Amendment0007 - 12RP45A83.pdf
PDF 29 KB Posted
- Attached to
- CGC BLAKE (WLM 563) FY12 DOCKSIDE REPAIRS
- Solicitation number
- HSCG85-12-R-P45A83
About this file
Amendment 0007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment0006 - 12RP45A83.pdf | ||
| Amendment0005 - 12RP45A83.pdf | ||
| Amendment0004 - 12RP45A83.pdf | ||
| CG Dwg 175-WLM-623-001 Rev L.pdf | ||
| Amendment0003 - 12RP45A83.pdf | ||
| Amendment0002 - 12RP45A83.pdf | ||
| Amendment0001 - 12RP45A83.pdf | ||
| AttJ.3Clarification_Form(12RP45A83).doc | DOC document | |
| AttJ.2ElectronicSectionB(12RP45A83).xls | XLS spreadsheet | |
| AttJ.1BlakeFY12DS(12RP45A83).doc | DOC document | |
| Solicitation(SchedA-M)(12RP45A83).doc | DOC document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0007 07 MAY 12 21-12-852P45A83
6. ISSUED BY CODE HSCG85 7. ADMINISTERED BY (If other than Item 6) CODE
COMMANDER
SURFACE FORCES LOGISTICS CENTER C&P2
1301 CLAY ST. STE 807N
OAKLAND, CA 94612-5217
8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9.A AMENDMENT OF SOLICITATION NO.
HSCG85-12-R-P45A83
9B. DATE (SEE ITEM 11)
13 APR 12
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
√ A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)
SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
CGC BLAKE (WLM 563) FY12 DOCKSIDE REPAIRS
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remain unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
)PREVIOUS EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.2
HSCG85-12-R-P45A83 Amendment 0007
1. Response(s) to Request(s) for Clarification 0009 is/are provided as Attachment A.
2. There is no change to the proposal closing date, which remains as follows:
05/15/12 11 a.m. Pacific Time
HSCG85-12-R-P45A83 Amendment 0007
ATTACHMENT A
Date: 5-3-12
Question No. 0009
REQUEST FOR CLARIFICATION
SHIP & HULL No.: CGC BLAKE (WLM 562) FY12 DOCKSIDE REPAIRS
RFP No.: HSCG85-12-R-P45A83
SOLICITATION SECTION: PARA NO.
WORK ITEM NO. 16 PARA NO.
3.2 task 5
TITLE: Service and inspect
QUESTION:
In item 16 3.2 task 5 service and inspect it tell us in SFLC 5000 3.2.3 SERVICE AND INSPECT
BUT 3.2.3 IS DISASSEMBLE AND INSPECT AND 3.2.2 IS SERVICE AND INSPECT. ARE WE TO
SERVICE AND INSPECT OR DIASSEMBLE AND INSPECT.
RESPONSE:
In WI 16, paragraph 3.2, Task 5, column headed “APPENDIX AND PARA. FROM 5000_STD”, delete:
“3.2.3 (Service and inspect)”
And substitute:
“3.2.2 (Service and inspect)”
File details come from the government source that posted it. Updated .