Attachment 1 - Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A002.pdf | ||
| Evaluation_Factors_(FINAL).doc | DOC document | |
| Questions_ _Answers.xlsx | XLSX spreadsheet | |
| A001.pdf | ||
| SF_330_Architect-Engineer_Qualifications.pdf | ||
| Evaluation_Factors_(FINAL).doc | DOC document | |
| IBM14R0006.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USIBWC/EL PASO
AMERICAN DAM FENCE
SUMMARY OF WORK
USIBWC/EL PASO
A-E SERVICES
STATEMENT OF WORK
INTERNATIONAL BOUNDARY AND WATER COMMISSION
U.S. SECTION
STATEMENT OF WORK
ARCHITECT-ENGINEER SERVICES
I. Statement of Work: The contractor shall furnish all labor, material, supplies, equipment, superintendence, and transportation necessary to complete task orders for Architect-Engineer services for projects located along the U.S./Mexico border in the United States (States of Texas, New Mexico, Arizona, and California) and the Republic of Mexico (States of Tamaulipas, Nuevo Leon, Coahuila, Chihuahua, Sonora, and Baja California). Task orders may include work to be performed within Mexico for international projects. The Contractor shall be required to perform all or part of the following services, which will be more specifically identified in individual task orders.
A. Inventory of facilities, data acquisition, measurement and recording; development of engineering, planning and feasibility/cost benefit studies; life-cycle-cost-analysis; investigations; evaluations; operations and maintenance studies; energy studies; risk analysis and vulnerability assessments; space utilization studies; safety plans; security assessments and planning, standard operating procedures; network analysis schedules; conceptual, preliminary, and final designs, and cost estimates.
B. Design services for rehabilitation, renovation, repair, and new construction for civil works associated with surface and subsurface water deliveries and accounting, flood control and hydropower, such as channels, levees, canals, dikes, dams, reservoir embankments, hydro-electric power plants as well as site work, buildings, roads and paving, erosion control, bridges, and security and communication systems. The design of each project shall include consideration of all necessary supporting features to provide a complete and a usable facility. These features in general include, but are not limited to access and service drives, buildings, including storage, administration/laboratory and maintenance, off-site roadway improvements, street extensions, utility line extensions, vehicle parking areas, grading, and drainage systems, including off-site discharge of storm water drainage.
C. Design services to include safety of dam studies, risk analysis for dams, dam modification studies, annual and five (5) year safety of dams inspections, and evaluations concerning dam operations.
D. Design services for rehabilitation, renovation, repair, maintenance, and new construction for civil environmental works, including wastewater (both advanced primary and secondary treatment) plants, wastewater collection, conveyance facilities, water treatment plants and potable water distribution systems. Design services shall include assessments, master planning, pre-design, conceptual, final designs, and preparation of the estimate of probable construction costs.
E. Design services for vertical and horizontal construction to include buildings that meet:
1. Current security systems/measures required under the standards set forth in the Interagency Security Committee, Physical Security Criteria for Federal Facilities, 2010 or latest edition. Examples of various measures would include: closed-circuit television (CCTV), intrusion detection systems, signage, vehicle barriers, blast resistant windows, cast in place concrete column construction, tamper proof air intakes, heating, ventilation and air conditioning (HVAC) and secure control panels, emergency generator access control, high security mechanical or electronic locks, and Homeland Security Presidential Directive 12 (HSPD-12) compliant physical access control measures.
2. The criteria as required by the U.S. Green Building Council (USGBC) to Leadership in Energy and Environmental Design (LEED) certify a building.
3. The criteria required by the Telecommunications Industry Association' (TIA) specifications on building servers or data center rooms.
4. The criteria required by National Institute of Standards and Technology (NIST) 800-53 to include physical and environmental controls for general security systems and criteria required under National Fire Protection Association (NFPA) 75, 2013 or latest edition for information technology equipment.
5. The criteria required by local, state, and federal regulatory agencies in areas of historical preservation, documentation and clearances.
F. Design services and technical support for and related to site remediation; corrective and removal action designs; design of hazardous waste containment systems; Underground Storage Tank (UST) upgrades and remediation.
G. Permitting support, including performance of additional engineering analyses, studies, computations, and preparation of applications and drawings necessary to obtain all required permits for construction and operation of proposed or constructed facilities.
H. Geotechnical services including concrete core sampling and testing; soil drilling, logging, sampling and testing; monitoring well drilling and logging; lithologic and geophysical logging; surface geophysical surveys (electromagnetic, seismic and magnetic); cone penetrometer testing; subsurface soil and groundwater investigations for determination of structural design criteria; seepage analysis, slope stability analysis, and design of de-watering and protective shoring systems.
I. Surveying, aerial photography, photogrammetry and geographic information system (GIS) database development, including both conventional and Global Positioning System (GPS), land and bathymetric surveys; easement and related field data collection; metes and bounds identification for possible property acquisition; topographic mapping (preparation of base maps from aerial photography) including Light Detecting and Ranging (LIDAR) surveys; preparation of rectified orthophotoquads; scanning, vectorization, and geo-referencing of historical maps and documents.
J. Engineering, hydraulic and hydrologic studies, including groundwater and surface water studies; flood routing studies; backwater studies; reservoir routing studies; sediment transport modeling; dam break analysis; sedimentation and scour analysis; aquifer studies, groundwater modeling, development of inundation maps, and reservoir capacity studies.
K. Design and bidding services – Preparation of construction plans, specifications, and cost estimates for all phases of design from conceptual to final in the areas of architectural, civil, structural, mechanical, electrical, safety, security, communication and instrumentation. Review and evaluation of third-party studies, reports, investigations, proposals, conceptual designs, and plans and specifications in both the English and Spanish language and Imperial and International System (SI) units. Design and bidding services may include preparation of contract solicitation documents and bid evaluation of: conventional design-bid build, design-build, design-build (construction manager at risk), design-build operation, and design-build-operate-transfer procurement actions; as well as responding to questions during bidding of projects, attending meetings, issuing addendums, preparing schedules, and maintaining files and documents and other construction related bidding procedures.
L. Construction Management (CM) Services or construction assistance services, including review of shop drawings and other construction contractor submittals; review of requests for changes and/or deviations; change order preparation and review of contractor proposals; responding to questions during construction (including request for information/requests for clarification); submittal and schedule monitoring; construction cost estimating; provision for training; preparation of the draft and final operations and maintenance manuals; preparation of staffing studies and plan of operations; performing value engineering review; utility negotiations support; review and verification of record drawings (as built); performance of inspection services; construction claim and expert witness support; and coordination support with federal, state, and local agencies, construction contractors, the public, and any other parties involved in construction process.
M. Start-up services, including preparation of staffing plans, development and implementation of training programs, quality control and safety programs; monitoring of facility start-up and operation for a specified period of time after completion of construction, including assistance for resolution of warranty items; revising the operation and maintenance manual, and certifying facility performance.
II. GENERAL REQUIREMENTS
A. Deliverables – Quantities and schedules for deliverables will be set forth in each task order. All deliverables shall be provided in the language(s) format specified in the task order (English, Spanish) and in the unit specified in the task order (SI units, Imperial units). All deliverables shall be provided in electronic format (AutoCAD, with no xreferences and no layers) and in PDF format and hard copy, reduction shall be such that all printing is legible and reproducible. Electronic format and the required number of copies will be specified in each individual task order. All deliverables for design services shall be provided in the following phases of development: 30% Preliminary, 90% Draft, 100% Pre-Final, and 100% Final.
1. Reports: All reports shall be 8.5 inch x 11 inch, typed on white bond paper, with binders or as specified in task order. All photographs shall be clear, color copies. All drawings in reports shall be 8.5 inch x 11 inch or 11 inch x 17 inch, computer generated, clear and legible or as specified in task order. Reduction shall be such that all printing is legible and reproducible. Data or report tables shall be provided in spreadsheet format (Excel 2007, latest edition, or as specified in the task order).
2. Plans: All final plans shall be computer generated (AutoCAD/AutoCAD Civil 3D 2012, latest edition or as specified in the task order), submitted as standard black and white paper, and 24 inch x 36 inch size (trim to trim, including the title block). All preliminary and draft drawings shall be submitted as standard black and white copies. The drawing will have the USIBWC title block and with lettering in Roman script. Applicable graphic symbols shall conform to the Architectural Graphic Standards. All plan drawings shall be geospatially referenced as described in the individual Task Orders.
3. Specifications:
(a) Specifications shall be prepared per Construction Specification Institute (CSI) Master Format 2012 edition, latest edition, or as specified in task order. Materials shall describe where possible, by recognized industry or technical society standards. Specifications shall be provided typed on 8.5 inch x 11-inch bond paper, and provided with an index of sections. Specifications shall be provided in MS Word 2007 or as specified in task order.
(b) The Contractor shall include specifications that permit full and open competition and may include restrictive provisions or conditions using brand name or equal descriptions only to the extent necessary to satisfy the needs of the Government when authorized by the Government. Specifications shall not be written to specify a particular brand name, product, or feature of a product, peculiar to one manufacturer unless the particular brand name, product, or feature is essential to the Government’s requirements, and other companies’ similar products would not meet the Governments’ minimum requirements for the item. Contractor shall provide in the case of brand name or equal specification at least five salient characteristics of the product. Contractor shall identify standard specifications by date of issuance.
4. Aerial Photography: All general site maps prepared from aerial photography for planning and/or inventory purposed shall be at a scale of 1:2500 or other mutually agreed upon scale, and shall have contour intervals of 0.5 meter or in Imperial units of 2 feet, or as specified by task order. All maps shall be provided on electronic media and hard copy if required. Horizontal and vertical scales shall be based upon current geodetic datum for the project area. All aerial maps shall also be provided in digital format and georeferenced when required by task order.
5. Cost Estimates: Cost estimates shall reflect current prices for labor, materials, and equipment at the proposed location of the work. The estimates shall be itemized by the major items of construction. Lump sum amounts for major items, which cannot be readily analyzed, will not be accepted. All cost estimates shall be provided in U.S. dollars and projected to mid-point of construction using current Engineering News Record Construction Cost Indexes, Consumer Price Index or other indices appropriate for the location in which the project is to be constructed. Contractor shall provide all sources used for preparing cost estimates such as RSMeans. Cost estimates utilizing Mexican economy may be required. Construction cost estimates will be utilized in preparing Government estimates for evaluating bids and as such will become confidential material for official use only. Such material shall not be divulged to anyone other than the Contracting Officer (CO) or his/her representative.
6. Forecast costs: Forecast cost estimating, for five year planning or as specified in task order, shall be itemized in the same format as Cost Estimates. Forecasts shall include the projected increase or decrease in costs, per year, should construction bidding and contracting be delayed.
7. Geographic Information Systems (GIS): Infrastructure data, hydrologic, hydraulic, environmental, geotechnical, terrain and topography, survey data, and other pertinent data shall be entered into a GIS geodatabase in ESRI (typically v10.0 or higher) ArcGIS format or other mutually agreed upon format as described by task order. Geospatial data delivered must have complete metadata that meets or exceeds the minimum content required by either the Federal Geographic Data Committee’s Content Standard for Digital Spatial Metadata (FGDC CDSDGm) or the North American Profile of ISO 19115 2003 Standard or as specified in task order.
8. Photographs:
(a) Unless otherwise stated, the Contractor shall provide all photographs requested under task orders to the Government in digital camera format. Photographs shall be clear, in color and of at least eight (8) megapixel resolution. The Contractor shall submit an electronic copy of all photographs in an electronic format and a hard copy in report format (Section II.A.1). The CD will contain a text file to identify each photograph as described below in paragraph b.
(b) Each photograph shall be identified by a photo number, project name, date, and time of photograph, location of photographer, orientation and description of photograph. The above captioned information shall be labeled below each photograph in the report.
B. Standards – All designs, drawings, and specifications shall be prepared in accordance with applicable codes and regulations applicable to the country and state in which the project will be developed and shall conform to sound engineering practices. All criteria, factors, assumptions and codes upon which the design is based are to be provided as well as the justification for the selection of these criteria.
C. Project Manager – The Contractor shall appoint a project coordinator or manager and alternate to serve as a single point of contact and liaison between the Contractor and the CO and/or their representative for the services required under the contract. The project manager shall be responsible for the coordination of the services provided under the contract and shall respond to questions regarding clarification of project deliverables during controls and review procedures to minimize conflicting errors and omissions and provide for the technical adequacy of design information.
D. Meetings – Progress and review meetings shall be held at a mutually agreed upon location for discussion of questions and problems relating to the work under the contract. Attendees shall be key players for the task order in question, if the assigned expert is not available then an expert with equal qualifications may be substituted.
E. Monthly Updates – The Contractor shall submit a monthly update report for each individual task order to include updated schedule on or before the 3rd of each month. The update will be submitted to the CO and respective Contracting Officer Representative (COR) and shall address the following per project/task order: Major Accomplishments, Significant Problems and Proposed Solutions, Issues with Contractual Requirements, Issues with Meeting the Task Order Deliverable Dates/Delays, and Contractor’s Proposed Action to Remediate the Delays, if applicable. The report may be submitted by email.
F. Coordination – When directed by the CO, the Contractor shall be required to coordinate with other consultants involved with specific design aspects of projects being developed under separate contracts.
G. Value Engineering (VE) – The Contractor shall cooperate with an “outside” (i.e., a third party) VE consultant when directed by the CO. This may require the Contractor to respond to VE recommendations and incorporated recommendations of the VE consultants into the design. If the Contractor is required to incorporate VE changes to the design documents, this work may be included by a modification to the task order if so determined by the CO.
H. Permits – Should it become necessary to secure the right of ingress and egress to perform any of the work on properties not owned or controlled by the Government, all necessary permits, licenses and approvals from all local, state/federal authorities shall be obtained as necessary for the performance of the services. The Contractor shall secure the consent of the owner prior to entry on such property. In the event the owner requires the payment of a fee for a license to enter upon and/or use of such property, the Contractor, when so directed by the CO, shall pay such fee and obtain a receipt. The Contractor, upon submission of such receipt, shall be reimbursed for the full amount thereof in accordance with the terms and conditions of this contract.
I. Re-submittal – In the event that documents submitted for review, as describe above, are deficient or incomplete as specifically defined in the task order for a particular stage of completion, the Contractor shall correct the deficiencies and resubmit the documents. No partial re-submittals will be permitted. The Contractor shall assume all costs due to the re-submittal of documents.
J. Work Plan – When required by a specific task order, the Contractor shall submit a Work Plan (WP). The WP shall describe the detailed approach for the performance of the task order, based upon the Government’s Scope of Work. At minimum, the WP shall contain the following elements:
1. Introduction: A general explanation documenting the task and goals.
2. Work Plan Approach: Explanation of how the activities will satisfy the requirements.
3. Key Personnel: Identification of key personnel to be used on the project and their responsibilities.
4. Quality Control: A description of the quality control organization, including a chart showing lines of authority and acknowledgement that the quality control plan shall be implemented for all aspect of the work specified in the task order.
5. Schedule: An overall schedule for the execution of the work required by the task order shall be included in the WP. The schedule shall identify major project phases (environmental, planning, design, and construction and shall be prepared using the Critical Path Method (Microsoft Project 2010, latest edition, or as specified in task order).
(END OF SOW)