HW DUIS.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
SIUSLAW NATIONAL FOREST MEADOW HANDWORK RFQ
Solicitation number
12363N23Q4157
Issued by

View the file

Other files

File Type Posted
Meadow Handwork Maps Hebo.zip ZIP file
SNF Meadow Handwork RFQ 12363N23Q157.pdf PDF
FY23 Meadow Handwork SOW.pdf PDF
Meadow Handwork Maps CCRD.zip ZIP file
WD 1977-0079.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Handwork
Hebo RD (Sarah Kaufman)
Item NumberProject SiteAcresTreatment Timing*Daily Timing RestrictionsRemarks
1.1Cedar Alder0.25All work must be completed within one day, or else work must be delayed until after August 5YesMeadow is off the south side of Forest road 1400. It will be west of the 1400 and 1491 intersection. Park at approximately Latt 45.2259, Long -123.8296 and walk about 0.1 mile along old trail to meadow at approximately Latt 45.2253, Long -123.8276.
1.2Cedar North0.25All work must be completed within one day, or else work must be delayed until after August 5YesMeadow is off the south side of Forest road 1430. It will be east of the 1430 and 1430-116 intersection. Meadow is at approximately Latt 45.2078, Long -123.8150.
1.3Cedar Pollard North0.6All work must be completed within one day, or else work must be delayed until after August 5YesMeadow is off the East side of Forest road 1432. South of the 1400 and 1432 intersection. North of the 1432 and 1432-111 Intersection. Park at approximately Latt 45.2194, Long -123.7874 and walk along old trail about 500ft to meadow at approximately Latt 45.2206, Long -123.7848.
1.4Wildcat West2.7All work must be completed within one day, or else work must be delayed until after August 5YesAccess to meadow by trail. Trail is off of Forest road 1432 spur 111. Park at approximately Latt 45.3310, Long -123.7973 and walk about 0.2 mile to meadow at approximately Latt 45.3333, Long -123.7954.
1.5Herbst Place3.5All work must be completed within one day, or else work must be delayed until after August 5YesAcess to meadow by closed road. Park on Forest road 1500 spur 111 and walk closed 143 spur to meadow. Park at approximately Latt 45.1932, Long -123.8481 and walk about 0.25 miles to meadow at approximately Latt 45.1907, Long -123.8462.
1.6Farmer West1.2All work must be completed within one day, or else work must be delayed until after August 5YesAccess is a short walk from Forest road 1024. Park at approximately Latt 45.24851, Long -123.89017 and walk 0.3 mile to meadow at approximately Latt 45.25055, Long -123.89265.
1.7Clarence Creek6.5All work must be completed within one day, or else work must be delayed until after August 5YesAccess is of Forest road 8376. Six part meadow all within 0.15 mile of road. Multiple sites to park on road within view of meadow, one such turnout at Latt 45.2900, Long -123.6312.
1.8Tony Creek18.2August 6 - September 15YesAccess to meadow by trail. Drive road 8590 and park on unamed spur at approximately Latt 45.2597, Long -123.7716. Walk elk trail about 0.15 miles to meadow at approximately Latt 45.2584, Long -123.7733. Nine part meadow all along the creek.
1.9Battle Lake0.2August 6 - September 15NoMeadow is off of Forest Road 8172-117 spur. Park at Latt 45.31760, Long -123.76820. This is a Walk In meadow that is approx. 1/4 mile from vehicle access. Follow the decommissioned road to the meadow at approximately Latt 45.3171, Long -123.7633.
TOTAL33.4
Central Coast RD (Kate Cronin)
Item NumberProject SiteAcresTreatment Timing*Daily Timing RestrictionsRemarks
2Brown's Homestead7August 6 - September 15YesWalk in access off 3100 rd. ~0.25 mile
2.1Gopher3August 6 - September 15YesWalk in access off 3125 rd. Small stream crossing
2.2Statler2August 6 - September 15NoFrom North Fork Rd., meadow is off road 739. Vehicle access down spur road. Remove all scotch broom and conifer seedlings. Remove scotch broom by handpulling or using a weed wrench, do not cut.
2.3Agate North3June 1-June 25NoAccess from private property on 101. Cut all enchroaching vegetation.
2.4Agate South2June 1-June 25NoAccess from private property on 101. Cut all blackberry and remove weeds from the raised bed area.
2.5Bray's point5June 1-June 25NoAccess from private property on 101. Walk in .10 mi brush trail for access, remove small conifers, cotoneaster, holly, bracken fern, scotch broom and blackberry throughout meadow. Remove holly and scotch broom by hand pulling or using a weed wrench, do not cut. Remove from meadow. Cut cotoneaster beneath the lowest branch and remove from meadow. Avoid no work zones.
TOTAL22
* All units labeled as "Yes" for Daily Timing Restrictions indicates that work must occur 2 hours AFTER sunrise and must be completed by 2 hours BEFORE Sunset

File details come from the government source that posted it. Updated .