Solicitation_Q A_responses_(18-48)_final.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- AF/PAK Logistics Monitoring Support Federal contract opportunity
- Solicitation number
- HTC711-16-R-R008
About this file
Q As 18-48
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attch_1_-_PWS_25Nov15_AFG-PAK_3PL.pdf | ||
| Solicitation_QA_responses_(49-68)_final.xlsx | XLSX spreadsheet | |
| 0003_HTC711-16-R-R008.pdf | ||
| Attch_2_-_Pricing_rate_table_(v2).xlsx | XLSX spreadsheet | |
| Attch_1_-_PWS_20Nov15_AFG-PAK_3PL.pdf | ||
| Attch_5_-_Offeror_Information_Sheet_(v2).pdf | ||
| 0002_HTC711-16-R-R008_signed.pdf | ||
| Solicitation_Q A_responses_(1-17).xlsx | XLSX spreadsheet | |
| Attch_1_-_PWS_30Oct15_AFG-PAK_3PL.pdf | ||
| 0001_HTC711-16-R-R008.doc | DOC document | |
| Attch_2_-_Pricing_rate_table.xlsx | XLSX spreadsheet | |
| HTC711-16-R-R008.pdf | ||
| Attch_3_-_Past_Performance_Questionnaire.pdf | ||
| Attch_1_-_PWS_21Oct15_AFG-PAK_3PL_Final.pdf | ||
| Attch_5_-_Offeror_Information_Sheet.pdf | ||
| Attch_4_-_Financial_Information_Questionnaire.pdf | ||
| Attch_2_-_Pricing_rate_table.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Question | Response | |
| 18 | Offeror plans to physically deliver its proposal to Scott AFB given hardcopy responses are required. Please provide base access instructions for the drop off of proposals on 30 November 2015. | Proposals may be dropped off at the Scott AFB Main Gate, Visitor's Center (10 Siebert Rd; Scott AFB, IL 62225) from 1300 to 1500 CT on November 30, 2015. |
| 19 | Paragraph states, “(a) Pursuant to the authority of USCENTCOM FRAGO’s 09-1567 and 10-143 this contract is awarded in Afghani (local currency), if awarded to a host nation vendor. The contractor will receive payment in local currency via Electronic Funds Transfer to a local (Afghan) banking institution.” What is the current rate for USD $1.00 to AFN? Is this the rate that will be used for the base year from 01-MAR-2016 to 28-FEB-2017? | If the contract is awarded to an Afghan vendor, the quotation or offer will be converted to Afghani using a Government budget rate 63.80 Afghani per U.S. dollar. See FAR Clause 252.232-7014, NOTIFICATION OF PAYMENT IN LOCAL CURRENCY (AFGHANISTAN) (SEP 2014) on page 139 of the solicitation. |
| 20 | Paragraph states, “1.5 The Government will notify the contractor within 30 days of any additional locations where the above-mentioned services are required to be performed. The contractor must maintain a constant capability to surge to any location within Afghanistan or Pakistan within this 30-day period.” There is no incentive for any offeror to adequately build this surge capability into their pricing structure for the current 15 locations. Offeror recommends the Government breakout this surge capability into a sixteenth series of CLINs to allow for a fair and equitable assessment of each offeror’s proposed surge capability. | While the surge requirement is necessary, it is difficult for the Government to anticipate when, where, and for how long the surge support is necessary. Furthermore, the Government understands that for each location the support is unique and therefore the pricing for is unique for each as well. Therefore, any surge support requested will have to be negotiated individually per occurrence. |
| 21 | Paragraph states, “They must also speak and write in fluent English.” Is it the Government’s intent that every single individual on this contract speak fluent English? If so, offeror recommends the Government qualify this statement by stating the desired level of fluency per an internationally recognized standard such as the Interagency Language Roundtable (ILR) scale. | Basic English. “Able to communicate and answer questions if asked.” |
| 22 | Paragraph states, “Copy of the Identification Document or driving license of each employee, and certificate of good conduct.” What are the requirements for the certificate of good conduct? | FPSC Policy for Bagram. |
| 23 | Paragraph states, “The company receiving award of this task order shall make any changes necessary in the appointment(s).” The phrase “task order” would indicate that this is an indefinite delivery / indefinite quantity (ID/IQ) contract, but it appears to be a single award firm fixed price (FFP) award. Please clarify. | See Amendment 0002, paragraph 6.6 of the PWS has been revised to read "The company receiving award of this requirement shall make any changes necessary in the appointment(s)." |
| 24 | Paragraph states, “Due to current limitations on having US military presence in Pakistan and threat levels precluding US Military active involvement with the contractor “outside the wire” in Afghanistan, the contractor must be proactive at identifying appropriate methods for obtaining the necessary in-transit visibility information outlined below.” |
Previously for SDDC missions we have used the Honeywell suite which we have integrated and to IRRIS/iSDDC to give near real time visibility, and avert issues before they become emergencies. May an offeror propose such technology in their proposal as an appropriate method method for obtaining in-transit visibility information?
| YES. If it is effective and all information requested can be presented through this system. | ||
| 25 | Paragraph states, “Afghanistan: Torkham, Hairatan, Kabul (Supreme / Camp Phoenix / ANA-ANP Depots), Jalalabad, Bagram, Kandahar, Spin Boldak, Sher Khan Border, Towraghaundi.” Camp Phoenix is closed. Please clarify. | See Amendment 0002, paragraph 8.2.4.2 of the PWS "Supreme / Camp Phoenix" has been removed and "as needed" has been added after Hairatan. |
| 26 | Paragraph states, “Containers arriving in Karachi and Qasim without seals shall be re- sealed by the contractor and the new seal serial numbers shall be annotated on the contractor’s Seal Operation Report.” Is the contractor responsible for providing the actual seals or will these be government furnished? | The contractor is responsible. |
| 27 | Paragraph states, “Containers departing without seals shall be re-sealed by the contractor and the new seal serials numbers shall be annotated on the contractor’s regular reports.” Is the contractor responsible for providing the actual seals or will these be government furnished? |
| The contractor is responsible. | |
| 28 | Paragraph states, “On a daily basis, the contractor shall record the arrival of shipments with RFID Tags at the Pakistan / Afghanistan entry nodes.” |
Offeror has a monitoring software which is secure, cloud-based, accepted by the Government, translated into Dari/Pashto, and can expedite and assist with CID incidents. We have a proven, externally mounted (no need to break seal) system that detects and reports container intrusion. This system allows personnel to take a photo in our smartphone application, which is then automatically uploaded to our software platform with ‘tamper proof’ location, time, date stamp of the subject. The incident data can then be sent directly to the Government or the Government could view securely in our system without any jeopardizing of their IT infrastructure. Is this a technology / system the Government would consider on this contract?
| This Government may consider this technology/system. | ||
| 29 | Paragraph states, “When requested by the COR, the contractor will dispatch appropriate personnel to any location within Pakistan and Afghanistan for the purpose of conducting joint surveys and inspections in conjunction with carrier, trucker, US Government, and host-nation representatives.” How are offerors expected to price this service within the CLIN structure presently provided? Again, the Government should consider adding additional CLINs to allow for a fair and equitable assessment. | This should be built in the offerors price of the available CLINs. |
| 30 | Paragraph states, “The Contractor shall establish logistics monitoring offices within the identified border control stations.” Will the Government provide office space at each of these locations? How many locations from the 15 provided are considered border control stations? Is there space to stage containerized offices? Will electricity be provided or is the contractor required to provide power? | See 15.5.5 Government Furnished Facilities, Bagram only. Border Control Stations are: Torkham, Chaman, Hairatan, Sher Khan Bander, Towraghundi and Aquina. Yes, there is space to stage containerized offices however the contractor is responsible for researching locations. Unless listed in 15.5.5 Government Furnished Property, Contractor is responsible for providing. |
| 31 | Paragraph states, “These services shall include, but are not limited to: IBS-SUST/CMM, In Transit Visibility (ITV) Reports, Truck Escorting Services, Logistics and Tracking, and Computer Operations.” How shall the contractor accomplish ITV reports? Is the Government furnishing access to Tapestry or similar system? |
| The US Government provides RFID Tags/HHI (Hand Held Interrogators) | ||
| 32 | PWS Paragraph 20.6.2 on page 16 of 27 states, “The Contractor shall provide three (3) escort vehicles and drivers for each shift.” However, bullet #6 on page 24 of 27 states, “Contractor shall provide four (4) escort vehicles and drivers during each shift for the performance of Truck Escort Services at Bagram Airfield 24 hours a day, 7 days a week.” Which is the correct number of escort vehicles? | See Amendment 0002, paragraph 20.6.2 of the PWS has been revised to read "The Contractor shall provide four (4) escort vehicles and drivers for each shift." |
| 33 | Paragraph states, “The Contractor will provide employee coverage to work 7 days per week, including US and Kuwaiti holidays.” Offeror assumes “Kuwaiti” should be Afghan / Pakistani. | See Amendment 0002, paragraph 21.4 of the PWS has been revised to read, "Hours of Operations: Work hours, including overtime, shall comply with Host Nation Labor Laws. The Contractor will provide employee coverage to work 7 days per week, including US and Afghan/Pakistani holidays." |
| 34 | Offeror assumes Government purposefully left page 20 of the PWS blank. | Yes. This was intentially left blank. |
| 35 | Attachment 5 states, “1. Company Name/Address (Must have ZIP + 4) and County:” Offeror is an Afghan company and does not have a ZIP + 4. May Afghan companies bid on this solicitation? | Yes. See Amendment 0002, Attachment 5 has been revised to read, "1. Company Name/Address (Include ZIP + 4 and County, if applicable):" |
| 36 | Attachment 5 states, “4. Offeror’s Standard Carrier Alpha Code (SCAC) Code:” Are offerors required to have a SCAC Code to bid on this solicitation? | No. See Amendment 0002, this requested information has been removed from Attachment 5 and the form has been renumbered. |
| 37 | Attachment 5 states, “5. Offeror’s Commercial and Government Entity (CAGE) Code:” Offeror is an Afghan company and does not have a CAGE Code. May the offeror submit its NCAGE Code to fulfill this requirement? | Yes. See Amendment 0002, Attachment 5 has been revised to read, "5. Offeror’s Commercial and Government Entity (CAGE) Code or NATO Commercial and Government Entity (NCAGE):" |
| 38 | Attachment 5 states, “6. Offeror’s Facility Clearance Level.” No DD254 is attached to this solicitation. The offeror is an Afghan company and is not eligible for a facility clearance. May Afghan companies bid on this solicitation? | Yes. See Amendment 0002, this requested information has been removed from Attachment 5 and the form has been renumbered. |
| 39 | Do any of the positions on Bagram require an individual to have a Security Clearance, for example to access secure facilities or to access US government computer systems? Also, to meet the requirement of the PWS page 3 paragraph 1.2 g) Regular route updates and intelligence, to include threat assessments throughout Afghanistan and Pakistan, and trend / transit time analyses Threat assessments are inherently classified, and usually require a Secret Clearance. We currently have a contract on Bagram which entails Threat Assessments and that position requires a Security Clearance. Also, page 6, paragraph 6.7 | For OCN's (ASCL tokens- (all back ground and security screening, terrorist and biometric scanning is required, BAGRAM FPSC POLICY), For US Citizens (mainly for supervision)- They will have to have a NAC ( National Agency Check) that is current in JPAS( no derogatory information), US Citizens will still have to be screened and checked by The Force Protection Security Center, Bagram. US Citizens may also be authorized a CAC card. They will be required to have access to USG computer systems (only those individuals that will be identified to perform computer functions). These requirements are specific to Bagram Air Field Only, not for off-post. They will not be privy to any classified systems. For OCN's (ASCL tokens- (all back ground and security screening, terrorist and biometric scanning is required, BAGRAM FPSC POLICY), For US Citizens (mainly for supervision)- They will have to have a NAC ( National Agency Check) that is current in JPAS( no derogatory information), US Citizens will still have to be screened and checked by The Force Protection Security Center, Bagram. US Citizens may also be authorized a CAC card. They will be required to have access to USG computer systems (only those individuals that will be identified to perform computer functions). These requirements are specific to Bagram Air Field Only, not for off-post. They will not be privy to any classified systems. |
| 40 | Can you please expand on the role of the movement control liason? | Means will track/assist/liase movement of cargo on behalf of the Government (SDDC) for government shippers and commercial carriers. Tracking cargo throughout theater from POD to POE and throughout the desingated routes. Most of the cargo are retrograde shipmentsbut are valuable so tracking and ITV systems are very important in maintaining accountability. |
| 41 | As our AQGTCC Headquarter is in Kabul and we have field office in difference provinces of Afghanistan .Is it necessary to have office in Karachi or any other parts of Pakistan? | No. If the contractor can provide services to those locations and when the mission requested joint inspections with the Customs Department and the respective EMBASSY CUSTOMS Houses. |
| 42 | We have operation section in HQ Kabul and we can control and Track through Seattleite System . Is it import to have an office in Pakistan ? | The U.S. Government doesn’t dictate where the Contractor will provide an office as long as they provide the services we require and they are accurate. It may be easier to have an office in Pakistan because of the movement throughout. Logistics and tracking services, ITV, RFID, etc. |
| 43 | Please if you kindly mention and specify the Origin and Destination for Cargos? | Cargo can be moved through several locations (please reference PWS sections 1.3, 8.2.4.1, 8.2.4.2 & Attch 2 pricing rate table for locations) |
| 44 | Who is responsible for the escorting , either in Afghanistan or Pakistan? |
Is the contractor who can pay for escort?
| The Contractor will provide escort services for Bagram Air Field only. | ||
| 45 | Shall contractor be responsible for the transportation of the shipments/containers from port/origination to destination/port? | Most cargo is shipped through commercial carriers |
| 46 | Shall contractor be responsible to seal (electronically/satellite) every shipment/container arriving at port and shall be verified at every check point until shipment arrives at destination? | Yes |
| 47 | Please clarify if the price proposal also need to be printed and included with the Hard copies ? | Yes, see RFP pages 112 and 113, Addendum to FAR 52.212-1 sections (i) (C) Volume I: Price Proposal Original Hard copy and 2 Soft copies AND |
(i) Volume I - Price Proposal. This volume is only for submission of the prices incorporated in the Rate Tables (Attachment 2). Pricing to be submitted in US dollars. Do not include fuel costs for CLINs 0015, 1015, 2015, 3015, and 4015 for services at Bagram, as it will be provided by the Government. No other documents will be in this volume.
48 The price Rate Table (Attach 2) is on Excel format. do we need to change it to word format to included on soft copy in CD ROM ? as the RFQ reading states "Offerors shall provide the required electronic (soft) copies on CD-ROM in Microsoft Office Word 2007-compatible format" Excel format is required and must be Microsoft Office 2007 compatible.
Afghanistan/Pakistan Logistic Monitoring Support (AF/PAK LMS) Draft Solicitation Questions and Answers (HTC711-16-R-R008)
Sheet2
Sheet3