Atch_3_-_SMS_CMS_CDRLs.pdf
PDF 243 KB Posted
- Attached to
- Single Mobility System (SMS)/Coalition Mobility System (CMS) Federal contract opportunity
- Solicitation number
- HTC711-13-R-D012
About this file
Attachment 3 - CDRLs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_2_-_HTC711-13-R-D012.pdf | ||
| Atch_4_-_Labor_Rates_-_Price_Proposal_Break_out.xlsx | XLSX spreadsheet | |
| Conformed_HTC711-13-R-D012_(includes_all_Amendments).pdf | ||
| Atch_10_-_DODAF_SV6_ _AV1_Draft_Documents.pdf | ||
| Questions_and_Answers_2_(all_inclusive).pdf | ||
| Questions_and_Answers_1.pdf | ||
| Conformed_HTC711-13-R-D012_(includes_Amendment_1).pdf | ||
| Amendment_1_-_HTC711-13-R-D012.pdf | ||
| HTC711-13-R-D012_-_RFP.pdf | ||
| Atch_5_-_PP_Reference_Sheet.docx | DOCX document | |
| Atch_2_-_SMS-CMS_QASP.pdf | ||
| Atch_1_-_DD254.pdf | ||
| Atch_6_-_PP_Questionnaire.docx | DOCX document | |
| Atch_4_-_Labor_Rates_-_Price_Proposal_Break_out.xlsx | XLSX spreadsheet | |
| Atch_7_-_PP_Log.doc | DOC document | |
| Atch_9_-_Subcontracting_Plan_Template.doc | DOC document | |
| Atch_8_-_PWS_Sections_to_CLIN_Mapping_Table_(For_Info._only).pdf | ||
| SMS_CMS_PWS_FY14-18_-_9_May_13_(DRAFT).pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved ( 1 Data Item) OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TOP TM OTHER ISPC
D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR
SMS - CMS/CTL
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
001 Version Description Document (VDD) VDD
4. AUTHORITY (Data Acquisition Document No.} 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-ISPC-81442A PWS Paras 1.4.2.1.1, 1.4.2.2.1 USTRANSCOM/PEO-TIM
7. DO 250 REQ 9. DIST STATEMENT 10.FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
ASREQ SEE BLK 16 LT b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final c SUBMISSION Draft A N/A SEEBLK 16 Reg Repro
16. REMARKS USTCAQ-CM 001 001
BLK 4: US TRANS COM may further tailor this DID to accommodate changes in security requirements.
BLK 8: Delivery in accordance with the PWS (Deliverable Tables 1.5.1-1 and 1.5.1-2).
BLK 9: Distribution Statement 'C'. Distribution authorized to the US Government agencies and contractors only; Software documentation, 30 October 1998. Other requests for this document shall be referred to the USTRANSCOM SMS/CMS Program Manager, 508 Scott Drive, Scott AFB, IL 62225.
BLKS 10, 12, and 13: Deliver VVD in accordance with the PWS.
BLK 14: Items are to be emailed to the USTRANSCOM PEO-T Configuration Manager and automatic notification given to the USTRANSCOM SMS/CMS program distribution list.
Tailor DID:
Document should be submitted in Microsoft Word format unless otherwise agreed upon by the SMS/CMS PM.
15. TOTAL I I 0
G. PREPARED BY H. DATE
~~~- J. DATE
10 Jun 13 ~ :-::::------- 10 Jun 13 Diane Nagel ~an 'R. Lee, SMS/CMS PM
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of I Pages Adobe Professional 7. 0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of taw, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TOP TM OTHER ADMN
D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR
SMS-CMS/CTL
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
002 Revisions to Existing Government Documents
4. AUTHORITY (Data Acquisition Document No.) ,5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-ADMN-80925 SEE BLK 16 USTRANSCOM/PEO-TIM
7. DD 250 REQ 9. DIST STATEMENT 10.FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED ASREQ SEE BLK 16 LT b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final
A c SUBMISSION Draft N/A SEE BLK 16 Reg Repro
16. REMARKS USTCAQ-CM 001 001
BLK 4: Format shall be the same basic content requirements as the basic Government document being revised.
BLK 5: PWS Paras: 1.4.2.1.1, 1.4.2.1.1.2, 1.4.2.1.1.3, 1.4.3.5.1, 1.4.3.5.1.1, 1.4.3.5.2, 1.4.2.2.1, 1.4.2.2.1.2, 1.4.2.2.1.3, 1.4.2.2.1.4, 1.4.3.1 0.2, 1.4.3.1 0.3, 1.4.8.3.
BLK8: Delivery in accordance with the PWS (Deliverable Tables 1.5.1-1 and 1.5.1-2).
BLK9: Distribution Statement 'C'. Distribution authorized to the US Government agencies and contractors only; Software documentation, 30 October 1998. Other requests for this document shall be referred to the USTRANSCOM SMS/CMS Program Manager, 508 Scott Drive, Scott AFB, IL 62225.
BLKS I 0, 12, and 13: Deliver revised documents in accordance with the PWS.
BLK 14: Items are to be emailed to the USTRANSCOM PEO-T Configuration Manager and automatic notification given to the USTRANSCOM SMS/CMS program distribution list.
Tailor DID:
Document should be submitted in Microsoft Word format unless otherwise agreed upon by the SMS/CMS PM.
15.TOTAL I 1 0
G. PREPARED BY H. DATE I.AP~?~ J. DATE
Diane Nagel 10 Jun 13 ft"aR1f.tee, SMS/CMS PM 10 Jun 13
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of I Pages Adobe Professional 7.0
I
I
I
I
17. PRICE GROUP
11 Data Item) OMB No. 0704-0188
The public reporting burden for this collection of information ts estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Direc~orate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply With a collection of information if it does not display a currently valid OMS control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
ISPC A TOP TM OTHER
D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR
SMS-CMS/CTL
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
003 Software Development Plan SDP
4. AUTHORITY (Data Acquisition Document No.} 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-ISPC-81427A PWS Para 1.4.1.1 USTRANSCOM/PEO-TIM
7. DO 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
ASREQ SEE BLK 16 LT b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final
A c SUBMISSION Draft N/A SEE BLK 16 Reg Repro
16. REMARKS USTCAQ-CM 1 1
BLK 4: USTRANSCOM may further tailor this DID to accommodate changes in security requirements.
BLK 8: Delivery in accordance with the PWS (Deliverable Tables 1.5.1-1 and 1.5.1-2).
BLK 9: Distribution Statement 'C'. Distribution authorized to the US Government agencies and contractors only; Software documentation, 30 October 1998. Other requests for this document shall be referred to the USTRANSCOM SMS/CMS Program Manager, 508 Scott Drive, Scott AFB, 1L 62225.
BLKS 10, 12, and 13: Deliver software development plan document in accordance with the
PWS.
BLK 14: Items are to be emailed to the USTRANSCOM PEO-T Configuration Manager and automatic notification given to the USTRANSCOM SMS/CMS program distribution list.
Tailor DID:
Document should be submitted in Microsoft Word format unless otherwise agreed upon by the SMS/CMS PM.
15.TOTAL I 1 0
G. PREPARED BY H. DATE
J. DATE
IOJun13 10 Jun 13 Diane Nagel cAltrfiR. Lee, PM -·---.-------
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of I Pages Adobe Professional 7.0
17. PRICE GROUP
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TOP TM OTHER ISPC
D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR
SMS-CMS/CTL
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
004 Software Test Plan STP
4. AUTHORITY (Data Acquisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-ISPC-81438A PWS Para 1.4.2.3.1 USTRANSCOM/PEO-TIM
7. DO 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION REQUIRED ASREQ SEE BLK 16 LT b. COPIES
8. APP CODE 11.ASOFDATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final
A c SUBMISSION Draft N/A SEE BLK 16 Reg Repro
16. REMARKS USTCAQ-CM 001 001
BLK 4: USTRANSCOM may further tailor this DID to accommodate changes in security requirements.
BLK 8: Delivery in accordance with the PWS (Deliverable Tables 1.5.1-1 and 1.5.1-2).
BLK 9: Distribution Statement 'C'. Distribution authorized to the US Government agencies and contractors only; Software documentation, 30 October 1998. Other requests for this document shall be referred to the USTRANSCOM SMS/CMS Program Manager, 508 Scott Drive, Scott AFB, IL 62225.
BLKS 10, 12, and 13: Deliver software test plan document in accordance with the PWS.
BLK 14: Items are to be em ailed to the USTRANSCOM PEO-T Configuration Manager and automatic notification given to the USTRANSCOM SMS/CMS program distribution list.
Tailor DID:
Document should be submitted in Microsoft Word format unless otherwise agreed upon by the SMS/CMS PM.
15.TOTAL 1 1 0
G. PREPARED BY H. DATE I. APPR~BY_ ~ J. DATE
10 Jun 13 ~~.·---- 10Jun13 Diane Nagel "~·Lee, SMS/CM PM DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of 1 Pages
Adobe Professional 7.0
17. PRICE GROUP
{ 1 Data Item) OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for review1ng 1nstru.ctions, searc~ing existing data sources, gathenng and ma1nta1n!ng the data needed, and completing and reviewing the collection of 1nformat1on Send comments regarding th1s burden estimate or any other aspect of th1s collection of information, 1nclud1ng suggestions for redu<;:i~g the burden, to the Department of Defense, Executiv.e. Services Direc~orate (0704-0188) Respondents should be aware that notw1thstandmg any other proVISion of law, no person shall be subject to any penalty for failmg to comply With a collection of information if it does not display a currently valid OMS control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TOP TM OTHER ISPC
D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR
SMS-CMS/CTL
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
005 Test Analysis Report TAR
4. AUTHORITY (Data Acquisition Document No.) ,5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-ISPC-81440A PWS Para 1.4.2.3.3. USTRANSCOM/PEO-TIM
7. DD 250 REO 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
ASREQ SEE BLK 16 LT b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final
A c SUBMISSION Draft N/A SEE BLK 16 Reg Repro
16. REMARKS USTCAQ-CM 001 001
BLK 4: USTRANSCOM may further tailor this DID to accommodate changes in security requirements.
BLK 8: Delivery in accordance with the PWS (Deliverable Tables 1.5.1-l and 1.5.1-2).
BLK9: Distribution Statement 'C'. Distribution authorized to the US Government agencies and contractors only; Software documentation. 30 October 1998. Other requests for this document shall be referred to the USTRANSCOM SMS/CMS Program Manager, 508 Scott Drive, Scott AFB, lL 62225.
BLKS 10, 12, and 13: Deliver test analysis report document in accordance with the PWS.
BLK 14: Items are to be emailed to the USTRANSCOM PEO-T Configuration Manager and automatic notification given to the USTRANSCOM SMS/CMS program distribution list.
Tailor DID:
Document should be submitted in Microsoft Word format unless otherwise agreed upon by the SMS/CMS PM.
15. TOTAL 1 1 0
G. PREPARED BY H. DATE
z~~
J. DATE
Diane Nagel 10 Jun 13 (V ~ S/C~-~- 10 Jun 13
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 7.0
17. PRICE GROUP
(1 Data Item) OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathenng and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collectJon of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TOP TM OTHER MISC
D. SYSTEM/ITEM j E. CONTRACT/PR NO. F. CONTRACTOR
SMS-CMS/CTL
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
006 Complete Source Code esc
4. AUTHORITY (Data Acquisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-ISPC-81441A PWS Paras 1.4.2.1.1, 1.4.2.2.1, 1.4.8.2 USTRANSCOM/PEO-TIM
7. DO 250 REO 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION REQUIRED ASREQ SEE BLK 16 LT b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final c SUBMISSION Draft A N/A SEE BLK 16 Reg Repro
16. REMARKS USTCAQ-CM 001 001
BLK 4: USTRANSCOM may further tailor this DID to accommodate changes in security requirements.
BLK 8: Delivery in accordance with the PWS (Deliverable Tables 1.5.1-1 and 1.5.1-2).
BLK 9: Distribution Statement 'C'. Distribution authorized to the US Government agencies and contractors only; Software documentation, 30 October 1998. Other requests for this document shall be referred to the USTRANSCOM SMS/CMS Program Manager, 508 Scott Drive, Scott AFB, IL 62225.
BLKS 10, 12, and 13: Deliver complete source code document in accordance with the
PWS.
BLK 14: Items are to be emailed to the USTRANSCOM PEO-T Configuration Manager and automatic notification given to the USTRANSCOM SMS/CMS program distribution list.
Tailor DID:
Document should be submitted in Microsoft Word format unless otherwise agreed upon by the SMS/CMS PM.
Source Code and executable to be delivered in the appropriate format on CD/DVD
15. TOTAL 1 1 0
G. PREPARED BY H. DATE
J. DATE
Diane Nagel 10Jun13 an R. Lee, SMS/CMS PM--. 10 Jun 13
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of 1 Pages Adobe Professional 7.0
17. PRICE GROUP
(1 Data Item) OMB No. 0704-0188
The public reporting burden for this collection of information ts estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other proviston of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TOP TM OTHER MISC
D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR
SMS-CMS/CTL
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
007 Migration Report NA
4. AUTHORITY (Data Acquisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-805088 PWS Para 1.4.6 and 1.4.7 USTRANSCOM/PEO-TIM
7. DO 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
BLK 16 BLKI6 LT b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final c SUBMISSION Draft A N/A BLKI6 Reg Repro
16. REMARKS USTCAQ-CM 001 001
BLK 8: Delivery in accordance with the PWS (Deliverable Tables 1.5.1-1 and 1.5.1-2).
BLK 9: Distribution Statement "C". Distribution authorized to the U.S. Government agencies and Contractors only. Other request for this document shall be referred to USTRANSCOM SMS/CMS Program Management Office (PMO), 508 Scott Drive, Scott
AFB IL, 62225.
BLKS: 10, 12, and 13 deliver in accordance with the PWS.
BLK 14: Items are to be emailed to the USTRANSCOM PEO-T Configuration Manager and automatic notification given to USTRANSCOM SMS/CMS program distribution list.
Tailor DID:
Format:
2 (a) Insert: MICROSOFT Word as basic document; other products may be used to support the analyses, but must be supported by MS Office Suite.
Section I Content:
3. (c) (1): Modify to provide either an Introduction or Problem Statement
3 (d): In Section II Contents will as a minimum contain:
• Results of work with the Government on any physical-to-virtual activities (e.g. loading virtualization software) as part of the virtualization analysis phase.
• Identify all interfaces that require rehosting.
• Identify rehosting activities to include; duration of testing events, any system administration and data/database steward requirements, and resources needed to accompany these events.
• Identify recommended timeline and method for cutover (e.g., running both environments in parallel for a prescribed period of time).
• Identify changes in operational and maintenance processes that may be affected by rehosting.
15. TOTAL I 1 0
G. PREPARED BY H. DATE I.APPR~B~:> J. DATE
Diane Nagel 10 Jun 13 ~~, src~;-~M-- 10 Jun 13
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of 2 Pages Adobe Professional 7.0
17. PRICE GROUP
A. CONTRACT LINE ITEM NO.
D. SYSTEM/ITEM
SMS-CMS/CTL
16. REMARKS (Continued)
CONTRACT OAT A REQUIREMENTS LIST
(1 Data Item) l
B. EXHIBIT IC. CATEGORY:
A TOP TM OTHER MISC
I E. CONTRACT/PR NO. I F. CONTRACTOR
• Identify any additional skills/skill levels that may be necessary to support sustainment efforts within the rehosted environment.
• Assess planned application-level security methodology (e.g. Ports, Protocols, and Services (PPS)), network configuration requirements, and provide recommendations.
• Include any additional analyses that may not have been specifically identified.
• Identify application software changes required to operate in the CPE, to include any development (including integration and testing) requirements.
DD FORM 1423-1, FEB 2001 Page __ 2_ of __ 2_Pages
File details come from the government source that posted it. Updated .