Amendment 003 to HSCGG1-12-B-PCDAXF
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BID ABSTRACT HSCGG1-12-B-PCGAXF REPL MED VOLTAGE TRANSFORMERS USCG ACADEMY NEW LONDON CT.pdf | ||
| amendment 0005.pdf | ||
| amendment 0004.pdf | ||
| PCGAXF AMEND 0002 POSTED.pdf | ||
| Amendment 0001 HSCGG112BPCGAXF.pdf | ||
| CT24.pdf | ||
| Specs as PDF.pdf | ||
| SOLICITATION HSCGG1-12-B-PCGAXF REPL MEDIUM VOLTAGE TRANSFORMERS USCGA.pdf | ||
| CC-1174-4533560.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGES
1 1
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
6/29/2012
4. REQUISITION/PURCHASE REQ.
2412G12PCGAXF
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 51283 7. ADMINISTERED BY (If other than Item 6) CODE 51283
Contracting Officer USCG Civil Engineering Unit Providence 300 Metro Center Blvd.
Warwick, RI 02886-1747
Contracting Officer USCG Civil Engineering Unit Providence 300 Metro Center Blvd.
Warwick, RI 02886-1747
8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)
TO ALL BIDDERS
THIS AMENDMENT MUST BE ACKNOWLEDGED
SEE BLOCK 11 BELOW
9A. AMENDMENT OF SOLICITATION NO.
HSCGG1-12-B-PCGAXF
9B. DATED (SEE ITEM 11)
18 JUN 2012
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Bid Opening Remains 19 July 2012, at 2:00 p.m.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET
FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The solicitation referenced on block 9, for Replacement of Medium Voltage Transformers at the USCG Academy, is amended as follows:
a) The attached (1 sheet) provides responses to clarifications requested.
All other terms and conditions remain unchanged. Due date for receipt of bids remains 19 July 2012, 2:00 p.m.
-End-
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or Print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Jean Bretz
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED
16B UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83) PREVIOUS EDITION UNUSABLE Prescribed by GSA
FAR (48 CFR) 53.243
Replace Medium Voltage Transformers
Project # 4533560
HSCGG1-12-B-PCGAXF
1. Clarify the voltage intent on the secondary of this transformer as per the detail all connections go to a common buss-duct/piece of switchgear. We have no information on the second secondary termination point?
Note #1 refers to dual voltage primary(13.2/4.16kv) and a dual voltage secondary (120/208 and 277/480volt this note contradict what is shown in the pictures and in Note #3 which says/shows termination to (1) piece of 3000 amp gear in the next room. Is this a typo? Where does the other secondary attach?
RESPONSE: This transformer is for Chase C where mid-life renovations are planned for the future.
During the renovations to other Chase Hall Annexes (currently A & B) the main distribution for the building is being changed from 208V to 480V. Currently Chase C is operating on 208V and will continue to do so until the renovations begin in four or five years or longer. The Academy will be upgrading the main distribution voltage within the next several years, so in an effort to plan for future upgrades, a dual tap primary voltage (Academy wide upgrade) with dual tap voltage secondary (for mid-life upgrade) transformer is needed.
For this project the 208V tap on the secondary is to be connected to the bus in the main switchgear.
2. Please clarify the style of termination at the existing G&W switch.
RESPONSE: 200A elsti-mold elbows. (see drawing E106, Note 2)
3. Please clarify if any of the existing G%W switches are under factory notification to not de-energize under load.
RESPONSE: There are currently no restrictions for operating the G&W switches under load. Most of the G&W switches (one Canadian Power Switch, also SF6, in Satterlee Hall) are SF6 gas switches that have been installed within the last five years.