Atch_3_-_SMS_CMS_CDRLs.pdf

PDF 243 KB Posted

Attached to
Single Mobility System (SMS)/Coalition Mobility System (CMS) Federal contract opportunity
Solicitation number
HTC711-13-R-D012
Issued by
Department of Defense United States Transportation Command

About this file

Attachment 3 - CDRLs

View the file

Other files for this federal contract opportunity

Other files attached to Single Mobility System (SMS)/Coalition Mobility System (CMS), newest first.
File Type Posted
Amendment_2_-_HTC711-13-R-D012.pdf PDF
Atch_4_-_Labor_Rates_-_Price_Proposal_Break_out.xlsx XLSX spreadsheet
Conformed_HTC711-13-R-D012_(includes_all_Amendments).pdf PDF
Atch_10_-_DODAF_SV6_ _AV1_Draft_Documents.pdf PDF
Questions_and_Answers_2_(all_inclusive).pdf PDF
Questions_and_Answers_1.pdf PDF
Conformed_HTC711-13-R-D012_(includes_Amendment_1).pdf PDF
Amendment_1_-_HTC711-13-R-D012.pdf PDF
HTC711-13-R-D012_-_RFP.pdf PDF
Atch_5_-_PP_Reference_Sheet.docx DOCX document
Atch_2_-_SMS-CMS_QASP.pdf PDF
Atch_1_-_DD254.pdf PDF
Atch_6_-_PP_Questionnaire.docx DOCX document
Atch_4_-_Labor_Rates_-_Price_Proposal_Break_out.xlsx XLSX spreadsheet
Atch_7_-_PP_Log.doc DOC document
Atch_9_-_Subcontracting_Plan_Template.doc DOC document
Atch_8_-_PWS_Sections_to_CLIN_Mapping_Table_(For_Info._only).pdf PDF
SMS_CMS_PWS_FY14-18_-_9_May_13_(DRAFT).pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved ( 1 Data Item) OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TOP TM OTHER ISPC

D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR

SMS - CMS/CTL

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

001 Version Description Document (VDD) VDD

4. AUTHORITY (Data Acquisition Document No.} 15. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-ISPC-81442A PWS Paras 1.4.2.1.1, 1.4.2.2.1 USTRANSCOM/PEO-TIM

7. DO 250 REQ 9. DIST STATEMENT 10.FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED

ASREQ SEE BLK 16 LT b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final c SUBMISSION Draft A N/A SEEBLK 16 Reg Repro

16. REMARKS USTCAQ-CM 001 001

BLK 4: US TRANS COM may further tailor this DID to accommodate changes in security requirements.

BLK 8: Delivery in accordance with the PWS (Deliverable Tables 1.5.1-1 and 1.5.1-2).

BLK 9: Distribution Statement 'C'. Distribution authorized to the US Government agencies and contractors only; Software documentation, 30 October 1998. Other requests for this document shall be referred to the USTRANSCOM SMS/CMS Program Manager, 508 Scott Drive, Scott AFB, IL 62225.

BLKS 10, 12, and 13: Deliver VVD in accordance with the PWS.

BLK 14: Items are to be emailed to the USTRANSCOM PEO-T Configuration Manager and automatic notification given to the USTRANSCOM SMS/CMS program distribution list.

Tailor DID:

Document should be submitted in Microsoft Word format unless otherwise agreed upon by the SMS/CMS PM.

15. TOTAL I I 0

G. PREPARED BY H. DATE

~~~- J. DATE

10 Jun 13 ~ :-::::------- 10 Jun 13 Diane Nagel ~an 'R. Lee, SMS/CMS PM

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of I Pages Adobe Professional 7. 0

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of taw, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TOP TM OTHER ADMN

D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR

SMS-CMS/CTL

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

002 Revisions to Existing Government Documents

4. AUTHORITY (Data Acquisition Document No.) ,5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-ADMN-80925 SEE BLK 16 USTRANSCOM/PEO-TIM

7. DD 250 REQ 9. DIST STATEMENT 10.FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED ASREQ SEE BLK 16 LT b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final

A c SUBMISSION Draft N/A SEE BLK 16 Reg Repro

16. REMARKS USTCAQ-CM 001 001

BLK 4: Format shall be the same basic content requirements as the basic Government document being revised.

BLK 5: PWS Paras: 1.4.2.1.1, 1.4.2.1.1.2, 1.4.2.1.1.3, 1.4.3.5.1, 1.4.3.5.1.1, 1.4.3.5.2, 1.4.2.2.1, 1.4.2.2.1.2, 1.4.2.2.1.3, 1.4.2.2.1.4, 1.4.3.1 0.2, 1.4.3.1 0.3, 1.4.8.3.

BLK8: Delivery in accordance with the PWS (Deliverable Tables 1.5.1-1 and 1.5.1-2).

BLK9: Distribution Statement 'C'. Distribution authorized to the US Government agencies and contractors only; Software documentation, 30 October 1998. Other requests for this document shall be referred to the USTRANSCOM SMS/CMS Program Manager, 508 Scott Drive, Scott AFB, IL 62225.

BLKS I 0, 12, and 13: Deliver revised documents in accordance with the PWS.

BLK 14: Items are to be emailed to the USTRANSCOM PEO-T Configuration Manager and automatic notification given to the USTRANSCOM SMS/CMS program distribution list.

Tailor DID:

Document should be submitted in Microsoft Word format unless otherwise agreed upon by the SMS/CMS PM.

15.TOTAL I 1 0

G. PREPARED BY H. DATE I.AP~?~ J. DATE

Diane Nagel 10 Jun 13 ft"aR1f.tee, SMS/CMS PM 10 Jun 13

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of I Pages Adobe Professional 7.0

I

I

I

I

17. PRICE GROUP

11 Data Item) OMB No. 0704-0188

The public reporting burden for this collection of information ts estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Direc~orate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply With a collection of information if it does not display a currently valid OMS control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

ISPC A TOP TM OTHER

D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR

SMS-CMS/CTL

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

003 Software Development Plan SDP

4. AUTHORITY (Data Acquisition Document No.} 15. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-ISPC-81427A PWS Para 1.4.1.1 USTRANSCOM/PEO-TIM

7. DO 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED

ASREQ SEE BLK 16 LT b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final

A c SUBMISSION Draft N/A SEE BLK 16 Reg Repro

16. REMARKS USTCAQ-CM 1 1

BLK 4: USTRANSCOM may further tailor this DID to accommodate changes in security requirements.

BLK 8: Delivery in accordance with the PWS (Deliverable Tables 1.5.1-1 and 1.5.1-2).

BLK 9: Distribution Statement 'C'. Distribution authorized to the US Government agencies and contractors only; Software documentation, 30 October 1998. Other requests for this document shall be referred to the USTRANSCOM SMS/CMS Program Manager, 508 Scott Drive, Scott AFB, 1L 62225.

BLKS 10, 12, and 13: Deliver software development plan document in accordance with the

PWS.

BLK 14: Items are to be emailed to the USTRANSCOM PEO-T Configuration Manager and automatic notification given to the USTRANSCOM SMS/CMS program distribution list.

Tailor DID:

Document should be submitted in Microsoft Word format unless otherwise agreed upon by the SMS/CMS PM.

15.TOTAL I 1 0

G. PREPARED BY H. DATE

J. DATE

IOJun13 10 Jun 13 Diane Nagel cAltrfiR. Lee, PM -·---.-------

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of I Pages Adobe Professional 7.0

17. PRICE GROUP

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TOP TM OTHER ISPC

D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR

SMS-CMS/CTL

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

004 Software Test Plan STP

4. AUTHORITY (Data Acquisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-ISPC-81438A PWS Para 1.4.2.3.1 USTRANSCOM/PEO-TIM

7. DO 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION REQUIRED ASREQ SEE BLK 16 LT b. COPIES

8. APP CODE 11.ASOFDATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final

A c SUBMISSION Draft N/A SEE BLK 16 Reg Repro

16. REMARKS USTCAQ-CM 001 001

BLK 4: USTRANSCOM may further tailor this DID to accommodate changes in security requirements.

BLK 8: Delivery in accordance with the PWS (Deliverable Tables 1.5.1-1 and 1.5.1-2).

BLK 9: Distribution Statement 'C'. Distribution authorized to the US Government agencies and contractors only; Software documentation, 30 October 1998. Other requests for this document shall be referred to the USTRANSCOM SMS/CMS Program Manager, 508 Scott Drive, Scott AFB, IL 62225.

BLKS 10, 12, and 13: Deliver software test plan document in accordance with the PWS.

BLK 14: Items are to be em ailed to the USTRANSCOM PEO-T Configuration Manager and automatic notification given to the USTRANSCOM SMS/CMS program distribution list.

Tailor DID:

Document should be submitted in Microsoft Word format unless otherwise agreed upon by the SMS/CMS PM.

15.TOTAL 1 1 0

G. PREPARED BY H. DATE I. APPR~BY_ ~ J. DATE

10 Jun 13 ~~.·---- 10Jun13 Diane Nagel "~·Lee, SMS/CM PM DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of 1 Pages

Adobe Professional 7.0

17. PRICE GROUP

{ 1 Data Item) OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for review1ng 1nstru.ctions, searc~ing existing data sources, gathenng and ma1nta1n!ng the data needed, and completing and reviewing the collection of 1nformat1on Send comments regarding th1s burden estimate or any other aspect of th1s collection of information, 1nclud1ng suggestions for redu<;:i~g the burden, to the Department of Defense, Executiv.e. Services Direc~orate (0704-0188) Respondents should be aware that notw1thstandmg any other proVISion of law, no person shall be subject to any penalty for failmg to comply With a collection of information if it does not display a currently valid OMS control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TOP TM OTHER ISPC

D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR

SMS-CMS/CTL

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

005 Test Analysis Report TAR

4. AUTHORITY (Data Acquisition Document No.) ,5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-ISPC-81440A PWS Para 1.4.2.3.3. USTRANSCOM/PEO-TIM

7. DD 250 REO 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED

ASREQ SEE BLK 16 LT b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final

A c SUBMISSION Draft N/A SEE BLK 16 Reg Repro

16. REMARKS USTCAQ-CM 001 001

BLK 4: USTRANSCOM may further tailor this DID to accommodate changes in security requirements.

BLK 8: Delivery in accordance with the PWS (Deliverable Tables 1.5.1-l and 1.5.1-2).

BLK9: Distribution Statement 'C'. Distribution authorized to the US Government agencies and contractors only; Software documentation. 30 October 1998. Other requests for this document shall be referred to the USTRANSCOM SMS/CMS Program Manager, 508 Scott Drive, Scott AFB, lL 62225.

BLKS 10, 12, and 13: Deliver test analysis report document in accordance with the PWS.

BLK 14: Items are to be emailed to the USTRANSCOM PEO-T Configuration Manager and automatic notification given to the USTRANSCOM SMS/CMS program distribution list.

Tailor DID:

Document should be submitted in Microsoft Word format unless otherwise agreed upon by the SMS/CMS PM.

15. TOTAL 1 1 0

G. PREPARED BY H. DATE

z~~

J. DATE

Diane Nagel 10 Jun 13 (V ~ S/C~-~- 10 Jun 13

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 7.0

17. PRICE GROUP

(1 Data Item) OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathenng and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collectJon of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TOP TM OTHER MISC

D. SYSTEM/ITEM j E. CONTRACT/PR NO. F. CONTRACTOR

SMS-CMS/CTL

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

006 Complete Source Code esc

4. AUTHORITY (Data Acquisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-ISPC-81441A PWS Paras 1.4.2.1.1, 1.4.2.2.1, 1.4.8.2 USTRANSCOM/PEO-TIM

7. DO 250 REO 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION REQUIRED ASREQ SEE BLK 16 LT b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final c SUBMISSION Draft A N/A SEE BLK 16 Reg Repro

16. REMARKS USTCAQ-CM 001 001

BLK 4: USTRANSCOM may further tailor this DID to accommodate changes in security requirements.

BLK 8: Delivery in accordance with the PWS (Deliverable Tables 1.5.1-1 and 1.5.1-2).

BLK 9: Distribution Statement 'C'. Distribution authorized to the US Government agencies and contractors only; Software documentation, 30 October 1998. Other requests for this document shall be referred to the USTRANSCOM SMS/CMS Program Manager, 508 Scott Drive, Scott AFB, IL 62225.

BLKS 10, 12, and 13: Deliver complete source code document in accordance with the

PWS.

BLK 14: Items are to be emailed to the USTRANSCOM PEO-T Configuration Manager and automatic notification given to the USTRANSCOM SMS/CMS program distribution list.

Tailor DID:

Document should be submitted in Microsoft Word format unless otherwise agreed upon by the SMS/CMS PM.

Source Code and executable to be delivered in the appropriate format on CD/DVD

15. TOTAL 1 1 0

G. PREPARED BY H. DATE

J. DATE

Diane Nagel 10Jun13 an R. Lee, SMS/CMS PM--. 10 Jun 13

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of 1 Pages Adobe Professional 7.0

17. PRICE GROUP

(1 Data Item) OMB No. 0704-0188

The public reporting burden for this collection of information ts estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other proviston of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TOP TM OTHER MISC

D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR

SMS-CMS/CTL

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

007 Migration Report NA

4. AUTHORITY (Data Acquisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-805088 PWS Para 1.4.6 and 1.4.7 USTRANSCOM/PEO-TIM

7. DO 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED

BLK 16 BLKI6 LT b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final c SUBMISSION Draft A N/A BLKI6 Reg Repro

16. REMARKS USTCAQ-CM 001 001

BLK 8: Delivery in accordance with the PWS (Deliverable Tables 1.5.1-1 and 1.5.1-2).

BLK 9: Distribution Statement "C". Distribution authorized to the U.S. Government agencies and Contractors only. Other request for this document shall be referred to USTRANSCOM SMS/CMS Program Management Office (PMO), 508 Scott Drive, Scott

AFB IL, 62225.

BLKS: 10, 12, and 13 deliver in accordance with the PWS.

BLK 14: Items are to be emailed to the USTRANSCOM PEO-T Configuration Manager and automatic notification given to USTRANSCOM SMS/CMS program distribution list.

Tailor DID:

Format:

2 (a) Insert: MICROSOFT Word as basic document; other products may be used to support the analyses, but must be supported by MS Office Suite.

Section I Content:

3. (c) (1): Modify to provide either an Introduction or Problem Statement

3 (d): In Section II Contents will as a minimum contain:

• Results of work with the Government on any physical-to-virtual activities (e.g. loading virtualization software) as part of the virtualization analysis phase.

• Identify all interfaces that require rehosting.

• Identify rehosting activities to include; duration of testing events, any system administration and data/database steward requirements, and resources needed to accompany these events.

• Identify recommended timeline and method for cutover (e.g., running both environments in parallel for a prescribed period of time).

• Identify changes in operational and maintenance processes that may be affected by rehosting.

15. TOTAL I 1 0

G. PREPARED BY H. DATE I.APPR~B~:> J. DATE

Diane Nagel 10 Jun 13 ~~, src~;-~M-- 10 Jun 13

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of 2 Pages Adobe Professional 7.0

17. PRICE GROUP

A. CONTRACT LINE ITEM NO.

D. SYSTEM/ITEM

SMS-CMS/CTL

16. REMARKS (Continued)

CONTRACT OAT A REQUIREMENTS LIST

(1 Data Item) l

B. EXHIBIT IC. CATEGORY:

A TOP TM OTHER MISC

I E. CONTRACT/PR NO. I F. CONTRACTOR

• Identify any additional skills/skill levels that may be necessary to support sustainment efforts within the rehosted environment.

• Assess planned application-level security methodology (e.g. Ports, Protocols, and Services (PPS)), network configuration requirements, and provide recommendations.

• Include any additional analyses that may not have been specifically identified.

• Identify application software changes required to operate in the CPE, to include any development (including integration and testing) requirements.

DD FORM 1423-1, FEB 2001 Page __ 2_ of __ 2_Pages

File details come from the government source that posted it. Updated .