SCIOTOBARGESECTIONB.xls

XLS spreadsheet 29 KB Posted

Attached to
DRYDOCK REPAIRS FOR THE USCGC SCIOTO BARGE
Solicitation number
HSCG85-17-Q-P45319
Issued by

About this file

SECTION B

View the file

Other files

File Type Posted
SCIOTOBARGEAttachment_3_Past_Performance_Information_Form.doc DOC document
SCIOTO_BARGE_SPECIFICATIONS.doc DOC document
SCIOTOBARGE.doc DOC document
SCIOTOBARGEUSCG_Ombudsman_Notice.doc DOC document
SCIOTOAttachment_4_Request_for_Clarification.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC SCIOTO BARGE (CGB 99002) PLANNED DRYDOCK AVAILABILITY FY2017
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Hull Plating (Side Scan), Ultrasonic Testing - BargeJOB1$0.00
D-002Hull Plating (U/W Body), Inspect - BargeJOB1$0.00
D-003Appendages (U/W), Leak Test - BargeJOB1$0.00
D-004Keel Coolers, Clean, Inspect and Hydro - BargeJOB1$0.00
D-005Spud Wells, Preserve - BargeJOB1$0.00
D-006U/W Body, Preserve (100%) - BargeJOB1$0.00
D-007Drydock - BargeJOB1$0.00
O-008Hull and Structural Plating (General) - 10.2-Pound Steel, Renew – Barge (Optional)JOB1$0.00
O-009Hull and Structural Plating (General) - 12.75-Pound Steel Plate, Renew – Barge (Optional)JOB1$0.00
O-010Hull and Structural Plating (General) - 15.3-Pound Steel Plate, Renew – Barge (Optional)JOB1$0.00
O-011Hull and Structural Plating (General) - Degraded Weld (Steel), Repair – Barge (Optional)JOB1$0.00
D-012Barge Hold(s) Hull Plating, RenewJOB1$0.00
D-013Hull Plating Freeboard, 100% Preserve - BargeJOB1$0.00
D-014Aft Trim Tank, Inspect, Preserve (100%), and Miscellaneous RepairsJOB1$0.00
O-00AComposite Labor RateHour150
D-00BGFP ReportNSPEANSP
D-00CTravel and Perdiem$500.00JOB$0.00
O-00ZLaydaysDay5
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items

&C(10/27/2016) Draft-1 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
USCGC SCIOTO BARGE (CGB 99002) PLANNED DRYDOCK AVAILABILITY FY201715%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
162Baltimore, MD
152Biloxi, MS
156Boston, MA
150Charleston, SC
160Corpus Christi, TX
151Hampton Roads
164Honolulu, HI
O-008Hull and Structural Plating (General) - 10.2-Pound Steel, Renew – Barge (Optional)155Houston, TX
O-009156Los Angeles, CA
O-010155Median Rate
O-011149Miami
D-012150Narragansett Bay, RI
D-013Hull Plating Freeboard, 100% Preserve - Barge155New London, CN
D-014145New Orleans
15062NYNY
NSP49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

&C(09/28/2009)_x000D_ Page &P of &N

CostEstimateTemplate

File details come from the government source that posted it. Updated .