HTC711-12-R-R011- Amendment 0002.pdf

PDF 55 KB Posted

Attached to
TRANSPORTATION SAFETY AND SECURITY II (TRANSS II) Federal contract opportunity
Solicitation number
HTC711-12-R-R011
Issued by
Department of Defense United States Transportation Command

About this file

Amendment 0002

View the file

Other files for this federal contract opportunity

Other files attached to TRANSPORTATION SAFETY AND SECURITY II (TRANSS II), newest first.
File Type Posted
TRANSS_II_Contract_Award_Anncmt.docx DOCX document
Ammendment_TRANSS_II_0004.pdf PDF
Attachment_2_-_Updated_Pricing_Schedule_TRANSS_II.xlsx XLSX spreadsheet
Attachment_2_-_Updated_Pricing_Schedule_TRANSS_II.xlsx XLSX spreadsheet
TRANSS II Amendment 0003.pdf PDF
Questions and Responses 16-21.pdf PDF
Questions and Responses 9-15.pdf PDF
Questions and Responses 1-8.docx DOCX document
Attachment 1 - Performance Work Statement_TRANSS II_Amd 1.docx DOCX document
Attachment 6 - DD Form 254_TRANSS II.pdf PDF
Attachment 1 - Performance Work Statement_TRANSS II.docx DOCX document
HTC711-12-R-R011 - Solicitation_TRANSS II.pdf PDF
Attachment 2 - Pricing Schedule_TRANSS II.xlsx XLSX spreadsheet
Attachment 3 - Wage Determination_TRANSS II.zip ZIP file
Attachment 5 - Financial Information Questionnaire_TRANSS II .doc DOC document
Attachment 4 - Past Performance Survey_TRANSS II.doc DOC document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

I I. CON1RA~T lD CODE I PAGE OF PAGES

1 1 2.

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECTNO.(Ifapplicablc)

0002 31-Aug-2012

6.ISSUEDBY CODE HTC711 7. ADMINISTERED BY (If other than item6) CODE I USTRANSCOM-AQ- HTC711 See Item 6 508SCOTTDR

SCOTT AFB IL~5357

8. NAME AND ADDRESS OF CONTRACfOR (No., Street, CoWJty, State and Zip Code) X 9A. AMENDMENT OF ~LICITATION NO.

HTC711-12-R-R011

X 9B. DATED (SEE ITEM II)

20-Aug-2012

I OA. MOD. OF CONTRACf /ORDER NO.

JOB. DATED (SEE ITEM 13)

CODE I FACILITY CODE

II. TillS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

'0The above nunbered solicitation is amended as set ilrth in Item 14. The hour and date specified ilr receipt ofOfi:r D is extended, 0 is not extended.

Ofrr lliiSt acknowledge receipt ofthis amendment prior to the hour and date specified in the solicitation or as amended by one ofthe illlowing m:thods:

(a) By corrpleting Items 8 and I 5, and returning copies ofthe amendm:nt; (b) By acknowledging receipt ofthis amendment on each copy ofthe ofi:r subnitted;

or (c) By sepamte letter or telegmmwhich includ~ce to the solicitation and amendment nunbcrs. FAILURE OF YOUR ACKNOWLEDGMENTm BE RECEIVED AT THE PLACE DESIGN A TED FOR lHE RECEIPT OF OFFERS PRIOR m THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. Ifby virtue ofthis amendment you desire to change an ofi:r already subnitted, such change may be made by telegmmor letter, provided each telegmmor letter makes rei:rence to the solicitation and this amendm:nt, and is received prior to the opening hour and date specified. ·

12. ACCOUNTING AND APPROPRIATION DATA (If required) --

13. TillS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACfSIORDERS.

IT MODIFIES THE CONTRACf/ORDERNO. ASDEOC:RIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACf ORDER NO. IN ITEM I OA.

B. THE ABOVE NUMBERED CONTRACf/ORDER IS MODIFIED TO REFLECf THE ADMINISfRATIVE CHANGES(such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORT ANT: Contractor D isnot, D is required to sign this docwnent and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT /MODIFICATION (Organized by UCF section headings, including solicitation/contract suf:dect matter \Were feasible.)

A. The purpose of this arrendrrent is to incorporate changes to paragraph (b)(12) A'oposal Format, 1 h. Page Linitations, Volurre I.

B. All other terms and conditions remain unchanged.

Except as provided herein, all term; and conditions ofthe docum:nt retrenced in ltem9A or lOA, as heretoilre changed, remains unchanged and in illl ilrceand efrct.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACfiNG OFFICER (Type or print)

TEL: EMAIL:

15B. CONTRACfORIOFFEROR 15C. DATE SIGNED 16B. UNITED Sf ATESOF AMERICA 16C. DATE SIGNED

(Signat\D'e of person authorized to sign)

EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

BY

30-105-04

(Signat\D'e of Contracting Officer) 31-Aug-2012

Sf ANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR(48 CFR) 53.243

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30- BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

h. Page Limitations:

FROM:

Transportation Safety and Security II {TRANSS II)

HTC711-12-R-R011

Amendment 0002

HTC711-12-R-R011

Page 2 of2

Volume I: The technical capability proposal is limited to a maximum of75 pages in length inclusive of any charts, diagrams, and/or other graphics. All pages shall be numbered. The font shall be Times New Roman and no smaller than 12 point.

TO:

Volume 1: The technical capability proposal is limited to a maximum of 7 5 pages in length inclusive of any charts, diagrams, and/or other graphics. All pages shall be numbered. The font shall be Times New Roman and no smaller than 12 point. Checklists are not included in the 75 page limit and may be included in the offeror's Volume I proposal as attachments.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .