PWS_ _PRS.pdf

PDF 85 KB Posted

Attached to
PUBLIC ASSISTANCE DIVISION REENGINEERING
Solicitation number
HSFE80-15-R-0007
Issued by

About this file

Performance Work Statement Performance Requirements Summary Template

View the file

Other files

File Type Posted
HSFE80-15-R-0007_0003.pdf PDF
HSFE80-15-R-0007_0002.pdf PDF
Revised_HSFE80-15-R-0007.pdf PDF
Q A_Part_1_ _2.pdf PDF
Revised_HSFE80-15-R-0007.pdf PDF
Revised_Statement_of_Objectives_PA_Reengineering.pdf PDF
HSFE80-15-R-0007_0001.pdf PDF
Past_Performance_Questionnaire.pdf PDF
PA-RE_Condensed_Playbook_06042015.pdf PDF
Statement_of_Objectives.pdf PDF
Cost_Price_Worksheet.pdf PDF
HSFE80-15-R-0007.pdf PDF
Wage_Determination.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT [TEMPLATE]

[Insert Title and Activity]

1.1 INTRODUCTION [Briefly describe the background and overall purpose of the procurement]

1.2. SCOPE OF WORK: Briefly describe the range of services to be acquired by the contract [ insert scope of work].

1.3 PLACE OF PERFORMANCE: [Describe the principal location of contract performance]

1.4 PERIOD OF PERFORMANCE: [Describe the base period of the contract from date of award; list any option years]

1.5. IDENTIFICATION OF PRIVACY ACT. [Identify if any exist]

1.6. PERFORMANCE QUALITY: The Contractor shall establish and maintain a complete Quality Control Plan …

2. GOVERNMENT FURNISHED ITEMS AND SERVICES: [Identify those items or services that will be needed for the contractor’s use (without cost to the contractor) to allow them to provide the required services, such as materials, facilities, training, etc.]

2.1. MATERIALS.

2.1.1. The Government will provide

2.2. FACILITIES.

2.3. GOVERNMENT SERVICES.

2.3.1. The Government will

3. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES: [Describe material and equipment tat the contractor must provide. Include in this section all personnel qualifications, if applicable.] The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under section <#> of this statement.

3.1.. PERSONNEL QUALIFICATIONS. An outline of qualifications for the Contractor staff is given below:

3.1.1.

3.2. MATERIALS. The Contractor shall:

3.2.1. Furnish materials, supplies, and equipment necessary to meet the requirements for the provision of services established under the terms of this contract.

3.3. EQUIPMENT. The Contractor shall:

3.3.1. Provide equipment and instrumentation necessary to

3.4. CONTRACTOR RESPONSIBILITIES. The contractor shall:

4. DESCRIPTION OF WORK: [This is the meat of the PWS. All of the work to be performed under the contract should be described in sufficient detail here.]

4.1. [SERVICE].

4.2. DELIVERABLES. [Identify any reports or documentation that needs to be submitted and the frequency of each. Must include the Contractor Management Reporting requirement.]

4.2.1. CONTRACTOR MANAGEMENT REPORTING (CMR):

5. APPLICABLE REGULATIONS AND MANUALS: (Current Editions) [List any publications, manuals, regulations that the contractor must abide by.]

5.1.

6. DEFINITIONS AND ACRONYMS:

6.1. DEFINITIONS:

6.2. ACRONYMS: [List all acronyms used in the PWS and what they represent.]

7. ATTACHMENT/TECHNICAL EXHIBIT LIST: List all attachments and technical exhibits that will be useful for the contractor to submit.

7.1. ATTACHMENT 1 / TECHNICAL EXHIBIT A – Title

7.2. ATTACHMENT 2 / TECHNICAL EXHIBIT B – Title

Performance Requirements Summary Template

PERFORMANCE

AREA

PARAGRAPH

NUMBER STANDARD PERFORMANCE MEASURE

METHOD OF

SURVEILLANCE

Identify the title of the performance area.

Provide a reference to the paragraph number in the Statement of Work or Performance Work Statement.

Identify the performance standard that relates to the performance area.

Identify the measure that must be met in order to be an “acceptable” work product or service.

Explain how the Government will monitor the work to validate it meets the performance standard.

Performance Work Statement worksheet (3).pdf
PERFORMANCE WORK STATEMENT [TEMPLATE]
1.2. SCOPE OF WORK: Briefly describe the range of services to be acquired by the contract [ insert scope of work].
1.6. PERFORMANCE QUALITY: The Contractor shall establish and maintain a complete Quality Control Plan …
2.1. MATERIALS.
3.1.. PERSONNEL QUALIFICATIONS. An outline of qualifications for the Contractor staff is given below:
4.2.1. CONTRACTOR MANAGEMENT REPORTING (CMR):
5.1.

File details come from the government source that posted it. Updated .