P45J97_SOW_CGC_WIRE_Sewage_Tank_Preservation.pdf

PDF 27 KB Posted

Attached to
TANK SEWAGE HOLDING PRESERVE
Solicitation number
HSCG85-15-I-P45K97
Issued by

View the file

Other files

File Type Posted
65-WYT_1112_8_2_-_A.pdf PDF
65-WYT_1112_8_1_-_A.pdf PDF
65-WYT_1112_9_1_-_B.pdf PDF
Amendment.doc DOC document
65-WYT_1112_8_3_-_A.pdf PDF
P45J97_CGC_WIRE_SF1449_for_FedBizOpps.pdf PDF
SERVICE_P45J97_CGC_WIRE_CLAUSES_Combined_Synopsis.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

63110_ENV_0814_110WPB

REC_59301_FLT_65’ WYTL (’C’ Class: Hulls 65610-65612) (1209)

WORK ITEM 1: Tanks (Sewage Holding), Preserve “100%”

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to prepare and preserve 100% of the following tank(s):

TYPE OF TANK LOCATION CAPACITY - 95%

(Gallons)

LOW SUCTION

(Gallons)

Sewage Holding Tank 3-6-0-V 250 20

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 65 WYT 1112-8, Rev A, Sewage Retent Tnk & Pump Fdn A,B,C & D

Classes Coast Guard Drawing 65 WYT 1112-9, Rev B, Sewage Retent Tank & Pump Fdn; A,B,C & D

Classes

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2014, Temporary Hull Accesses

OTHER REFERENCES

None.

3. REQUIREMENTS

3.1 General. The Contractor shall refer to Coast Guard drawings 65 WYT 1112-8 and 65 WYT 1112-9 for guidance.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.3.1 The Contractor shall plug all inlet and outlet piping in the tank(s) to prevent contaminants from entering. Use plugs with an attached lanyard, ring or other system that will ensure plugs are not lost in the pipe openings. Maintain a plug accountability log outside the tank to prevent any of the installed temporary plugs from being lost inside the tank or forgotten inside at tank closure. Submit this log to the COTR after completion of work item.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:

• Piping.

• Pumps.

• TLI.

• Sewage ejector assembly.

3.1.5 Temporary access openings. Due to limited access to work areas, the Contractor may, with express permission of the KO (via submission of a CFR), cut access holes to facilitate accomplishment of the work specified herein. Perform all work required to open and close the access openings in accordance with SFLC Std Spec 8636.

NOTE

Requirements for tank opening and closing, content disposal, and inspection are covered in the clean and inspect work items.

3.2 Inspection. After surface preparation and before coating application, the Contractor shall visually inspect all interior surfaces; including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:

• Structural condition.

• Inaccessible areas.

• Tank level indicator (TLI) and/or float switch condition.

• Sounding tube and striker plate condition.

• Suction and discharge piping.

3.3 Surface preservation. The Contractor shall accomplish the following tasks for the tanks listed in paragraph 1.1 (Intent):

3.3.1 Remove and retain the tank manhole cover(s). Remove the sewage ejector and bulkhead packing gland assembly.

3.3.2 Prepare and coat all tank interior surfaces (including the interior and exterior bulkhead surfaces under the packing gland assembly and the internal surfaces of manhole cover(s), the manhole cover hull ring(s) extending outward to the weld line that ties the hull ring into the tank plating on the tank exterior), using the system specified for "Tanks and Voids (Grey Water, Sewage, and CHT Tanks), Option I", in SFLC Std Spec 6310, Appendix B (Cutters and Boat Interior Paint Systems). Select finish/top coat color to match existing.

3.3.3 Prepare and coat all manhole cover external surfaces to match existing adjacent surfaces, using the system specified for “Decks, Metal Interior and Non-Skid Areas (Steel and Aluminum Decks - Wet Areas, Food Preparation Areas, Exit Areas, and Areas Subject To Condensation)”, in SFLC Std Spec 6310, Appendix B (Cutter and Boat Interior Painting Systems). Select finish/top coat color to match existing adjacent surfaces.

3.4 In-process quality control measures. The Contractor shall abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces). Surfaces being preserved are considered “critical-coated surfaces”.

4. NOTES

This section is not applicable to this work item.

WORK ITEM 1: Tanks (Sewage Holding), Preserve “100%”