I.G. PWS N6660424Q0306.pdf

PDF 148 KB Posted

Attached to
RESEARCH PROJECT PHYSICS OF HIGH SPEED WATER ENTRY
Solicitation number
N6660424Q0306
Issued by

About this file

This document is a Performance Work Statement (PWS) for a federal contract opportunity related to a research project investigating the physics of high-speed water entry. The Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) is seeking a contractor with unique subject matter expertise and facilities to design, fabricate, and deliver a custom apparatus for performing cavity pressure measurements in the wake of a spherical body entering the water under various conditions. The contractor will use this apparatus to collect experimental data, including pressure measurements and high-speed imaging, which will be delivered to the government. The contract is a firm-fixed-price with a period of performance from April 2024 to April 2025. The solicitation is being issued as an unrestricted commercial item acquisition with a lowest price, technically acceptable evaluation. Interested offerors must submit a proposal by April 4, 2023 and demonstrate their subject matter expertise through a record of relevant peer-reviewed publications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

v3.5_December2023

STATEMENT OF WORK (SOW)/PERFORMANCE WORK STATEMENT (PWS)

AFRL Cavity Measurements

1.0 Background

Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT), Code 85 is being funded by the Air Force Research Lab (AFRL) to execute a 6.1 basic research project investigating the physics of high-speed water entry. One sub-task of this effort involves measurement of the cavity physics of canonical body water entry. The prospective Contractor must possess unique subject matter expertise (SME) and facilities to perform such cavity physics experimental measurements. Subject matter expertise must be demonstrated through a historical record of peer-reviewed journal articles on the topics of water entry and cavitation.

1.1 Places of Performance

The experimental apparatus will be designed and fabricated at the Contractor’s Facility and

NUWC Division Newport, Newport, RI. The Government estimates one trip to Newport, RI will be required for testing.

1.2 Authorized Users

Code 85

1.3 Sponsors

Air Force Research Lab.

1.4 Types of Funding

Research Development Test and Evaluation (RDT&E)

2.0 Scope

The Contractor will design, fabricate, and deliver a custom apparatus for performing cavity pressure measurements in the wake of a spherical body entering the water in atmospheric and reduced ambient pressure conditions. The Contractor will use said apparatus to perform measurements under a range of input parameters.

3.0 RESERVED

4.0 Technical Requirements

4.1 Experimental apparatus design & fabrication

The contractor shall:

4.1.1 Propose an experimental apparatus design schematic to perform cavity pressure measurements in the wake of a spherical body entering the water. The design shall include an instrumentation parts list. The experimental apparatus will be delivered to

Newport, RI 02841 upon completion.

Deliverable: CDRL A001 – Presentation Material - Experimental Design Review.

4.1.2 Fabricate and/or assemble the experimental apparatus and demonstrate functionality with preliminary water entry testing under conditions to be chosen by the contractor. The water entry test conditions shall have a sphere impact speed of at least U = 20 m/s.

Deliverable: CDRL A002 – Test Report - Preliminary Data and Technical Brief.

4.2 Generation of experimental data set

The contractor shall:

4.2.1 Propose an experimental test matrix with variations in sphere radius and impact speed.

Matrix shall include any raw high speed video, hydrophone and pressure sensor data. The test matrix is subject to approval by NUWC prior to execution of testing.

Deliverable: CDRL A003 – Technical Report – Raw Data.

4.2.2 Perform experiments in accordance with the conditions in the approved test matrix.

Experimental data to be collected shall include pressure measurements in the cavity formed in the wake of spheres entering the water, and high speed imaging of the same.

Deliverable: CDRL A004 – Test Report

5.0 Progress Reports

The Contractor shall communicate progress to the Government in the form of phone conversations, e-mails, and test reports.

5.1 Bi-weekly progress update

The Contractor and NUWC shall discuss progress on a bi-weekly basis.

6.0 RESERVED

7.0 RESERVED

8.0 RESERVED

9.0 Information and Communication Technology (ICT) Accessibility Requirements

The Government has determined that this procurement is not Information and Communication

Technology (ICT).

10.0 Security Compliance

10.1 Program Protection

SECURITY: All Contractor personnel shall adhere to the Security provisions of 32 CFR Part 117

– National Industrial Security Program Operating Manual (NISPOM) and the security requirements of the attached DD254. While performing work associated with NUWCDIVNPT, Contractor personnel shall comply with the NUWCDIVNPT Security Manual and, if at another facility, the security regulations of the host facility. Applicable FAR, DFARS, NMCARS clauses, and NAVSEA text shall be adhered to in the performance of this contract. Security incidents shall be promptly reported through the companies Facility Security Officer (FSO), to the Contracting Officer’s Representative (COR), Technical Point of Contact (TPOC), and the

Cognizant Security Office to NUWCDIVNPT Security.

Controlled Unclassified Information (CUI) including Legacy FOUO and Covered Defense

Information (meeting the definition of 48 CFR 252.204–7012(a)) generated and/or provided under this contract shall be marked and safeguarded as specified in DoD Instruction 5200.48, CUI available at:

https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/520048p.PDF. Any product containing Covered Defense Information shall be assigned a distribution statement (distribution statements B through F) in accordance with DoDI 5230.24 (Distribution Statements on Technical

Documents); and DoDI 5230.24, Enclosure 3 Procedures, available at https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/523024p.pdf

INFORMATION SECURITY: If the work is performed at the Contractor's facility, the

Contractor shall implement and maintain security procedures and controls to prevent unauthorized disclosure of classified information and controlled unclassified information (CUI) and to control distribution of CUI in accordance with National Industrial Security Program

Operating Manual (NISPOM) codifying 32 CFR Part 117, NISPOM Rule, and SECNAV M-

5510.36B. If the work is performed at the Government's facility, the Contractor shall comply with facility policy.

CUI INCIDENT REPORTING AND RESPONSE: The Contractor shall promptly report any unauthorized, inadvertent, or illegal release or disclosure of CUI to the Contracting Officer’s

Representative / Technical Point of Contact (TPOC), Procuring Contracting Officer, and the

Security Office. Contractor personnel shall coordinate this effort through the relevant industry site FSO.

PUBLIC RELEASE: Any controlled unclassified information pertaining to this contract shall not be released for public dissemination, including posting to any social media sites such as

Facebook or Twitter, unless it has been approved for public release by appropriate U.S.

Government authority. Proposed public releases shall be submitted for approval prior to release through Commander, Naval Undersea Warfare Center, Division Newport, Newport, RI 02841.

10.2 Operations Security (OPSEC)

OPSEC is a process that identifies critical information to determine if friendly actions can be observed by adversary intelligence systems, determines if information obtained by adversaries could be interpreted to be useful to them, and then executes selected measures that eliminate or reduce adversary exploitation of friendly critical information.

The Contractor shall develop and implement, and update and maintain an OPSEC program to protect controlled unclassified and classified activities, information, equipment, and material used or developed by the Contractor and any subcontractor during performance of the contract.

The Contractor shall be responsible for the subcontractor implementation of the OPSEC requirements. The Contractor developed OPSEC program may include Information Assurance and Communications Security (COMSEC). The OPSEC program shall be in accordance with

National Security Decision Directive (NSDD) 298, and at a minimum shall include:

1) Assignment of responsibility for OPSEC direction and implementation.

2) Issuance of procedures and planning guidance for the use of OPSEC techniques to identify vulnerabilities and apply applicable countermeasures.

3) Establishment of OPSEC education and awareness training.

4) Provisions for management, annual review, and evaluation of OPSEC programs.

5) Flow down of OPSEC requirements to subcontractors when applicable.

While performing aboard NUWC or NUWC sites, the contractor shall: comply with all OPSEC instructions and policies detailed in the NUWCDIVNPT Security Manual; Include OPSEC as part of its ongoing security awareness program and take all required Agency training;

Be responsive to the Supporting OPSEC Manager on a non-interference basis; and Protect sensitive unclassified information and activities, which could compromise classified information or operations, or degrade the planning and execution of operations performed by the Requiring

Organization and contractor in support of the mission.

File details come from the government source that posted it. Updated .