SOW_OAK_BRIDGE_MATTING.docx
DOCX document 19 KB Posted
- Attached to
- RHINO ANTI-FATIGUE MATTING
- Solicitation number
- HSCG85-17-Q-1S6459
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WAGE_DETERMINATION.txt | TXT text file | |
| DRAWING.pdf | ||
| REPS_AND_CERTS.doc | DOC document | |
| FAR_CLAUSES.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ANTI-FATIGUE MATTING INSTALLAION FOR THE
HSCG85-17-P-1S6459
THE USCGC OAK (WLB 211)
1. Background. This requirement is for the installation of anti-fatigue matting on the bridge of the USCGC OAK.
2. Scope. The scope of this work is on the bridge USCGC OAK and consists of installation of anti-fatigue matting.
3. Objective. The objective of this requirement is to install anti-fatigue matting on the bridge of the USCGC OAK.
4. Tasks. The contractor shall provide materials and labor.
5. Delivery. Contractor shall deliver materials to the ship and install during USCGC OAK’s scheduled Charlie period.
6. Government furnished property. There is no Government furnished property (GFP) anticipated. If GFP is required, it will be incorporated via contract modification.
7. Security Requirement. Base access is required. Vendor shall have a valid driver’s license and show identification. The vendor will have to be escorted on to base and to the site location by members from the USCGC OAK.
8. Place of performance- Cutter's home pier, Newport, RI.
9. Period of performance- 18 – 22 September, 2017.
File details come from the government source that posted it. Updated .