AMENDMENT 1 CGC DALLAS FY11 MR1 DS.docx
DOCX document 22 KB Posted
- Attached to
- CGC DALLAS DOCKSIDE REPAIR
- Solicitation number
- HSCG85-11-Q-P45BW8
About this file
AMENDMENT 1 CGC DALLAS FY11 MR1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 3 CGC DALLAS FY11 MR1 DS.docx | DOCX document | |
| AMENDMENT 2 CGC DALLAS FY11 MR1 DS.docx | DOCX document | |
| Specification DALLAS FY11 MR1 SPEC REV1.docx | DOCX document | |
| RFQ CGC DALLAS | — | |
| Specification DALLAS FY11 MR1 SPEC REV 0.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE
OF PAGES
2. AMENDMENT/MODIFICATION NO.
00001
3. EFFECTIVE DATE
March 15, 2011
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO.
6. ISSUED BY CODE:
USCG, Surface Force Logistics Center Attn: Mia Mayers, SFLC–CPD-C&P2-LRE PL 300 E Main Street, Suite 550 Norfolk, VA 23510-9111
7. ADMINISTERED BY CODE:
8. NAME AND ADDRESS OF CONTRACTOR (No, street, county, state and Zip Code)
CODE: FACILITY CODE:
9a. AMENDMENT OF SOLICITATION NO.
HSCG85-11-Q-P45BW8
9b. DATED (SEE ITEM 11) 7 March 2011 10a. MODIFICATION OF CONTRACT NO.
10b. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENT OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of offers ___ is extended _X_ is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning one copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (IF REQUIRED)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO DESCRIBED IN ITEM 14.
A. This change order is issued pursuant to: (Specify authority) The changes set forth in Item 14 are made in the contract order no in item 10A.
B. The above numbered contract/order is modified to reflect the administrative changes (such as changes in paying office, appropriation data, etc.) set forth in Item 14 pursuant to the authority of FAR 43.103(b).
C. This supplemental agreement is entered into in pursuant to authority of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, X is required to sign this document and return ___1___ copies to the issuing office.
14. Description of amendment/modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
USCC DALLAS (WHEC 716)
DOCKSIDE REPAIR
1. CGC DALLAS (WHEC 716) Specification Rev 1/dated March 14, 2011 is attached and is hereby incorporated into the solicitation.
2. The deadline for receipt of quotes remains 16 March 2011 at 12:00 p.m.,(EST).
3. ALL OTHER TERMS AND CONDITIONS OF THIS SOLICITATION REMAIN UNCHANGED.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type/Print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type/Print)
MIA R. MAYERS
HSCG85-11-Q-P-45BW8
USCGC DALLAS (WHEC 716) FY 2011 MR1 DOCKSIDE REPAIR
CONTRACTOR:
WI 10 (Berthing Head Renovation) does not address renewing the deck covering exactly.
In the scope, paragraph 1.1 it states the deck covering to be renewed:
"1.1 Intent. This work item describes the requirements for the Contractor to refurbish the entire head. Showers will be removed and rebuilt, deck covering will be removed and new deck covering installed, bulkheads will be repaired and painted, and miscellaneous hardware will be renewed. Decks will be inspected for damage and deck covering renewed."
In paragraph 3.5.6 it states to remove deck covering referencing another work item (that doesn't exist):
"3.5.6 Remove and scrap the existing deck covering as described in the Work Item “Deck Coverings (Interior Polymeric) Renew”. This includes decking around the commodes, under the sink and in way of the showers, and all decking in the compartment."
And in paragraph 3.5.9.1 it states to renew deck covering again referencing a work item that doesn't exist:
"3.5.9.1 Coordinate deck renewal and deck plate inspection with Work Item “Deck Coverings (Interior Polymeric) Renew."
USCG RESPONSE: See SPEC REV-1