CGC KANKAKEE FY11 DD SCHEDULE 1-26-11.pdf
PDF 134 KB Posted
- Attached to
- CGC KANKAKEE FY11 DRY DOCK REPAIRS
- Solicitation number
- HSCG85-11-Q-P45R62
About this file
CGC KANKAKEE FY11 DD - SCHEDULE
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CGC KANKAKEE FY11 DD - RFQ. 1-28-11.pdf | ||
| CGC KANKAKEE FY11 SPECIFICATION - REV 0.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICING SCHEDULE FOR:
USCGC KANKAKEE (WLR-75500) DRYDOCK AVAILABILITY 2011
ITEM DESCRIPTION UNIT PRICE UNIT QTY EXTENDED PRICE
D-001 Hull Plating, U/W Body, Inspect - Tender $0.00 JOB 1 $0.00
D-002 Hull Plating, U/W Body, Inspect - Barge $0.00 JOB 1 $0.00
D-003 Hull Plating (U/W Body), Ultrasonic Testing - Tender $0.00 JOB 1 $0.00
D-004 Hull Plating (U/W Body), Ultrasonic Testing - Barge $0.00 JOB 1 $0.00
D-005 Voids (Non-Accessible), Leak Test - Barge $0.00 JOB 1 $0.00
D-006 Propulsion Shaft Rope Guards, Inspect and Repair $0.00 JOB 1 $0.00
O-007 Voids (Non-Accessible) - Internal, Preserve - Barge $0.00 JOB 1 $0.00
D-008 Voids (Non-Accessible), Leak Test - Tender $0.00 JOB 1 $0.00
O-009 Voids (Non-Accessible), Preserve Internal Surfaces - Tender $0.00 JOB 1 $0.00
D-010 Propulsion Shafting, Strain Gage Alignment Inspections $0.00 JOB 1 $0.00
D-011 Propulsion Shafting; Remove, Inspect, and Reinstall $0.00 EA 2 $0.00
D-012 Propulsion Intermediate Shaft; Remove, Inspect, and Reinstall $0.00 JOB 1 $0.00
O-013 Propulsion Shafting, Straighten $0.00 EA 2 $0.00
O-014 Propeller Shaft Sleeve(s), Renew $0.00 JOB 1 $0.00
D-015 Propulsion Shaft Bearings (External), Renew $0.00 JOB 1 $0.00
D-016 Propulsion Stern Tube Bearings, Renew $0.00 JOB 1 $0.00
D-017 Propellers, Clean and Inspect $0.00 JOB 1 $0.00
O-018 Propeller, Perform Minor Repairs and Reconditioning $0.00 JOB 1 $0.00
D-019 Keel Coolers - Tender; Clean, Inspect and Hydro $0.00 JOB 1 $0.00
D-020 Keel Coolers - Barge, Clean, Inspect and Hydro $0.00 JOB 1 $0.00
D-021 Rudder Assembly, Remove, Inspect and Reinstall $0.00 JOB 1 $0.00
O-022 Rudder Stock Housing (Lower), Renew $0.00 EA 6 $0.00
O-023 Rudder Stock Housing (Upper), Renew $0.00 EA 6 $0.00
O-024 Rudder Stock, Rebuild $0.00 EA 6 $0.00
D-025 Spud Wells, Preserve - Tender $0.00 JOB 1 $0.00
D-026 Spud Wells, Preserve - Barge $0.00 JOB 1 $0.00
O-027 Deck Fittings, Inspect - Tender $0.00 JOB 1 $0.00
O-028 Deck Fittings (Barge), Inspect $0.00 JOB 1 $0.00
PRICING SCHEDULE FOR:
USCGC KANKAKEE (WLR-75500) DRYDOCK AVAILABILITY 2011
ITEM DESCRIPTION UNIT PRICE UNIT QTY EXTENDED PRICE
D-029 Tanks (Potable Water), Preserve “ 100% ” - Tender $0.00 JOB 1 $0.00
D-030 Decks - Exterior( Barge Buoy ), Preserve $0.00 JOB 1 $0.00
O-031 U/W Body, Preserve ( “100%” ) - Tender $0.00 JOB 1 $0.00
O-032 U/W Body, Preserve ( “100%” ) - Barge $0.00 JOB 1 $0.00
O-033 U/W Body, Preserve (“Partial – Condition A ”) - Tender $0.00 JOB 1 NSP
O-034 U/W Body, Preserve (“Partial – Condition A ”) - Barge $0.00 JOB 1 NSP
O-035 U/W Body, Preserve (“Partial - Condition B”) - Tender $0.00 JOB 1 NSP
O-036 U/W Body, Preserve (“Partial - Condition B”) - Barge $0.00 JOB 1 NSP
D-037 Stern Tube Interior Surfaces, Preserve 100% $0.00 JOB 1 $0.00
D-038 Drydocking - Tender $0.00 JOB 1 $0.00
D-039 Drydocking - Barge $0.00 JOB 1 $0.00
D-040 Temporary Services, Provide $0.00 JOB 1 $0.00
D-041 Sea Trial Performance, Provide Support $0.00 JOB 1 $0.00
D-042 Boat Davit Winch, Shrink Wrap $0.00 JOB 1 $0.00
D-043 Buoy and Cargo Handling Crane, Shrink Wrap $0.00 JOB 1 $0.00
D-044 Cathodic Protection, Renew - Tender $0.00 JOB 1 $0.00
D-045 Cathodic Protection, Renew - Barge $0.00 JOB 1 $0.00
O-00A Composite Labor Rate $0.00 Hour 500 $0.00
D-00B GFP Report NSP EA NSP
O-00Z Laydays $0.00 Day 5
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items
File details come from the government source that posted it. Updated .