AMEND SF30.doc

DOC document 68 KB Posted

Attached to
Structural Repairs on CGC MUNRO in Kodiak, AK
Solicitation number
HSCG85-09-R-625217
Issued by

About this file

Amendment A00001 for structural repairs on USCGC MUNRO in Kodiak AK Due date for proposals is extended to 26 Nov 2008 at 9 00 AM AK time.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE

PAGE
NO OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1
1
2. Amendment/Modification Number
3. EFFECTIVE DATE
4 REQUISITION Number.
5. PROJECT NO. (If pplicable)
A00001
21 Nov 2008
2109859625217
6. ISSUED BY
CODE
HSCG85
7.
CODE

COMMANDER, MAINTENANCE & LOGISTICS COMMAND, PACIFIC

1301 Clay St, Suite 800N, Oakland, CA 94612-5249

C/O Rebecca Budde, 1300 Stedman St, Rm 303 Ketchikan, AK 99901 Structural Repairs on CGC MUNRO

8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code)
(
9.A AMENDMENT OF SOLICITATION NO.

All Prospective Bidders

HSCG85-09-R-625217

X
9B. DATE (SEE ITEM 11)

13 Nov 2008

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FORMCHECKBOX

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)

SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: Mutual Agreement

D. OTHER (Specify type of modification and authority).

E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return copy to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

1. Due date for proposals is extended from: 24 Nov 2008, 11:00 AM Local AK time to: 26 Nov 2008, 9:00 AM Local AK time.

2. Period of performance is revised from: 5 Jan - 23 Jan 2009 to: 5 Jan – 30 Jan 2009.

3. Contractor Question: Item 2 shows that the aluminum on both sides of the expansion joint is to be renewed. Is the contractor to remove the expansion joint as an interference? Are the joint materials to be reused or renewed?

Answer: Yes, the expansion joint will need to be removed and aluminum on both sides is to be renewed. Replacement of joint materials will depend on their condition. If renewal of joint materials is required, it will be the subject of a work request.

4. All other requirements remain unchanged.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Rebecca Budde, Contract Specialist

15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070

30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS EDITION UNUSABLE

Prescribed by GSA, FAR (48 CFR) 53.243