ID06170027_Attach_5_Exh_2_Staffing_Matrix.xls

XLS spreadsheet 56 KB Posted

Attached to
Defense Language Institute Foreign Language Center (DLIFLC) DLPT5 Quality Control & Validations
Solicitation number
ID06170027
Issued by

About this file

Attach 5 Exh 2 Staffing Matrix

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Example

STAFF MATRIX EXAMPLE
List the type of personnel proposed, by Specific Task, within the PWS. Include the hours proposed per labor category. If the solicitation contains options, a matrix is required for each period of performance.
Begin with the second tab, identified as "Staff Matrix Base", to create your matrix for the base year. When applicable, prepare tabs Option 1 and 2 for submission. All cells highlited in YELLOW on this sheet are your responsibility on the subsequent sheets
What is the baseline of hours used for a FTE?1920
PWS, Part 5, Specific TasksHours Per
Labor Category
Task #Task NamePMMAIMAIISMATotal
5.1Prepare and submit reports2020
5.2Bi-weekly VTCs5120134200459
5.3Draft Doctrine and Concepts515001505
5.4Staff and Revise Doctrine1020002010
5.5Battle Rhythm213001302
5.6Collect Lessons Learned5400405
0
0
0
0
0
0
Base Period Totals472120134340005701
Labor Categories
PM=Program Manager
MAI=Military Analyst I
MAII= Military Analyst II
SMA=Senior Military Analyst

&RID06170027

Attachment 5 / Exhibit 2

Staff Matrix Base

STAFF MATRIX BASE PERIOD
List the type of personnel proposed, by Specific Task, within the PWS, Part 3. Include the hours proposed per labor category. If the solicitation contains options, a matrix is required for each period of performance.
What is the baseline of hours used for a FTE?1920
PWS, Part 3, Specific TasksHours Per
Labor Category
Task #Task NameTotal
0
0
0
0
0
0
0
0
0
0
0
0
Base Period Totals000000
Labor CategoriesLabor Categories

Staff Matrix Option 1

STAFF MATRIX OPTION PERIOD 1
List the type of personnel proposed, by Specific Task, within the PWS, Part 3. Include the hours proposed per labor category. If the solicitation contains options, a matrix is required for each period of performance.
What is the baseline of hours used for a FTE?
PWS, Part 3, Specific TasksHours Per
Labor Category
Task #Task NameTotal
0
0
0
0
0
0
0
0
0
0
0
0
Base Period Totals000000
Labor CategoriesLabor Categories

Staff Matrix Option 2

STAFF MATRIX OPTION PERIOD 2
List the type of personnel proposed, by Specific Task, within the PWS, Part 3. Include the hours proposed per labor category. If the solicitation contains options, a matrix is required for each period of performance.
What is the baseline of hours used for a FTE?
PWS, Part 3, Specific TasksHours Per
Labor Category
Task #Task NameTotal
0
0
0
0
0
0
0
0
0
0
0
0
Base Period Totals000000
Labor CategoriesLabor Categories

File details come from the government source that posted it. Updated .