Text version

USCGC ALEX HALEY (WMEC 39)

CATERPILLAR ENGINE OVERHAUL TECHNICAL ASSIST

FY2016

Developed By: Elise V Maher

(Rev-0, 01 October 2015)

USCGC ALEX HALEY (WMEC-282) CAT ENGINE OVERHAUL TECHNICAL ASSIST

ii (Rev-0)

TABLE OF CONTENTS

Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property .................................................................................. v Consolidated List of Critical Inspection Items ............................................................................................. vi Principal Characteristics ............................................................................................................................. vii General Requirements WORK ITEM 1: Disassemble, Clean, Inspect, Repair or Renew and Reassemble Engine Units and

Accessories iii (Rev-0)

Revisions Record

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

iv (Rev-0)

Consolidated List of References

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:

MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm

Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp

Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::

www.gpoaccess.gov

The Government is aware of the following internet web links where contractors may procure commercial specifications:

American Welding Society (AWS): http://www.awspubs.com/index.php

ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/

NFPA: http://www.nfpa.org

SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

CATERPILLAR Marine D353, D3516 Disassembly and Assembly (Series) Manuals and/or the latest original equipment manufacturer (OEM) technical bulletins and specifications manuals as guidance.

Guidelines for “Index of Publications on Reusability or Salvage of Used Parts”, Publication, SEBF8029 (series).

v (Rev-0)

Consolidated List of Government-furnished Property

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

See listing of items posted at the end of the scope of work (SOW) vi (Rev-0)

Consolidated List of Critical Inspection Items

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):

Work

Item Title

This section is not applicable to this package.

vii (Rev-0)

Principal Characteristics

282' WMEC (CGC ALEX HALEY)

PHYSICAL

Length overall 282' 8" Length between perpendiculars 264' 0" Beam, extreme 50' 0" Beam @ DWL 47' 0" Depth, molded 24' 0" Draft, mean @ full load displacement 15' 0" Full load displacement 3088 long tons Minimum operating displacement 2567 long tons Light ship displacement 2058 long tons

HULL

Hull material Steel

MACHINERY

Main propulsion Diesel Diesel engines Four Caterpillar 3516 Propeller 2 CPP 11' 9" diameter x 7' 4" pitch, 4 blade, bronze Shore tie 440 VAC, 400 Amp Shaft bearings, forward Orion Thrust Shaft bearings, aft Thordon Shaft Seals; fore & aft John Crane Type MX9

TANK CAPACITIES

Diesel oil 653.1 long tons JP-5 (aviation) 79.5 long tons Fresh water 131.3 long tons Ballast 57.2 long tons

8 (Rev-0)

00000_0315_FLT

REC_00000_FLT_ Commercial Project @ CG Facility (1212)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of

9 (Rev-0) this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:

Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.

Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.

3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).

NOTE

Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.

3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.

3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

10 (Rev-0)

3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.

3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer.

The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).

3.5.5 Additional Requirements. The Contractor shall be aware of the following:

3.5.5.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.

3.5.5.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.

3.5.5.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.

3.6 Local Policy. None.

4. NOTES

None

11 (Rev-0)

WORK ITEM 1: Disassemble, Clean, Inspect, Repair or Renew and Reassemble Engine Units and Accessories

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to disassemble, clean, inspect, repair and reassemble (Top End and Center Section Overhaul) Caterpillar Diesel Engine Units and Accessories, to include engine models D353, and D3516, onboard the CGC ALEX HALEY in Kodiak, AK. Two D353 overhauls and one D3516 overhaul will be performed. Serial numbers for the concerned engines are as follows:

NR4 MDE 3516: 29Z00939

NR3 SSDG 353: 47B04947

NR4 SSDG 353: 47B04943

All parts will be provided by the Coast Guard. Additional Coast Guard personnel, minimum of eight (08), will be assigned to support.

1.2 Government-funded property.

See supplied parts list; included post SOW.

2. REFERNCES

COAST GUARD DRAWINGS

None.

COAST GUARD PUBLICATIONS

OTHER REFERENCES

CATERPILLAR Marine D353, D3516 Disassembly and Assembly (Series) Manuals and/or the latest original equipment manufacturer (OEM) technical bulletins and specifications manuals as guidance.

Guidelines for “Index of Publications on Reusability or Salvage of Used Parts”, Publication, SEBF8029 (series).

3. REQUIREMENTS

3.1 General. The Contractor shall provide tools required which includes but is not limited to (standard tools/special tools/Test Equipment.

3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):

3.1.2 Tech Rep.

12 (Rev-0)

3.1.2.1 The Contractor shall provide the services of a qualified Tech Rep, who is familiar with the Caterpillar Engines engine models D353, and D3516, to do the following, on site:

Advise on manufacturer's proprietary information pertinent to the system.

Assist with performing the overhaul (top-end or center section/complete).

Ensure compliance with manufacturer's procedures and standards during disassembly, inspection, and reassembly of the system above specified engines.

3.1.2.2 Ensure that the Tech Rep has a resume of demonstrated experience with the system/equipment stated above.

3.1.2.3 Submit a copy of the Tech Rep’s résumé and a list of references to the COTR at the Arrival Conference.

3.1.3 Protective measures. Not applicable.

3.1.4 Interferences. None.

3.1.5 References. The Contractor/technicians shall disassemble, clean, inspect, repair or renew and reassemble the Caterpillar engine units and accessories in accordance with the references listed in Section 2 herein.

3.1.6 Authority to proceed. The Contractor/technicians shall not proceed with any work on the engine units or accessories described in this specification, until specific instructions are given by the KO on what work is to be accomplished.

3.1.7 Responsibility for inspection. The Contractor/technicians shall be responsible for all inspections and test requirements specified herein. The Contractor shall provide the necessary calibrated test equipment to conduct all of the inspection requirements. Be aware that the Government reserves the right to verify or perform any of the inspections or tests set forth in this specification where such inspections are deemed necessary to assure that supplies or services conform to the prescribed requirements.

3.2 Operational test – initial. Prior to commencement of work, the Contractor shall witness an operational pre- test (by Coast Guard personnel) of the Main Diesel Engine to demonstrate existing operational condition. Submit a CFR.

3.3 Clean and Inspect Engine Components. The Contractor shall disassemble, clean, inspect and test the engine components listed below, (Refer to Table 1) utilizing the appropriate publications as outlined in Section 2.1 and 2.2 as guidance. Provide a CFR of these components to the KO for potential reuse determination.

Table 1 - Engine Components to be disassembled, cleaned, inspected or tested during the performance of a Top End/Center Section Overhaul

TOP END CENTER SECTION (includes Top End)

Aftercooler Camshaft Exhaust Manifold Camshaft Lifters Rocker Shaft Assembly and Push Rods Connecting Rods

13 (Rev-0)

Turbocharger Crankshaft Water Manifold Crankshaft Vibration Damper

Cylinder Block Cylinder Liners Driven Equipment (alignment) Engine Mounts Flywheel Front Gear Train (Gears) Fuel Injection Pump Fuel Transfer Pump Governor Oil Cooler Core Oil Suction Screen Pistons (Crowns/Skirts) Rear Gear Train (Gears)

3.3.1 Report. The Contractor shall record the appropriate inspection findings on a CFR (clearance and tolerance readings of the cylinder block and related components). Submit a written report of all findings and recommendations to the Coast Guard Inspector (CGI) within 24 hours after inspection.

3.3.2 Government’s right for furnishing various components and parts. The Contractor shall be aware that the Government reserves the right, to furnish new or rebuilt components or parts for installation, in place of the existing parts, at no additional cost to the Government. If the Government exercises this right, the Contractor shall turn over all existing components or parts to the Coast Guard PA as Mandatory Turn-In (MTI) items.

3.4 Automatic renewal. The Contractor shall perform the following engine component renewals with genuine, remanufactured (or new) OEM components, (Refer to Table 2).

14 (Rev-0)

Table 2 - Engine Components to be disassembled and automatically renewed during the performance of a Top End/Center Section Overhaul

Complete Cylinder Head Assemblies Camshaft Bearings Cylinder Head Gaskets and Seals Con Rod Bearings Inlet Air Line Seals Crankshaft Seals Turbocharger Bearings, Bushings and Seals Crankshaft Thrust Plates Valve Lubricator (If Equipped) Exhaust Manifold (Seals and Bellows) Water Pump Bearings and Seals Fuel Group Water Temperature Regulators and Seals Fuel Injectors

Fuel Transfer Pump Gear Train Bushings Inlet Manifold (Gaskets and Seals) Jacket Water Pump Lube Oil Cooler Lubricating Oil Pump Main Bearings Piston rings Sea Water Pump Software (Install new software when a new ECM is installed) Valve Rotators

3.5 Discretionary renewal. If items in Table 3, below, require renewal submit CFR stating need to replace.

With modification from the KO, the Contractor shall renew the specified engine components with genuine, remanufactured (or new) OEM components. (Refer to Table 3).

15 (Rev-0)

Table 3 - Engine Components to be renewed upon inspection and with KO authorization

Aftercooler Crankshaft Exhaust Manifold Camshaft Rocker Shaft Assembly and Push Rods Crankshaft Vibration Damper (only 353) Turbocharger Cylinder Block Water Manifold Cylinder Liners

Driven Equipment (alignment) Engine Mounts Flywheel Front Gear Train (Gears) Fuel Injection Pump Fuel Transfer Pump Governor Oil Cooler Core Oil Suction Screen Rear Gear Train (Gears)

3.6 Gaskets and seal. Renew all gaskets and seals (consumables) associated with the engine reassembly in this contract. Government will provide material.

3.7 Fluids. Renew all fluids and filters associated with the engine reassembly. Government will provide material.

3.8 Reassemble Engine Units and Accessories. After any authorized repairs and renewals, the authorized Caterpillar Contractor/technician’s shall reassemble the engine units and accessories to its original configuration utilizing the appropriate publications as outlined in Section 2.1 as guidance.

3.9 Operational test – post repairs. After completion of work, the Contractor shall witness an operational test (by Coast Guard personnel) of the diesel engine unit and accessories to prove satisfactory operating condition. The Contractor shall conduct engine test run (break-in) in accordance with applicable Caterpillar and Coast Guard standards. Upon successful operational testing, the Contractor shall perform the applicable PAR test requirement.

3.10 Compliance. All work shall meet the requirements of section 3 (Requirements) of this work specification. The inspections set forth shall become part of the Contractor's overall Inspection System or Quality Program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of ensuring that all work submitted to the Government for acceptance complies with all requirements of the contract.

3.10.1 Noncompliance. If any work fails to pass a test or inspection, the Contractor shall take action to correct the work.

16 (Rev-0)

3.11 Acceptance. Acceptance of the work shall be discontinued until corrective actions, acceptable to the Government, have been taken. After taking corrective action, repeat the inspection on the corrected work.

3.12 Final acceptance. Final acceptance shall be withheld until re-inspection shows the corrective action to be successful. In the event of failure after re-inspection, the Contractor shall submit to the Coast Guard Inspector a written report concerning the failure with recommended corrective actions.

3.13 Conformance. Quality conformance tests and inspections shall be the minimum test and inspection methods used to demonstrate compliance to the requirements set forth in section 3 of this work specification.

4. NOTES

4.1 Equipment operation. Coast Guard personnel will operate all shipboard machinery and equipment during all operational tests.

4.2 Coast Guard Inspector responsibilities. Although the Contractor is responsible for applying appropriate quality assurance measures, the Coast Guard will witness the accomplishment of these measures. Therefore, a Coast Guard Inspector will:

4.2.1 Monitor the assigned work items to keep informed of progress and to ensure that the specifications are being followed.

4.2.2 Witness all test as required by the specification.

4.2.3 Be guided by the work item and seek immediate clarification when necessary.

4.2.4 Immediately bring to the attention of the Contracting Officer any work which appears to be contrary to the work item requirements.

4.2.5 Document all work performed in the Machinery History Log.

4.3 Definitions.

4.3.1 Tools - Common tools normally contained in a standard toolbox (screwdrivers, wrenches, pliers) etc.

4.3.2 Special Tools/Test Equipment - Such as torque wrenches, calibrated electronic meters, computer devices etc not normally found in a standard toolbox.

4.3.3 Consumables - A non-reusable item such as a rag, disposable gloves, paint, oil, grease, solvent, adhesive, sealant, corrosion preventive product, cleaner, etc.

NOTE

When there is overwhelming documentation to record. The Engineer Officer/Engineer Petty officer may state in the Machinery History Log, “All overhaul documentation is located

(indicate where) for reference.

17 (Rev-0)

D3516 Parts Supplied:

Part Numbers Description # of Parts

3J9196 NUT 48

9L7712 NUT 32

8F8858 BUTTON 48

7N4927 GASKET 1

1W7587 GASKET 4

101-1365 PLATE THRUST 1

1B-4367 CAPSCREW 4

4P-5091 WASHER THRUS 2

144-5692 GASKET 16

0L-1351 CAP SCREW 4

0S-1595 CAP SCREW 1

116-3254 TUBE AS 16

2176692 HOSE-TEE 1

2190280 KIT - GASKET 1

2473796 GASKET 2

1092332 SEAL O RING 2

0T0102 CAP SCREW 16

1W4188 RETAINER A 16

4W3027 BREATHER A 4

0336031 O-RING 2

1264175 GASKET KIT 1

4574532 KIT GASKET 1

4640893 KIT GASKET 1

4579709 KIT GASKET 1

4577714 KIT GASKET 1

4577929 KIT GASKET 1

1N4679 ROD A 16

7C3258 WASHER AS 1

1275400 BEARING 2

1N3986 WASHER-THRUS 2

149-6031 BEARING-MAIN 9

7N2048 BRG-CAMSHAFT 18

3550767 KIT-GASKET(S 16

7E1754 GASKET 16

110-6994 SPACER PLATE 16

7N1961 BOLT 24

1077330 BEARING 16

18 (Rev-0)

3S9643 SEAL 4

9W1494 METER KIT 1

1N4054 SHAFT 2

8M8255 VALVE G 2

7C6209 PLATE-THRUST 2

248-5513 REGULATOR-TE 4

113-8432 SEAL GP 1

358-0768 SCREW-ADJUST 1

436-1479 SEAL-CRANKSH 1

7N4782 SPRING 48

144-8263 GEAR AS 1

107-2477 GEAR AS 1

4P-5440 GEAR AS 2

4P-5437 SHAFT 1

4P-5090 SHAFT IDLER 2

7C3260 SHAFT 1

0R5544 COOLER GP-OIL 1

0R7849 DAMPER AS 1

10R-9838 PUMP GP F 1

10R-1669 PUMP GP WTR 1

0R3230 PUMP GP 1

20R3540 HEAD G CYL 13

0R4446 CYL PACK 16

0R2921 INJ G REM 16

0R-9808 CARTRIDGE GP 2

0R3927 ARM A ROCKER 32

0R3926 ARM A ROCKER 16

10R3138 LIFTER AS 48

19 (Rev-0)

D353 Parts Supplied:

Part Number Description Quantity

9M9542 BREATHER A 2

6L5457 GASKET 2

6L5458 GASKET 2

5P8977 KIT GASKET 2

6V1690 GASKET KIT 2

6V1691 GASKET KIT 2

5P8971 GASKET KIT 2

6V1689 GASKET KIT 2

5P8972 GASKET KIT 2

5P8965 GASKET KIT 4

5P8976 GASKET KIT 2

1W7027 KIT REBUILD 2

8M4987 SEAL O RIN 2

4L1267 GASKET 2

8N2748 GASKET 2

4L9564 SEAL O RIN 2

5L1902 GASKET 4

0R-8388 CORE AS-OIL 2

1B-7182 CAPSCREW 4

5S-0003 NUT 4

6L-2845 BRACKET 2

9M-1974 WASHER 4

126-1768 SOCKET 4

155-2270 PLUG KIT 2

291-1593 METER AS-SER 2

5P8974 KIT GASKET 2

6B8241 GASKET 2

5H2669 GASKET 2

0R5882 REB CART G 2

8N1831 NOZZLE A 12

0R0805 PUMP WATER 2

0R0805 CORE 2

3N0653 PUMP A 2

8H4827 GASKET 2

0R3296 CYL KIT 12

0R3296 CORE 12

0R1444 HEAD GP. 4

20 (Rev-0)

0R3270 LIFTER AS 24

1N-4317 BEARING 8

2W-2191 SEAL 2

1N-4331 BEARING 2

1N-4318 BEARING 2

1N-4316 BEARING 2

162-3904 PUMP AS-F PR 2

2S2430 THROWER 2

1S8607 BAFFLE 2

0L0364 LOCK 6

1S6827 SEAL 2

2B1738 LOCK 2

2L3451 GASKET 2

2L3549 GASKET 4

3L5686 LOCK STRIP 4

5B9656 GASKET 2

5H1032 GASKET 2

5H4263 GASKET 2

5S1770 LOCK-NUT 2

6L5038 GASKET 2

6L5386 GASKET 2

6L5435 GASKET 2

6L5436 GASKET 2

6L5457 GASKET 2

1A0744 SCREW 24

2H2330 BEARING 12

0L1213 GASKET 12

6L5458 GASKET 2

6L5490 GASKET 4

7H1662 GASKET 2

8F4099 GASKET 2

8M4986 SEAL O RING 2

8M7587 LOCK-NUT 12

9M5252 GASKET 2

2H2329 BEARING 4

9H8164 LOCK NUT 2

3H8031 BUSHING 4

0S1922 LOCK 2

2H4572 LOCK NUT 6

4H0569 LOCK 6

21 (Rev-0)

5H8090 LOCK 2

6F8146 SEAL 2

1M6866 BEARING 4

0T0290 LOCK 2

1P1033 SEAL 8

7H1662 GASKET 2

5H2831 GASKET 2

2M4453 SEAL O-RING 12

8F0212 SEAL O RING 12

3N0751 CORE A AFTCL 2

4L9556 GASKET 2

4L8337 SEAL 4

2M5177 GASKET 2

5H2912 GASKET 12

2N2280 NUT 48

5L4940 GASKET 12

4H3376 GASKET 2

5H-1039 SEAL 4

2S7264 PUMP A 12

3B4508 LOCKWASHER 72

0S1585 CAP SCREW 50

6B9186 GASKET 2

3D0490 STUD 48