RFQ_Atch_3_-_ID05170076_BBD_QASP.docx
DOCX document 67 KB Posted
- Solicitation number
- ID05170076
- Issued by
-
GSA Federal Acquisition Service
About this file
RFQ Atch 3 - Quality Assurance Surveillance Plan
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ_Atch_2_-_Provisions_&_Clauses.doc | DOC document | |
| RFQ_Atch_1_-_PWS_(11_Sep_17).docx | DOCX document | |
| ID05170076_RFQ_Letter.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
TABLE OF CONTENTS:
1.0 Mission
2.0 Purpose
3.0 Authority
4.0 Roles and Responsibilities
5.0 Contractor’s Quality Control Plan (QCP)
6.0 Performance Requirements and Method(s) of Surveillance
7.0 Surveillance Documentation
8.0 Acceptance of Services
9.0 Contract Management
Appendices:
1. Services Summary (SS) and Method of Surveillance
2. Corrective Action Report (CAR)
3. Customer Complaint Record
4. Performance Assessment Report (PAR)
5. Sample COR Services Summary Surveillance Report Quality Assurance Surveillance Plan (QASP)
1.0 Mission (of the program)
The contractor shall deliver/teach an existing, four (4)-day Air Force workshop called “Better Business Deals.” The contractor shall be an Association to Advance Collegiate Schools of Business (AACSB) accredited or an Accreditation Council for Business Schools (ACBSP) accredited business school. The workshop addresses topics and objectives listed in Appendix A of this PWS as well as pertinent and related current and emerging issues affecting DOD and Government business, with particular focus on Air Force acquisition programs. The contractor shall maintain an awareness of current Air Force and DOD acquisition topics and issues by periodically reviewing the GAO website for current GAO reports, along with aerospace and defense-related trade journals to integrate current topics/issues that are relevant to the workshop learning objectives into the workshop as appropriate. In addition, financial statements and information from publicly-traded defense contractors used within the workshop must be current as of the date of the workshop. The Government will provide a list of program teams and their associated contractors at least two weeks prior to each workshop offering. At least two of these specific contractors’ financial information should also be used or highlighted in the teaching of this workshop. The target audience for this workshop will be senior military and civilian acquisition professionals. Student’s career grades will typically range from O-2 to O-6 for the military and GS-12 to GS-15 for the civilian attendees. Students include contracting managers, program managers, logisticians, engineers, financial managers and others, typically with 10-20+ years of experience members in the defense acquisition workforce.
2.0 Purpose
This Quality Assurance Surveillance Plan (QASP) is a government-developed document used to determine if the contractor’s performance meets the performance standards contained in the task order. The QASP establishes procedures on how this surveillance/inspection process will be conducted to ensure successful PWS performance. It provides a systematic method for a continuous oversight process to determine conformity with the technical requirements of the contract. The QASP establishes:
· What will be monitored.
· How monitoring will take place.
· Who will conduct monitoring.
· How monitoring efforts and results will be documented.
The contractor is responsible for implementing and delivering performance that meets contract objectives using its Quality Control Plan (QCP). The QASP provides the structure for the government’s surveillance of the contractor’s performance to assure that it meets task order requirements. It is the government’s responsibility to be objective, fair and consistent in evaluating contractor performance. The Contracting Officer (CO) shall also ensure that the contractor receives impartial, fair, and equitable treatment under this task order and determines the final assessment of contractor performance.
The QASP is not part of the contract nor is it intended to duplicate the contractor’s QCP. This QASP is a living document. Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on contractor performance.
The government may provide a copy of the QASP to the contractor to facilitate open communication. In addition, the QASP should recognize that unforeseen or uncontrollable circumstances might occur that are outside the control of the contractor.
The QASP should ensure early identification and resolution of performance issues to minimize impact on mission performance.
3.0 Authority
Authority for issuance of this QASP is provided under Part 37.604 and 46.4 of the Federal Acquisition Regulation (FAR), Inspection of Services clauses, which provides for inspection, acceptance and documentation of the service called for in the contract or order. This acceptance is to be executed by the Contracting Officer (CO) or a duly authorized representative.
4.0 Roles and Responsibilities
The following personnel comprise the Multi-Functional Team (MFT) and shall oversee and coordinate surveillance activities.
Government Representatives:
Contracting Officer Representative (COR) - The COR is responsible for providing continuous program and technical oversight of the contractor’s performance. While the COR may serve as a direct conduit to provide Government guidance and feedback to the contractor on technical matters, they are not empowered to make any contractual commitments or any contract changes on the government’s behalf. The COR is responsible for reporting early identification of performance problems to the CO and may use the applicable appendix items for documenting contractor performance.
Specific duties of the COR include:
· Evaluating and documenting the contractor’s performance in accordance with the procedures set forth in the QASP.
· Recommending any changes necessary to the contract, PWS, QASP, or other items to provide more effective operations or eliminate unnecessary costs.
· Keeping the COR file that accurately documents the contractor’s actual performance (i.e. COR surveillance reports).
· Utilizing COR file data (i.e. performance and COR surveillance reports) to assist the CO in the preparation of the CPARS reports.
· Receiving required training before performing any COR duties (IAW MP5301.602-2(d)).
· Notifying the CO immediately regarding contractor non-compliance with FAR 52.222-50, “Combating Trafficking in Persons.”
Assigned COR: Mr. Steve Breitenstein Organization or Agency: AFIT Telephone: 937-255-7777 x3205 Email: steve.breitenstein@afit.edu
Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship.
Specific duties of the CO include:
· Delegating authority for inspection and/or acceptance to COR in accordance with the terms and conditions of the contract.
· Informing the contractor of the names, duties, and limitations of authority for all COR assigned to the contract.
· Periodically assessing COR’s performance.
· Providing contract-specific training (to include refresher training) administered by CO or CO’s designee to all appointed COR’s.
· Participating as a member of the MFT in the post-award management phase.
Assigned CO: Jacqueline M. McGlone Organization or Agency: GSA Region 5 Telephone: (618) 206-5215 Email: Jacqueline.mcglone@gsa.gov
GSA Project Manager (PM)/Contracting Officer Representative (COR) – The GSA Contracting Officer’s Representative (GSA-COR) will be responsible for technical oversight of this contract and will monitor technical and delivery compliance. The COR(s) may also perform invoice reviews.
Specific duties of the GSA PM/COR include:
· Periodically assessing Client COR’s performance.
· Managing contractor performance surveillance data, including submitting Contractor Performance Assessment Reporting System (CPARS) reports.
· Ensuring the MFT reviews this QASP annually (at a minimum) for recommended changes.
· Participating as a member of the MFT in the post-award management phase.
· Reviewing invoices for acceptance, only those services that conform to contract requirements.
Assigned PM/COR: Robin Swaney Organization or Agency: GSA Region 5 Telephone: (618) 622-5805 Email: robin.swaney@gsa.gov
Contractor: (Complete this section after contract award.)
Contractor – Complies fully with the terms and conditions of the contract and ensures non-conforming contract services are identified and corrected.
Specific duties of the Contractor include:
· Participating as a member of the MFT in the post-award management phase.
· Maintaining and implementing their commercial quality procedures that ensure contract requirements are met.
· Ensuring that the QCP is revised when necessary to prevent recurrence of non-conforming contract services.
· Tendering to the government for acceptance, only those services that conform to contract requirements.
· Recommending any changes to the contract that will provide more effective operations or eliminate unnecessary costs.
Contract Manager: <upon award, enter name> Telephone: <enter number> Email: <enter address>
Other Contract Personnel: <upon award, enter name or delete this line if not applicable> Title: <enter title> Telephone: <enter number> Email: <enter address>
5.0 Contractor’s Quality Control Plan (QCP)
As required by the contract, the contractor’s commercial QCP included in the final proposal dated ___________________, is incorporated by reference.
6.0 Performance Requirements and Method(s) of Surveillance
6.1 Contract Surveillance
The goal of the QASP is to ensure that contractor performance is effectively monitored and documented. The COR contribution is their professional, non-adversarial relationships with the CO and the contractor, which enables positive, open and timely communications. The COR uses the methods contained in this QASP to ensure the contractor is in compliance with contract requirements. The COR function is responsible for a wide range of surveillance requirements that effectively measure and evaluate the contractor’s performance. Additionally, this QASP is based on the premise that the contractor, not the Government, is responsible for management and quality control/quality assurance actions to successfully meet the terms of the contract.
6.2 Surveillance Summary
The Services Summary (SS) and Method of Surveillance (Appendix 1) is the list of performance objectives and thresholds that must be performed by the contractor. This summary details the method(s) of surveillance the COR will use to validate and inspect these performance objectives. Inspection of each objective will be documented in the COR file.
Performance objectives define the desired outcomes. Performance thresholds define the level of service required under the contract to successfully meet the performance objective. The Government performs surveillance, using this QASP, to determine the quality of the contractor’s performance as it relates to the performance thresholds. The PWS and QASP should be used to form the foundation of the COR’s inspection.
Method(s) of Surveillance:
100% Inspection: The COR will inspect and evaluate the contractor’s performance each time it is performed. The result of the contractor’s overall performance is then evaluated to determine acceptability of the service provided.
Periodic Inspection: These items are inspected using periodic surveillance (daily, weekly, monthly, quarterly, etc.) as determined by the COR. The results of the periodic surveillance inspections may be used as the basis for actions (other than payment deductions) toward the contractor. In such cases the Inspection of Services clause becomes the basis for the CO’s actions. The schedules (if applicable) are submitted to the CO for review prior to the month being inspected.
Customer Complaint: The COR is the point of contact and must collect all customer complaints. The Customer Complaint Record below will be used for this purpose. All complaints and any resulting resolution of such complaints must be documented with the information required on the customer complaint form. Customer complaint forms become a permanent part of the COR file.
7.0 Surveillance Documentation
7.1 Corrective Action Report (CAR) (Appendix 2)
Corrective Action reporting is divided into two categories, which are as follows: minor and major.
Minor: A minor discrepancy is a departure from established standards having little bearing on the service provided. Some examples would be data deliverables with minor grammatical or spelling errors or insufficient copies of documents. When the COR identifies a minor discrepancy, the COR shall document the discrepancy and verbally contact the designated contractor s, but is not required to notify the COR; however, if the same minor discrepancy is identified more than once, it may be an indication that a major discrepancy is occurring or has occurred because the contractor has not taken proper steps to prevent recurrence. In this case, the COR shall notify the CO in writing, which may include e-mail.
Major: If at any time the COR identifies a condition as having a significant adverse effect on the quality of the service, such as those stated below, the COR shall document their findings and notify the CO immediately in writing. E-mail is acceptable. Major discrepancies will be reported by the COR to the designated contractor in writing; however, copies of written correspondence will be coordinated with the CO prior to issuance to the contactor. Some examples would contractor failure to meet a performance objective, failure to provide adequate corrective action to preclude recurrence of government-identified findings, failure to provide corrective action to deficiencies identified by the COR within a prescribed suspense period or failure to adhere to security regulations that results in a security incident.
7.2 Customer Complaint Record (Appendix 3)
The COR shall ensure complaint procedures and forms are made available to all customers (See Customer Complaint Record below). Any personnel that observe questionable or incomplete services or services not performed, or performed improperly, should immediately contact the COR. The COR shall receive, document, and validate or invalidate all complaints. If the complaint is invalid, the COR shall contact the complainant and explain why the complaint was invalid. The COR shall fully document the resolution for each complaint on the Customer Complaint Record. Complaints will be tracked and if the performance threshold is exceeded, the COR shall notify the CO in writing. The CO will notify the contractor and appropriate action can be taken.
7.3 Performance Assessment Report (PAR) (Appendix 4)
PARs will be used to report all minor discrepancies and will be generated by the COR and sent to the contractor for corrective action. Contractor will be given 5 days to correct PARs unless they have requested an extension. One (1) day if minor discrepancies are found, combine them and process a CAR.
7.4 Sample COR Services Summary Surveillance Report (Appendix 5)
The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed using the methods of surveillance shown in the SS surveillance.
8.0 Acceptance of Services
Before acceptance of product(s) or service(s) and/or approval of an invoice, the COR shall prepare a COR Services Summary Surveillance Report (Appendix 5) in accordance with the QASP and FAR 52.212-4 (Contract Terms and Conditions – Commercial Items), Inspection and Acceptance Clause. The report shall identify both positive and negative performance. At a minimum, the report shall identify the number of assessments scheduled and conducted, the number of unacceptable/acceptable performances observed, the number of CARs issued, number of valid complaints, any significant contractor performance discrepancies, and a rating of the Contractor’s overall performance. The report shall be signed and dated by the COR.
The COR will certify that acceptable services were received, in accordance with the terms and conditions of the contract. The COR will certify receipt of contractor services via Information Technology Solutions Shop (ITSS) website. Certification of services shall be accomplished no later than fifteen calendar days after receipt of the invoice. To avoid payment of interest penalties, if the invoice is unacceptable, it should be rejected within the first seven calendar days after receipt of the invoice, and the CO should be notified immediately.
9.0 Contract Management
The MFT shall conduct periodic progress meetings to review the contractor’s performance. At these meetings the CO will apprise the contractor of how the Government views the contractor’s performance and the contractor will apprise the Government of problems, if any, being experienced. The contractor will immediately notify the CO and/or COR of any work being performed that the contractor considers over and above the requirements of the contract. Appropriate action shall be taken to resolve any outstanding issues (i.e. CPARS, customer complaint reports, etc.).
The MFT shall also provide any recommended changes to the QASP to the CO at the progress meetings or on an annual basis (at a minimum).
Appendix 1 – Services Summary (SS) and Method of Surveillance
| PERFORMANCE OBJECTIVE |
| PWS SECTION REFERENCE |
| PERFORMANCE THRESHOLD |
| METHOD OF SURVEILLANCE |
| Instructional Materials |
| Section 1.0, para. and 1.3.4 |
| All changes to workshop materials are presented to Gov’t and approved prior to use in workshop delivery; no unapproved changes presented to students |
| 100% Inspection |
| Student Materials |
| Section 1.0, para. 1.3.8 |
| All students receive all required student materials at each workshop offering as specified in Section 1.3.8 of PWS |
| 100% Inspection |
Student Survey
| Course evaluation/feedbacks |
| Section 1.0, para. |
1.3.9
| Average ratings on Likert scale questions are at least 85% of maximum; contractor provides summary report after each workshop offering as specified in Section 1.3.9 of PWS |
| 100% Inspection |
| Workshop offerings |
| Section 1.0, para. |
1.3.5
| Maximum of 8 offerings. Offerings delivered using approved course materials which address all learning objectives and measurable samples of behavior listed in Appendix A of PWS. Each offering taught with Government-approved teaching team that meets requirements of Section 1.3.1 and subparagraphs of the PWS. |
| Periodic Inspection |
Appendix 2 – Corrective Action Report
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6. CONTROL NUMBER
7. DEFICIENCY |_| MAJOR |_| MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. COR (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
11. COR DETERMINATION
|_| ACCEPTED |_| REJECTED
12. CLOSE DATE
Appendix 3 – Customer Complaint Record
CUSTOMER COMPLAINT RECORD
DATE/TIME OF COMPLAINT
SOURCE OF COMPLAINT
ORGANIZATION
BUILDING NUMBER
INDIVIDUAL
PHONE NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
| 1. CONTRACT/TASK ORDER NUMBER |
| 2. CONTRACTOR |
| 3. TYPE OF SERVICES |
4. COR (COR) SIGNATURE AND DATE
| 5. COR PHONE |
| 6. SUSPENSE DATE |
I. PERFORMANCE
7. |_| DEFICIENCY (CHECK ALL BOXES THAT APPLY)
|_| NEW
|_| REPEAT
|_| NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED
| 9. BRIEF DESCORIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS CHECKED) |
| 10. DETAILED PERFORMANCE ASSESSMENT |
II. CONTRACTOR VALIDATION
11. CONTRACTOR |_| CONCUR |_| NON-CONCUR
12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE
13. CONTRACTOR CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY
III. ACTION CORRECTED
14. |_| CONCUR |_| NON-CONCUR COR SIGNATURE AND DATE
15. COR REMARKS (REQUIRED)
16. CONTRACTOR REMARKS
Appendix 4 – Performance Assessment Report Appendix 5 - Sample COR Services Summary Surveillance Report
SERVICE or STANDARD:
SURVEY PERIOD:
SURVEILLANCE METHOD (Check):
Random Sampling 100% Inspection Periodic Inspection Customer Complaint LEVEL OF SURVEILLANCE (Check):
| Monthly | Quarterly | As needed | |
| PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: | ______ % |
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ______%
| Service Provider’s Performance (Check): | Meets Standards |
| Does Not Meet Standards |
Narrative of Performance During Survey Period:
PREPARED BY: ___________________________________ DATE: ________________
File details come from the government source that posted it. Updated .