SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC WALNUT (WLB-225A) DOCKSIDE AVAILABILITY FY2018 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Tanks (MP Fuel Service), Clean and Inspect | JOB | 1 | $0.00 | |
| D-002 | Compressed Air Receivers and System Valves (All), Clean, Inspect, Hydro and Lift | JOB | 1 | $0.00 | |
| D-003 | Hydraulic Chain Stoppers, Inspect And Service | JOB | 1 | $0.00 | |
| D-004 | Crossdeck Winches, Inspect and Service | JOB | 1 | $0.00 | |
| D-005 | Mechanical Chain Stoppers, Inspect and Service | JOB | 1 | $0.00 | |
| D-006 | Commissary Hoist, Inspect and Service | JOB | 1 | $0.00 | |
| D-007 | Grey Water Holding Tank(s), Clean and Inspect | JOB | 1 | $0.00 | |
| D-008 | Sewage Holding Tank(s), Clean and Inspect | JOB | 1 | $0.00 | |
| D-009 | Grey Water Piping, Clean and Flush | JOB | 1 | $0.00 | |
| D-010 | Sewage Piping, Clean And Flush | JOB | 1 | $0.00 | |
| O-011 | Water Tight Hatches (Internal DC Deck and Below), Renew | JOB | 1 | $0.00 | |
| D-012 | Vent Fans and Motors, Renew | JOB | 1 | $0.00 | |
| D-013 | Vent Ducts, Renew | JOB | 1 | $0.00 | |
| D-014 | Vent Ducts (Engine And Motor Room All), Commercial Cleaning | JOB | 1 | $0.00 | |
| D-015 | Single Point Davit, Inspect and Service | JOB | 1 | $0.00 | |
| D-016 | Twin Pivot Arm Davit, Inspect and Service | JOB | 1 | $0.00 | |
| O-017 | Tanks (Grey Water Holding), Preserve “100%” | JOB | 1 | $0.00 | |
| O-018 | Tanks (Grey Water Holding), Preserve “Partial” | JOB | 1 | $0.00 | |
| O-019 | Tanks (Sewage Holding), Preserve “100%” (O) | JOB | 1 | $0.00 | |
| O-020 | Tanks (Sewage Holding), Preserve “Partial” | JOB | 1 | $0.00 | |
| D-021 | Deck Covering (Interior Wet/Dry), Renew | JOB | 1 | $0.00 | |
| D-022 | Decks - Exterior, Preserve (“MIL-Spec/Flight Deck” System) | JOB | 1 | $0.00 | |
| D-023 | 1-92-0-L Passageway Deck Section, Renew | JOB | 1 | $0.00 | |
| O-024 | Shore Power Station, Repair | JOB | 1 | $0.00 | |
| D-025 | Fire Dampers, Repair | JOB | 1 | $0.00 | |
| O-026 | Machinery Space Decks, Preserve (Various Compartments) | JOB | 1 | $0.00 | |
| D-027 | Fuel Piping, Renew | JOB | 1 | $0.00 | |
| D-028 | Tank Vent Piping Renewals | JOB | 1 | $0.00 | |
| D-029 | SORS Cargo Hatch, Inspect and Repair | JOB | 1 | $0.00 | |
| D-030 | Deck Covering, Wet/Dry, Seal (Various Compartments) | JOB | 1 | $0.00 | |
| D-031 | Pilothouse Grab-Rail & Foot-Rail, Renew | JOB | 1 | $0.00 | |
| D-032 | Tank Sounding Tube Piping Renewal | JOB | 1 | $0.00 | |
| D-033 | Misc System Relief Valves, Test & Adjust | JOB | 1 | $0.00 | |
| D-034 | Walk-In Reefer and Freezer, Repair / Renew | JOB | 1 | $0.00 | |
| O-035 | Buoy Deck Auxiliary Cleat & Snubbing Winch Installation | JOB | 1 | $0.00 | |
| O-036 | Dive Air System, Removal | JOB | 1 | $0.00 | |
| D-037 | Sewage Vacuum Pipe, Renew | JOB | 1 | $0.00 | |
| O-038 | Buoy Crane Main Winch (A-Class Only), Replace | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | 1080 | 0 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | $0.00 | JOB | $0.00 | |
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(7/17/2017) Draft-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 1 | 62 | Baltimore, MD | ||||||||||||||||||||||
| 1 | 52 | Biloxi, MS | ||||||||||||||||||||||
| 1 | 56 | Boston, MA | ||||||||||||||||||||||
| 1 | 50 | Charleston, SC | ||||||||||||||||||||||
| 1 | 60 | Corpus Christi, TX | ||||||||||||||||||||||
| 1 | 51 | Hampton Roads | ||||||||||||||||||||||
| 1 | 64 | Honolulu, HI | ||||||||||||||||||||||
| 1 | 55 | Houston, TX | ||||||||||||||||||||||
| 1 | 56 | Los Angeles, CA | ||||||||||||||||||||||
| 1 | 55 | Median Rate | ||||||||||||||||||||||
| O-011 | 1 | 49 | Miami | |||||||||||||||||||||
| 1 | 50 | Narragansett Bay, RI | ||||||||||||||||||||||
| 1 | 55 | New London, CN | ||||||||||||||||||||||
| 1 | 45 | New Orleans | ||||||||||||||||||||||
| 1 | 62 | NYNY | ||||||||||||||||||||||
| 1 | 49 | Panama City, FL | ||||||||||||||||||||||
| O-017 | 1 | 60 | Philadelphia, PA | |||||||||||||||||||||
| O-018 | 1 | 51 | Portland, ME | |||||||||||||||||||||
| O-019 | 1 | 57 | Portland, OR | |||||||||||||||||||||
| O-020 | 1 | 55 | San Diego, CA | |||||||||||||||||||||
| 1 | 67 | San Francisco, CA | ||||||||||||||||||||||
| 1 | 55 | Santa Barbara, CA | ||||||||||||||||||||||
| 1 | 55 | SE North Carolina | ||||||||||||||||||||||
| O-024 | Shore Power Station, Repair | 1 | 65 | Seattle, WA | ||||||||||||||||||||
| 1 | 48 | Tampa-St. Petersburg | ||||||||||||||||||||||
| O-026 | 1 | 60 | Wilmington, DE | |||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| Tank Vent Piping Renewals | 1 | |||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| Pilothouse Grab-Rail & Foot-Rail, Renew | 1 | |||||||||||||||||||||||
| Tank Sounding Tube Piping Renewal | 1 | |||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| O-035 | 1 | |||||||||||||||||||||||
| O-036 | 1 | |||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| O-038 | 1 | |||||||||||||||||||||||
| 1080 |
&C(09/28/2009)_x000D_ Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .