HSFEHQ-10-Q-0123 A00001.pdf
PDF 66 KB Posted
- Attached to
- Warehouse Labels
- Solicitation number
- HSFEHQ-10-Q-0123
About this file
Amendment A00001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AttC-Installation Diagram.pdf | ||
| AttB-Magnetic Label Diagram.pdf | ||
| AttA-Adhesive Label Diagram.pdf | ||
| HSFEHQ-10-Q-0123.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NO.
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NO.
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR AC-
KNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 10-83)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(No., street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(If applicable)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
(X)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
A00001 08-10-2010
Federal Emergency Management Agency
Office of Acquisition Management
500 C Street, S.W., PP 5th Floor
Washington DC 20472
To all Offerors/Bidders HSFEHQ-10-Q-0123
08-05-2010 X
X X
The purpose of this amendment is to provide questions and answers related to this solicitation.
Interested parties may submit questions until 10:00am Eastern, Wednesday 11 August 2010.
The due date remains unchanged at 4:30pm Eastern, Thursday 12 August 2010.
Aleta Dust
08-10-2010
A00001
CONTINUATION PAGE
Questions submitted by interested vendors are in italic. Answers are in blue font.
1. How many different products will be involved for labeling? Do you mean how many types of labels? The labels should mirror the examples we provided. Three different magnetic label sizes total. The differences are the arrows that go up, down, or side to side.
2. Do you have any idea of the quantity mix of these products? The solicitation does not provide a way of calculating print production runs for the various labels required. The mix is defined in the layout diagram that shows how to apply them as well as an Excel Spreadsheet we will provide the vendor upon award. The only way to calculate is to look at the rack diagram and divide by pallet positions.
3. Since the contractor is required to make arrangements for lifts at each location except Atlanta and Frederick, and due to time constraints to submit a quote, will the government reimburse the contractor for expenses incurred if rental of lifts is required at the other locations? These costs should be included in the Installation CLINs prices.
4. How much time will the contractor be allowed for installation of the labels at each location? Frederick is the critical site where there is a time crunch. All of Frederick needs to be installed prior to 13 Sept 2010. The remaining are expected to be completed by 31 Oct 2010.
5. For the label CLINs 0001, 0002, 0003, and 0004:
a. Are there material specifications for durability time frame, or adhesive type or finish? Adhesive labels should have permanent adhesive be applied +50 Degrees F to a clean & dry surface.
b. Are there grade requirements for the codes specified? ISO/IEC 15416 is standard.
c. Are all labels to be pre printed off site? Yes.
d. Are all labels printed in black and white? Yes - Black lettering/black bars on a white background.
e. What type of material will the adhesive be expected to stick to? Coated metal, steel.
f. In what format will data to be printed be provided in? Microsoft Excel.
g. Will the strings to be printed in the 2D code be already concatenated or will the supplier need to format the strings to be encoded? The Supplier will need to format.
6. For the CLINs 0005, 0006, and 0007:
a. Please provide the construction expected for the pouch, i.e. is it clear or opaque, self adhesive or not, meant to be a durable for a certain time frame? Clear, self-adhesive, permanent.
b. Do you have a specification for the gage of plastic? 6 to 8 gauge.
7. For all installations, CLINs 0008-0014:
a. What is the time frame required for each installation site to commence and end? Frederick needs to be installed prior to 13 Sept 2010. The remaining are expected to be completed by 31 Oct 2010.
b. How many labels are to be applied at each location? Please review the table on the SOW. Magnetic labels and their pouches are to be installed.
c. Is any physical equipment needed to install at required heights or locations? Reach lift.
d. What are the available working hours at each location? Hours vary at each site, but usually 8am to
4pm.
e. Does the quote need to be inclusive of all travel costs or are they subject to approval per site? Travel costs are to be included in the Installation CLINs.
File details come from the government source that posted it. Updated .