HT0011-24-R-0050_TST2_RFP_Att2_QASP_DRAFT_06.11.2024.docx
DOCX document 54 KB Posted
- Attached to
- Training Support Team (J-7) Federal contract opportunity
- Solicitation number
- HT0011-24-R-0050
- Issued by
- Defense Health Agency
About this file
This document is a Quality Assurance Surveillance Plan (QASP) for a federal contract opportunity to provide Training Support Team (TST) services to the Defense Health Agency (DHA). The QASP outlines the government's approach to monitoring the contractor's performance, including the roles and responsibilities of key personnel, the performance requirements and methods of surveillance, and the performance reporting procedures.
The related federal contract opportunity is Solicitation HT0011-24-R-0050, which seeks a contractor to provide personnel support for e-Learning courseware development, instructional system design (ISD) projects, learning management system (LMS) administration, and training support. The contract objectives include standardizing and assuring quality of DHA e-Learning products, providing LMS administration and user training, and managing the complete ADDIE process for DHA courseware projects. Proposals are due by 4 September 2024, and the contract period of performance is unspecified.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| HT0011-24-R-0050_TST_RFP_Amd_0001_08.21.24_Final.docx | DOCX document | |
| HT0011-24-R-0050_TST_RFP_Att1_PWS_06.14.2024_v_08.21.24_Final.docx | DOCX document | |
| HT0011-24-R-0050_TST_RFP_Att4_QuestionsAndAnswers_08.21.2024_Final.docx | DOCX document | |
| HT0011-24-R-0050_TST2_RFP_Att1_PWS_06.14.2024_v2_Final.docx | DOCX document | |
| HT0011-24-R-0050_TST2_RFP_Exhibit_A_CDRLs A001-A010_COMBINED.pdf | ||
| HT0011-24-R-0050_TST2_RFP_Att3_PPQ_2024.06.26_Final.docx | DOCX document | |
| HT0011-24-R-0050_TST2_RFP_2024.07.31_Final.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEFENSE HEALTH AGENCY
Quality Assurance Surveillance Plan (QASP) Version – <enter date or version #>
For Training Support Team (TST) Contract Number: < upon award, enter contract number> Contract Description: < enter contract description > Contractor’s Name: < upon award, enter name of contractor > (hereafter referred to as the contractor).
1. Vision (import from the Automated Requirements Roadmap Tool Suite (ARRT) or Charter)
The Contractor will be responsible for the development of Military Health System (MHS) e-Learning courses to be hosted on a learning management system (LMS). The Contractor shall accomplish design, development, maintenance, and conversion of content using codified ISD methodologies to be distributed on the LMS. This team will support courseware development requirements across the Military Health System (MHS), serve as a liaison between the Government Program Manager and customers, establish and maintain standards for instructional design, and manage development, updating and retiring of courses in a systematic manner. The contractor will assist in the administration of any enterprise level LMS, and will facilitate and/or deliver virtual training to new elevated users on the functions of the LMS.
2. Mission (import from ARRT or Charter) To support the policy development, program planning and execution of educational activities related to MTF Operations.
3. Purpose
This Quality Assurance Surveillance Plan (QASP) is a government-developed document used to determine if the contractor’s performance meets the performance standards contained in the contract. The QASP establishes procedures on how this assessment/inspection process will be conducted. It provides the detailed process for a continuous oversight process:
· What will be monitored
· How monitoring will take place
· Who will conduct the monitoring
· How monitoring efforts and results will be documented
The contractor is responsible for implementing and delivering performance that meets contract standards using its Quality Control Plan. The QASP provides the structure for the government’s surveillance of the contractor’s performance and their Quality Assurance/Quality Control (QA/QC) actions to assure they meet contract standards. It is the government’s responsibility to be objective, fair and consistent in evaluating contractor performance.
The QASP is not part of the contract nor is it intended to duplicate the contractor’s quality control plan. This QASP is a living document. Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on contractor performance.
The government may provide a copy of the QASP to the contractor to facilitate open communication. In addition, the QASP should recognize that unforeseen or uncontrollable circumstances might occur that are outside the control of the contractor.
Bottom line, the QASP should ensure early identification and resolution of performance issues to minimize impact on mission performance.
4. Authority
Authority for issuance of this QASP is provided under Part 46 of the Federal Acquisition Regulation, Inspection of Services clauses, which provides for inspection, acceptance and documentation of the service called for in the contract or order. This acceptance is to be executed by the contracting officer or a duly authorized representative.
5. Roles and Responsibilities
The following personnel shall oversee and coordinate surveillance activities.
Program/Project Manager (PM) or Functional Services Manager (FSM) – The PM/FSM provides primary program oversight, nominates the contracting officer’s representative (COR), ensures the COR is trained before performing any COR duties and supports the COR’s performance assessment activities. While the PM/FSM may serve as a direct conduit to provide Government guidance and feedback to the Contractor on technical matters, they are not empowered to make any contractual commitments or any contract changes on the government’s behalf.
Assigned PM/FSM: Mr. Mark E. Heist, LMS Manager, SEAT Division Organization or Agency: DHA/J7 Telephone: 210-808-0656 Email: mark.e.heist.civ@health.mil
Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO shall also determine the final assessment of the contractor’s performance.
Additionally, the CO shall include a requirement in the quality assurance surveillance plan to revalidate all key personnel annually to determine whether the contractors meet the labor categories specified in the contract.
The CO shall maintain documentation in the contract files that demonstrates their review and approval of initial and replacement contractor employees in key personnel positions.
The CO shall include a requirement in information technology service contracts QASPs to review a sample of non‑key personnel quarterly to determine whether the contractor personnel meet the labor categories specified in the contract.
Assigned CO: Ms. Linda M. Walker Organization or Agency: Defense Health Agency (DHA) – Contracting Office – Falls Church (CO-FC) Telephone: 703-681-6571 Email: linda.m.walker38.civ@health.mil
Contracting Officer’s Representative (COR) The COR is responsible for providing continuous technical oversight of the contractor’s performance. The COR uses the QASP to conduct the oversight/surveillance process. The COR shall keep a Quality Assurance file that accurately documents the contractor’s actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The COR is responsible for reporting early identification of performance problems to the CO. The COR is required to provide an annual performance assessment to the CO which will be used in documenting past performance. The QASP is the primary tool for surveillance of the contractor’s quality program and help the COR to document contractor performance. The COR is not empowered to make any contractual commitments or to authorize any contractual change on the Government’s behalf.
Assigned COR: Dr. Anita D. Lyons Organization or Agency: DHA/J-7/Education and Training Directorate Telephone: 703-681-1777 Email: anita.d.lyons.civ@health.mil
Other Key Government Personnel (enter name or delete this line if not applicable) This may include performance monitors, inspectors, technical experts, or others who provide information that helps the COR monitor contractor performance.
Contractor Representatives
The following employees of the contractor serve as the contractor’s Program Manager and Task Manager for this contract. (Complete this section after the contract award)
Contractor Program Manager - <upon award, enter name> Telephone: <enter number> Email: <enter address>
Contractor Task Manager - <upon award, enter name> Telephone: <enter number> Email: <enter address>
Other Key Contractor Personnel - <upon award, enter name or delete these lines if not applicable> Title: <enter title> Telephone: <enter number> Email: <enter address>
6. Performance Requirements and Method of Surveillance
6.1. Contract Surveillance
The goal of the QASP is to ensure that contractor performance is effectively monitored and documented. The COR’s contribution is their professional, non-adversarial relationships with the CO, PM and the contractor, which enables positive, open and timely communications. The foundation of this relationship is built upon objective, fair, and consistent COR evaluations of contractor performance against contract requirements. The COR uses the methods contained in this QASP to ensure the contractor is in compliance with contract requirements. The COR function is responsible for a wide range of surveillance requirements that effectively measure and evaluate the contractor’s performance. Additionally, this QASP is based on the premise that the contractor, not the government, is responsible for management and QC/QA actions to successfully meet the terms of the contract.
6.2. Surveillance Matrix
The Surveillance Matrix (see sample at Attachment 1) is the list of performance objectives and standards that must be performed by the contractor. This matrix details the method of surveillance and frequency the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.
DFARS 222.17 mandates including surveillance for ensuring compliance with Combatting Trafficking in Persons (CTIP) in the QASP. Use the CTIP sample checklist from PGI 222.17. See the DoD CTIP website.
Performance objectives define the desired outcomes. Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performs surveillance, using this QASP, to determine the quality of the contractor’s performance as it relates to the performance element standards. The Performance Requirement Summary (PRS) should be used to form the foundation of the COR’s inspection checklist.
6.3. Performance Rating Definitions
The performance ratings below reflect definitions at FAR 42.1503 Table 42-1. The COR will use these rating to evaluate the quality of contractor’s performance. [If your organization requires that you use a different rating mechanism, insert it here.]
Performance Rating Definition
| Exceptional |
| Performance meets contractual requirements and exceeds many to the government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective. |
| Very Good |
| Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective. |
| Satisfactory |
| Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
| Marginal |
| Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. |
| Unsatisfactory |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective. |
Note 1: Plus or minus signs may be used to indicate an improving (+) or worsening (-) trend insufficient to change the evaluation status.
Note 2: N/A (not applicable) should be used if the ratings are not going to be applied to a particular area for evaluation.
7. Performance Reporting
7.1. Corrective Action Report (CAR)
Describes how discrepancies are reported and resolved (see sample CAR below).
7.2. Customer Complaint Form
(See sample customer complaint form below)
7.3. Performance Assessment Report (PAR) (See sample customer PAR page 11)
DHA QASP Template V1 2 Appendix 1 - Surveillance Matrix
| PWS Para |
| Performance Objective |
| Standard |
| Performance Threshold |
| Method of Surveillance |
Para 5.2.1
| The contractor provided a project timeline |
| The Contractor provided plans and coordinated the various phases of assigned projects which, due to their size, scope, and priority, must be segmented and assigned to other development specialists within the organization. |
| The contractor provided a project timeline within 10 business days of receiving project approval from the government lead with the OPR draft content package. 95% of projects are delivered on time. If required, Contractor will notify Government 10 business days prior to deadline they will be unable to meet. Contractor will provide an update to the date of delivery deliverable at the same time as the notification. |
| Delivery of a plan of actions and milestones with proposed delivery schedule |
Para 5.2.1
| The Contractor shall provide a development timeline. |
| The Contractor provided plans and coordinated the various phases of assigned projects which, due to their size, scope, and priority, must be segmented and assigned to other development specialists within the organization. |
| The contractor provided an updated development timeline within 5 business days of receiving an approved storyboard. 95% of projects are delivered on time. If required, Contractor will notify Government 10 business days prior to deadline they will be unable to meet. Contractor will provide an update to the date of delivery deliverable at the same time as the notification. |
| Direct observation, status meetings, and analysis of timeline and delivery schedule. |
| Para 5.2.1 |
| The Contractor shall supply a quarterly report. |
| The Contractor provided quarterly reports to provide status updates on the development and implementation of all assigned courses. |
| Delivered to program manager NLT 10 days after the end of each quarter. If required, Contractor will notify Government 10 business days prior to deadline they will be unable to meet. Contractor will provide an update to the date of delivery deliverable at the same time as the notification. |
| Direct observation and analysis of Contractor reports. |
| Para 5.2.1 |
| The contractor shall provide timely notification on items requiring government action. |
| The Contractor provided event reports and/or products where Government action is required. |
| No more than 1 Report (or 8%) of the Reports to the Appropriate Government Contract may be later than the Specified Time Period. |
| Direct observation, status meetings and analysis of Contractor reports. |
| Para 5.3.1 |
| The Contractor shall provide draft storyboards based on the inputs of customer/SMEs. |
| The Contractor provided draft storyboards that include the designs and layouts for a wide variety of organizational, technical, and general training materials of a complex nature. |
| No more than one revision for each deliverable product. If required, Government will provide edits within 10 business days, Contractor will have up to 10 business days to provide revised products. |
| Direct observation, status meetings, and analysis of proposed storyboards. |
| Para 5.4.1 |
| The Contractor shall provide training and technical assistance. |
| The Contractor provided training and technical assistance to subordinate developers on design, the correct use of equipment, and publishing methods. |
| No more than one revision for each technical assistance product. If required, Government will provide edits within 10 business days, Contractor will have up to 10 business days to provide revised products. |
| Direct observation, status meetings, and client feedback. |
Para 5.4.1
| The Contractor shall provide high-quality and accurate final learning products. |
| The Contractor provided high-quality and accurate final products, ensuring achievement of training objectives. |
| Delivered to program manager NLT 3 days after the expected due date. If required, Contractor will notify Government 10 business days prior to deadline they will be unable to meet. Contractor will provide an update to the date of delivery deliverable at the same time as the notification. |
| Direct observation, status meetings, participant/client feedback and analysis of Contractor reports. |
| Para 5.5.1 |
| The Contractor shall provide high-quality system administration of the learning management system |
| The Contractor provided high-quality and accurate final products, ensuring achievement of DHA LMS mission and/or program guidelines. |
| No more than 1 report of an LMS administration action resulting in a rework of the actions to correct the discrepancy. |
| Direct observation, status meetings, participant/client feedback and analysis of Contractor reports. |
Para 5.5.1
| The Contractor shall provide high-quality instructor-led training. |
| The Contractor provided instructor-led events with up to date materials. |
| Delivered at least twice per month on a routine scheduled and any ad-hoc for unique training topics or location time adjustments. If required, Contractor will notify Government 2 business days prior to deadline they will be unable to meet. Contractor will provide an update date of delivery deliverable at the same time as the notification. |
| Direct observation, status meetings, participant feedback and analysis of Contractor reports. |
Inspection Metrologies:
M1: Inspection of Reports. All reports shall be reviewed upon receipt. The reviewer will report any flaws in the document and categorize the flaws (Editorial, Format, and/or Substance).
DHA QASP Template V1 8
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6. CONTROL NUMBER
7. DEFICIENCY |_| MAJOR |_| MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
11. COR DETERMINATION
|_| ACCEPTED |_| REJECTED
12. CLOSE DATE
CUSTOMER COMPLAINT RECORD
DATE/TIME OF COMPLAINT
SOURCE OF COMPLAINT
ORGANIZATION
BUILDING NUMBER
INDIVIDUAL
PHONE NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
| 1. CONTRACT/TASK ORDER NUMBER |
| 2. CONTRACTOR |
| 3. TYPE OF SERVICES |
4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE
| 5. COR PHONE |
| 6. SUSPENSE DATE |
I. PERFORMANCE
7. |_| DEFICIENCY (CHECK ALL BOXES THAT APPLY)
|_| NEW
|_| REPEAT
|_| NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED
| 9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS CHECKED) |
| 10. DETAILED PERFORMANCE ASSESSMENT |
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE |_| CONCUR |_| NON-CONCUR
12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY
III. ACTION CORRECTED
14. |_| CONCUR |_| NON-CONCUR COR SIGNATURE AND DATE
15. COR REMARKS (REQUIRED)
16. CONTRACTOR REPRESENTATIVE REMARKS
DHA QASP Template V1 11
File details come from the government source that posted it. Updated .