HTUV152005 Specifications - Vol 1 - 07092020.pdf

PDF 15 MB Posted

Attached to
Construct/Renovate Flight Operations Building
Solicitation number
W50S9G-21-R-0001
Issued by

About this file

This document is a sources sought notice for market research regarding a potential small business set-aside construction contract. The Air Force is seeking information from potential offerors to construct and renovate a Flight Operations Building at the 128th Air Refueling Wing in Milwaukee, Wisconsin. The estimated value of the firm-fixed price contract is between $10 million and $25 million, with a period of performance of 730 days from notice to proceed and a required completion date of September 30, 2021. Responses are requested by November 19, 2020 regarding offerors' capabilities, interest, bonding capacity, and socioeconomic status. The NAICS code is 236220 for commercial and institutional building construction with a size standard of $36.5 million.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

RENOVATE BUILDING 522

B-3 FINAL DESIGN SUBMITTAL

128th AIR REFUELING WING

GENERAL MITCHELL INTERNATIONAL AIRPORT

AIR NATIONAL GUARD BASE

MILWAUKEE, WISCONSIN

W9133L-16-D-0009 W912J218F5008

PROJECT No. HTUV152005

07-09-2020

VOLUME 1 OF 2

AECOM

277 WEST NATIONWIDE BLVD., 5TH FLOOR, COLUMBUS, OHIO 43215-2566

T 614-464-4500 F 614-464-0588

128th Air Refueling Wing, General Mitchell International Airport Air National Guard Base, Milwaukee, Wisconsin

P.O. No. W9133L-16-D-0009 Order No. W912J218F5008

AECOM No. 60580469

B-3 Final Design Submittal

Section TOC Table of Contents

Project No. HTUV152005

07-09-2020

TABLE OF CONTENTS

VOLUME 1

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

Section 00 0107 - Seals Page Section 00 3119 - Existing Condition Information Section 00 3126 - Existing Hazardous Material Information Attachment: B522 Asbestos Management Plan Section 00 4323 - Alternates Form

DIVISION 01 - GENERAL REQUIREMENTS

Section 01 1000 – Summary Attachment: Contractor Security and Access Program Section 01 2100 - Allowances Section 01 2300 - Alternates Section 01 2500 - Substitution Procedures Section 01 2600 - Contract Modification Procedures Section 01 3100 - Project Management and Coordination Section 01 3200 - Construction Progress Documentation Section 01 3233 - Photographic Documentation Section 01 3300 - Submittal Procedures Attachment: Submittal Report Section 01 3516 - Alteration Project Procedures Section 01 4000 - Quality Requirements Section 01 4200 - References Section 01 5000 - Temporary Facilities and Controls Section 01 6000 - Product Requirements Section 01 7300 - Execution Section 01 7419 - Construction Waste Management and Disposal Attachments:

07 7419.10 – Form CWM-1 07 7419.20 – Form CWM-2 07 7419.30 – Form CWM-3 07 7419.40 – Form CWM-4 07 7419.50 – Form CWM-5 07 7419.60 – Form CWM-6 07 7419.70 – Form CWM-7 07 7419.80 – Form CWM-8 Section 01 7700 - Closeout Procedures Section 01 7823 - Operation and Maintenance Data Section 01 7839 - Project Record Documents Section 01 7900 - Demonstration and Training Section 01 9113 - General Commissioning Requirements

DIVISION 02 - EXISTING CONDITIONS

Section 02 4119 - Selective Demolition Section 02 8200 - Asbestos Remediation

DIVISION 03 - CONCRETE

Section 03 2000 - Concrete Reinforcing Section 03 3000 - Cast-In-Place Concrete

Section TOC Table of Contents

Project No. HTUV152005

DIVISION 04 - MASONRY

Section 04 2200 - Concrete Unit Masonry

DIVISION 05 - METALS

Section 05 1200 - Structural Steel Framing Section 05 3100 - Steel Decking Section 05 4000 - Cold-Formed Metal Framing Section 05 4400 - Cold-Formed Metal Trusses Section 05 5000 - Metal Fabrications Section 05 5113 - Metal Pan Stairs Section 05 5213 - Pipe and Tube Railings Section 05 5313 - Bar Gratings

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

Section 06 1000 - Rough Carpentry Section 06 1600 - Sheathing Section 06 4116 - Plastic-Laminate-Clad Architectural Cabinets

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

Section 07 2100 - Thermal Insulation Section 07 4113.16 - Standing-Seam Metal Roof Panels Section 07 4213.13 - Formed Metal Wall Panels Section 07 5323 - EPDM Roofing Section 07 6200 - Sheet Metal Flashing and Trim Section 07 7100 - Roof Specialties Section 07 7200 - Roof Accessories Section 07 7253 - Snow Guards Section 07 8413 - Penetration Firestopping Section 07 9200 - Joint Sealants

DIVISION 08 - OPENINGS

Section 08 1113 - Hollow Metal Doors and Frames Section 08 3113 - Access Doors and Frames Section 08 3473.13 - Metal Sound Control Door Assemblies Section 08 4113 - Aluminum-Framed Entrances and Storefronts Section 08 7100 - Door Hardware Section 08 7100.10 - Door Hardware Schedule Section 08 7113 - Automatic Door Operators (Alternate Only) Section 08 8000 - Glazing Section 08 8114 - Fragment Retention Glazing Film Section 08 9119 - Fixed Louvers

DIVISION 09 - FINISHES

Section 09 2116.23 - Gypsum Board Shaft Wall Assemblies Section 09 2216 - Non-Structural Metal Framing Section 09 2900 - Gypsum Board Section 09 3013 - Ceramic Tiling Section 09 5113 - Acoustical Panel Ceilings Section 09 5424 - Linear Wood Ceiling System Section 09 6513 - Resilient Base and Accessories Section 09 6519 - Resilient Tile Flooring Section 09 6813 - Tile Carpeting Section 09 7733 - Glass Fiber Reinforced Panels Section 09 9113 - Exterior Painting Section 09 9123 - Interior Painting

Section TOC Table of Contents

Project No. HTUV152005

RENOVATE BUILDING 522

Section 09 9600 - High-Performance Coatings

DIVISION 10 - SPECIALTIES

Section 10 1423.16 - Room-Identification Panel Signage Section 10 2113.19 - Plastic Toilet Compartments Section 10 2239 - Folding Panel Partitions Section 10 2800 - Toilet, Bath, and Laundry Accessories Section 10 4413 - Fire Protection Cabinets Section 10 4416 - Fire Extinguishers Section 10 5113 - Metal Lockers

DIVISION 11 - EQUIPMENT

Section 11 1319 - Stationary Loading Dock Equipment

DIVISION 12 - FURNISHINGS

Section 12 2113 - Louver Blinds Section 12 3661 - Solid Surface Wall Panels Section 12 3661.16 - Solid Surfacing Countertops

DIVISION 13 - SPECIAL CONSTRUCTION

Not Applicable

DIVISION 14 - CONVEYING EQUIPMENT

Section 14 4200 - Wheelchair Lifts

DIVISION 21 - FIRE SUPPRESSION

Section 21 0517 - Sleeves and Sleeve Seals for Fire-Suppression Piping Section 21 0518 - Escutcheons for Fire-Suppression Piping Section 21 0523 - General-Duty Valves for Fire Protection Piping Section 21 0529 - Hangers and Supports for Fire Suppression Piping and Equipment Section 21 0553 - Identification for Fire-Suppression Piping and Equipment Section 21 0800 - Commissioning of Fire Suppression Section 21 1100 - Facility Fire-Suppression Water-Service Piping Section 21 1116 - Facility Fire Hydrants Section 21 1119 - Fire Department Connections Section 21 1313 - Wet-Pipe Sprinkler Systems

DIVISION 22 - PLUMBING

Section 22 0501 - Common Work Results for Plumbing Section 22 0513 - Common Motor Requirements for Plumbing Equipment Section 22 0519 - Meters and Gauges for Plumbing Piping Section 22 0523 - General-Duty Valves for Plumbing Piping Section 22 0529 - Hangers and Supports for Plumbing Piping and Equipment Section 22 0548 - Vibration Controls for Plumbing Piping and Equipment Section 22 0553 - Identification for Plumbing Piping and Equipment Section 22 0561 - Preparation of Plumbing Systems Section 22 0593 - Plumbing Systems Testing, Adjusting, and Balancing Section 22 0700 - Plumbing Insulation Section 22 1116 - Domestic Water Piping Section 22 1316 - Building Sanitary Section 22 1330 - Duplex Sewage Ejector and Sump Pump Section 22 2000 - Facility Natural Gas System Section 22 3300 - Domestic Water Heaters Section 22 4000 - Plumbing Fixtures

Section TOC Table of Contents

Project No. HTUV152005

VOLUME 2

DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

Section 23 0500 - General Mechanical Requirements Section 23 0510 - Mechanical Demolition & Salvage Section 23 0519 - Meters and Gauges for HVAC Piping Section 23 0523 - Valves for HVAC Piping Section 23 0529 - Hangers, Sleeves, and Supports Section 23 0548 - Vibration Control for HVAC Piping and Equipment Section 23 0553 - Identification for HVAC Piping and Equipment Section 23 0593 - Mechanical Systems Testing, Adjusting, and Balancing Section 23 0700 - HVAC Insulation Section 23 0800 - Mechanical Systems Commissioning Requirements Section 23 0900 - HVAC Instrumentation and Control Section 23 2113 - Hydronic Piping Section 23 2116 - Hydronic Specialties Section 23 2123 - Hydronic Pumps Section 23 2300 - Refrigerant Piping Section 23 2500 - HVAC Water Treatment Section 23 3000 - Ductwork and Accessories Section 23 3400 - Exhaust and Ventilating Fans Section 23 3401 - Kitchen Hood Exhaust System Section 23 3616 - Terminal Boxes - DDC Control Section 23 5216 - Fire-Tube Condensing Boilers Section 23 7415 - Packaged Gas Heating and Electric Cooling Units Section 23 8123 - Computer Room Air-Conditioning Units Section 23 8126 - Ductless Split System Units Section 23 8223 - Cabinet-Type Unit Heaters Section 23 8236 - Perimeter Heat Section 23 8240 - Propeller Unit Heaters

DIVISION 25 - INTEGRATED AUTOMATION

DIVISION 26 - ELECTRICAL

Section 26 0505 - Basic Electrical Requirements Section 26 0519 - Low-Voltage Electrical Power Conductors and Cables Section 26 0523 - Control-Voltage Electrical Power Cables Section 26 0526 - Grounding and Bonding for Electrical Systems Section 26 0529 - Hangers and Supports for Electrical Systems Section 26 0533 - Raceways and Boxes for Electrical Systems Section 26 0543 - Underground Ducts and Raceways for Electrical Systems Section 26 0544 - Sleeves and Sleeve Seals for Electrical Raceways and Cabling Section 26 0553 - Identification for Electrical Systems Section 26 0573.13 - Short Circuit Studies Section 26 0573.16 - Coordination Studies Section 26 0913 - Electrical Power Monitoring and Control Section 26 0923 - Lighting Control Devices Section 26 0936 - Modular Dimming Controls Section 26 2213 - Low-Voltage Distribution Transformers Section 26 2300 - Low-Voltage Switchgear Section 26 2313 - Paralleling Low-Voltage Switchgear Section 26 2413 - Switchboards Section 26 2416 - Panelboards Section 26 2726 - Wiring Devices Section 26 2816 - Enclosed Switches and Circuit Breakers

Section TOC Table of Contents

Project No. HTUV152005

Section 26 3213.19 - Multi-Fuel Emergency Engine Generators Section 26 3323.11 - Central Battery Equipment for Emergency Lighting Section 26 3600 - Transfer Switches Section 26 4113 - Lightning Protection for Structures Section 26 4313 - Surge Protection for Low-Voltage Electrical Power Circuits Section 26 5119 - Led Interior Lighting Section 26 5213 - Emergency and Exit Lighting Section 26 5619 - Led Exterior Lighting

DIVISION 27 - COMMUNICATIONS

Section 27 0526 - Grounding and Bonding for Communications Systems Section 27 0528 - Pathways for Communications Systems Section 27 0529 - Hangers and Supports for Communications Systems Section 27 0536 - Cable Trays for Communications Systems Section 27 0543 - Underground Pathways and Structures for Communication Systems Section 27 0544 - Sleeves and Sleeve Seals for Communications Pathways and Cabling Section 27 0553 - Identification for Communications Systems Section 27 1100 - Communications Equipment Room Fittings Section 27 1116 - Communications Racks, Frames, and Enclosures Section 27 1313 - Communications Copper Backbone Cabling Section 27 1323 - Communications Optical Fiber Backbone Cabling Section 27 1333 - Communications Coaxial Backbone Cabling Section 27 1513 - Communications Copper Horizontal Cabling Section 27 1523 - Communications Optical Fiber Horizontal Cabling Section 27 1533 - Communications Coaxial Horizontal Cabling

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

Section 28 1300 - Access Control Software and Database Management Section 28 1500 - Access Control Hardware Devices Section 28 2000 - Video Surveillance Section 28 3100 - Intrusion Detection Section 28 4621.11 - Addressable Fire-Alarm Systems

DIVISION 31 - EARTHWORK

Section 31 1000 - Site Clearing Section 31 2000 - Earth Moving

DIVISION 32 - EXTERIOR IMPROVEMENTS

Section 32 1000 - Paving Base Paving Backfill Curbs Gutters and Sidewalks Section 32 3113 - Chain Link Fences and Gates Section 32 9200 - Turf and Grasses

DIVISIONS 33 - 48

END OF TABLE OF CONTENTS

Section 00 0107

SEALS PAGE

Project No. HTUV152005

RENOVATE BUILDING 522

07-09-2020

DOCUMENT 00 0107

SEALS PAGE

PART 1 - GENERAL

1.01 DESIGN PROFESSIONALS OF RECORD

A. Architect

1. Stephen F. Stika

2. AR 1917651

B. Civil Engineer:

1. John R. Ortli.

2. E-64641

C. Structural Engineer:

1. Timothy W. Lauth.

2. E-45934.

D. Fire-Protection Engineer:

1. Jennifer Walker.

2. 72506.

Section 00 0107

SEALS PAGE

Project No. HTUV152005

RENOVATE BUILDING 522

07-09-2020

E. Plumbing Engineer:

1. Michael A. Nickoson.

2. E-69364.

F. HVAC Engineer:

1. Zachary James Oldham.

2. 79676.

G. Electrical Engineer:

1. David M. Shook.

2. E-69236.

END OF DOCUMENT

P.O. No. W9133L-16-D-0009 Order No. W912J218F5008

AECOM No. 60580469

B-3 Final Design Submittal

Section 00 3119

EXISTING CONDITION INFORMATION

Project No. HTUV152005

RENOVATE BUILDING 522

07-09-2020

DOCUMENT 00 3119

EXISTING CONDITION INFORMATION

PART 1 - GENERAL

1.01 EXISTING CONDITION INFORMATION

A. This Document with its referenced attachments is part of the Procurement and Contracting Requirements for Project. They provide Government's information for Bidders' convenience and are intended to supplement rather than serve in lieu of the Bidders' own investigations. They are made available for Bidders' convenience and information, but are not a warranty of existing conditions. This Document and its attachments are not part of the Contract Documents.

B. Existing drawings that include information on existing conditions including previous construction at Project site are available for viewing at the office of Government.

C. Survey information that includes information on existing conditions, is available for viewing as part of Drawings.

D. Related Requirements:

1. Document 003126 "Existing Hazardous Material Information" for hazardous materials reports that are made available to bidders.

P.O. No. W9133L-16-D-0009 Order No. W912J218F5008

AECOM No. 60580469

B-3 Final Design Submittal

Section 00 3126

EXISTING HAZARDOUS MATERIAL INFORMATION

Project No. HTUV152005

RENOVATE BUILDING 522

07-09-2020

DOCUMENT 00 3126

EXISTING HAZARDOUS MATERIAL INFORMATION

PART 1 - GENERAL

1.01 EXISTING HAZARDOUS MATERIAL INFORMATION

A. This Document with its referenced attachments is part of the Procurement and Contracting Requirements for Project. They provide Government's information for Bidders' convenience and are intended to supplement rather than serve in lieu of Bidders' own investigations. They are made available for Bidders' convenience and information, but are not a warranty of existing conditions. This Document and its attachments are not part of the Contract Documents.

B. An existing asbestos report for Project, entitled "Asbestos Management Plan" prepared by Air National Guard Civil Engineering, Technical Services Center, is available for viewing as appended to this Document.

C. Related Requirements:

1. Document 00 2113: Instructions to Bidders.

2. Document 00 3119: Existing Condition Information.

3. Section 02 4119: Selective Demolition.

4. Section 02 8200: Asbestos Remediation.

B522 Design Operations Building Gen. Mitchell International Airport Air National Guard Base, Milwaukee, WI 62

A-2 Concept Submittal Revised Final Project: HTUV152005

03 April 2019

Asbestos Management Plan

Air National Guard Base, Milwaukee, WI 64

A-2 Concept Submittal Revised Final Project: HTUV152005

Air National Guard Base, Milwaukee, WI 66

A-2 Concept Submittal Revised Final

Air National Guard Base, Milwaukee, WI 68

A-2 Concept Submittal Revised Final

Air National Guard Base, Milwaukee, WI 70

A-2 Concept Submittal Revised Final

P.O. No. W9133L-16-D-0009 Order No. W912J218F5008

AECOM No. 60580469

B-3 Final Design Submittal

Section 00 4323

ALTERNATES FORM

Project No. HTUV152005

RENOVATE BUILDING 522

07-09-2020

SECTION 00 4323

ALTERNATES FORM

PART 1 - GENERAL

1.01 BID INFORMATION

A. Bidder: ____________________________________________________.

B. Prime Contract: _____________________________________________.

C. Project Name: Renovate Building 522.

D. Project Location: Milwaukee Air National Guard.

E. Government: Milwaukee Air National Guard.

1.02 BID FORM SUPPLEMENT

A. This form is required to be attached to the Bid Form.

1.03 DESCRIPTION

A. The undersigned Bidder proposes the amount below be added to or deducted from the Base Bid if particular alternates are accepted by Government. Amounts listed for each alternate include costs of related coordination, modification, or adjustment.

B. If the alternate does not affect the Contract Sum, the Bidder shall indicate "NO CHANGE."

C. If the alternate does not affect the Work of this Contract, the Bidder shall indicate "NOT APPLICABLE."

D. The Bidder shall be responsible for determining from the Contract Documents the affects of each alternate on the Contract Time and the Contract Sum.

E. Government reserves the right to accept or reject any alternate, in any order, and to award or amend the Contract accordingly within 60 days of the Notice of Award unless otherwise indicated in the Contract Documents.

F. Acceptance or non-acceptance of any alternates by the Government shall have no affect on the Contract Time unless the "Schedule of Alternates" Article below provides a formatted space for the adjustment of the Contract Time.

1.04 SCHEDULE OF ALTERNATES

A. Alternate No. 1: New Windows in New Openings:

1. ADD____ DEDUCT____ NO CHANGE____ NOT APPLICABLE____.

2. ________________________________________________ Dollars ($______________).

P.O. No. W9133L-16-D-0009 Order No. W912J218F5008

AECOM No. 60580469

B-3 Final Design Submittal

Section 00 4323

ALTERNATES FORM

Project No. HTUV152005

RENOVATE BUILDING 522

07-09-2020

3. ADD____ DEDUCT____ calendar days to adjust the Contract Time for this alternate.

B. Alternate No. 2: Viewing Platform:

1. ADD____ DEDUCT____ NO CHANGE____ NOT APPLICABLE____.

2. ________________________________________________ Dollars ($______________).

3. ADD____ DEDUCT____ calendar days to adjust the Contract Time for this alternate.

C. Alternate No. 3: Replacement of Windows in Existing Openings

1. ADD____ DEDUCT____ NO CHANGE____ NOT APPLICABLE____.

2. ________________________________________________ Dollars ($______________).

3. ADD____ DEDUCT____ calendar days to adjust the Contract Time for this alternate.

D. Alternate No. 4: Automatic Door Operator for Acoustical Door

1. ADD____ DEDUCT____ NO CHANGE____ NOT APPLICABLE____.

2. ________________________________________________ Dollars ($______________).

3. ADD____ DEDUCT____ calendar days to adjust the Contract Time for this alternate.

E. Alternate No. 5: Telecommunications Cabling

1. ADD____ DEDUCT____ NO CHANGE____ NOT APPLICABLE____.

2. ________________________________________________ Dollars ($______________).

3. ADD____ DEDUCT____ calendar days to adjust the Contract Time for this alternate.

F. Alternate No. 6: Annex Canopy

1. ADD____ DEDUCT____ NO CHANGE____ NOT APPLICABLE____.

2. ________________________________________________ Dollars ($______________).

3. ADD____ DEDUCT____ calendar days to adjust the Contract Time for this alternate.

1.05 SUBMISSION OF BID SUPPLEMENT

A. Respectfully submitted this ____ day of ____________, <Insert year>.

B. Submitted By:___________________________________(Insert name of bidding firm or corporation).

C. Authorized Signature:____________________________________(Handwritten signature).

D. Signed By:______________________________________________(Type or print name).

E. Title:___________________________________(Owner/Partner/President/Vice President).

P.O. No. W9133L-16-D-0009 Order No. W912J218F5008

AECOM No. 60580469

B-3 Final Design Submittal

Section 01 1000

SUMMARY

Project No. HTUV152005

RENOVATE BUILDING 522

07-09-2020

SECTION 01 1000

SUMMARY

PART 1 - GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.02 SUMMARY

A. Section Includes:

1. Project information.

2. Work covered by Contract Documents.

a. Including Design-Build for Communications Tower

b. Special cost breakout for Global ASNT.

3. Work performed by Government.

4. Work under Government's separate contracts.

5. Government-furnished/Contractor-installed (GFCI) products.

6. Government-furnished/Government-installed (GFGI) products.

7. Contractor's use of site and premises.

8. Coordination with occupants.

9. Work restrictions.

10. Specification and Drawing conventions.

11. Miscellaneous provisions.

B. Related Requirements:

1. Section 01 5000: Temporary Facilities and Controls,.

2. Section 01 7300: Execution.

3. Section 02 4119: Selective Demolition.

1.03 DEFINITIONS

A. Work Package: A group of specifications, drawings, and schedules prepared by the design team to describe a portion of the Project Work for pricing, permitting, and construction.

1.04 PROJECT INFORMATION

A. Project Identification: Renovate Operations Building 522 located at 1839 East Grange.

1. Project Location/Mailing Address: Department of the Air Force; Headquarters 128th Air

Refueling Wing; 128 ARW/MSC; 1685 East Grange Avenue; Milwaukee, Wisconsin 90071-3173.

B. Government Contact:

1. Government's Representative: Lt. Col. Mathew Lee; Contracting Officer; SMSgt Dionne Holloway.

C. Architect: AECOM Technical Services, Inc.

1. Architect's Representative: Mike Russell, AIA, LEED AP; Vice President, Architecture; 277 West

Nationwide Boulevard; Columbus, Ohio 43215; T +1-614-464-4500.

D. Contractor: Not Determined.

P.O. No. W9133L-16-D-0009 Order No. W912J218F5008

AECOM No. 60580469

B-3 Final Design Submittal

Section 01 1000

SUMMARY

Project No. HTUV152005

RENOVATE BUILDING 522

07-09-2020

1. Contractor Representative: TBD.

1.05 WORK COVERED BY CONTRACT DOCUMENTS

A. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following:

1. Providing of temporary office trailers for the duration of the construction activity and for 30 days beyond building occupancy.

2. Demolition of Architectural, Civil, and MEP elements as identified and necessary to allow for the shown new construction. Installation of new windows and exterior building elements, and repairs to exterior surfaces as identified. Site improvements and repairs. Construction of new walls, doors, flooring, ceiling, stairs, roofing, lifts, mechanical systems, plumbing systems, electrical systems and fire protection systems. Construction of secure environments where indicated.

3. The building is not to be LEED certified, however it is to meet the sustainable goals of the Government as outlined on the High Perfromance Sustainable Building (HPSB) Scoresheet and is to meet third party verification.

4. Relocation of existing 34-inch by 35-inch transaction window located within the Command Post Entrapment Area to the south wall of the new Security Checkpoint room.

5. Relocation of existing ice machine and water filters in Break Room.

a. Note: Government may relocate them for temporary use during construction. Contractor shall relocate to final location.

B. Type of Contract:

1. Project will be constructed under a single prime contract.

C. Salvage performed by Contractor:

1. Refer to Section 02 4119 - Selective Demolition for requirements.

D. Design-Build Communications Tower:

1. In addition to the general construction Work, the Contractor is to provide a 60-foot high

Communications Tower, including tower, foundations, antenna mounting arms and communications routing to be designed and supplied by the Tower Manufacturer, through a Design-Build process.

2. The Basis of Design Manufacturer and Supplier for this Tower is Model 60 FT. SSV by Rohn Products, LLC, P.O. Box 5999, Peoria, IL 61601.

E. Temporary trailers for relocating employees: Provide the following:

1. Temporary trailers for temporary relocation of employees shall include:

a. Minimum Trailer Width: 10 feet.

b. Trailer No. 1 to accommodate:

1) Two, 10-foot by 12-foot offices at either end.

2) Six, 3-foot by 4-foot work stations in center.

3) Lockable closet for Communications panel on wall.

4) Heating and cooling equipment necessary to maintain a uniform indoor temperature of 68 to 72 deg F (20 to 22 deg C).

5) Provide electrical power service and 120-V ac duplex receptacles, with no fewer than one receptacle on each wall within enclosed spaces and one duplex adjacent to each work station.

6) Lighting fixtures capable of maintaining average illumination of 20 fc (215 lx) at desk height.

7) No restroom facilities required.

8) One, 2'-4" table for supplies.

c. Trailer No. 2 to accommodate:

1) Divided into two separate areas with each area accommodating four, 3-foot by

4-foot work stations.

2) Lockable closet for Communications panel on wall.

P.O. No. W9133L-16-D-0009 Order No. W912J218F5008

AECOM No. 60580469

B-3 Final Design Submittal

Section 01 1000

SUMMARY

Project No. HTUV152005

RENOVATE BUILDING 522

07-09-2020

3) Heating and cooling equipment necessary to maintain a uniform indoor temperature of 68 to 72 deg F (20 to 22 deg C).

4) Provide electrical power service and 120-V ac duplex receptacles, with no fewer than one receptacle on each wall within enclosed spaces and one duplex adjacent to each work station.

5) Lighting fixtures capable of maintaining average illumination of 20 fc (215 lx) at desk height.

6) No restroom facilities required.

7) One, 2'-4" table for supplies.

d. Refer to electrical drawings for location of temporary power for these trailers.

e. Refer to communications drawings for data requirements.

F. Special Cost Breakout for Global ASNT: The Contractor shall include with their Bid a Cost Breakout for the Global ASNT. This special breakout is to be used by the Government for information purposes only and does not alter the bidding documents.

1.06 WORK PERFORMED BY GOVERNMENT

A. Cooperate fully with Government, so work may be carried out smoothly, without interfering with or delaying Work under this Contract or work by Government. Coordinate the Work of this Contract with work performed by Government.

B. Preceding Work:

1. None Anticipated.

C. Concurrent Work: Government will perform the following construction operations at Project site. Those operations will be conducted simultaneously with Work under this Contract.

1. The government will remove/salvage the following list of materials from the building. This work will occur after the temporary trailers have been installed and all employees have been relocated, and prior to start of any work by the contractor within Building 522. The contractor shall allow 15 days in the schedule from the time the trailers are occupiable to start of any work within the building. Exterior, on-site mobilization may start during this time as long as it does not impede access to the building or disrupt government work within the building. All remaining items within the building shall follow the demolition and removal requirements of the contract.

a. Furniture and equipment, as they determine fit for re-use.

b. Security systems.

c. CCTV systems.

d. Communications devices including radios and antennas.

e. Certification and inspection of critical areas of construction.

D. Retain "Subsequent Work" Paragraph below if future work to be performed by Owner depends on successful Subsequent Work: Government will perform the following additional work at site after Substantial Completion. Completion of that work will depend on successful completion of preparatory Work under this Contract.

1. Installation of furniture and equipment

2. Installation of various antenna systems

3. Installation of security systems

4. Installation of door locks.

5. Installation of CCTV systems

6. Installation of Communications cabling and devices.

7. SCIF Certification Inspections.

8. Other security infrastructure

P.O. No. W9133L-16-D-0009 Order No. W912J218F5008

AECOM No. 60580469

B-3 Final Design Submittal

Section 01 1000

SUMMARY

Project No. HTUV152005

RENOVATE BUILDING 522

07-09-2020

1.07 WORK UNDER GOVERNMENT'S SEPARATE CONTRACTS

A. Work with Separate Contractors: Cooperate fully with Government's separate contractors, so work on those contracts may be carried out smoothly, without interfering with or delaying Work under this Contract or other contracts. Coordinate the Work of this Contract with work performed under Government's separate contracts.

B. Preceding Work: Government has awarded or will award separate contract(s) for the following construction operations at Project site. Those operations may be substantially complete or may be partially conducted simultaneously with Work under this Contract.

1. Artwork and Memorabilia removal: Contractor: TBD. This contractor will remove all Artwork and

Memorabilia as determined needing special care by the government. This includes, but is not limited to:

2. The suspended model plane in the front stair.

3. The large canvas artwork in the Briefing Room.

4. Framed photographs and memorabilia throughout.

5. Miscellaneous items in display cases throughout.

C. Concurrent Work:

1. None anticipated at this time.

D. Subsequent Work: Government will award separate contract(s) for the following additional work to be performed at site following Substantial Completion. Completion of that work will depend on successful completion of preparatory Work under this Contract.

1. Some or all of the items listed in Section 1.06D above may be completed by separate government contractors in lieu of by the government directly

2. Artwork re-installation: Contractor: TBD. This contractor will install the Artwork and Memorabilia noted below.

a. The suspended plane in the front stair.

b. The large canvas artwork in the Main Briefing Room.

E. Future Work Not Part of this Contract: The Contract Documents include requirements that will allow Government to carry out future work following completion of this Project; provide for the following future work:

1. Some or all of the items listed in Section 1.06D above may be completed by separate government contract following the completion of this contract in lieu of by the government directly.

1.08 GOVERNMENT-FURNISHED/CONTRACTOR-INSTALLED (GFCI) PRODUCTS

A. Government's Responsibilities: Government will furnish products indicated and perform the following, as applicable:

1. Provide to Contractor Government-reviewed Product Data, Shop Drawings, and Samples.

2. Provide for delivery of Government-furnished products to Project site.

3. Upon delivery, inspect, with Contractor present, delivered items.

a. If Government-furnished products are damaged, defective, or missing, arrange for replacement.

4. Obtain manufacturer's inspections, service, and warranties.

5. Inform Contractor of earliest available delivery date for Government-furnished products.

B. Contractor's Responsibilities: The Work includes the following, as applicable:

1. Designate delivery dates of Government-furnished products in Contractor's construction schedule, utilizing Government-furnished earliest available delivery dates.

2. Review Government-reviewed Product Data, Shop Drawings, and Samples, noting discrepancies and other issues in providing for Government-furnished products in the Work.

3. Receive, unload, handle, store, protect, and install Government-furnished products.

4. Make building services connections for Government-furnished products.

P.O. No. W9133L-16-D-0009 Order No. W912J218F5008

AECOM No. 60580469

B-3 Final Design Submittal

Section 01 1000

SUMMARY

Project No. HTUV152005

RENOVATE BUILDING 522

07-09-2020

5. Protect Government-furnished products from damage during storage, handling, and installation and prior to Substantial Completion.

6. Repair or replace Government-furnished products damaged following receipt.

C. Government-Furnished/Contractor-Installed (GFCI) Products:

1. Paper towel & toilet paper dispensers.

2. Hand soap dispensers.

3. Door lock cores.

4. Kitchen and laundry appliances.

1.09 CONTRACTOR'S USE OF SITE AND PREMISES

A. Restricted Use of Site: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section.

B. Contractor Security and Access Program:

1. Contractor and all sub-contractors, sub-sub-contractors and material suppliers shall conform to the requirements of the Contractor Security and Access Program, attached to this Section.

C. Limits on Use of Site: Limit use of Project site to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Driveways, Walkways and Entrances: Keep driveways loading areas, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or for storage of materials.

a. Schedule deliveries to minimize use of driveways and entrances by construction operations.

b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

2. The designated haul route through the base shall be used at all time for vehicles coming to and leaving the construction zone. See Civil drawings.

D. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations.

1. Exterior window openings shall be protected at all times.

2. Roof penetrations created for ductwork and/or for the support of new structure above, shall be protected from damage and intrusion of moisture.

E. Condition of Existing Grounds: Maintain portions of existing grounds, landscaping, and hardscaping affected by construction operations throughout construction period. Repair damage caused by construction operations.

1. Any lawn areas within the construction fencing shall be mowed/maintained on a regular basis similar to the surrounding areas of the base. Restore all disturbed areas upon completion of the work in that area.

1.10 COORDINATION WITH OCCUPANTS

A. Cooperate with Government during construction operations to minimize conflicts and facilitate continuous Government usage of all areas adjacent to the construction site. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits unless otherwise indicated.

1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.

Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Government and approval of authorities having jurisdiction.

2. Notify Government not less than 72 hours in advance of activities that will affect Government's operations.

P.O. No. W9133L-16-D-0009 Order No. W912J218F5008

AECOM No. 60580469

B-3 Final Design Submittal

Section 01 1000

SUMMARY

Project No. HTUV152005

RENOVATE BUILDING 522

07-09-2020

B. Government Limited Occupancy of Completed Areas of Construction: Government reserves the right to occupy and to place and install equipment in completed portions of the Work, prior to Substantial Completion of the Work, provided such occupancy does not interfere with completion of the Work. Such placement of equipment and limited occupancy shall not constitute acceptance of the total Work.

1. Government will prepare a Certificate of Substantial Completion for each specific portion of the

Work to be occupied prior to Government acceptance of the completed Work.

2. Obtain a Certificate of Occupancy from authorities having jurisdiction before limited Government occupancy.

3. Before limited Government occupancy, mechanical and electrical systems shall be fully operational, and required tests and inspections shall be successfully completed. On occupancy, Government will operate and maintain mechanical and electrical systems serving occupied portions of Work.

4. On occupancy, Government will assume responsibility for maintenance and custodial service for occupied portions of Work.

1.11 WORK RESTRICTIONS

A. Security and Site Access:

1. Access to the Site is controlled. The Contractor and all subs, suppliers, and vendors will be required to go through security, each time, when entering the base.

2. Contractor and all sub-contractors, sub-sub-contractors and material suppliers shall conform to the requirements of the Contractor Security and Access Program. See form attached to this Section.

3. The construction site will also be controlled by the Contractor so that at any time, the Government can identify exactly who is currently on the construction site.

B. Comply with restrictions on construction operations.

1. Comply with limitations on use of airport property, public streets, work on public streets, rights of way, and other requirements of authorities having jurisdiction.

C. On-Site Work Hours: Limit work to between 0630 to 1630, Tuesday through Friday, unless otherwise approved by the Government. Work hours may be modified to meet Project requirements if approved by Government and authorities having jurisdiction.

1. Weekend Hours: Not permitted.

2. Early Morning Hours: Not restricted.

3. Hours for Utility Shutdowns: Requires prior approval.

4. Hours for noisy activity are not limited on normal work days.

D. On-Site Work Day Restrictions: Do not perform work resulting in utility shutdowns or resulting in noisy activity on-site during work black-out days.

E. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging for temporary utility services according to requirements indicated:

1. Notify Government not less than two days in advance of proposed utility interruptions.

2. Obtain Government's written permission before proceeding with utility interruptions.

F. Noise, Vibration, Dust, and Odors: Coordinate operations that may result in high levels of noise and vibration, dust, odors, or other disruption to Government occupancy with Government.

1. Notify Government not less than two days in advance of proposed disruptive operations.

2. Obtain Government's written permission before proceeding with disruptive operations.

G. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet (8 m) of entrances, operable windows, or outdoor-air intakes.

H. Employee Identification: Government will provide identification tags for Contractor personnel working on Project site. Require personnel to use identification tags at all times.

P.O. No. W9133L-16-D-0009 Order No. W912J218F5008

AECOM No. 60580469

B-3 Final Design Submittal

Section 01 1000

SUMMARY

Project No. HTUV152005

RENOVATE BUILDING 522

07-09-2020

I. Employee Screening: Comply with Government's requirements for drug and background screening of Contractor personnel working on Project site.

1. Maintain list of approved screened personnel with Government's representative.

1.12 SPECIFICATION AND DRAWING CONVENTIONS

A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:

1. Imperative mood and streamlined language are generally used in the Specifications. The words

"shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:)

is used within a sentence or phrase.

2. Hypertext: Text used in the Specifications may contain hyperlinks. Hyperlinks may allow for access to linked information that is not residing in the Specifications. Unless otherwise indicated, linked information is not part of the Contract Documents.

3. Specification requirements are to be performed by Contractor unless specifically stated otherwise.

B. Division 00 Contracting Requirements: General provisions of the Contract, including General and Supplementary Conditions, apply to all Sections of the Specifications.

C. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.

D. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:

1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.

2. Abbreviations: Materials and products are identified by abbreviations published as part of the U.S.

National CAD Standard.

3. Keynoting: Materials and products are identified by reference keynotes referencing Specification

Section numbers found in this Project Manual.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

Attachment

END OF SECTION

BY ORDER OF THE COMMANDER 128 ARW INSTRUCTION 31-3

128th AIR REFUELING WING

128th AIR REFUELING WING

27 JANUARY 2015

Security

CONTRACTOR SECURITY AND ACCESS PROGRAM

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

ACCESSIBILITY: Publications and forms are available on the 128th Air Refueling Wing Intranet.

RELEASIBILITY: There are no releasibility restrictions on this publication.

OPR: 128 ATO Certified by: SFS/CC (Major Aaron Gulczynski)

Pages: 12

This instruction provides local procedures for contractor security and access programs. This instruction is applicable to all contractors operating at the 128th Air Refueling Wing (ARW), and any tenant unit, or property owned, managed, or cared for by the 128 ARW. Use this instruction in conjunction with DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), DoD 5220.22-R, Industrial Security Regulation, DoD 5200.1-R, Information Security Program Regulation, Wisconsin Time System (E-Time), AFI 31-113 Installation Perimeter Access Control and AFI 10-245, Antiterrorism (AT). Refer recommended changes and questions about this publication to the Office of Primary Responsibility (OPR) using the AF IMT 847, Recommendation for Change of Publication; route AF IMT 847s from the field through the appropriate functional’s chain of command. Ensure that all records created as a result of processes prescribed in this publication are maintained in accordance with Air Force Manual (AFMAN) 33-363, Management of Records, and disposed of in accordance with Air Force Records Information Management System (AFRIMS) Records Disposition Schedule (RDS) located at https://www.my.af.mil/gcss- af61a/afrims/afrims/

1. Overview.

1.1 A favorable criminal background history (CBH) check must be completed for all short-and long-term primary contractors or subcontractors prior to being allowed access/entry to the installation or any off-site locations. CBH checks will be considered current for a 24-month period from the date they were obtained, and valid for all contracts performed within the 24-month time period. NOTE: Contractors may request emergency or exigent exceptions to these requirements and procedures through the contracting office, and the installation commander must approve all exceptions to these requirements.

https://www.my.af.mil/gcss-af61a/afrims/afrims/ https://www.my.af.mil/gcss-af61a/afrims/afrims/

2 128 ARWI 31-3 27 JANUARY 2015

1.2. Contractors and equipment are subject to lawful search and seizure procedures upon entering, while on, or exiting the installation. The 128 ARW may conduct open-source, public record wants/warrants and/or National Crime Information Center (NCIC) criminal history checks on all employees requiring access to the installation regardless of the length of time that will be spent on the installation. In addition, the Milwaukee County Sheriff’s Office, the Milwaukee Police Department, or any other law enforcement agency could be contacted and may conduct nation-wide criminal background checks as well as i l legal immigrant checks on all employees requiring access to the installation.

2. Responsibilities.

2.1. Installation Commander. The installation commander grants authority for contractors to enter the installation. Under authority of the Internal Security Act of 1950, Section 21, and 50 U.S. Code 797, the installation commander is held responsible for protection of government resources.

2.2. Contracting Office. In accordance with AFI 10-245, paragraph 2.173. contracts will include a statement that requires personnel, (contractors), to consent to criminal background checks, and/or provide an official CBH to the 128 ARW, prior to being granted entry onto the installation. Contracting Office will also include measures in the contracts to preclude the unmonitored presence of cleaning or other service personnel in vulnerable facilities.

2.2.1. Single day access for events such as site visits will be coordinated through contracting and information will be forwarded to SF for addition to Visitor EAL. Use 128 ARW Form 11. Send form to 128ARW.BaseAccessRequestSF@ang.af.mil.

2.3. Contractors.

2.3.1. All contractors must provide as part of the contract: Last, First, M.I., Date of Birth, Sex-M/F, Place of Birth, Last four of Social Security Number (SSN), and Immigration Number (if applicable) if requiring access to the installation. This will be accomplished via the required Form 128 ARW Form 10. Contracts requiring ten or more contractors will provide all the required information and list of names at least five workdays prior to job start. Contracts requiring less than ten contractors will provide the list of names at least three workdays prior to job start. Short-term contractors may also be required to submit required information of individuals requiring access. Expect three working days for the processing of the background check. The 128 ARW Form 10 and the Contractor Denial memorandum will be retained by SFS in their General Correspondence file.

2.3.2. All contractors requiring access to sensitive areas will complete an SF Form 85, Special Access Form and provide a state or government issued driver’s license or official photo identification card upon arrival to the installation.

2.3.3. Contractors may be required to report to the Security Forces Squadron (SFS) Pass and ID Section prior to job start on the first day of work to obtain access credentials or badge. Based on Force Protections Conditions (FPCON), contractors could have their photos taken, and may be issued a Contractor Badge and be required to carry on their person and/or to be placed in their vehicles. Contractors may be required to wear a Contractor Badge on their person at all times while on the installation. The Contractor Pass will be worn on the outermost layer of clothing (i.e. shirt, jacket, coat, overall top, etc.), so it will be visible at all times. Note: Exceptions may be made based on safety concerns.

2.3.4. SFS may also issue a Vehicle Pass to contractor vehicles requiring access to the installation. Vehicle passes are to remain in vehicles that will be operating on the

128 ARWI 31-3 27 JANUARY 2015

installation. Vehicle passes will be placed on top of the dashboard on the driver’s side.

Contractors must safeguard passes when not on the installation.

2.3.5. The loss or theft of any Contractor Pass or Vehicle Pass must be reported immediately to SFS and the Base Defense Operations Center (BDOC). Contractors are responsible for providing immediate notification to Contracting and SFS of any changes in personnel who require access/entry to the installation. This includes newly hired contractors or subcontractors, and any contractors who were discharged, quit, or contractors that have disqualifying factors occur after the initial background checks were completed.

2.3.6. All passes must be returned to SFS upon completion of the contract or change of personnel and/or vehicles.

2.3.7. Contractors will enter and exit the installation through the Main Gate during normal work hours. Installation personnel on duty will assist contractors with directions of the installation and work site. This gate may be used for heavy trucks and equipment.

The College Avenue (South Gate) may be used for heavy trucks and equipment, however, use of this gate requires prior coordination.

2.3.8. Construction and delivery vehicles will be searched daily and privately-owned vehicles (POVs) will be searched at random.

2.3.9. Except as necessary to accomplish a contract and/or project, contractors may not bring or possess any of the following items while on the installation.

2.3.9.1 Instruments capable of propelling a projectile by compressed air, gasses, springs, or other mechanical or physical means. Such weapons include, but are not limited to, firearms, paintball guns, pellet guns, BB guns, blowguns, bows and arrows, underwater spear guns, hunting slingshots, and throwing spears.

2.3.9.2. Any instrument which has the capacity to inflict death and from the manner in which it is used is likely to produce or may easily and readily produce death. The following instruments are included in, but not limited to, this category. Knives in excess of three inches, spring-loaded knives (switchblades), swords, blackjacks, metal knuckles, “Nunchucks” fighting sticks, kung-fu stars, boomerangs, chains (wrapped), and billy clubs. Possession of these items is expressly prohibited at all times, except when they are in use as part of the bearer’s lawful “tools of the trade,” such as craftsmen (electricians, carpenters, or other such trades).

2.3.9.3. Explosive materials, consisting of ammunition, gunpowder, firecrackers, and similar items.

2.3.9.4. Narcotics or drugs in any quantity except for those prescription medications issued by a licensed pharmacist based on written prescription from a licensed medical doctor for health care purposes. Drug paraphernalia and any contents contained therein.

2.3.9.5. Alcohol, which includes but is not limited to beer in open containers no matter what the quantity, is strictly prohibited from being consumed on the installation and/or job site.

4 128 ARWI 31-3 27 JANUARY 2015

2.3.10. The speed limit on base is 20 miles per hour unless otherwise posted. Contractors are responsible for maintaining current registration requirements. State vehicle registration, driver’s license, vehicle insurance, etc., must be up-to-date at all times. Failure to do so may result in cancellation of installation vehicle registration, pass, and driving privileges.

All vehicle occupants (exceptions – special purpose vehicles) will wear seat belts.

Cellular phones are prohibited while vehicle is in motion.

2.3.11. If an employee is injured or has a medical emergency, they will call 911 from an installation phone, and/or notify BDOC. Any 911 call made from a cell phone will be connected to the nearest municipal emergency services operator, which may delay installation response.

2.3.12. Contractors will follow safety instructions announced over the installation’s public address system for severe weather.

2.3.13. Contractors must pay special attention to Foreign Object or Debris (FOD). All streets or roadways must be kept clean so installation or contractor vehicles do not track FOD onto the flightline.