code of Virginia.

See the Invitation for Bids for additional qualification requirements.

All executive branch agencies are directed to advance Executive Order 35, dated July 3, 2019.

The Invitation for Bids for the above project, including the drawings and the specifications containing the information necessary for bidding, shall be obtained from https://eva.virginia.gov

Kareem Rahman

Authorized Official of Owner/Agency

Attachment: eVA Vendor Registration Requirements https://eva.virginia.gov/ https://eva.virginia.gov/

DGS-30-384

(Rev. 01/21)

Vendor eVA Registration Requirements eVA Business-to-Government Vendor Registration, Contracts, and Order: The eVA

Internet electronic procurement solution, web site portal www.eVA.virginia.gov, streamlines and automates government purchasing activities in the Commonwealth. The eVA portal is the gateway for vendors to conduct business with state agencies and public bodies. All vendors desiring to provide construction and/or professional services to the

Commonwealth shall participate in the eVA Internet e-procurement solution by completing the free eVA Vendor Registration. All bidders or offerors must register in eVA and pay the Vendor Transaction Fees specified below; failure to register will result in their bid/proposal being rejected.

Vendor transaction fees are determined by the date the original purchase order is issued and the current fees can be found on the eVA website at https://eva.virginia.gov/eva-billing.html.

eVA Orders and Contracts: The solicitation/contract will result in (One (1)) purchase order(s) with the eVA applicable transaction fee assessed for each order.

https://eva.virginia.gov/eva-billing.html https://eva.virginia.gov/eva-billing.html

DGS-30-055 CO-7A

(Rev. 07/22) Page 1 of 9

INSTRUCTIONS TO BIDDERS

The Invitation For Bids (“IFB”) consists of the Notice, these Instructions To Bidders, the Bid Form, the Pre-Bid Question Form, the General Conditions of the Construction Contract, the Supplemental General Conditions (if any), the Special Conditions (if any), the Forms to be used, and the Scope of Work as described by the Plans and Specifications, other documents listed in the Specifications, and any addenda which may be issued, all of which request qualified bidders to submit competitive prices or bids for providing the described work of the Contract.

As used herein, the terms “bidder” and “Contractor” both shall refer to the Person submitting a bid.

eVA Vendor Registration: The bidder shall be a registered vendor in eVA. See the attached eVA Vendor Registration Requirements.

1. CONDITIONS AT SITE OR STRUCTURE: Bidders shall visit the Site and shall be responsible for ascertaining pertinent local conditions such as location, accessibility, general character of the Site, structure or building, and the character and extent of existing conditions, improvements or work within or adjacent to the Site. No Claims shall be submitted as a result of Bidder’s failure to have done so, but shall be deemed waived and will not be considered by the Owner. See Section 7 of the General Conditions entitled "Conditions at Site."

2. EXPLANATIONS TO BIDDERS: No oral explanation in regard to the meaning of drawings and specifications will be made and no oral instructions will be given before the award of the Contract. The Owner shall not be responsible for any conclusions, assumptions or interpretations made by bidders during the preparation of bids that are contrary to the Drawings and Specifications and their clear intent.

Discrepancies, conflicts, errors, omissions or doubts as to the meaning of the Contract Documents shall be communicated in writing to the A/E for interpretation. Bidders must use the "Prebid Question Form" provided in the bid documents. Bidders must so act to assure that questions reach the A/E at least six (6) days prior to the time set for the receipt of bids to allow a sufficient time for an addendum to reach all bidders before the submission of their bids. If, however, there are two (2) weeks or less between the first bid advertisement and the time set for receipt of bids, then bidders must submit questions so that they reach the A/E no later than three (3) days prior to the time set for receipt of bids. Any interpretation made will be in the form of an addendum to the Specifications which will be forwarded to all bidders, and its receipt shall be acknowledged by the bidder on Bid Forms. If such discrepancies, conflicts, errors, omissions or doubts are reasonably apparent or should have been reasonably apparent to the bidder, and the bidder failed to submit questions to the A/E in the time and manner required herein and the Contract is awarded to the bidder, then any claims shall be deemed waived and the bidder shall not be entitled to additional compensation or time, or entitled to sue the Owner based on such discrepancies, conflicts, errors, omissions, or doubts.

3. TIME FOR COMPLETION:

(a) "Time for Completion" shall be designated by the Owner on the Invitation for Bids or other prebid documents and shall mean the number of consecutive calendar days following the issuance of the Notice to Proceed which the Contractor has to substantially complete all Work required by the Contract. In some instances, the Time for Completion may be stated in the form of a Contract Completion Date based on a stipulated date of Notice to Proceed.

Unless otherwise specified, the Contractor shall achieve Final Completion within thirty (30) days after the date of Substantial Completion.

(b) When the Notice to Proceed is issued, it will state a Contract Completion Date, which has been set by the Owner based on date of the Notice to Proceed and the Time for Completion.

(Rev. 07/22) Page 2 of 9

(c) The Contractor, in preparing and submitting its bid, is required to take into consideration normal weather conditions. Normal weather does not mean statistically average weather, but rather means a range of weather patterns which might be anticipated based on weather conditions and events for the past ten (10) years. Normal weather conditions shall be determined from the public historical records available, including the U.S. Department of Commerce, Local Climatological Data Sheets, Oceanic and Atmospheric Administration/Environmental Data and Information Service, National Climatic Center and the National Weather Service. The data sheets to be used shall be for the locality or localities closest to the Site. No additional compensation, costs or damages will be paid to the Contractor because of normal weather conditions, including normal adverse weather to be anticipated during the Project. An extension of time for abnormal adverse weather conditions which directly impact the Work will be considered by the Owner as set forth in the General Conditions.

(d) If the Owner designates the public historical climatological records to be used to establish normal weather patterns, the bidder shall use those records in estimating and preparing its bid. If the Owner requests each bidder to indicate the weather pattern records used in preparation of a bid, each bidder may select the public historical climatological records upon which it will rely in preparing its bid. In the latter situation, each bidder shall designate in the space provided which of such climatological data records were used in preparing the bid. A bidder's failure to designate climatological records when submitting a bid shall not disqualify a bid, but shall constitute a waiver of any claim or request for an extension of time as the result of abnormal adverse weather.

In either case, the bid submitted and the Time for Completion shall be presumed to have been based upon normal weather patterns, including normal adverse weather, as derived from the climatological records used.

4. PREPARATION AND SUBMISSION OF BIDS:

(a) Bids shall be submitted on the forms furnished, or copies thereof, and shall be signed in ink, or in the case of bids submitted electronically, signatures shall be in accordance with Code of Virginia § 59.1-479 et seq. The Owner’s agreement to accept electronic bids, if made, will be indicated in the IFB. Erasures or other changes in a bid must be explained or noted over the signature of the bidder. Bids containing any conditions, omissions, unexplained erasures, alterations or items not called for in the proposal, or irregularities of any kind, may be rejected by the Owner as being incomplete or nonresponsive.

(b) Each bid must give the complete legal name and full business address of the bidder and be signed by the bidder, or the bidder's authorized representative. Bids by partnerships must be signed in the partnership name by one of the general partners of the partnership or an authorized representative, followed by the designation/title of the person signing, and a list of the partners. Bids by joint ventures must be signed in the joint venture name by one of the joint venturers or an authorized representative of one of the joint venturers, followed by the designation/title of the person signing, and a list of the joint venturers. Bids by corporations must be signed with the legal name of the corporation followed by the name of the state in which it is incorporated and by the signature and title of the person authorized to bind it in this matter. The name of each person signing shall be typed or printed below the signature. A signature on a bid by a person who identifies their title as "President," "Secretary," "Agent" or other designation without disclosing the principal firm, shall be held to be the bid of the individual signing. When requested by the Owner, satisfactory evidence of the authority of the officer signing on behalf of the corporation shall be furnished.

Trade or fictitious names may be referenced by using "t/a _ _ _ ," but bids shall be in the legal name of the person or entity submitting the bid.

(c) Bids with the bid guarantee shall be enclosed in a sealed envelope which shall be marked and addressed as indicated by the advertisement. If a Contract is for one hundred twenty thousand

(Rev. 07/22) Page 3 of 9 dollars ($120,000) or more, or if the total value of all construction, removal, repair or improvements undertaken by the bidder within any twelve-month period is seven hundred fifty thousand dollars ($750,000) or more, the bidder is required under Code of Virginia §§ 54.1-1100, et seq., to be licensed in Virginia as a "Class A Contractor." If a Contract is for ten thousand dollars ($10,000) or more, but less than one hundred twenty thousand dollars ($120,000), or if the total value of all construction, removal, repair or improvements undertaken by the bidder within any twelve-month period is one hundred fifty thousand dollars ($150,000) or more, but less than seven hundred fifty thousand dollars ($750,000), the bidder is required to be licensed in Virginia as a "Class B Contractor." The bidder shall place on the outside of the envelope containing the bid and shall place in the bid over its signature whichever of the following notations is appropriate and insert its Contractor license/registration number:

Licensed Class A Virginia Contractor No. ______________ or Licensed Class B Virginia Contractor No. ______________

If the bidder is not properly licensed in Virginia at the time the bid is submitted, or if the bidder fails to provide this information on its bid or on the envelope containing the bid and fails to promptly provide said Contractor license number to the Owner in writing when requested to do so before the opening of bids, the bidder shall be deemed to be in violation of Code of Virginia § 54.1-1115 and its bid will not be considered.

(d) Following guidance from the Board for Contractors, the Owner may, as a part of determining whether the bidder is "responsible," require the apparent low bidder to submit a listing of its Subcontractors along with the license number and classification or specialty of each. See DEP’T OF

PROF’L AND OCCUPATIONAL REGULATION, BD. FOR CONTRACTORS POLICIES & INTERPRETATIONS, No. 2959 (July 11, 2016) (“A licensed contractor may bid on work, or enter into a contract for work, which is outside the scope of [its] license classification(s) provided that [it] subcontracts that work, to properly licensed contractors, and the work of the subcontractors is incidental to the contract.”).

(e) The bidder must place its Employer Identification Number (SSN or FEIN) in the space provided on the Bid Form.

(f) Every bidder organized as a stock or nonstock corporation, limited liability company, business trust, or limited partnership or registered as a registered limited liability partnership must be authorized to transact business in the Commonwealth as a domestic or foreign business entity if so required by Title 13.1 or Title 50 of the Code of Virginia, as amended, or as otherwise required by law. Any bidder organized or authorized to transact business in the Commonwealth pursuant to Title 13.1 or Title 50 must include in its bid the identification number issued to it by the State Corporation Commission. Any bidder that is not required to be authorized to transact business in the Commonwealth as a foreign business entity under Title 13.1 or Title 50 or as otherwise required by law shall include in its bid or proposal a statement describing why the bidder is not required to be so authorized. A bidder required to be authorized to transact business in Virginia that fails to provide the required information shall not receive an award unless a waiver of this requirement and of any administrative policies and procedures established to implement Code of Virginia § 2.2-4311.2 is granted by the chief executive of the Owner.

If awarded the Contract, the bidder shall not allow its existence to lapse or its certificate of authority or registration to transact business in the Commonwealth, if so required under Title 13.1 or Title 50, to be revoked or cancelled at any time during the term of the Contract. Doing so shall be deemed to be a violation of Code of Virginia § 2.2-4311.2 and the bidder understands and agrees that the Owner may void the Contract if the bidder fails to comply with this provision.

(Rev. 07/22) Page 4 of 9

(g). Code of Virginia, § 2.2-4376.2 shall be applicable to the Work of the Contract.

5. BID GUARANTEE:

(a) Any bid (including the Total Base Bid plus all Additive Bid Items) which exceeds five hundred thousand dollars ($500,000) shall be accompanied by a Commonwealth of Virginia Standard Bid Bond, Form CO-10.2, payable to the Owner as obligee in an amount equal to five percent (5%) of the amount of the bid (the “Bid Bond”). The Owner agrees to accept a Bid Bond on which the Surety has utilized electronic signatures and/or electronic notarization if the electronic notarization meets the requirements of Virginia Code §§ 47.1-6.1, -7, and -12, and the Commonwealth of Virginia State Corporation Commission Bureau of Insurance and the Bid Bond contains any SURETY BOND SEAL ADDENDUM established by the Commonwealth of Virginia State Corporation Commission Bureau of Insurance. For construction contracts up to $500,000, where bid bond requirements have been waived by Owner as stated in the IFB, prospective Contractors may be prequalified in accordance with Code of Virginia § 2.2-4317.A Bid Bond may be required for Contracts having bids of up to five hundred thousand dollars ($500,000) if such requirement is stated in the IFB. The Bid Bond must be issued by a surety company which is legally authorized by the Virginia State Corporation Commission to do surety business in the Commonwealth of Virginia. Such Bid Bond shall guarantee the following: that the bidder will not withdraw its bid during the thirty (30) day period following the date of the opening of bids; that if the bid is accepted, the bidder will enter into the Contract with the Owner described in the IFB; that the bidder can and will submit a properly executed and authorized Standard Performance Bond and Standard Labor and Material Payment Bond on the forms included in the IFB. If the bidder withdraws its bid within the thirty (day) period following bid opening, fails to enter into the Contract, or fails to provide the required Standard Performance Bond and Standard Labor and Material Payment Bond within ten (10) days after the bidder’s receipt of notice of acceptance of its bid, the bidder and the bidder’s surety shall be jointly and severally be liable to the Owner for the difference between the amount specified in the bidder’s bid and such larger amount for which the Owner may contract with another party to perform the work covered by said bid, up to the amount of the bid guarantee of 5% of the bidder’s total bid amount, as the damage to the Owner resulting from the bidder’s default. See Code of Virginia §2.2-4336.

(b) Code of Virginia § 2.2-4338 contains provisions allowing for alternative forms of bid security in lieu of a Bid Bond. A bidder’s use of an alternative form of Security as listed in Code of Virginia § 2.2-4338.B must be approved by the Owner prior to the bidder’s submission of its bid on the Bid Receipt date and time to be accepted in lieu of a Bid Bond.

(c) The Bid Bond or other alternative bid security will be returned to all but the three lowest bidders after the formal opening of bids. The remaining Bid Bonds or bid security will be returned to the bidders after the Owner and the accepted bidder have executed the Contract and the required Standard Performance Bond and the Standard Labor and Material Payment Bond for the Contract have been received and approved by the Owner.

(d) If the Contract and required bonds have not been executed by the accepted bidder within thirty

(30) days after the date of the opening of the bids, then the Bid Bond or other bid security of any bidder will be returned upon a bidder’s request, provided the bidder has not been notified of the acceptance of its bid prior to the date of such request.

6. WITHDRAWAL OR MODIFICATION OF BIDS: Bids may be withdrawn or modified by written or telefaxed notice received at the designated location from bidders prior to the deadline fixed for bid receipt.

E-mail withdrawals and modifications are not acceptable. The withdrawal or modification may be made by the person who signed the bid or by an individual(s) who is authorized by the bidder on the face of the bid.

Written modifications may be made on the bid form itself, on the envelope in which the bid is enclosed, or on a separate document. Written modifications, whether the original is delivered or telefaxed, must be

(Rev. 07/22) Page 5 of 9 signed by the person making the modification or withdrawal. The modification must state specifically what is to be modified and by what amount or it must state the item to be modified and what the corrected amount should be.

7. RECEIPT OF BIDS:

(a) Bids will be received at or before the date and the hour and at the place stipulated in the IFB as may be modified by subsequent Addenda.

(b) It is the responsibility of the bidder to assure that its bid and any bid modifications are delivered to the place designated for receipt of bids by the date and hour (deadline) set for receipt of bids. Therefore, it is the bidder’s responsibility to take into account all factors which may impact on its bid deliverer / courier’s ability to deliver the bid and to implement whatever actions are necessary to have the bid delivered to the proper bid receipt location prior to the bid receipt deadline. No bids or bid modifications submitted or offered after the date and hour designated for receipt of bids will be accepted or considered.

(c) The Bid Officer is the Owner's representative designated to receive bids at the time and place noted in the IFB and to open the bids received at the appointed time.

(d) The official time used for the receipt of responses is determined by reference to the clock designated by the Bid Officer. The Bid Officer shall determine when the Bid Receipt Deadline has arrived and shall announce that the Deadline has arrived and that no further bids or bid modifications will be accepted. All bids and bid modifications in the possession of the Bid Officer and their assistants at the time the announcement is completed are deemed to be timely, whether or not the bid envelope has been physically date/time stamped or otherwise marked by the time the Bid Officer makes the deadline announcement.

(e) In the event the bid receipt occurs during a period of suspended state business operations, the receipt and opening will be delayed one business day.

8. OPENING OF BIDS:

(a) Bids will be opened at the time and place stated in the IFB or as modified by subsequent Addenda, and their contents publicly announced. The Bid Officer shall decide when the specified time for bid opening has arrived. No responsibility will be attached to any officer or agent for the premature opening of a bid not properly addressed and identified. Bid opening shall be no sooner than twenty-four (24) hours after the time set for receipt of bids.

(b) The provisions of Code of Virginia § 2.2-4342, as amended, shall be applicable to the inspections of bids received.

(c) In the event the bid opening occurs during a period of suspended state business operations, the opening will be delayed until the next business day.

9. ERRORS IN BIDS: A bidder may withdraw its bid from consideration if the price bid was substantially lower than the other bids due solely to a mistake therein, provided the bid was submitted in good faith, and the mistake was a clerical mistake as opposed to a judgment mistake, and was actually due to an unintentional arithmetic error or an unintentional omission of a quantity of work, labor or material made directly in the compilation of a bid, which unintentional arithmetic error or unintentional omission can be clearly shown by objective evidence drawn from inspection of original work papers, documents and materials used in the preparation of the bid sought to be withdrawn.

In accordance with Code of Virginia § 2.2-4330(B)(2), the bidder must submit to the Owner its original work papers, documents and materials used in the preparation of the bid within one day after the date fixed for submission of bids. Such work papers must be submitted in an envelope or package separate and apart

(Rev. 07/22) Page 6 of 9 from the envelope containing the bid and marked clearly as to the contents and shall be delivered to the Owner by the bidder in person or by registered mail prior to the time fixed for the opening of bids and may not be withdrawn until after the two-hour period (referred to later) has elapsed. The bids shall be opened at the time designated in the IFB, as amended by addendum. Bid opening is usually one day following the time fixed by the Owner for the submission of bids, but no sooner. Once the bids have been opened, the bidder shall have two (2) hours after the opening of bids within which to claim in writing any mistake as defined herein and withdraw its bid. The Contract shall not be awarded by the Owner until such two-hour period has elapsed. Such mistake shall be proved only from the original work papers, documents and materials delivered to the Owner prior to bid opening. This procedure in Code of Virginia § 2.2-4330(B)(2) shall not apply to when the entire bid is required to be submitted on a unit price basis.

Failure of a bidder to submit its original work papers, documents and materials used in the preparation of its bid on or before the time, date and place required shall constitute a waiver by that bidder of its right to withdraw its bid due to a mistake.

No bid may be withdrawn under this section when the result would be the awarding of the Contract on another bid of the same bidder or of another bidder in which the ownership of the withdrawing bidder is more than five (5%) percent.

No bidder who is permitted to withdraw a bid shall, for compensation, supply any material or labor to or perform any subcontract or other work agreement for the person or firm to whom the Contract is awarded or otherwise benefit, directly or indirectly, from the performance of the project for which the withdrawn bid was submitted. The person or firm to whom the Contract was awarded and the withdrawing bidder are jointly liable to the Owner in an amount equal to any compensation paid to or for the benefit of the withdrawing bidder without such approval.

If the apparent low bid is withdrawn under authority of this section, the lowest remaining bid shall be deemed to be the low bid on the project.

10. REJECTION OF BIDS: The Owner reserves the right to cancel the IFB, to reject any and all bids at its sole discretion when such rejection is in the interest of the Owner, or to reject the bid of any bidder who is determined to be not responsive or not responsible. See Code of Virginia § 2.2-4319.

11. DETERMINATION OF RESPONSIBILITY

Each bidder shall be prepared, if so requested by the Owner, to present evidence of its experience, qualifications and financial ability to carry out the terms of the Contract.

Prior to award of the Contract, an evaluation will be made to determine if the low bidder has the capability, in all respects, to perform fully the contract requirements and the moral and business integrity and reliability which will assure good faith performance, and who has been prequalified, if required. Factors to be evaluated include, but are not limited to:

(a) sufficient financial ability to perform the contract as evidenced by the bidder's ability to obtain payment and performance bonds from an acceptable surety;

(b) appropriate experience to perform the Work described in the bid documents;

(c) any judgments entered against the bidder, or any officers, directors, partners or owners for breach of a contract for construction;

(d) any substantial noncompliance with the terms and conditions of prior construction contracts with a public body without good cause where the substantial noncompliance is documented; or

(e) a conviction of the bidder or any officer, director, partner, project manager, procurement manager, chief financial officer, or owner in the last five years of a crime relating to governmental or nongovernmental construction or contracting; and/or

(Rev. 07/22) Page 7 of 9

(f) any current debarment of the contractor, any officer, director or owner, from bidding or contracting by any public body of any state, any state agency, or any agency of the federal government.

The Owner reserves the right to disqualify or refuse to accept the bid of any bidder who has been convicted, or entered a plea of guilty or nolo contendere, in any federal or state court to any charge involving any unlawful, corrupt or collusive practice involving a public contract whether federal, state, or local, or who has been determined in any judicial proceeding to have violated any antitrust, bid-rigging or collusive practice statute in connection with any public contract, or against whom such formal criminal prosecution or other judicial proceeding has been initiated.

A bidder who, despite being the apparent low bidder, is determined not to be a responsible bidder shall be notified in writing in conformance with the procedures in Code of Virginia § 2.2-4359.

12. AWARD OF CONTRACT

(a) Basis for Contract Award: The Contract, if awarded, will be awarded to the lowest responsive and responsible bidder, if any, provided its bid is reasonable and it is in the best interest of the Owner to accept it and subject to the Owner's right to reject any and all bids and to waive informality in the bids and in the bidding. The Bid Form contains a multi-part Base Bid and may contain Additive Bid Items. Determination of the lowest responsible bidder, if any, will be based on the Total Base Bid Amount entered on the Bid Form including any properly submitted bid modifications plus as many Additive Bid Items taken in sequence as the Owner in its discretion chooses to Award. Where the sum of the values entered in the multiple parts do not agree with the Total Base Bid amount, the Total Base Bid amount entered on the bid form, including any properly submitted bid modifications, shall take precedence.

In the event that the Total Base Bid from the lowest responsible bidder exceeds available funds, the Owner may negotiate the Total Base Bid amount with the apparent low bidder to obtain a Contract Price within available funds, pursuant to Code § 2.2-4318 and Section 12(c) herein.

(b) Informalities: The Owner reserves the right to waive any informality in the bids when such waiver is in the interest of the Owner.

(c) Negotiation With Lowest Responsible Bidder: If award of the Contract to the lowest responsive and responsible bidder is precluded because of limitations on available funds, under the provisions of Code § 2.2-4318 the Owner reserves the right to negotiate the Total Base Bid amount with the lowest responsive, responsible bidder to obtain a Contract Price within the available funds. This may involve changes in either the features or scope of the work included in the Base Bid. Such negotiations with the apparent low bidder may include reducing the quantity, quality, or other cost saving mechanisms involving items in the Total Base Bid. Negotiations for Additive Bid Items are excluded. The Owner shall notify the lowest responsive and responsible bidder that such a situation exists and the Owner and bidder shall then conduct their negotiations in person, by mail, by telephone or by any means they find convenient. If an acceptable Contract can be negotiated, any changes to the IFB documents agreed upon in the negotiations shall be summarized in a "Post Bid Modification" and included in the Contract. If an acceptable Contract cannot be negotiated, the Owner shall terminate negotiations and reject all bids.

(d) Notice of Intent to Award or Notice of Award: The Notice of Award or the Notice of Intent to

Award will be posted at the Agency’s standard location for posting notices as shown on the “Notice of Invitation to Bid”. In addition, the Agency may also post such notice on the Agency’s Website and/or the DGS central electronic procurement Website. Any bidder who desires to protest the award or decision to award a contract shall submit the protest in writing to the public body no later than ten days after the posting of the Notice of Award or Notice of Intent to Award, whichever comes first. See Code of Virginia § 2.2-4360.

(Rev. 07/22) Page 8 of 9

13. CONTRACT SECURITY: For contracts which exceed five hundred thousand dollars ($500,000), the

Standard Performance Bond (CO-10) and the Standard Labor and Material Payment Bond (CO-10.1) shall be required, as specified in the IFB. For construction contracts up to $500,000, where Bid Bond requirements are waived, prospective contractors may be prequalified in accordance with Code of Virginia § 2.2-4317. See General Conditions and Code of Virginia § 2.2-4337 and § 2.2-4338. The Owner reserves the right to require such bonds for contracts up to five hundred thousand dollars ($500,000). If the Owner so elects, the requirement shall be set forth in the IFB.

14. CERTIFICATION: The bidder, by its signature on the Bid Form, certifies that neither its organization nor any of its officers, directors, partners or owners is currently barred from bidding on contracts by any Agency of the Commonwealth of Virginia, or any public body or agency of another state, or any agency of the federal government. See "Disqualification of Contractors" in the Bid Form.

15. ETHICS IN PUBLIC CONTRACTING: The provisions, requirements and prohibitions as contained in

Code of Virginia §2.2-4367 et seq., pertaining to bidders, offerors, contractors, and subcontractors are applicable to this project.

16. BUILDING PERMITS: Because this is a Project of the Commonwealth of Virginia, codes or zoning ordinances of local political subdivisions do not apply. However, the Virginia Uniform Statewide Building Code shall apply to the Work and shall be administered by the Building Official for State-owned Buildings.

The Building Permit will be obtained and paid for by the Owner. All other permits, local license fees, business fees, taxes, or similar assessments imposed by the appropriate political subdivision shall be obtained and paid for by the Contractor. See Section 25 of the General Conditions for utility connection fees and services.

17. UTILIZATION OF SMALL BUSINESSES: It is the policy of the Commonwealth of Virginia to maximize the participation of small businesses in state contracting. The participation of these businesses directly and through partnerships, joint ventures, subcontracts and other contractual opportunities may be encouraged for this Project based on the Owner’s requirements (if applicable) on the Bid Form. Bidders shall provide a Small Business Procurement Plan in conjunction with their sealed bid.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .