PAST_PERFORMANCE_QUESTIONAIRE.docx
DOCX document 15 KB Posted
- Attached to
- USCGC CLAMP (WLIC 75306) Dock Side Repairs
- Solicitation number
- HSCG85-15-Q-P45294
About this file
PAST_PERFORMANCE_QUESTIONAIRE
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CLAMP_(WLIC_75D)_DS_FQ2_NEV_15E_Rev0.xlsx | XLSX spreadsheet | |
| CLAMP_(WLIC_75D)_DS_FQ2_NEV_15Rev0_(2).pdf | ||
| HSCG85_15_Q_P45294_-_Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAST PERFORMANCE QUESTIONNAIRE -
Project Title:
Contract No:
Performance Period:
Contract Value:
| 1. |
| Quality of Product or Service – Rating: |
Comments for Quality of Product or Service
| 2. |
| Schedule – Rating: |
Comments for Cost Control
| 3. |
| Cost Control – Rating: |
Comments for Timeliness of Performance
| 4. |
| Business Relations – Rating: |
Comments for Business Relations
| 5. |
| Management of Key Personnel – Rating: |
Comments for Management of Key Personnel:
Past Performance information provided by:
The ratings used on the Contractor Performance Survey shall be used to evaluate Past Performance. See the description of ratings below.
| Rating |
| Definition |
| Exceptional |
| Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective. |
| Good |
| Superior accomplishment of contract requirements and very high customer satisfaction. |
| Acceptable |
| Fully compliant accomplishment of contract requirements and positive customer satisfaction. |
| Marginal |
| Accomplishes most, but not all, of the desired contract requirements and customer is marginally satisfied. |
| Unsatisfactory |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective. |
| Unacceptable |
| Failure to properly accomplish contract requirements and failure to satisfy customer. |
| Neutral |
| The offeror has no past performance history OR the Contracting Officer has determined that the past performance information is not directly related or similar to the requirements in the RFP. |
File details come from the government source that posted it. Updated .