attachment-IBM10B0003 1 addl questions_Canutillo.pdf
PDF 9 KB Posted
- Attached to
- RECOVERY-Canutillo Phase I Levee Improvements Federal contract opportunity
- Solicitation number
- IBM10B0003
About this file
Attachment to amendment A002 IBM10B0003 Canutillo
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Canutillo Abstract Spreadsheet 12-22-09 pg 1.xls | XLS spreadsheet | |
| Amend A002-IBM10B0003_Canutillo.pdf | ||
| attachment-IBM10B0003 questions Canutillo.pdf | ||
| attachment-IBM10003 Summary of Specs sections Plan sheets_1.pdf | ||
| attachment-IBM10B0003 1-130 questions Canutillo.pdf | ||
| Canutillo Bidder Questions_1_15.pdf | ||
| IBM10B0003 Plan Holder List.pdf | ||
| IBM10B0003 A001.pdf | ||
| contract questions.doc | DOC document | |
| FINALSPECPDF.pdf | ||
| nm wage det.pdf | ||
| sf28.pdf | ||
| IBM10B0003.pdf | ||
| IBWC 116.pdf | ||
| tx wage det.pdf | ||
| IBWC 117.pdf | ||
| sf24_f.pdf | ||
| IBWC 110.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BIDDER QUESTIONS SUMMARY
Project: Rehabilitation of Improvements for the Rio Grande Canalization Protective Levee System
River Segment Upper Rio Grande By:
Task Order: IBM09T0030 S&B Infrastructure, Ltd.
Client: IBWC Combined Bidders Questions Hatch, Canutillo & Mesilla Date: 12/11/2009
Ite m
N o.
B id
P kg
Date Contractor Contractor Comment Agree (Y/N) S&B Response Comments Respon der
All three Hatch, Canutillo , Mesilla
12/10/09 Skanska USA Civil West RMD
This message is sent regarding the Specification 60 69 00, Sluice Gate Maintenance, in the above-referenced projects. We have the following concerns:It seems that the existing gates on these projects are from different manufacturers. We will require a list of the manufacturer of each gate to know who to contact. Coordinating with suppliers is the responsibility of the Contractor
All three Hatch, Canutillo , Mesilla
12/10/09 Skanska USA Civil West RMD
It is difficult at this time to determine the condition and the scope of the maintenance required at each individual gate. We request that the specification describe exactly what the Government wants done to each gate to be able to have the manufacturers give us a price for the work.
It is unclear about whether this is in refernce to vehicular gates or hydro gates. In each case, the Contractor is responsible for contructing the gates to the final specification and verifying the condition of the gates prior to construction.
All three Hatch, Canutillo , Mesilla
12/10/09 Skanska USA Civil West RMD
In lieu of the above information, we believe it would be better if this work be handled as an allowance. Please let us know if this is something the Government would consider. IBWC is responsible for this decision
File details come from the government source that posted it. Updated .