IFB SOLICITATION HSCGG1-12-B-PRV121
View the file
Other files
| File | Type | Posted |
|---|---|---|
| fire island dredging.pdf | ||
| Amendment 0001 fire island dredging.pdf | ||
| P3294307Spc.pdf | ||
| P3294307Dwg.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IFB DTCGG1-01-B-3WK122
USCG PENNFIELD REEF LIGHT REPAIRS
LONG ISLAND SOUND, FAIRFIELD, CT
Contract Number: HSCGG1-12-C-PRV121 Solicitation Number: HSCGG1-12-B-PRV121
INVITATION FOR BID
SOLICITATION NUMBER: HSCGG1-12-B-PRV121
Issue Date on 5/03/12, Bids due 2:00 PM 6/6/2012
WARWICK, RHODE ISLAND
FOR: MAINTENANCE DREDGING AT USCG STATION FIRE ISLAND, BABYLON, NY
IMPORTANT - NOTICE TO BIDDER
1. This solicitation contains Sections A through L. Please read the entire solicitation and complete the following:
(a) Sign and return ONE COPY of the Bid Form, Section B, and Section K.
(b) Complete annual representations and certifications electronically via the Online Representations and Certifications Applications (ORCA) website at http://orca.bpn.gov to Supplement Section K submission.
(c) INCLUDE A DETAILED BREAKDOWN OF THE OFFERED PRICE WITH YOUR RESPONSE.
(d) Keep the remaining sections for your records.
(e) In accordance with FAR Case 2002-24, Federal Acquisition Circular (FAC) 2001-26, and FAR Subpart 4.12 - Annual Representations and Certifications, the use of ORCA became mandatory as of January 1, 2005. ORCA is available through the Business Partner Network (BPN) at <http://www.bpn.gov/ >. Contractors will use ORCA to electronically submit annual Representations and Certifications (Reps & Certs). Contractors will no longer be required to submit hard copies of their Reps & Certs with each proposal. For contractors to be able to upload their Reps & Certs to ORCA, they must have an active Central Contractor Registration (CCR) record and a Marketing Partner Identification Number (MPIN).
2. See Section L for Instructions, Conditions, and Notice to Bidders.
3. Before mailing your proposal, please recheck the following:
| (a) Does your offer/bid set forth full, accurate, and complete information as required by this solicitation including attachments and any amendments which may have been issued? |
| (b) Have you rechecked your figures, including calculations on your work sheets? |
| (c) Have you completed and signed all required documents? Check all sections. |
| (d) Bidders offering less than sixty (60) calendar days acceptance time WILL NOT BE considered and WILL BE rejected. |
4. For general information contact Mattie Walker, Contract Specialist at (401)736-1721. Requests for interpretations shall be submitted in writing only by fax (401)736-1704, letter, or Email to: mattie.walker@uscg.mil.
5. TECHNICAL QUESTIONS REGARDING SPECIFICATIONS AND/OR DRAWINGS SHOULD BE SUBMITTED IN WRITING VIA fax (401)736-1704, letter, or Email. NO LATER THAN 7 DAYS PRIOR TO THE BID OPENING DATE.
NOTICE FOR FILING AGENCY PROTESTS
United States Coast Guard Ombudsman Program
It is the policy of the United States Coast Guard (USCG) to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time-consuming litigation. OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the General Accountability Office (GAO).
Interested parties are encouraged to seek resolution of their concerns within the USCG as an Alternative Dispute Resolution (ADR) forum, rather than filing a protest with the GAO or some external forum. Interested parties may seek resolution of their concerns informally or opt to file a formal agency protest with the contracting officer or Ombudsman.
Informal forum with the Ombudsman. Interested parties who believe a specific USCG procurement is unfair or otherwise defective should first direct their concerns to the cognizant contracting officer. If the contracting officer is unable to satisfy the concerns, the interested party is encouraged to contact the USCG Ombudsman for Agency Protests. Under this informal process, the agency is not required to suspend contract award performance. Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum. In order to ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, contracting officer, and solicitation closing date (if applicable).
Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the contracting officer through open and frank discussions. If the protester’s concerns are unresolved, an independent review is available by the Ombudsman. The protester may file a formal agency protest to either the contracting officer or as an alternative to that, the Ombudsman under the OPAP program. Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined in writing to be in the best interest of the Government. The agency’s goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth in FAR 33.103. If the protester fails to submit the required information, resolution of the protest may be delayed or the protest may be dismissed. This will not preclude re-filing of the protest to meet the requirement. To be timely, protests must be filed within the period specified in FAR 33.103(e). Formal protests filed under the OPAP program should be submitted to:
Department of Homeland Security United States Coast Guard (CG-9131) Ombudsman Program for Agency Protests 1900 Half Street, SW, Room 11-0602 Washington, D. C. 20593-0001
FAX: 202.475.3904
The Ombudsman Hotline telephone number is 202.372.3695.
RFQ DTCGG1-98-Q-3WK208 Page 2 of 19
SITE ALTERATIONS AT USCG MANASQUAN ESMT, NEW JERSEY
DTCGG1-98-Q-xxxxxx Page of 23
SOLICITATION OFFER
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
HSCGG1-12-B-PRV121
2. tYPE OF SOLICITATION
|X| SEALED BID (IFB)
|_| NEGOTIATED (RFP)
05/3/12
PAGE OF PAGES
IMPORTANT - The "offer" section on page 2 must be fully completed by offeror.
4. contract nO.
HSCGG1-12-C-PRV121
5. requisition/purchase request no.
2412G11PRV121
6. project no.
| 7. issued by code |
| 51283 |
| 8. address offer to |
Contracting Officer CEU Providence 300 Metro Center Blvd Warwick, RI 02886
Same as Block 7.
9. FOR INFORMATION
CALL
a. name Mattie Walker Contract Specialist b telephone no. (Include area code) (no collect calls) 401-736-1721
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
HSCGG1-12-B-PRV121, MAINTENANCE AT U.S. COAST GUARD STATION FIRE ISLAND, BABYLON, NY (SUFFOLK COUNTY)
Work consists of the dredging and disposing by hydraulic means approximately 4,500 cubic yards of primarily silt from a mooring basin: Preparing an adjacent upland containment basin to receive the dredged material by excavating and disposing off-site existing material, building a containment berm around the site using existing materials, installing a de-watering structure and incidental related work. All work shall be accomplished in accordance with the contract terms and conditions, the specifications attached hereto, drawings, and applicable wage rates as incorporated herein.
CAUTION TO BIDDERS: You are urged to visit the site and take such steps as may be reasonably necessary to ascertain the nature and exact location of the work. Failure to visit the site for this purpose does not relieve you from the responsibility for estimating properly the difficulty or cost of successfully performing the work. Visits should be scheduled with DCC William Nilsen at 631-395-4433, or LT Amalia Daratos at 631-395-4477.
The total estimated construction range of this solicitation is between $100,000 and $250,000. THIS IS A TOTAL SMALL BUSINESS SET ASIDE.
ALL FEDERAL, STATE AND LOCAL TAXES SHALL BE INCLUDED IN BID PRICES. NO TAX EXEMPT CERTIFICATE WILL BE ISSUED.
11. The contractor shall begin performance within 10 calendar days and complete the work within 90 calendar days after receiving |_| award, |_| notice to proceed. This performance period is |_| mandatory, |_| negotiable. *(See Section F)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12B.)
|_| YES |_| NO
12B. CALENDAR DAYS
TEN
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by _2PM_____ (hour) local time 06/06/12 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee |X| is, |_| is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
| STANDARD FORM 1442 (Rev. 4-85) |
| Prescribed by GSA |
| FAR 53.301-1442 HSCGG1-12-B-PRV121 Page 2 | FEDERAL ACQUISITION REGULATION |
| OFFER (Must be fully completed by offeror) |
14. name and address of offeror (Include ZIP Code)
15. telephone no./fax nO. (Include area code)
TIN NO: ______________________
16. remittance address (Include only if different than Item 14)
DUNS NO: ___________________
| CODE |
| FACILITY CODE |
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS
TOTAL LUMP SUM OFFER $__________________________________________
18. The offeror agrees to furnish any required performance and payment bonds
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. name and title of person authorized to sign offer (Type or print) 20B. signature
20C. offer date
AWARD (To be completed by Government)
21. items accepted:
22. amount
23. accounting and appropriation data
2/P/201/137/43/0/RV/30199/2546 PROJ3294307
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. Other than full and open competition pursuant to
|_| 10 USC 2304I ( 5 ) |_| 41 USC USC 253I ( )
| 26. administered by code |
| 27. payment will be made by |
USCG CEU Providence Attn: Mattie Walker 300 Metro Center Blvd.
Warwick, RI 02886 (401)736-1721
COMMANDING OFFICER (0324)
USCG Finance Center 1430A Kristina Way Chesapeake, VA 23326-0324 For payment inquiries, call (757)523-6940
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
|_| 28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.)
Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
|_| 29. AWARD (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN
(Type or print) 31A. name of contracting officer (Type or print)
Jean Bretz, Contracting Officer
30b. signature
30C. DATE
31b. united states of america by 31c. award date
SECTION A
SOLICITATION/CONTRACT FORM
TABLE OF CONTENTS
(X)|SEC.| DESCRIPTION _____ ______________________PAGE(S)
PART I - THE SCHEDULE
| X | | A | |SOLICITATION/CONTRACT FORM | 3-4 | ||
| X | | B | |SUPPLIES OR SERVICES AND PRICES/COSTS _ | 5 _____ | ||
| X | | C | |DESCRIPTION/SPECS/WORK STATEMENT_______ | 5 | ||
| | D | |PACKAGING AND MARKING | 6 | |||
| X | | E | |INSPECTION AND ACCEPTANCE | 6-7 | ||
| X | | F | |DELIVERIES OR PERFORMANCE | 7__ __ | ||
| X | | G | |CONTRACT ADMINISTRATION DATA | 8-9 _ | ||
| X | | H | |SPECIAL CONTRACT REQUIREMENTS | 10-12 _ | ||
| PART II - CONTRACT CLAUSES | _______ _ X | | I | |CONTRACT CLAUSES | 13-21 _ |
PART III - LIST OF DOCUMENTS, EXHIBITS AND
| OTHER ATTACHMENTS | _______ _ | |||
| X | | J | |LIST OF ATTACHMENTS | 22_ __ | |
| PART IV – REPRESENTATI | ONS AND INSTRUCTIONS | ________ _ | ||
| | | |REPRESENTATIONS, CERTIFICATIONS AND OTHER | |||
| X | | K | |STATEMENTS OF OFFERORS | 23-30 | |
| X | | L | |INST., CONDITIONS, AND NOTICES TO OFFERORS | 31-34 | |
| X M SECTION M 35 |
A.1 The estimated cost of this project ranges between $100,000 and $250,000.
A.2 The NAICS code for this project is 237990*, with a small business size standard $20.0 Million. (*To be considered small under the dredging NAICS code, a concern must perform 40% of volume dredged with its own equipment or equipment owned by another small dredging concern.)
NOTES: Both Federal state permits contain restrictions for dredging. See U.S. Army Corps permit Condition (B), and the New York DEC permit Special Conditions (2). .
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
1. The Contractor shall provide all labor, materials, equipment, transportation, supervision and disposal necessary for the dredging and disposing by hydraulic means approximately 4,500 cubic yards of primarily silt from a mooring basin: Preparing an adjacent upland containment basin to receive the dredged material by excavating and disposing off-site existing material, building a containment berm around the site using existing materials, installing a de-watering structure and incidental related work. All work shall be accomplished in accordance with the contract terms and conditions, the specifications attached hereto, drawings, and applicable wage rates as incorporated herein, Department of the Army Permit, No. NAN-2010-01316, US Army Corps of Engineers – New York District, Bid Item Dredge and dispose of dredged material at the designated disposal site:
B.1 4,500 cy (Estimated Quantity) @ $________ per cubic yard* = $______________
B2. Total Lump Sum Bid equals all other costs Mobilization/Demobilization, Progress Schedule and Construction Submittals Environmental Controls, and Pre-dredging survey and Post dredging Plan and Quantity Calculations.
Lump Sum Bid: $_______________
Total Lump Sum Bid B.1 and B.2 $________________
SECTION C
DESCRIPTION/SPECIFICATION/WORK STATEMENT
All work shall be performed in accordance with the following documents:
Specifications for Maintenance Dredging at USCG Station Fire Island, Babylon, NY (Suffolk County) PSN 3294307 Drawings Number P3294307 (Sheet 1 of 4) Wage-Rate General Decision No. NY120001 dated 01/06/2012
SECTION D
PACKAGING AND MARKING
This section is not applicable.
SECTION E
INSPECTION AND ACCEPTANCE
E.1 INSPECTION OF CONSTRUCTION (FAR 52.246-12)(AUG 1996)
(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not—
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may—
(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(2) Terminate for default the Contractor’s right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.
SECTION F
DELIVERIES OR PERFORMANCE
52.211-18 Variation in Estimated Quantity Apr 1984
F.1 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52.211-10)(APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the work within 90 calendar days after receipt of Notice to Proceed.
NOTE: Any dredging prior to 1 October will require SILTRATION Control. Therefore, actual dredging will not begin until 1 October. All other activities may commence upon issuance of the Notice to Proceed.
F.2 CONTRACT TIME NOTICE TO PROCEED
(a) The Contractor shall perform no work under this contract until the required contract documents and bonds have been furnished. Thereafter, work at other than the contract site may be undertaken. The Contractor shall perform no work at the contract site except pursuant to a notice to proceed given by the Contracting Officer.
(b) Notice to proceed may be issued by the Government at its convenience. Any right of the contractor to a price adjustment because of unreasonable delay on the part of the Government in issuing notice to proceed shall be determined in accordance with the clause titled "Suspension of Work."
SECTION G
CONTRACT ADMINISTRATION DATA
G.1 INVOICING REQUIREMENTS (FIRM FIXED-PRICE)
NEW (REVISED) INVOICING CLAUSE FOR CENTRAL INVOICE SUBMITTAL
Usually found in Section G of contracts
(a) Invoices shall be prepared and submitted in accordance with the provisions of FAR clause 52.232-27, "Prompt Payment for Construction Contracts." Payments will not be made more frequently than once per month.
(b) Each invoice shall contain the following information:
(1) Contract and Delivery/Task Order Number
(2) Name of the Contract Specialist or Contracting Officer
(3) Invoice Routing Code (IRC) assigned by the Coast Guard
(4) Annotate on the invoice indicating that the contractor represents a small business for accelerated payment purposes.
(c) The Coast Guard unique Invoice Routing Code (IRC) for this contract or delivery/task order is:
CEU-PROV.
(d) Each invoice must be submitted to the designated billing office via one of the following modes, listed in descending order of preference:
(1) FINCEN Website invoice receipt form:
http://www.fincen.uscg.mil/centralinv/central_inv_contr.cfm
(2) Fax: (757-523-6900)
| (3) Mailed to: | Commercial Invoices | |
| U.S. Coast Guard Finance Center | ||
| 1430A Kristina Way | ||
| Chesapeake, VA 23326 |
(e) To facilitate processing, all proper invoices and any supporting information submitted electronically using the FINCEN web based invoice submission capability must be submitted as a single Adobe .pdf formatted file, or as otherwise specified in the contract.
(f) Supporting documentation along with a courtesy copy of the invoice shall also be e-mailed to the Contract Specialist and/or COR at the addresses cited below:
| _________ ________@uscg.mil [fill in Contract Specialist e-mail address] |
| _________ ________@uscg.mil [fill in COR e-mail address]” |
(g) In accordance with the Prompt Payment Act, for the purposes of determining a payment due date and the date on which interest will begin to accrue if a payment is late, a proper invoice shall be deemed to have been received:
(1) On the later of:
(i) For invoices that are mailed or transmitted via facsimile, the date a proper invoice is actually received by the designated billing office and annotates the invoice with date of receipt at the time of receipt.
(ii) For invoices electronically transmitted by the contractor via web based submission, the date a transmission is received by the designated billing office, and receipt confirmation is provided to the designated recipient; or
(ii) The seventh day after the date on which the property is actually delivered or performance of the services is actually completed; unless—
a) The agency has actually accepted the property or services before the seventh day in which case the acceptance date shall substitute for the seventh day after the delivery date; or
b) A longer acceptance period is specified in the contract, in which case the date of actual acceptance or the date on which such longer acceptance period ends shall substitute for the seventh day after the delivery date;
(2) On the date placed on the invoice by the contractor, when the agency fails to annotate the invoice with date of receipt of the invoice at the time of receipt (such invoice must be a proper invoice); or
(3) On the date of delivery, when the contract specifies that the delivery ticket may serve as an invoice.
(4) Web based submission by the contractor and receipt confirmation does not reflect Government review or acceptance of the invoice.
(5) Payment inquiries and status may be obtained - at the following website: https://www.fincen.uscg.mil/secure/payment.htm.
G.2 CONTRACT ADMINISTRATION
The Contracting Officer, U.S. Coast Guard, Civil Engineering Unit Providence will administer this contract. All matters related to the performance of this contract, and all correspondence, shall be coordinated with the Contract Branch and be directed to:
| USCG Civil Engineering Unit Providence |
| Attention: Mattie Walker, Contract Specialist |
| 300 Metro Center Blvd. |
| Warwick, RI 02886 |
| (401)736-1721 Fax (401) 736-1704 |
| E-mail: mattie.walker@uscg.mil |
SECTION H
SPECIAL CONTRACT REQUIREMENTS
H.1 52.228-1 BID GUARANTEE (Sept 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be (20%)_percent of the bid price or $_$3 Million, which, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of provision) H.2 52.228-2 ADDITIONAL BOND SECURITY. (Oct 1997)
The Contractor shall promptly furnish additional security required to protect the Government and persons supplying labor or materials under this contract if—
(a) Any surety upon any bond, or issuing financial institution for other security, furnished with this contract becomes unacceptable to the Government;
(b) Any surety fails to furnish reports on its financial condition as required by the Government;
(c) The contract price is increased so that the penal sum of any bond becomes inadequate in the opinion of the Contracting Officer; or
(d) An irrevocable letter of credit (ILC) used as security will expire before the end of the period of required security. If the Contractor does not furnish an acceptable extension or replacement ILC, or other acceptable substitute, at least 30 days before an ILC’s scheduled expiration, the Contracting officer has the right to immediately draw on the ILC.
(End of clause)
H.3 INSURANCE - WORK ON A GOVERNMENT INSTALLATION (FAR 52.228-5) (JAN 1997)
(a) The Contractor shall, at its own expense, provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required in the schedule or elsewhere in the contract.
(b) Before commencing work under this contract, the Contractor shall notify the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective (1) for such period as the laws of the State in which this contract is to be performed prescribed or (2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.
(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require sub-contractors to provide and maintain the insurance required in the Schedule or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors' proofs of required insurance, and shall make copies available to the Contracting Officer upon request.
H.4 REQUIREMENT FOR INSURANCE
In accordance with the provisions of FAR Clause 52.228-5, "Insurance - Work on a Government Installation," the Contractor shall furnish to the Contracting Officer a certificate of insurance, identified by contract number, as evidence of the existence of the following minimum insurance coverages.
Type of Coverage Accident Per Person Per Accident Property
Comprehensive General Liability $500,000 Automobile Liability $200,000 $500,000 $20,000
Workmen's Compensation--As required by Federal and State Law.
Full insurance coverage in accordance with the U.S. Longshoremen's and Harbor Worker's Compensation Act, 33 USC 901 et seq will be required when a specific project involves operations in or on piers or waterways. All insurance policies shall provide for notice of cancellation and shall be given to the Contracting Officer not less than 30 days before the effective date of such cancellation, and the certificates of insurance shall indicate that the above provision has been included.
************************************************************************A certificate of insurance must be presented to the Contracting Officer within ten (10) calendar days after award of the contract.
H.5 SUBCONTRACT DATA
The Contractor shall submit an executed Statement and Acknowledgement (Standard Form 1413), to the Contracting Officer for every subcontractor (including every subcontractor of the second or lower tier) that will be performing work at the construction site. This shall be done before the subcontractor begins work. This form provides an acknowledgement by the subcontractor that mandatory "flow-down" contract clauses have been included in his/her contract in accordance with Clause 52.222-11. A copy of Form SF 1413 will be given to the Contractor at time of award. Completing this form creates no contractual relationship between the subcontractor and the Government.
H.6 PRICING OF ADJUSTMENTS
When costs are a factor in any determination of a contract price adjustment pursuant to the Changes clause or any other provision of this contract such costs shall be in accordance with the contract cost principles and procedures in Federal Acquisition Regulation Part 31.
H.7 NOTIFICATION OF MILLER ACT PAYMENT BOND PROTECTION (USCG)
(HSAR 3052.228-90) (DEC 2003)
This notice clause shall be inserted by first tier subcontractors in all their subcontracts and shall contain the surety which has provided the payment bond under the prime contract.
(a) The prime contract is subject to the Miller Act (40 USC 270), under which the prime contractor has obtained a payment bond. This payment bond may provide certain unpaid employees, suppliers, and subcontractors a right to sue the bonding surety under the Miller Act for amounts owed for work performed and materials delivered under the prime contract.
(b) Persons believing that they have legal remedies under the Miller Act should consult their legal advisor regarding the proper steps to take to obtain these remedies. This notice clause does not provide any party any rights against the Federal Government, or create any relationship, contractual or otherwise, between the Federal Government and any private party.
(c) The surety who has provided the payment bond under the prime contract is:
______________________________ (Name) ______________________________ (Street Address) ______________________________ (City, State, Zip Code) ______________________________ (Contact and Telephone No.)
SECTION I
CONTRACT CLAUSES
I.1 CLAUSES INCORPORATED BY REFERENCE (FAR 52.252-2) (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: http://www.acquisition.gov/comp/far/index.html
| 52.202-1 | Definitions | JAN 2012 | |
| 52.203-3 | Gratuities | APR 1984 | |
| 52.203-5 | Covenant Against Contingent Fees | APR 1984 | |
| 52.203-6 | Restrictions on Subcontractor Sales | SEP 2006 | |
| To the Government | |||
| 52.203-7 | Anti-Kickback Procedures | OCT 2010 | |
| 52.203-8 | Cancellation, Rescission, and Recovery of Funds | ||
| for Illegal or Improper Activity | JAN 1997 | ||
| 52.203-10 | Price or Fee Adjustment for Illegal or Improper | JAN 1997 | |
| Activity | |||
| 52.203-12 | Limitation on Payments to Influence Certain | OCT 2010 | |
| Federal transactions | |||
| 52.203-16 | Preventing Personal Conflicts of Interest | DEC 2011 | |
| 52.204-4 | Printed or Copied Double-Sided Postconsumer | MAY 2011 | |
| Fiber Paper | |||
| 52.204-7 | Central Contractor Registration | FEB 2012 | |
| 52.204-9 | Personal Identity Verification of Contractor | JAN 2011 |
Personnel
| 52.204-10 | Reporting Executive Compensation and First- | FEB 2012 | |
| Tier Subcontract Awards | |||
| 52.209-6 | Protecting the Government's Interest when | DEC2010 Subcontracting With Contractors Debarred, | |
| Suspended, or Proposed for Debarment | |||
| 52.209-9 | Update of Publicly Available Information | FEB 2012 | |
| Regarding Responsibility Matters | |||
| 52.214-26 | Audit and Records—Sealed Bidding | OCT 2010 | |
| 52.214-29 | Order OF Precedence-Sealed Bidding | JAN 1986 | |
| 52.219-6 | Notice of Total Small Business Set-Aside | NOV 2011 | |
| 52.219-8 | Utilization of Small business Concerns | JAN 2011 | |
| 52.219-14 | Limitation on Subcontracting | NOV 2011 | |
| 52.219-28 | Post-Award Small Business Program | APR 2009 | |
| 52.222-3 | Convict Labor | JUN 2003 | |
| 52.222-4 | Contract Work Hours and Safety Standards Act – | JUL 2005 | |
| Overtime -Compensation | |||
| 52.222-6 | Davis-Bacon Act | JUL 2005 | |
| 52.222-7 | Withholding of Funds | FEB 1988 | |
| 52.222-8 | Payrolls and Basic Records | JUN 2010 | |
| 52.222-9 | Apprentices and Trainees | JUL 2005 | |
| 52.222-10 | Compliance With Copeland Act Requirements | FEB 1988 | |
| 52.222-11 | Subcontracts (Labor Standards) | JUL 2005 | |
| 52.222-12 | Contract Termination – Debarment | FEB 1988 | |
| 52.222-13 | Compliance with Davis-Bacon and Related | FEB 1988 | |
| Act Regulations | |||
| 52.222-14 | Disputes Concerning Labor Standards | FEB 1988 | |
| 52.222-15 | Certification of Eligibility | FEB 1988 | |
| 52.222-21 Prohibition of Segregated Facilities | FEB 1999 | ||
| 52.222-23 Notice of Requirement For affirmative Action to | FEB 1999 | ||
| Ensure Equal Employment Opportunity for | |||
| Construction Minority: 5.8%: Women 6.9%: | |||
| Suffolk County | |||
| 52.222-26 | Equal Opportunity | MAR 2007 | |
| 52.222-27 | Affirmative Action Compliance Requirements | FEB 1999 | |
| For Construction | |||
| 52.222-35 | Equal Opportunity for Veterans | SEP 2010 | |
| 52.222-36 | Affirmative Action for Workers with Disabilities | OCT 2010 | |
| 52.222-37 | Employment Reports Veterans, | SEP 2010 | |
| 52.222-40 | Notification of Employee Rights Under | DEC 2010 | |
| The National Labor Relations Act | |||
| 52.222-50 | Combating Trafficking in Persons | FEB 2009 | |
| 52.223-2 | Affirmative Procurement of Biobased Products | DEC 2007 | |
| Under Service and Construction Contracts | |||
| 52.223-3 | Hazardous Material Identification & Material | JAN 1977 | |
| Safety Date | |||
| 52.223-5 | Pollution Prevention and Right-to-Know | MAY 2011 | |
| Information | |||
| 52.223-6 | Drug-Free Workplace | MAY 2001 | |
| 52.223-9 | Estimate of Percentage of Recovered | MAY 2008 | |
| Material Content for EPA Designated Items | |||
| 52.223-15 | Energy Efficiency in Energy Consuming Products | DEC 2007 | |
| 52.223-17 | Affirmative Procurement of EPA-Designated | MAY 2008 |
Items in Service & Construction Contracts
| 52.223-18 | Encouraging Contractor Policies to Ban | AUG 2011 | |||
| Text Messaging While Driving | |||||
| 52.225-10 | Notice of Buy American Act Requirement- | FEB 2009 | |||
| Construction Materials | |||||
| 52.225-13 | Restrictions on Certain Foreign Purchases | JUN 2008 | |||
| 52.227-2 | Notice and Assistance Regarding Patent and | DEC 2007 | |||
| Copyright infringement | |||||
| 52.227-4 | Patent Indemnity - Construction Contracts | DEC 2007 | |||
| 52.228-11 | Pledges of Assets | JAN 2012 | |||
| 52.228-12 | Prospective Subcontractor Requests for Bonds | OCT 1995 | |||
| 52.228-14 | Irrevocable Letter of Credit | DEC 1999 | |||
| 52.228-15 | Performance & Payment Bonds – Construction | OCT 2010 | |||
| 52.229-3 | Federal, State, and Local Taxes | APR 2003 |
| 52.232-5 | Payments Under Fixed-Price Construction Contracts | SEP 2002 | |||||||
| 52.232-17 | Interest | OCT 2010 | |||||||
| 52.232-23 | Assignment of Claims | JAN 1986 | |||||||
| 52.232-27 | Prompt Payment for Construction Contracts | OCT 2008 (a)(1)(i)(A) 30 Days | |||||||
| 52.232-33 | Payment by Electronic Funds Transfer – | OCT 2003 | |||||||
| Central Contractor Registration | |||||||||
| 52.233-1 | Disputes (Alt I - DEC 1991) | JUL 2002 | |||||||
| 52.233-3 | Protest After Award | AUG 1996 | |||||||
| 52.233-4 | Applicable Law for Breach of Contract Claim | OCT 2004 | |||||||
| 52.236-2 | Differing Site Conditions | APR 1984 | |||||||
| 52.236-3 | Site Investigation and Conditions Affecting the Work | APR 1984 | |||||||
| 52.236-5 | Material and Workmanship | APR 1984 | |||||||
| 52.236-7 | Permits & Responsibilities | NOV 1991 | |||||||
| 52.236-8 | Other Contracts | APR 1984 | |||||||
| 52.236-9 | Protection of Existing Vegetation, Structures, | APR 1984 Equipment, Utilities and Improvements | |||||||
| 52.236-10 | Operations and Storage Areas | APR 1984 | |||||||
| 52.236-11 | Use and Possession Prior to Completion | APR 1984 | |||||||
| 52.236-12 | Cleaning Up | APR 1984 | |||||||
| 52.236-13 | Accident Prevention | NOV 1991 | |||||||
| 52.236-14 | Availability and Use of Utility Services | APR 1984 | |||||||
| 52.236-15 | Schedules for Construction Contracts | APR 1984 | |||||||
| 52.236-17 | Layout of Work | APR 1984 | |||||||
| 52.236-21 | Specifications and Drawings for Construction | FEB 1997 | |||||||
| 52.236-26 | Pre-construction Conference | FEB 1995 | |||||||
| 52.242-13 | Bankruptcy | JUL 1995 | |||||||
| 52.242-14 | Suspension of Work | APR 1984 | |||||||
| 52.243-4 | Changes | JUN 2007 | |||||||
| 52.243-6 | Change Order Accounting | APR 1984 | |||||||
| 52.244-6 | Subcontracts for Commercial Items | DEC 2010 | |||||||
| 52.246-21 | Warranty of Construction | MAR 1994 | |||||||
| 52.248-3 | Value Engineering - Construction | OCT 2010 | |||||||
| 52.249-2 | Termination for Convenience of the Government | APR 2012 (Fixed Price) ALT I (SEP 1996) | |||||||
| 52.249-10 | Default (Fixed-Price Construction) | APR 1984 | |||||||
| 52.253-1 | Computer Generated Forms | JAN 1991 |
The following Homeland Security Acquisition Regulation (HSAR) clauses are also incorporated by reference:
3052.211-70, Index for Specifications (Dec 2003) 3052.220-70, Strikes or Picketing Affecting Timely Completion of the Contract Work (Dec 2003) 3052.222-71, Strikes or Picketing Affecting Access to a DHS Facility (Dec 2003) 3052.222-90, Local Hire (Jun 2006) 3052.223-90, Accident & Fire Reporting (Dec 2003) 3052.228-70, Insurance (Dec 2003) 3052.242-71, Dissemination of Contract Information (Dec 2003)
I.2 POST-AWARD SMALL BUSINESS PROGRAM REPRESENTATION (FAR 52.219-28) (APR 2012)
(a) Definitions. As used in this clause— Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is “not dominant in its field of operation” when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.
(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:
(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.
(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.
(3) For long-term contracts—
(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and
(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.
(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at http://www.sba.gov/services/contractingopportunities/sizestandardstopics/.
(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.
(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the rerepresentation required by paragraph (b) of this clause by validating or updating all its representations in the Online
Representations and Certifications Application and its data in the Central Contractor Registration, as necessary, to ensure that they reflect the Contractor’s current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.
(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.
(g) If the Contractor does not have representations and certifications in ORCA, or does not have a representation in ORCA for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code 237990 assigned to contract number HSCG-12-C-PRV121.
[Contractor to sign and date and insert authorized signer’s name and title].
Contractor’s Signature Date (End of clause)
I.3 BUY AMERICAN ACT—CONSTRUCTION MATERIALS (FAR 52.225-9) (SEP 2010)
(a) Definitions. As used in this clause— “Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 ( 46 U.S.C. App. 1702), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means—
(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the Buy American Act (41 U.S.C. 10a - 10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
[Contracting Officer to list applicable excepted materials or indicate “none”]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
| Construction Material Description |
| Unit of Measure |
| Quantity |
| Price (Dollars)* |
Item 1:
| Foreign construction material |
| _______ |
| _______ |
| _______ |
| Domestic construction material |
| _______ |
| _______ |
| _______ |
| Item 2: |
| _______ |
| _______ |
| _______ |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .