CHIPPEWA SPECS 75404_DD_MWC_10R1.pdf
PDF 453 KB Posted
- Attached to
- CHIPPEWA DD FY10
- Solicitation number
- HSCG85-10-Q-P45G46
About this file
Specification for USCGC Chippewa
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ CHIPPEWA 2-10-10 .doc | DOC document | |
| RFQ CHIPPEWA 2-10-10 .doc | DOC document | |
| RFQ CHIPPEWA 2-10-10 .doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC CHIPPEWA (WLR-75404) 75 FOOT “C” CLASS RIVER
BUOY TENDER
SPECIFICATIONS FOR DRYDOCK REPAIRS
Developed By: Mike Check
(Rev-1, 22 Dec 2009)
Commander (SFLC) Surface Forces Logistics Center – Norfolk Detachment
300 East Main Street Norfolk, VA 23510
(December 22, 2009 / Rev-1)
USCGC CHIPPEWA (WLR-75404) DRYDOCK AVAILABILITY 2010
TABLE OF CONTENTS
Work Item Title Page
List of Sketches iv
Revisions Record v
List of Applicable References vi
List of Government-furnished Property x
List of Critical Inspection Items xi
Specification Feedback xii
Principle Characteristics xiii
General Requirements 1
1 Perform Ultrasonic Thickness Measurements - Underwater Hull Plating (Barge) 8
2 Perform Ultrasonic Thickness Measurements - Underwater Hull Plating (Tender) 9
3 Perform Hull and Structural Plating Repairs (10.2-Pound) 10
4 Perform Hull and Structural Plating Repairs (12.75-Pound) 11
5 Perform Hull and Structural Plating Repairs (15.3-Pound) 12
6 Perform Hull and Structural Shaped Plate Repairs (12.75-Pound) 13
7 Perform Hull and Structural Shaped Plate Repairs (15.3-Pound) 14
8 Perform Hull and Structural Plating Repairs – Eroded Welds (Steel) 15
9 Perform Hull and Structural Plating Repairs – Crack (Steel) 16
10 Perform Hull and Structural Plating Repairs – Overlay Welding (Steel) 17
11 Remove, Inspect, and Reinstall Propeller Shafts 18
12 DELETED 21
13 Straighten Shaft 22
14 Inspect Water-Lubricated Shaft Bearings 24
Page i (Rev-1)
15 Renew Propeller Shaft Sleeves 26
16 DELETED 28
17 Remove, Inspect, and Reinstall Propellers 29
18 Perform Minor Repairs and Reconditioning of Propeller 32
19 Clean, Inspect, and Test Grid Coolers (Barge) 35
20 Clean, Inspect, and Test Grid Coolers (Tender) 38
21 DELETED 41
22 DELETED 42
23 DELETED 43
24 Remove, Inspect and Reinstall Steering and Backing Rudder Assemblies 44
25 DELETED 47
26 DELETED 48
27 Inspect and Repair Push Knee Mounting Surfaces 49
28 Preserve Spud and Spud Well Surfaces and Renew Spud Well Liners (Barge) 51
29 Preserve Spud and Spud Well Surfaces and Renew Spud Well Liners (Tender) 54
30 Shrink Wrap Crane and Small Boat Davits 57
31 DELETED 59
32 Preserve Barge Buoy Deck 60
33 Preserve Underwater Body (Barge) – “100%" 62
34 Preserve Underwater Body (Tender) - "100%" 64
35 DELETED 66
36 DELETED 67
37 Routine Drydocking (Barge) 68
38 Routine Drydocking (Tender) 71
39 Provide Temporary Logistics 74
40 DELETED 76
Page ii (Rev-1)
41 DELETED 77
42 DELETED 78
43 DELETED 79
44 DELETED 80
Page iii (Rev-1)
List of Sketches
Work Item Sketch Number Page
This section is not applicable to this package.
Page iv (Rev-1)
Revisions Record
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
12/22/09 1
12, 16, 21, 22, 23, 25, 26, 31, 35, 36, 40, 41, 42, 43, and 44
Deleted work items from specification and Schedule of Supply and Services (SOS&S)
14 Revised work item to inspect in lieu of renewal
27 & 34 Changed work items from “optional” to “definite”, updating the SOS&S accordingly
List of Sketches Pg iv – Updated List of Sketches to reflect deletion of WI 40
List of CIRs Pg xi – Updated List of Critical Inspection Reports to reflect deletion of WIs 12, 22, 23, and 36
NOTE: All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Page v (Rev-1)
List of Applicable References
The below-listed documents form a part of this specification to the extent specified herein.
Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution. Electronic copies of the latest Editions of MLCA Standard Specifications are available on the Internet and may be accessed at the following Internet Uniform Resource Locator (URL) address:
http://www.uscg.mil/mlclant/vdiv/standard_specifications.asp. Guidance for obtaining copies of all other documents referenced herein is provided in the solicitation.
Order of precedence. In the event of conflicts between text of this specification and the applicable references specified herein, order of precedence shall be in accordance with MLCA Standard Specification 0000_STD, paragraph 3.2 (Order of precedence), unless otherwise specified by the Contracting Officer (KO). The Contractor shall immediately notify the KO in writing of any perceived conflicts contained herein. Nothing in these documents, however, supersedes applicable laws and regulations, unless a specific exemption has been obtained.
FEDERAL AND MILITARY SPECIFICATIONS AND STANDARDS
MIL-PRF-16173, Sep 2006, Corrosive Preventive Compound, Solvent Cutback, Cold Application
MIL-PRF-18458, May 2003, Grease, Wire Rope-Exposed Gear
MIL-PRF-24647, Feb 2005, Paint System, Anticorrosive and Antifouling, Ship Hull
MIL-PRF-83483, Feb 1998, Thread Compound, Antiseize, Molybdenum Disulfide Petrolatum
MIL-STD-167-1, Nov 2005, Mechanical Vibrations of Shipboard Equipment (Type I - Environmental and Type II - Internally Excited)
MIL-STD-2191, Nov 1992, Repair Welding, Weld Cladding, Straightening, and Cold Rolling of Main Propulsion Shafting
OTHER GOVERNMENT DOCUMENTS, DRAWINGS, AND PUBLICATIONS
DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 8634_STD, 2004 Edition, Drydocking
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 8635_STD, 2004 Edition, Provide Temporary Logistics
Page vi (Rev-1) http://www.uscg.mil/mlclant/vdiv/standard_specifications.asp
DRAWINGS
Coast Guard Drawing 130 CGB71-77 085-004, Rev 1, Docking Plan
Coast Guard Drawing 130 CGB71-77 111-002, Rev -, Hull Details, Side Shell Plating and Framing Sections and Details
Coast Guard Drawing 130 CGB71-77 117-001, Rev -, Hull Details – Transverse Frames
Coast Guard Drawing 130 CGB71-77 121-001, Rev -, Hull Details – Bulkhead and Truss
Coast Guard Drawing 130 CGB71-77 123-001, Rev -, Spud Well Bhds & Spud Details
Coast Guard Drawing 130 CGB71-77 521-001, Rev 1, Fire Water, Ballast, and Jetting Piping Schematic
Coast Guard Drawing 130 CGB71-77 530-002, Rev -, Cooling Water Piping Schematic
Coast Guard Drawing 130 CGB74-77 085-001, Rev C, General Arrangement and Profile
Coast Guard Drawing 130 CGB74-77 111-001, Rev A, Hull Details - Bottom and Main Deck Plating and Framing Details
Coast Guard Drawing 75C WAGL 0700-025, Rev -, 75 Foot “C” Class Towboat Docking Block Arrangement
Coast Guard Drawing 75C WAGL 1107-001, Rev 4, Lower Deckhouse (75401-75405)
Coast Guard Drawing 75C WAGL 1107-004, Rev 3, Upper Deckhouse (75401-75405)
Coast Guard Drawing 75C WAGL 2200-022, Rev -, Steering Rudder Trunk Details (75402-05)
Coast Guard Drawing 75C WAGL 2200-023, Rev 1, Backing Rudder Trunk Details (75402-05)
Coast Guard Drawing 75C WAGL 2200-024, Rev -, Rudder Details (75402-05)
Coast Guard Drawing 75C WAGL 2602-021, Rev 1, Spud Derrick and Spud (75402-04)
Coast Guard Drawing 75C WAGL 2602-024, Rev 1, Towing Knees and Spudwell (75402-04)
Coast Guard Drawing 75C WAGL 3601-021, Rev -, Officer’s and Crew’s Shower
Coast Guard Drawing 75C WAGL 4103-022, Rev -, Engine Cooling Water Piping Diagram (75402- 75405)
Coast Guard Drawing 75C WAGL 4103-023, Rev 2, Engine Cooling Water Piping Arrangement (75402- 75405)
Coast Guard Drawing 75C WAGL 4301-022, Rev -, Stern Strut, Shaft Log, Stern Tube and Bulkhead Stuffing Box (75402-05)
Coast Guard Drawing 75C WAGL 4301-023, Rev 1, Prop Shaft Details (75402-05)
Page vii (Rev-1)
Coast Guard Drawing 75C WAGL 4301-024, Rev -, Prop Shaft Couplings (75402-05)
Coast Guard Drawing 75C WAGL 4301-025, Rev -, Shaft Brake & Steady Rest Bearing Support for Prop Shafting (75402-05)
Coast Guard Drawing 75C WAGL 4301-026, Rev -, Prop Shft Layout & Rud Arrgt (75405)
Coast Guard Drawing 75C WAGL 4803-021, Rev -, Fire Piping Diagram (75402-75405)
Coast Guard Drawing 75C WAGL 6202-022, Rev -, Isometric of 220V System (75404)
Coast Guard Drawing 75C WAGL 6401-022, Rev 2, Isometric of 115V Power & Lighting Feeders (75402-75404)
Coast Guard Drawing 75C WAGL 6401-023, Rev -, Lighting Wiring Schematic (75404)
Coast Guard Fleet Drawing FL 2602-10, Rev E, Spud Arrangements and Details
NAVSEA Drawing 803-2145807, Rev C, Propulsion Shafting and Components
PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Jun 2006, Coatings and Color Manual
Fernstrum Gridcooler Installation and Maintenance Manual, 2006, Form 165
INDUSTRY STANDARDS
American Bureau of Shipping (ABS) 2, Rule Requirements for Survey After Construction, 2007, Part 7, Appendix Section 10, Guide for Bronze and Stainless Steel Propeller Castings
American Society for Testing and Materials (ASTM), D1709, 10 August 2001, Standard Test Methods for Impact Resistance of Plastic Film by the Free-Falling Dart Method
American Society for Testing and Materials (ASTM), D1922 Rev A, 10 November 2000, Standard Test Method for Propagation Tear Resistance of Plastic Film and Thin Sheeting by the Pendulum Method
American Society for Testing and Materials (ASTM) D882, 2002, Standard Test Method for Tensile Properties of Thin Plastic Sheeting
American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and Welding End
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2003 Edition, Bronze Gate, Globe, Angle and Check Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves
Page viii (Rev-1)
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G6032, 1999, Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 7/NACE No.4, 2004, Brush-Off Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2004, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting
The Society for Protective Coatings (SSPC)/NACE International (NACE) 2004, Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, Near-White Blast Cleaning
International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller - Manufacturing Tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50 m, Inclusive
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D3951, Reapproved 2004, Standard Practice for Commercial Packaging
ASTM International (ASTM) E797, 2005, Standard Practice for Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method
ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates
Page ix (Rev-1)
List of Government-furnished Property
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
17 Y **Propeller (RH) NSN: 2010-01-501-5504 1 ea. 5,600.00 Y **Propeller (LH) NSN: 2010-01-501-5506 1 ea. 5,600.00
37 N *Transducer cover plate N/A 2 ea. 50.00 38 N *Transducer cover plate N/A 1 ea. 50.00
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel, Electronic Systems Support Unit (ESU) or local Electronic Support Detachment (ESD).
Page x (Rev-1)
List of Critical Inspection Items
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see Std Spec 0000_STD, paragraph
3.6.2 (Inspection report particulars)):
Work Item Title
1 Perform Ultrasonic Thickness Measurements - Underwater Hull Plating (Barge)
2 Perform Ultrasonic Thickness Measurements - Underwater Hull Plating (Tender)
11 Remove, Inspect, and Reinstall Propeller Shafts
19 Clean, Inspect, and Test Grid Coolers (Barge)
20 Clean, Inspect, and Test Grid Coolers (Tender)
24 Remove, Inspect and Reinstall Steering and Backing Rudder Assemblies
28 Preserve Spud and Spud Well Surfaces and Renew Spud Well Liners (Barge)
29 Preserve Spud and Spud Well Surfaces and Renew Spud Well Liners (Tender)
Page xi (Rev-1)
Specification Feedback
The intent of this section is to inform all users that a spec feedback mechanism is in place, and is located on the MLCA Naval Engineering Division’s website. Spec feedback is a very important part of our overall continuous improvement process, and is crucial to specification development. It will allow spec writers to capture all specification-related lessons learned, and avoid mistakes or ambiguities in follow-on availabilities. All feedback will be reviewed, evaluated, and responded to in a timely manner.
If you have access to the CGWeb (Intranet), please use the following link, which will connect you to the MLCA(v) Naval Engineering website, for submitting your feedbacks:
http://webapps.mlca.uscg.mil/vdiv/specifications/feedback/default.cfm
If you do not have access to the CGWeb (Intranet), you may still submit your feedbacks, using the following web link:
http://www.uscg.mil/mlclant/vdiv/specfeedback.asp
Page xii (Rev-1) http://webapps.mlca.uscg.mil/vdiv/specifications/feedback/default.cfm http://www.uscg.mil/mlclant/vdiv/specfeedback.asp
Page xiii (Rev-1)
PC_75C_WLR_Chippewa_Barge (26 Oct 2005)
75C WLR
Principle Characteristics
75' WLR (C Class) "Chippewa" Small Buoy River Tender
Length Overall 75' 5-1/2"
Depth (main deck at side to baseline) 7' 8-1/2"
Maximum Beam 22' 5"
Frame Spacing 1' 6"
Full Load Draft 4' 2"
Full Load Displacement 150 long tons
Shore Tie Voltage Requirements 230VAC, 200A, 3 Phase
PROPELLERS / SHAFT
Number of Propellers 2
Number of Blades per Propeller 4
Diameter of Propeller 48"
Pitch 43" fixed
Revolutions per Minute (RPM) 410
Shaft Diameter 4-1/2”
CG BARGE
Length Overall (LOA) 130' 0"
Depth (main deck at side to baseline) 7' 6"
Maximum Beam 30' 0"
Frame Spacing 15" 30"
Full Load Draft 5' 0"
Full Load Displacement 250 long tons
00000_DLA_FLT (23 Oct 2008)
General Requirements
1. SCOPE
1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Jun 2006, Coatings and Color Manual
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in Std Spec 0000_STD and in this item, as applicable, during the performance of this availability.
NOTICE!
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and nondestructive inspection (NDI), in accordance with Std Spec 0740_STD.
3.4 Term substitution - COTR for COR. The Contractor shall be aware that the term "COR" (Contracting Officer's Representative) has been discontinued in favor of "COTR" (Contracting Officer's Technical Representative); consequently, whenever "COR" is encountered in this specification package, including referenced standard specifications and other referenced documents, it shall refer to "COTR", explicitly.
Page 1 (Rev-1)
3.5 Small boat storage. When a small boat (Motor Surf Boat (MSB)/Motor Cargo Boat (MCB)/Rigid Hull Inflatable (RHI) boat) is removed as interference to Contractor-work, the Contractor shall provide a suitable pier side storage cradle, for safely storing said boat.
3.5.1 Cradle design. Ensure that the temporary cradle meets the following criteria:
• Structure is templated from the geometry and arrangement of the contact support areas of the existing cradle onboard the vessel, to provide same or more support area as that which is provided by the existing cradle.
• Arrangement will allow ship’s force to perform maintenance on the small boat, without modification of the cradle.
• Structure is manufactured using the most economical methods and materials available, and is capable of supporting the full weight of the small boat under normal conditions experienced during routine maintenance.
• Contact surfaces are no harder or rougher than the contact surfaces for existing cradle onboard the vessel.
3.5.2 Boat accessibility. Ensure the storage is located in the vicinity of the vessel, and is unrestricted, to allow for ship's force to complete maintenance during normal working hours for the entire performance period.
3.5.3 Boat protection. Provide full protection that can be safely and completely secured when the small boat is left unattended (e.g. watertight cover, storage in a warehouse or shop, etc.), in addition to isolating the boat from the elements.
3.5.4 Boat transportation. Transport each small boat to its storage area within one week of docking the vessel and back to the vessel prior to the end of the performance period.
4. NOTES
4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may be accessed at the following URL address:
http://www.uscg.mil/directives/cim.asp
4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in Std Spec 0000_STD to be completed and submitted during preservation of "critical-coated surfaces", are provided at the end of this item.
Page 2 (Rev-1) http://www.uscg.mil/directives/cim.asp
QA-1: QUALITY ASSURANCE INSPECTION FORM - PRESERVATION CHECKLIST
CHECKPOINT 1 - COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10?).
Verify surface anchor profile (1.5-3.5 mils for abrasive-blasted steel surfaces; 1.0 mil (minimum) for power-tool cleaned surfaces; 1.0-1.5 mils for abrasive-blasted aluminum surfaces); and 1.5 -2.5 for surfaces to be coated w/single coat of inorganic zinc).
Measure soluble salt conductivity (5 measurements per 1000 sqft) - maximum threshold: 70 microsiemens/cm for non-submerged surfaces and 30 microsiemens/cm for submerged surfaces.
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the Coating Manufacturer(s).
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 - STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer's instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 - TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer's instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 - FINAL INSPECTION
Verify final system dry film thickness.
Verify system cure for service resumption - U/W Body surfaces: 5-8 hours @ 77 degrees F; Potable water tanks: 7 days @
77 degrees F.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure (minimum 7 days @ 77 degrees F.), to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
CHECKPOINT 10 - RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
Signature of Inspector:______________________________________________________Date:____________
Page 3 (Rev-1)
QA-2: QUALITY ASSURANCE INSPECTION FORM
ENVIRONMENTAL READINGS
(Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat)
DATE TIME
ENTER ACTIVITY
(Surface preparation, primer coat, barrier coat, top coat, etc?)
LOCATION DEW
POINT
SURFACE
TEMP.
% REL.
HUMIDITY
SIGNATURE
OF
INSPECTOR
.Signature of Inspector:__________________________________________________Date:____________
Page 4 (Rev-1)
QA-3: QUALITY ASSURANCE INSPECTION FORM
SURFACE PROFILE LOG
Vessel Name And Hull Number:__________________________________________________
Work Item Title:_______________________________________________________________
Location Of Work (Including Frame Numbers):_____________________________________
Area (Square Feet):_____________
Surface Preparation Method:_____________________________________________________
Abrasive Manufacturer And Size:_________________________________________________
Degreasing Method Used:________________________________________________________
Number Of Hours Surfaces (Steel Only) Left Unpainted:______________________________
Sweep blasting performed to remove flash rusting (steel)? Yes/No:_____________________
Place Surface Profile Replica Tapes In The Spaces Provided Below, To Serve As Permanent QA record.
Maintain separate log for each area/location. When an Area Is Divided Into Separate Sections, Maintain A Separate Log for Each Section.
AVERAGE MILS
(IAW ASTM D4417,
METHOD C)
Place Surface Profile Replica Tape Here
Reading:__________ mils
Date and Time:__________________________________________________
Location of Surface Profile Measurements:___________________________________________________________
Signature of Inspector:____________________________________________________________________________
Page 5 (Rev-1)
QA-4: QUALITY ASSURANCE INSPECTION FORM
SURFACE SOLUBLE SALT CONDUCTIVITY LOG
Vessel Name and Hull Number:__________________________________________________
Work Item Title:_______________________________________________________________
Location of Work (including frame numbers):_______________________________________
Area (square feet):____________
DATE TEST LOCATIONS CONDUCTIVITY
(microsiemens/cm)
Date and Time:_________________________________________
Signature of Inspector:___________________________________
Page 6 (Rev-1)
QA-5: QUALITY ASSURANCE DATA FORM
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC PA-2
(Use one sheet for each sequence)
Vessel Name and Hull Number:__________________________________________________
Work Item Title:______________________________________________________________
Coating Manufacturer:_________________________________________________________
Product Name:________________________________________________________________
Batch Number:________________________________________________________________
Induction Time:_______________________________________________________________
Coating System Sequence (Indicate whether: primer, touch-up primer, barrier coat, 3rd coat?):__________________
DFT
MEASUREMENT
NUMBER
LOCATION OF READINGS MEASURED DFT
Application Method (Airless, Conventional Spray, Rolled):____________________
Average DFT: __________________________________________________________
Date and Time: _________________________________________________________
Signature of Inspector: ___________________________________
Page 7 (Rev-1)
11003_UT.UWB_TEF_FLT (03 Dec 2008)
WORK ITEM 1: Perform Ultrasonic Thickness Measurements - Underwater Hull Plating (Barge)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform thickness measurements of underwater hull plating, by ultrasonic methods.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
ASTM International (ASTM) E797, 2005, Standard Practice for Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method
3. REQUIREMENTS
3.1 General.
3.1.1 Critical Inspection Report. The Contractor shall submit a critical inspection report (CIR) for the inspections listed in the following paragraph(s), within 24 hours after inspection completion:
• 3.2 (Thickness measurement particulars).
3.2 Thickness measurement particulars. The Contractor shall perform a total of 350 ultrasonic thickness measurements of the hull plating, in locations designated by the Coast Guard Inspector. Submit a CIR.
Ensure that the ultrasonic apparatus, procedure requirements, and report shall be in accordance with ASTM E797, and the report results shall additionally include the following, for each test point:
• Location.
• Original metal thickness.
• Measured metal thickness.
• Percent deterioration (calculation is based on the original metal thickness).
3.3 Apparatus Standardization. The Contractor shall perform ultrasonic equipment standardization in accordance with ASTM E797, Section 7 (Standardization of Apparatus) and Section 8 (Tech Hazards).
4. NOTES
This section is not applicable to this work item.
Page 8 (Rev-1)
11003_UT.UWB_TEF_FLT (03 Dec 2008)
WORK ITEM 2: Perform Ultrasonic Thickness Measurements - Underwater Hull Plating (Tender)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform thickness measurements of underwater hull plating, by ultrasonic methods.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
ASTM International (ASTM) E797, 2005, Standard Practice for Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method
3. REQUIREMENTS
3.1 General.
3.1.1 Critical Inspection Report. The Contractor shall submit a critical inspection report (CIR) for the inspections listed in the following paragraph(s), within 24 hours after inspection completion:
• 3.2 (Thickness measurement particulars).
3.2 Thickness measurement particulars. The Contractor shall perform a total of 200 ultrasonic thickness measurements of the hull plating, in locations designated by the Coast Guard Inspector. Submit a CIR.
Ensure that the ultrasonic apparatus, procedure requirements, and report shall be in accordance with ASTM E797, and the report results shall additionally include the following, for each test point:
• Location.
• Original metal thickness.
• Measured metal thickness.
• Percent deterioration (calculation is based on the original metal thickness).
3.3 Apparatus Standardization. The Contractor shall perform ultrasonic equipment standardization in accordance with ASTM E797, Section 7 (Standardization of Apparatus) and Section 8 (Tech Hazards).
4. NOTES
Page 9 (Rev-1)
11100_TEF_10.2LB_Steel Plating (30 Oct 2008)
WORK ITEM 3: Perform Hull and Structural Plating Repairs (10.2- Pound)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew 1/4” thick (10.2-lb/sqft) steel structural plating.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
3. REQUIREMENTS
3.1 General. The Contractor shall perform all welding and nondestructive inspection (NDI) in accordance with Std Spec 0740_STD. Be aware that this work item includes all welding related activities only and does not include interference removal.
3.2 Renewal. If a Change Request has been authorized and released by the KO, the Contractor shall renew 1/4” thick (10.2- lb/sqft) steel structural plating, as designated by the Coast Guard Inspector, up to 100 square feet in increments of 4 square feet.
4. NOTES
Page 10 (Rev-1)
11100_TEF_12.75LB_Plating (30 Oct 2008)
WORK ITEM 4: Perform Hull and Structural Plating Repairs (12.75- Pound)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew 5/16” thick (12.75-lb/sqft) steel plating.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
3. REQUIREMENTS
3.1 General. The Contractor shall perform all welding and nondestructive inspection (NDI) in accordance with Std Spec 0740_STD. Be aware that this work item includes all welding related activities only and does not include interference removal.
3.2 Renewal. If a Change Request has been authorized and released by the KO, the Contractor shall renew 5/16” thick (12.75-lb/sqft) steel plating, as designated by the Coast Guard Inspector, up to 100 square feet in increments of 4 square feet.
Page 11 (Rev-1)
11100_TEF_15.3LB_Plating (30 Oct 2008)
WORK ITEM 5: Perform Hull and Structural Plating Repairs (15.3- Pound)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew 3/8” thick (15.3-lb/sqft) steel plating.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
3. REQUIREMENTS
3.1 General. The Contractor shall perform all welding and nondestructive inspection (NDI) in accordance with Std Spec 0740_STD. Be aware that this work item includes all welding related activities only and does not include interference removal.
3.2 Renewal. If a Change Request has been authorized and released by the KO, the Contractor shall renew 3/8” thick (15.3- lb/sqft) steel plating, as designated by the Coast Guard Inspector, up to 100 square feet in increments of 4 square feet.
Page 12 (Rev-1)
11100_TEF_12.75LB_Shaped Plate (30 Oct 2008)
WORK ITEM 6: Perform Hull and Structural Shaped Plate Repairs (12.75-Pound)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew 5/16” thick (12.75-lb/sqft) steel shaped plate.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
3. REQUIREMENTS
3.1 General. The Contractor shall perform all welding and nondestructive inspection (NDI) in accordance with Std Spec 0740_STD. Be aware that this work item includes all welding related activities only and does not include interference removal.
3.2 Renewal. If a Change Request has been authorized and released by the KO, the Contractor shall renew 5/16” thick (12.75-lb/sqft) steel shaped plate, as designated by the Coast Guard Inspector, up to 100 square feet in increments of 4 square feet.
Page 13 (Rev-1)
11100_TEF_15.3LB_Steel Shaped Plate (30 Oct 2008)
WORK ITEM 7: Perform Hull and Structural Shaped Plate Repairs (15.3-Pound)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew 3/8” thick (15.3-lb/sqft) steel shaped plate.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
3. REQUIREMENTS
3.1 General. The Contractor shall perform all welding and nondestructive inspection (NDI) in accordance with Std Spec 0740_STD. Be aware that this work item includes all welding related activities only and does not include interference removal.
3.2 Renewal. If a Change Request has been authorized and released by the KO, the Contractor shall renew 3/8” thick (15.3- lb/sqft) steel shaped plate, as designated by the Coast Guard Inspector, up to 100 square feet in increments of 4 square feet.
Page 14 (Rev-1)
11100_TEF_ERODED_STL_WELD (30 Oct 2008)
WORK ITEM 8: Perform Hull and Structural Plating Repairs – Eroded Welds (Steel)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew eroded steel welds.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
3. REQUIREMENTS
3.1 General. The Contractor shall perform all welding and nondestructive inspection (NDI) in accordance with Std Spec 0740_STD. Be aware that this work item includes all welding related activities only and does not include interference removal.
3.2 Renewal. If a Change Request has been authorized and released by the KO, the Contractor shall renew the designated eroded steel welds, up to 50 linear feet in increments of one linear foot.
Page 15 (Rev-1)
11100_TEF_STL_CRACK (30 Oct 2008)
WORK ITEM 9: Perform Hull and Structural Plating Repairs – Crack (Steel)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to repair the cracked steel welds.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
3. REQUIREMENTS
3.1 General. The Contractor shall perform all welding and nondestructive inspection (NDI) in accordance with Std Spec 0740_STD. Be aware that this work item includes all welding related activities only and does not include interference removal.
3.2 Repair particulars. If a Change Request has been authorized and released by the KO, the Contractor shall repair the designated cracked steel welds, up to 50 linear feet in increments of one linear foot.
Page 16 (Rev-1)
11100_TEF_OVERLAY_STL (30 Oct 2008)
WORK ITEM 10: Perform Hull and Structural Plating Repairs – Overlay Welding (Steel)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform overlay welding repairs.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
3. REQUIREMENTS
3.1 General. The Contractor shall perform all welding and nondestructive inspection (NDI) in accordance with Std Spec 0740_STD. Be aware that this work item includes all welding related activities only and does not include interference removal.
3.2 Repair particulars. If a Change Request has been authorized and released by the KO, the Contractor shall perform steel overlay welding repairs, up to 48 square inches in increments of 8 square inches.
Page 17 (Rev-1)
24310_MWS_FLT (14 Jan 2009) 75402-05 WLR (30 Jul 2008)
WORK ITEM 11: Remove, Inspect, and Reinstall Propeller Shafts
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to remove, inspect, and reinstall the port and starboard propeller shafts.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Drawing 75C WAGL 4301-022, Rev -, Stern Strut, Shaft Log, Stern Tube and Bulkhead Stuffing Box (75402-05)
Coast Guard Drawing 75C WAGL 4301-023, Rev 1, Prop Shaft Details (75402-05)
Coast Guard Drawing 75C WAGL 4301-024, Rev -, Prop Shaft Couplings (75402-05)
Coast Guard Drawing 75C WAGL 4301-025, Rev -, Shaft Brake & Steady Rest Bearing Support for Prop Shafting (75402-05)
Coast Guard Drawing 75C WAGL 4301-026, Rev -, Prop Shft Layout & Rud Arrgt (75405)
3. REQUIREMENTS
3.1 General.
3.1.1 Critical Inspection Report. The Contractor shall submit a critical inspection report (CIR) for the inspections listed in the following paragraph(s):
• 3.2.2 (Inspections).
3.1.2 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the following:
• Rope guard.
• Fairwater.
Page 18 (Rev-1)
3.2 Work to be accomplished. Using Coast Guard Drawings 75C WAGL 4301-022, 75C WAGL 4301- 023, 75C WAGL 4301-024, 75C WAGL 4301-025, and 75C WAGL 4301-026 as guidance, as applicable, the Contractor shall accomplish the following for a designated propeller shaft:
3.2.1 Removals.
3.2.1.1 Mark existing shaft position, and match-mark shaft coupling bolts to their respective holes, to facilitate reinstallation procedures.
3.2.1.2 Remove the shaft and attached components to a suitable repair facility. Ensure shaft is properly protected and supported at all bearing journals, at all times, until reinstallation.
3.2.2 Inspections. Clean the shaft free of all marine growth, and accomplish the following inspections, as applicable (Submit CIR):
3.2.2.1 Visually inspect the following components, as applicable, for excessive wear and other mechanical defects such as nicks, cracks, and corrosion:
• Shaft surfaces.
• Bearing surfaces.
• All shaft and propeller associated fasteners.
• Stern tube surfaces.
• Couplings.
• Stern tube/shaft sealing systems.
• Packing ring and glands.
NOTICE!
Before taking shaft runout readings, spin the shaft on a lathe for approximately two hours at the vessel's maximum rated RPM to eliminate any sagging that may have occurred during handling and storage.
3.2.2.2 Measurements.
• Measure keys and keyways.
• Measure all bearing sleeve or journal diameters.
• Measure runouts for shaft taper, shaft straightness, and coupling end diameters.
• With the key in-place, fit the shaft coupling to the shaft in shop and check the contact percentage by bluing. If the contact is less than 80%, the Contractor shall grind and hand stone the coupling hub to achieve a minimum of 80 percent contact, and verify by bluing again. Make a small inscription on the shaft to mark the coupling hub location and use it as a reference in final assembly. Measure and record the coupling face and bore runouts.
3.2.2.3 Perform nondestructive inspection of all bearing sleeves, shaft tapers, coupling bolts, keyways, and welded repair surfaces, in accordance with Std Spec 0740_STD, Appendix C.
Page 19 (Rev-1)
3.2.3 Reinstallation. Reinstall the propeller shaft to its original configuration and accomplish the following, using Coast Guard Drawings 75C WAGL 4301-022, 75C WAGL 4301-023, 75C WAGL 4301-024, 75C WAGL 4301-025, and 75C WAGL 4301-026, as applicable.
3.2.3.1 Machine, grind, or hand-stone couplings, if necessary, to achieve a minimum of 80 percent contact. True couplings to shaft by cutting coupling faces and land area.
3.2.3.2 Renew all stainless steel self-locking nuts for packing glands.
3.2.3.3 Renew all packing materials and hardware.
3.3 Post-repair operational testing. In the presence of the Coast Guard Inspector, the Contractor shall thoroughly test and prove the shafting system to be in satisfactory operating condition (see 4.1 (Equipment operation)). Conduct a sea trial to test the propeller shaft in all modes of operation for a minimum of 4 hours. Inspect and correct any excessive leakage, abnormal noise and excessive vibration.
4. NOTES
4.1 Equipment operation. Coast Guard personnel will operate all shipboard machinery and equipment during all operational tests.
Page 20 (Rev-1)
WORK ITEM 12: DELETED
Page 21 (Rev-1)
24350_MWS_FLT (18 Sep 2008) 75402-05_WLR (23 Jan 2004)
WORK ITEM 13: Straighten Shaft
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to straighten a designated shaft.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
MIL-STD-2191, Nov 1992, Repair Welding, Weld Cladding, Straightening, and Cold Rolling of Main Propulsion Shafting
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Drawing 75C WAGL 4301-023, Rev 1, Prop Shaft Details (75402-05)
Coast Guard Drawing 75C WAGL 4301-024, Rev -, Prop Shaft Couplings (75402-05)
3. REQUIREMENTS
3.1 Shaft straightening requirements. Based on inspection results obtained from a related shaft work item in this specification package, or provided by the Coast Guard Inspector, the Contractor shall straighten the designated shaft, using Coast Guard Drawings 75C WAGL 4301-023, 75C WAGL 4301-024, and MIL- STD-2191 as guidance and as specified herein.
3.2 Pre-straightening inspection. Prior to initiating straightening processes, determine the location, magnitude and type of bend in the shaft, with the entire shaft supported on centers in a lathe, as follows:
• Before taking shaft runout readings, spin the shaft on the lathe for approximately two hours to eliminate any sagging that may have occurred during handling and storage.
• Conduct a dial indicator survey of shaft runout at stations spaced every two feet of shaft length to determine the magnitude and location of the bend.
• At each station, mark the position of maximum runout on the periphery of the shaft.
Page 22 (Rev-1)
NOTICE!
Be aware that the marks on the shaft periphery will be in a straight line if the shaft contains a simple bend, and will spiral part way around the shaft, if the shaft is both bent and twisted.
• Plot the maximum runout to an exaggerated scale, in order to locate the center of the bend, and to determine the extent of straightening required.
• Submit a CFR including locations and magnitudes of the bend.
3.3 Straightening procedures. Straighten the shaft to equal or less than 0.005" total indicator runout, using the localized heating (hot spotting method for carbon steel shafts, in accordance with MIL-STD- 2191, Section 11.2.2.2 and sub-paragraphs).
3.4 Post-straightening inspections. After completion of straightening procedures, accomplish inspections, and submit a CFR:
• Conduct non-destructive inspection of all straightened areas in accordance with Std Spec 0740_STD, Appendix C.
• Recheck the shaft surfaces, as specified in paragraph 3.2 (Pre-straightening inspection).
4. NOTES
Page 23 (Rev-1)
24400_MWS_FLT (10 Sept 2008) 75402-05 (10 Sept 2008)
75404_MWC (22 Dec 2009)
WORK ITEM 14: Inspect Water-Lubricated Shaft Bearings
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect the water-lubricated bearings for the port and starboard shafts.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Drawing 75C WAGL 4301-022, Rev -, Stern Strut, Shaft Log, Stern Tube and Bulkhead Stuffing Box (75402-05)
Coast Guard Drawing 75C WAGL 4301-023, Rev 1, Prop Shaft Details (75402-05)
3. REQUIREMENTS
3.1 Bearing inspection. The Contractor shall accomplish the following, using Coast Guard Drawings 75C WAGL 4301-022 and 75C WAGL 4301-023 as guidance:
3.1.1 Inspections.
3.1.1.1 Visual. Visually inspect the following to the maximum extent practical:
• Chocking material, if installed in the bearing housings.
• Bearings.
• Bearing housing bores.
• Shaft journal in way of bearings.
3.1.1.2 Measurements. Measure the inner diameter of each bearing housing at the forward, middle and aft positions.
3.1.1.3 Documentation. Submit a CFR after the inspection and measurements.
Page 24 (Rev-1)
Page 25 (Rev-1)
24420_MWS_FLT (18 Sep 2008) 75402-05 (30 Jan 2004)
WORK ITEM 15: Renew Propeller Shaft Sleeves
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew the sleeves on the port and starboard propeller shafts.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Drawing 75C WAGL 4301-022, Rev -, Stern Strut, Shaft Log, Stern Tube and Bulkhead Stuffing Box (75402-05)
Coast Guard Drawing 75C WAGL 4301-025, Rev -, Shaft Brake & Steady Rest Bearing Support for Prop Shafting (75402-05)
NAVSEA Drawing 803-2145807, Rev C, Propulsion Shafting and Components
3. REQUIREMENTS
3.1 Sleeve renewal requirements. Using Coast Guard Drawings 75C WAGL 4301-022 and 75C WAGL 4301-025 as guidance, the Contractor shall accomplish the following, for the port and starboard propeller shafts:
3.1.1 Removal. Remove and dispose of the sleeves.
3.1.2 Inspections. Clean all shaft journal surfaces, and accomplish the following:
3.1.2.1 Perform a visual inspection of the shaft journal surfaces for corrosion, deterioration, and other signs of failures.
3.1.2.2 Measure and record in the shaft journal outside diameter and the shaft bearing inside diameter in the following positions:
• Forward.
• Middle.
Page 26 (Rev-1)
• Aft.
3.1.2.3 Conduct nondestructive testing of all shaft surfaces in the way of sleeve fit areas, in accordance with Std Spec 0740_STD, Appendix C.
3.1.3 Inspection report. The Contractor shall submit a CFR for the completed inspection and measurements.
3.1.4 New sleeve installation requirements. After the Coast Guard Inspector has reviewed all measurement findings, the Contractor shall furnish new hard steel nickel-chrome-boron shaft sleeves (see
4.1 (Shaft sleeve supplier)) and accomplish the following:
3.1.4.1 Bore new sleeve ID to the dimensions based on the recorded shaft journal OD readings, to facilitate an interference fit, as specified below.
3.1.4.2 Install the new sleeves onto the shaft with a shrink-fit equal to 0.00075-inch per inch of shaft diameter, in accordance with NAVSEA_Drawing 803-2145807, Table 8-1 (Shaft Sleeve Shrink Fit).
3.1.4.3 After installation, machine new steps at the end of each sleeve where the shaft covering is required.
3.1.5 Concentricity measurement. Check the outside diameter of each shaft sleeve to ensure it is concentric with the axis of rotation within 0.0005 inch (0.001 inch runout).
3.1.6 Polishing. Polish the sleeve surfaces to a 32 micro-inch RMS finish, upon completion of installation and all required machining.
3.2 Final documentation. The Contractor shall provide a complete set of the new sleeve dimensional readings to the COTR within 48 hours after completion of sleeve installation. At a minimum, the set of readings shall include the new sleeve length, diameters (inside and outside) at the bearing journals, concentricity, and polish.
4. NOTES
4.1 Nickel-chrome-boron shaft sleeve suppliers. Known suppliers for the nickel-chrome-boron shaft sleeve include, but are not limited to the following:
National Maintenance and Repair Hartford, Illinois Phone: (618) 254-7451
Dover Corp/Dover Diversified/Waukesha Bearings Corporation Waukesha, Wisconsin Phone: (414) 547-3381
Page 27 (Rev-1)
WORK ITEM 16: DELETED
Page 28 (Rev-1)
24500_MWS_FLT (18 Sep 2008) 75402-05 (02 Dec 2005)
WORK ITEM 17: Remove, Inspect, and Reinstall Propellers
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to remove, inspect, and reinstall port and starboard propellers.
1.2 Government-furnished property.
MTI ITEM
DESCRIPTION NSN/PN QTY
ESTIMATED
COST
($/UNIT)
Y **Propeller (RH) NSN: 2010-01-501-5504 1 ea. 5,600.00
Y **Propeller (LH) NSN: 2010-01-501-5506 1 ea. 5,600.00
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
2. APPLICABLE DOCUMENTS
MIL-PRF-16173, Sep 2006, Corrosive Preventive Compound, Solvent Cutback, Cold Application
International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller - Manufacturing Tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50 m, Inclusive
3. REQUIREMENTS
3.1 General.
3.1.1 Protective and safety measures. The Contractor shall accomplish the following:
• Before removing each propeller or propeller nut, fit a shore from the floor of the dock to one propeller blade near the root, to prevent shock transmission to reduction gear, as necessary.
• Protect propeller blade edges and blade roots with suitable covers, at all times until reinstallation, to prevent damage.
3.2 Work to be accomplished. The Contractor shall accomplish the following for each propeller, using the drawing provided by the Coast Guard Inspector as guidance.
3.2.1 Removal. Remove the propeller to a suitable repair shop.
Page 29 (Rev-1)
NOTICE!
If it becomes necessary to apply heat to facilitate propeller removal, ensure that the hub…