SLEDGE_-_FY16_DD_-_P45H85_-_SPEC.pdf

PDF 665 KB Posted

Attached to
SLEDGE FY16 DD Federal contract opportunity
Solicitation number
HSCG85-16-Q-P45H85
Issued by
Department of Homeland Security US Coast Guard

About this file

SLEDGE SPEC

View the file

Other files for this federal contract opportunity

Other files attached to SLEDGE FY16 DD, newest first.
File Type Posted
AMENDMENT_0002__HSCG85-16-Q-P45H85_SLEDGE.pdf PDF
AMENDMENT_A0001__HSCG85-16-Q-P45H85.pdf PDF
SLEDGE_-_P45H85_-_FY16_DD_-_REQUEST_FOR_CLARIFICATION.docx DOCX document
SLEDGE_-_FY16_DD_-_P45H85_-_SOLICITATION.docx DOCX document
SLEDGE_-_FY16_DD_-_P45H85_-_BLANK_SECTION_B.xls XLS spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC SLEDGE (WLIC 75303)

USCG 84 BARGE (84001)

SPECIFICATION FOR DRYDOCK REPAIRS

FY2016

Developed By: Bryan G. Wright

(Rev-0, 04 May 2016)

USCGC SLEDGE (WLIC-75B) DRYDOCK AVAILABILITY FY2016

ii (Rev-0)

TABLE OF CONTENTS

Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ............................................................................... vii Consolidated List of Critical Inspection Items .......................................................................................... viii Principal Characteristics - Tender ................................................................................................................ ix Principal Characteristics - Barge ................................................................................................................... x General Requirements WORK ITEM 1: Keel Coolers, Clean, Inspect and Hydro WORK ITEM 2: Fathometer Transducer, Renew – Tender WORK ITEM 3: Fathometer Transducer, Renew – Barge WORK ITEM 4: Spud Wells, Preserve - Barge WORK ITEM 5: U/W Body, Preserve (100%) - Tender WORK ITEM 6: U/W Body, Preserve (100%) - Barge WORK ITEM 7: Cathodic Protection / Zinc Anodes, Renew - Tender WORK ITEM 8: Drydock - Tender WORK ITEM 9: Drydock - Barge WORK ITEM 10: Temporary Services, Provide WORK ITEM 11: Sea Trial Performance, Support, Provide WORK ITEM 12: Stern Tube Interior Surfaces, Preserve 100% WORK ITEM 13: Hull Plating (Side Scan), Ultrasonic Testing - Tender WORK ITEM 14: Hull Plating (Side Scan), Ultrasonic Testing - Barge WORK ITEM 15: Propellers, Remove, and Reinstall WORK ITEM 16: Cathodic Protection/Zinc Anodes, Renew - Barge WORK ITEM 17: Propulsion Shafting, Remove, Inspect, and Reinstall WORK ITEM 18: Rudder Assembly; Remove, Inspect and Reinstall WORK ITEM 19: Lead-Based Paint and Asbestos-Containing Material, Perform Spot Abatement -

Option WORK ITEM 20: Hull Plating Freeboard, Preserve “100%” - Tender WORK ITEM 21: Hull Plating Freeboard, Preserve “100%” - Barge iii (Rev-0)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

iv (Rev-0)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:

• MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm

• Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp

• Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::

www.gpoaccess.gov

The Government is aware of the following internet web links where contractors may procure commercial specifications:

• American Welding Society (AWS): http://www.awspubs.com/index.php

• ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/

• NFPA: http://www.nfpa.org

• SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace

COAST GUARD DRAWINGS

CCoast Guard Drawing 75B WAGL 1101-004, Rev A, New Grid Cooler Pocket P/S to Suit IF1312 MDE

& 80MDDCD SSDG (SLEDGE)

Coast Guard Drawing 68-CGB 1112-2, Rev -, Transducer Wet Wall & Blister Installation Coast Guard Drawing 75 WAGL 0700-004, Rev -, Docking Plan Coast Guard Drawing 75 WAGL 633-001, Rev A, Cathodic Protection Coast Guard Drawing 75B WAGL 0500-001, Rev -, Lines and Offsets Coast Guard Drawing 75B WAGL 0700-003, Rev -, 75FT “B” Class Towboat Docking Block

Arrangement Coast Guard Drawing 75B WAGL 103-6 (75304 and 75305), Rev -, Outboard Profile and Inboard Profile Coast Guard Drawing 75B WAGL 1101-001, Rev 1, Shell Expansion Coast Guard Drawing 75B WAGL 2202-001, Rev A, Steering System Control & Alarms to suit

JASTRAM S2-16-2-35

Coast Guard Drawing 75B WAGL 2200-006, Rev C, Steering System Arrangement for JASTRAM S2-

16-2-35 Coast Guard Drawing 75B WAGL 2200-007, Rev C, Flanking Steering System Arrangement for

JASTRAM S2-16-2-35

Coast Guard Drawing 75B WAGL 2200-010, Rev F, Rudder Post Installation for JASTRAM S2-16-2-35

Steering System Coast Guard Drawing 75B WAGL 4103-019, Rev A, Jacket Water Mods to Suit IF1312 MDE &

80MDDCD SSDG (SLEDGE)

http://www.assistdocs.com/search/search_basic.cfm http://www.uscg.mil/directives/default.asp http://www.gpoaccess.gov/ http://www.awspubs.com/index.php http://www.techstreet.com/ http://www.nfpa.org/ http://shopping.netsuite.com/sspcmarketplace v (Rev-0)

Coast Guard Drawing 75B-WAGL 4301-5, Rev A, Shafting Installation to Suit If 1312 MDE (Vise & Mallet)

Coast Guard Drawing 75B-WAGL 4301-6, Rev -, Shafting Installation to Suit If 1312 MDE (Sledge) Coast Guard Drawing 75B-WAGL 4301-6, Rev B, Shafting Installation to Suit If 1312 MDE (Sledge) Coast Guard Drawing 75B-WAGL 4301-5, Rev A, Shafting Installation to Suit If 1312 MDE (Vise &

Mallet) Coast Guard Drawing 75B-WAGL 4301-6, Rev -, Shafting Installation to Suit If 1312 MDE (Sledge) Coast Guard Drawing 75D WAGL 2901-001, Rev A, Curves of Form Coast Guard Drawing 75-WAGL 4301-5, Rev E, Shafting Machining Details to Suit If 1312 MDE Coast Guard Drawing 75-WAGL 4400-3, Rev E, Propeller to Suit IF1312 MDE Coast Guard Drawing 75-WAGL 4301-5, Rev E, Shafting Machining Details to Suit If 1312 MDE Coast Guard Drawing 75-WAGL 4400-3, Rev E, Propeller to Suit IF1312 MDE Coast Guard Drawing 84 CGB 0103-2, Rev 4, General Arrangement Plan, and Outboard Profile Coast Guard Drawing 84 CGB 2602-1, Rev 2, Spud Wells and Stern Logs Coast Guard Drawing 84 CGB-0700-003, Rev -, 84’ Barge Docking Block Arrangement Coast Guard Drawing 84 CGB-1103-001, Rev 3, 84’ CGB Deck & Bottom Framing Plans Coast Guard Drawing 84-CGB-0700-003, Rev -, 84’ Barge Docking Block Arrangement Coast Guard Drawing 84-CGB-101-001, Rev -, Construction Barge CGB 84000 Arrangement and

Structure Coast Guard Drawing 84-CGB-1103-001, Rev -, Deck and Bottom Framing Plans Coast Guard Drawing FL 1204-3, Rev A, Welded Padeyes & Links Coast Guard Drawing FL 6713-203, Rev -, CRP-V850 Transducer (SS505) Adapter Assembly Coast Guard Fleet Drawing FL 2602-10, Rev J, Spud Arrangements and Details NAVSEA Drawing 803-921865, Rev R, Cathodic Protection Hull Zinc Anodes Coast Guard Drawing 75 WAGL 0103-4, Rev A, Booklet of General Plans Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem Coast Guard Fleet Drawing FL 2804-22, Rev-, Consolidated Visual ID for Cutters Coast Guard Drawing 84 CGB 0103-2, Rev 4, General Arrangement Plan, and Outboard Profile Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem Coast Guard Fleet Drawing FL 2804-22, Rev-, Consolidated Visual ID for Cutters

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors

Manual Coast Guard Technical Publication (TP) 3494, 2013, Shaft Seal - Type FSE Coast Guard Technical Publication (TP) 5491, SWBS 256, Apr 2013, Keel Grid Cooler (Duramax) Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General

Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and

Allied Processes Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary

Machine Systems vi (Rev-0)

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2014, Drydocking Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2014, Temporary

Services

OTHER REFERENCES

American Society for Nondestructive Testing (ASNT) SNT-TC-1A, 2013, Recommended Practice for

Personal Qualification and Certification in Nondestructive Testing ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component

Adhesives (An) Commercial Item Description (CID) A-A-52624, Nov 2008, Antifreeze, Multi Engine Type, Ethylene

Glycol (For Caterpillar equipment applications, use CAT Extended Life Pre-Mix coolant.)

Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Anti-seize, Zinc Dust-

Petrolatum Federal Specification (Fed Spec) HH-P-151, Mar 1991, Packing; Rubber-Sheet, Cloth-Insert Federal Specification (Fed Spec) HH-P-151, Mar 1991, Packing; Rubber-Sheet, Cloth-Insert International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller -

Manufacturing Tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50 m, Inclusive MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418) MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning MIL-PRF-16173, 2006, Corrosive Preventive Compound, Solvent Cutback, Cold Application MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application MIL-PRF-24647, Apr 2013, Paint System, Anticorrosive and Antifouling, Ship Hull MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2015, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal The Society for Protective Coatings (SSPC), January 2015, Paint Application Specification No. 2 (PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation

Standard SSPC-SP 12/NACE No.5, 2002, Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP WJ-2/NACE WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough Cleaning

The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Blast Cleaning vii (Rev-0)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM

DESCRIPTION

NSN/PN QTY ESTIMATED

COST

($/UNIT)

N Anode Kit for SC-

48DP-114 DuraCooler (For the MDEs)

P/N: 8200108AK 2 ea. 142.23

N

Anode Kit for SC- 216DP-63 (For the

SSDGs) P/N: 8200281AK 2 ea. 94.45

2 N ***Fathometer Transducer, Shallow Water, 50-200 kHz

(Airmar Technology

SS505)

NSN: 5845-01-470-

1 ea. 343.63

3 N ***Fathometer Transducer, Shallow Water, 50-200 kHz

(Airmar Technology

SS505)

NSN: 5845-01-470-

2 ea. 343.63

15 Y Propeller right hand NSN: 2010-01-534-

1 ea. 10,129.00

15 Y Propeller left hand NSN: 2010-01-534-

1 ea. 10,129.00

17 Y **Propeller shaft 2010-01-557-1512 2 ea. 19,184.17

18 Y **Steering Rudder assembly

NSN: 2040-01-530-9095 2 ea. 27,325

18 Y **Flanking Rudder assembly

NSN: 2040-01-531-4393 2 ea. 39,514

18 N Wartsila FH7542-01 Rudder Seal Minor

Overhaul Kit

P/N WLP001427 001 4 ea 500.00

18 N Upper Bearing NSN: 3110-01-F11-2241 4 ea 800 18 N Lower Bearing NSN: 3120-01-599-4857 4 ea 195

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter viii (Rev-0)

CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):

Work Item Title

5 U/W Body, Preserve (100%) - Tender

6 U/W Body, Preserve (100%) - Barge

13 Hull Plating (Side Scan), Ultrasonic Testing - Tender

14 Hull Plating (Side Scan), Ultrasonic Testing - Barge

17 Propulsion Shafting, Remove, Inspect, and Reinstall

18 Rudder Assembly, Remove, Inspect and Reinstall ix (Rev-0)

PRINCIPAL CHARACTERISTICS - TENDER

75' WLIC (B-CLASS), TENDER

PHYSICAL

Length overall 75' 0" Depth 7' 7-3/4" Maximum beam 22' 0" Height of highest projection 32' 0" Full load draft 4' 8 3/4" LCF Draft Full load displacement 158.21 Long Tons Fresh Water Shore tie voltage requirements 480V/3PH/60HZ/150AMP Frame spacing 1' 6"

HULL

Hull material Steel

MACHINERY

Number of propellers 2 Number of blades 4 Diameter of propeller 48" Pitch 40" fixed

RPM 400

Shaft diameter 4.5” x (Rev-0)

PRINCIPAL CHARACTERISTICS - BARGE

84' CGB, BARGE

PHYSICAL

Length overall 84' 0" Depth 7' 7-3/4" Maximum beam 28' 0" Full load draft 3' 0" Full load displacement 169.5 Long Tons Shore tie voltage requirements 480V/3PH/60HZ/100AMP Frame spacing 1' 0"

1 (Rev-0)

00000_1215_FLT

REC_00000_FLT_CG Yard Project (1212)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by and at CG the Yard for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General

Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and

Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

2 (Rev-0)

3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.

3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).

NOTE

Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.

3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.

3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is Large Quantity.

3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:

• Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.

• National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.

• Air Emission Permit: Unit has a Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.

3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.

3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, 3 (Rev-0) and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;

ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Coast Guard Yard personnel and Contractors shall comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental Protection At USCG Facilities for HW disposal.

3.6 Local Policy. None.

3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:

3.7.1 SFLC Standard Specification 6310, Requirements for Preservation of Ship Structures.

3.7.1.1 SFLC Std Spec 6310, page C-2, Section C1.5.1. Change from "lead-containing paint as 0.06%" to "lead-containing paint as 0.009%".

3.7.1.2 SFLC Std Spec 6310, page 4, Section 2 References, Group- Other References. Add “The Society for Protective Coatings (SSPC) Paint Application Guide No. 11, 2008, Protecting Edges, Crevices, and Irregular Steel Surfaces by Stripe Coating”

3.7.1.3 SFLC Std Spec 6310, page Appendix C-6, add "Hempel Hempadur Multi-Strength GF 35870" with FED- STD-595 color "Black/Red" under ANTI-ABRASION COATING, ICE BREAKING CAPABLE VESSELS, <235’.

3.7.1.4 Standard Spec 6310, page Appendix A-7, Under "UNDERWATER (U/W) BODY/BOOT-TOP", Add line Column 1: Option for U/W Body and Boot-Top, Steel Hulls, <154', in Salt Water. Column 2: Blank. Column 3:

SSPC-SP 10/NACE NO. 2 using grit conforming to MIL-A-22262 / (1.5-3.5) - or - SSPC-SP WJ-2(M)/NACE WJ-2(M). Columns 4 and 5: Same as "U/W Body and Boot-Top, Aluminum Hull, High Speed (>30 knots)".

3.7.2 SFLC Standard Specification 0000 General Requirements.

4 (Rev-0)

3.7.2.1 SFLC Std Spec 0000, paragraph 1.3 ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

5 (Rev-0)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

VESSEL NAME HULL # WORK ITEM # WORK ITEM TITLE

LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME

6 (Rev-0)

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE

TIME

ACTIVITY (SURFACE

PREPARATION, PRIMER COAT,

BARRIER COAT, TOP COAT,

ETC…)

LOCATION (FRAME &

DECK, RELATION TO

EQUIPMENT, ETC.)

TEMPERATURE % REL.

HUMID-

ITY

DEW

PT.

SURFACE AMBIENT ΔT

| DP -

SURFACE |

7 (Rev-0)

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:

8 (Rev-0)

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Reading (mils)

Mean Reading (mils) IAW ASTM DD4417).

9 (Rev-0)

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15.

DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)

10 (Rev-0)

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

COATING MFG PRODUCT NAME BATCH

INDUCTION

TIME

COATING SYSTEM SEQUENCE

(PRIMER/TOUCHUP/3RD COAT, ETC.)

Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2.

SPOT 1 2 3 4 5 AVERAGE

VALUE

*BASE METAL READING

(BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

1 AVG. BMR DEVIATION

1 AVG. BMR DEVIATION

APPLICATION METHOD (AIRLESS, CONVENTIONAL SPRAY,

ROLLED)

AVERAGE DFT

11 (Rev-0)

25620_0615_FLT

REC_25620_FLT_75 WLIC (‘B’ Class: Hulls 75303 - 75305) [tender] (0814)

WORK ITEM 1: Keel Coolers, Clean, Inspect and Hydro

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean, inspect, and hydro the following grid coolers (Refer to Para 4.1 “Term applicability”):

SERVICE QTY FRAME

LOCATION

MDE 2 38-45

S/S Generator 2 38-45

1.2 Government-furnished property.

MTI ITEM DESCRIPTION NSN/PN QTY

ESTIMATED

COST

($/UNIT)

N Anode Kit for SC-48DP-114 DuraCooler (For the MDEs) P/N: 8200108AK 2 ea. 142.23

N Anode Kit for SC-216DP-63 (For the SSDGs) P/N: 8200281AK 2 ea. 94.45

2. REFERENCES

COAST GUARD DRAWINGS

CCoast Guard Drawing 75B WAGL 1101-004, Rev A, New Grid Cooler Pocket P/S to

Suit IF1312 MDE & 80MDDCD SSDG (SLEDGE) Coast Guard Drawing 75B WAGL 4103-019, Rev A, Jacket Water Mods to Suit IF1312

MDE & 80MDDCD SSDG (SLEDGE)

COAST GUARD PUBLICATIONS

Coast Guard Technical Publication (TP) 5491, SWBS 256, Apr 2013, Keel Grid Cooler

(Duramax)

12 (Rev-0)

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary Machine Systems

OTHER REFERENCES

Commercial Item Description (CID) A-A-52624, Nov 2008, Antifreeze, Multi Engine

Type, Ethylene Glycol (For Caterpillar equipment applications, use CAT Extended Life Pre-Mix coolant.)

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.3.1 Install blanks on the open ends of piping to prevent any contamination or foreign debris from entering the affected systems. Ensure that all cleaning equipment or media used in the cleaning process do not cause any damage to cooler components.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:

• Piping

3.2 Environmental compliance. The Contractor shall dispose of all waste fluids in accordance with all Federal, state and local regulations.

3.3 Cleaning, inspection, and testing (hydro) requirements. The Contractor shall accomplish the following for each designated cooler (see Paragraph 1.1 - Intent), as shown on Coast Guard Drawings 75B WAGL 4103-012, 75B WAGL 4103-016 and 75B WAGL 4103-019:

3.3.1 Preparation. Prepare as follows:

• Drain and dispose of all existing cooler fluids.

• Remove and dispose of all existing thermostats, if contained in the system.

13 (Rev-0)

• Disconnect and remove the cooler to a suitable repair shop.

3.3.2 Inspection. Perform a visual inspection of all surfaces/components for deterioration or other defects. Visually inspect suction and discharge piping. Submit a CFR that includes the following information:

• Visual inspection results

• Make & model of cooler (manufacturer name, model number, part number, serial number as applicable) based upon existing label plates and/or engraving

• Last known test data (test pressure, test date, testing facility) as indicated by affixed data plate (indicate “Unknown” if data plate is missing or illegible)

3.3.3 Cleaning. Clean all cooler interior and exterior surfaces free of all debris or contaminants using industrial standard methods and in accordance with manufacturer’s recommendations.

Refer to Coast Guard TP-5491.

3.3.4 Pressure test (hydro). Pressure test each cooler in the presence of the COR in accordance with paragraph C2.7 (Heat exchangers and fluid coolers) of SFLC Std Spec 5000. Be aware that no leakage or permanent deformation of pressure-containing parts is permissible. Repair all leaks and discrepancies found. Submit a CFR. Duramax does not specify an operating pressure, but does specify a test pressure of 30 PSI. The Contractor shall use this test pressure for all tests required under SFLC Std Spec 5000.

CAUTION

Extreme precaution must be taken to not exceed manufacturer’s recommended test pressure during hydrostatic testing.

3.4 Reassembly. After cleaning and any authorized repairs are complete, the Contractor shall reassemble the cooler. Renew the following components, as applicable, in accordance with cooler manufacturer’s recommendations:

• Fasteners (shall be stainless steel).

• Threaded fittings.

• O-rings and seals.

• Hoses between cooler and piping systems, and associated hose clamps.

3.5 Reinstallation. After completion of testing and all authorized repairs, the Contractor shall reinstall each cooler. Where applicable, renew all zinc electrode plates, gaskets, and recessed hex-head bolts in accordance with the manufacturer's specifications. Apply a copper-based anti-seize compound on all bolts; and torque in accordance with manufacturer’s specifications.

3.6 System replenishing. The Contractor shall completely fill the cooling water system with a 50/50 mixture of distilled water and ethylene glycol antifreeze, conforming to CID A-A-52624.

3.7 Clean. The Contractor shall ensure that all cleaned surfaces are one hundred percent free of debris and surface contaminants.

14 (Rev-0)

3.8 Label plates. The Contractor shall attach an anodized aluminum test data plate to each cooler using epoxy resin cement. Ensure that each plate is engraved with ¼-inch high letters, stating the following:

• Test pressure.

• Test date.

• Testing facility.

3.9 Leak test. After reconnecting the cooler(s) on the vessel (and prior to undocking), the Contractor shall perform an operational test of the cooler and associated system piping using the system fluid at normal operating pressure. Be aware that no visible leakage or deformation is acceptable. Repair all leaks and discrepancies found. Submit a CFR.

4. NOTES

4.1 Term applicability. The term grid cooler is applicable to grid coolers and keel coolers.

4.2 Grid cooler manufacturer.

Duramax Marine

17990 Great Lakes Parkway, Hiram, Ohio 44234

(440) 834-5400 http://www.duramaxmarine.com

4.3 Grid cooler information:

4.3.1 MDE - NSN 2040-01-F11-2291 (P/N: SC-418DP-114)

4.3.2 SSDG - NSN 2040-01-F11-2290 (P/N: SC-216DP-63)

4.4 Cooling system capacity. Cooling system approximate gallon-capacity is as follows:

4.4.1 Tender MDE: 100 gallons.

4.4.2 Tender S/S Gen.: 55 gallons.

15 (Rev-0)

42410_1215_FLT

REC_42410_FLT_75 WLIC (0512)

WORK ITEM 2: Fathometer Transducer, Renew – Tender

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to renew the transducer(s).

ESTIMATED

COST

($/UNIT)

N ***Fathometer Transducer, Shallow Water, 50-200 kHz (Airmar Technology SS505)

NSN: 5845-01-470-2500 1 ea. 343.63

***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing FL 6713-203, Rev -, CRP-V850 Transducer (SS505) Adapter

Assembly

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes

OTHER REFERENCES

Federal Specification (Fed Spec) HH-P-151, Mar 1991, Packing; Rubber-Sheet, Cloth-

Insert

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

16 (Rev-0)

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.3.1 Transducer and lines. Protect all exposed ends of transmission lines, control lines, connectors, and cables from weather, moisture, and physical damage while they are disconnected from the transducer. Take all necessary measures to protect transducer from damage during the performance of work specified herein. Inform the COR, in writing, of all damage, if any, that is incurred by the transducer.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

3.2 Transducer renewal particulars. The Contractor shall accomplish the following tasks using Coast Guard Drawing FL-6713-201 for guidance:

3.2.1 Transducer removal. Disconnect and remove the existing fathometer transducer. Retain the mounting hardware for reinstallation. Dispose of the removed transducer.

NOTE

Do not discard any hull ring adapter(s). They are to be reused with the new transducer(s).

3.2.2 New transducer installation. Install new Government-furnished transducer(s), in place of the removed. Reinstall each hull ring adapter and transducer in accordance with the applicable drawing listed in Section 2 (References) using new gaskets, mold release coating, and adhesive sealants. Apply mold release aerosol coating to both adaptor orifice and transducer to facilitate future removal of the transducer from the adaptor ring.

NOTE

A piece of neoprene or a washer may need to be placed at the bottom of the hull ring adaptor to facilitate transducer and bottom of hull ring flushness.

3.2.2.1 Using chocking compound as transducer bedding material, install transducer into hull ring adaptor. After the chocking compound has cured, paint the bottom half of the hull ring adaptor and transducer in accordance with drawing notes.

3.2.2.2 Renew the transducer head to hull ring gasket with new gasket conforming to HH-P-151, Class 4. Using appropriate thickness gasket, place gasket on adaptor plate of transducer; apply ½” bead of marine adhesive on adaptor plate along the inside edge of the gasket. Install transducer flush with hull.

17 (Rev-0)

3.2.2.3 Reconnect each transducer cable to its terminal board in the adjacent connection box.

Renew all stuffing tube packing and seals. Inspect the connection in the presence of the Coast Guard Inspector. Submit a CFR. If cable renewal is authorized via approved Change Request, cut the transducer cable to length leaving 2-foot service loop in the cable. Ensure cables are installed in a manner to prevent any chaffing which may require new cable way clamps and stuffing tubes.

3.2.2.4 Following completion of transducer installation, fabricate a ¾” × 3” × ¼” aluminum label plate, engraved with ¼-inch high numbers stating the installation date. Affix a label plate, using suitable epoxy cement. Ensure that the label plate is visible and legible, without the need to move equipment or cables.

3.2.2.5 Thoroughly clean the transducer radiating surfaces with a strong solution of household detergent to remove any oil, dirt, and all other surface contaminants.

3.3 Transducer seal. If not waterborne, the Contractor shall inspect the transducer to ensure that its outer circumference is installed flush to the hull ring and the transducer cover plate forms a tight seal with the hull ring. Submit CFR.

3.4 Post installation tests. After completion of work, the Contractor shall accomplish the following tasks, in the presence of the Coast Guard Inspector:

3.4.1 Preliminary leak test. If not waterborne, inspect and perform a water hose test of all affected boundaries in accordance with SFLC Std Spec 0740, Appendix C. If waterborne, slowly back off the emergency cover plate bolts and allow seawater to flood the transducer well. No leakage allowed. Submit a CFR.

3.4.2 Not waterborne. Replace the hull ring set screws with new Monel fasteners, coating the threads with anti-seize compound. Recess the set screws ⅛” and cover with beeswax tallow.

3.4.3 Waterborne. Using a diver, remove and retain the hull ring set screws. Install an emergency cover plate and gasket over the transducer to be renewed. If available, the vessel’s emergency cover plate may be used; otherwise a new cover plate shall be fabricated and turned over to the vessel at the completion of the work.

3.4.3.1 Slowly back off the fasteners that normally maintain the transducer pressure boundary to sea. Ensure that any leakage through the emergency cover plate pressure boundary is minor prior to proceeding with transducer removal.

3.4.3.2 Upon completion of work and preliminary leak testing, completely remove the emergency cover plate. Clean all vacated tapped holes of anti-seize compound and beeswax tallow. Chase all threads. Install new Monel set screws in each hull ring, coating the threads with anti-seize compound. Recess the set screws ⅛” and cover with beeswax tallow.

3. 5 Leak repairs. The Contractor shall observe each transducer for leaks during the vessel re-floating process (if drydocked) or emergency cover plate removal (if waterborne). Repair all leaks detected. Submit a CFR.

3.6 Operational test – post repairs. After completion of work, the Contractor shall thoroughly test and prove the transducer(s) to be in satisfactory operating condition. Submit a CFR.

18 (Rev-0)

4. NOTES

4.1 Operation of equipment. Coast Guard personnel will operate all shipboard machinery and equipment.

19 (Rev-0)

42410_1215_FLT

REC_42410_FLT_84’ Barge (0512)

WORK ITEM 3: Fathometer Transducer, Renew – Barge

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to renew the transducer(s).

ESTIMATED

COST

($/UNIT)

N ***Fathometer Transducer, Shallow Water, 50-200 kHz (Airmar Technology SS505)

NSN: 5845-01-470-2500 2 ea. 343.63

***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 68-CGB 1112-2, Rev -, Transducer Wet Wall & Blister Installation

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes

OTHER REFERENCES

Federal Specification (Fed Spec) HH-P-151, Mar 1991, Packing; Rubber-Sheet, Cloth-

Insert

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

20 (Rev-0)

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.3.1 Transducer and lines. Protect all exposed ends of transmission lines, control lines, connectors, and cables from weather, moisture, and physical damage while they are disconnected from the transducer. Take all necessary measures to protect transducer from damage during the performance of work specified herein. Inform the COR, in writing, of all damage, if any, that is incurred by the transducer.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

3.2 Transducer renewal particulars. The Contractor shall accomplish the following tasks using Coast Guard Drawing 68-CGB 1112-2 for guidance:

3.2.1 Transducer removal. Disconnect and remove the existing fathometer transducers. Retain the mounting hardware for reinstallation. Dispose of the removed transducers.

NOTE

Do not discard any hull ring adapter(s). They are to be reused with the new transducer(s).

3.2.2 New transducer installation. Install new Government-furnished transducer(s), in place of the removed. Reinstall each hull ring adapter and transducer in accordance with the applicable drawing listed in Section 2 (References) using new gaskets, mold release coating, and adhesive sealants. Apply mold release aerosol coating to both adaptor orifice and transducer to facilitate future removal of the transducer from the adaptor ring.

NOTE

A piece of neoprene or a washer may need to be placed at the bottom of the hull ring adaptor to facilitate transducer and bottom of hull ring flushness.

3.2.2.1 Using chocking compound as transducer bedding material, install transducer into hull ring adaptor. After the chocking compound has cured, paint the bottom half of the hull ring adaptor and transducer in accordance with drawing notes.

3.2.2.2 Renew the transducer head to hull ring gasket with new gasket conforming to HH-P-151, Class 4. Using appropriate thickness gasket, place gasket on adaptor plate of transducer; apply ½” bead of marine adhesive on adaptor plate along the inside edge of the gasket. Install transducer flush with hull.

21 (Rev-0)

3.2.2.3 Reconnect each transducer cable to its terminal board in the adjacent connection box.

Renew all stuffing tube packing and seals. Inspect the connection in the presence of the Coast Guard Inspector. Submit a CFR. If cable renewal is authorized via approved Change Request, cut the transducer cable to length leaving 2-foot service loop in the cable. Ensure cables are installed in a manner to prevent any chaffing which may require new cable way clamps and stuffing tubes.

3.2.2.4 Following completion of transducer installation, fabricate a ¾” × 3” × ¼” aluminum label plate, engraved with ¼-inch high numbers stating the installation date. Affix a label plate, using suitable epoxy cement. Ensure that the label plate is visible and legible, without the need to move equipment or cables.

3.2.2.5 Thoroughly clean the transducer radiating surfaces with a strong solution of household detergent to remove any oil, dirt, and all other surface contaminants.

3.3 Transducer seal. If not waterborne, the Contractor shall inspect the transducer to ensure that its outer circumference is installed flush to the hull ring and the transducer cover plate forms a tight seal with the hull ring. Submit CFR.

3.4 Post installation tests. After completion of work, the Contractor shall accomplish the following tasks, in the presence of the Coast Guard Inspector:

3.4.1 Preliminary leak test. If not waterborne, inspect and perform a water hose test of all affected boundaries in accordance with SFLC Std Spec 0740, Appendix C.