Attachment_B_-_CLINs_Records_Retention_Room_Project.docx

DOCX document 32 KB Posted

Attached to
Office Remodeling Projects Federal contract opportunity
Solicitation number
HSFE09-15-Q-0118
Issued by
Federal Emergency Management Agency Response Section

About this file

Attachment B - CLINs Records Retention Room

View the file

Other files for this federal contract opportunity

Other files attached to Office Remodeling Projects, newest first.
File Type Posted
HSFE09-15-Q-0118_Revised_91515.pdf PDF
Records_Retention_Room_Exhibit_1.pdf PDF
Conference_Room_Exhibits_A1_-_A4.pdf PDF
Attachment_A_-_CLINs_Conference_Room_Project.docx DOCX document
Attachment_C_-_SOW_Conference_Room_Project_Final.docx DOCX document
Attachment_D_-_SOW_Records_Retention_Area_Renovation_Final.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Line Item Numbers

CLIN 0001

Wall Finishing All interior concrete walls shall be cleaned, touched-up and painted.

All interior built-in wood framed walls shall be completed with drywall installation, taping, sanding, primer, and painted.

Design and build drywall around fire alarm.

Finish and paint trim around interior of each access door.

Box frame and drywall (taped/sanded/painted) around ceiling to floor sewer pipe.

CLIN 0002

Flooring Clean and re-grout existing quarry tile floor.

Perform minor repairs. Completed and finished look must be as close as possible to the existing tile.

CLIN 0003

Acoustical Ceiling Install acoustical ceiling to include grid.

The ceiling grid must accommodate (3) laying fluorescent lighting fixtures.

Contractor shall use existing ceiling materials if practical.

CLIN 0004

Fluorescent Lights Install (3) fluorescent lights to include electrical wiring from/to panel, lights and switches.

Install an electrical switch at each entrance door

CLIN 0005

Electrical Outlets Install (2) additional electrical 20 amp wall outlets location determined by the PAO Point of Contact.

CLIN 0006

Access Doors Sand, primer, and paint existing access doors.

CLIN 0007

Windows Clean, finish and paint window interior trim.

Tint windows to a Visible Transmittance factor of 0.50 or less.

CLIN 0008

Air Conditioning Install an independently controlled air conditioning unit correctly sized and sufficient to dehumidify the storage room.

Multi-Split system unit is recommended due to available outside compressor.

File details come from the government source that posted it. Updated .