Project Specifications_CMS-1042 061109.doc

DOC document 702 KB Posted

Attached to
Gravel Road Drainage and Paving
Solicitation number
HSCG83-09-B-3WN032
Issued by

View the file

Other files

File Type Posted
Bid Results —
T-5639-CD.pdf PDF
T-5641-CD.pdf PDF
IFB 09-3WN032 cape may.doc DOC document
T-5644A-ED.pdf PDF
T-5640-CD.pdf PDF
T-5645-CD.pdf PDF
T-5642-CD.pdf PDF
T-5644B-ED.pdf PDF
T-5644-CD.pdf PDF
T-5643-CD.pdf PDF
T-5327-CD.pdf PDF
T-5638-CD.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRAINING CENTER

CAPE MAY, NJ

FACILITIES ENGINEERING

DIVISION

CMS-1043

SAMS Nos.: 77-T04014 & 77-T04123 July 2008

SPECIFICATION FOR GRAVEL ROAD DRAINAGE & PAVING

RITTICHIER ROAD & UNNAMED ROAD

TRACEN CAPE MAY

CAPE MAY, NEW JERSEY

TABLE OF CONTENTS

1DRAWING INDEX

2DIVISION 1 – GENERAL REQUIREMENTS

2SECTION 01010 SUMMARY OF WORK

11SECTION 01305 ACCESS PROTOCOL

13SECTION 01310 CONSTRUCTION SCHEDULES

16SECTION 01401 QUALITY CONTROL

30SECTION 01710 GENERAL CLEANING

32SECTION 01999 FIRE PREVENTION AND LIFE SAFETY PROTECTION

35DIVISION 2

35SECTION 02220 EXCAVATING, BACKFILLING, AND COMPACTION

43SECTION 02221 TRENCHING, BACKFILLING, AND COMPACTION

51SECTION 02230 SITE CLEARING

53SECTION 02445 WOOD FENCE

59SECTION 02490 TREES, PLANTS, AND GROUND COVERS

75SECTION 02513 ASPHALT CONCRETE PAVEMENT

78SECTION 02630 STORM DRAINAGE

81SECTION 02820 LAWN ESTABLISHMENT

88DIVISION 3

88SECTION 03301 CAST-IN-PLACE-CONCRETE

95DIVISION 16

95SECTION 16100 GENERAL ELECTRICAL

99SECTION 16500 LIGHTING FIXTURES

DRAWING INDEX

T-5645-CD

TITLE SHEET

SHEET 1 OF 11

T-5327-CD

CONSTRUCTION PLANS

SHEET 2 OF 11

T-5638-CD

GRADING PLAN AND PROFILE

SHEET 3 OF 11

(RITTICHIER ROAD)

T-5639-CD

GRADING PLAN AND PROFILE

SHEET 4 OF 11

(UNNAMED ROAD)

T-5640-CD

SIGNAGE, STRIPING AND

SHEET 5 OF 11

LANDSCAPE PLAN

T-5641-CD

CONSTRUCTION DETAILS 1

SHEET 6 OF 11

T-5642-CD

CONSTRUCTION DETAILS 2

SHEET 7 OF 11

T-5643-CD

CONSTRUCTION DETAILS 3

SHEET 8 OF 11

T-5644-CD

CONSTRUCTION DETAILS 4

SHEET 9 OF 11

T-5644A-ED

LIGHTING PLAN

SHEET 10 OF 11

T-5644B-ED

LIGHTING DETAILS

SHEET 11 OF 11

DIVISION 1 – GENERAL REQUIREMENTS

SECTION 01010

SUMMARY OF WORK

1. SCOPE: The work covered in this project includes all materials, labor, equipment and services and all operations necessary for the Gravel Road Drainage and Paving, Rittichier Road & Unnamed Road, United States Coast Guard Training Center, Cape May, New Jersey.

In general the work includes but is not limited to the following:

1.1. Construction of approximately 760 lineal feet of roadway.

1.2. Construction of an 11 space parking area.

1.3. Construction of approximately 270 lineal feet of storm sewer.

1.4. Installation of 9 street light poles and fixtures.

1.5. Mobilization, demobilization and clean up.

1.6. Provide all labor, material, equipment, supervision and all other incidentals necessary to complete the work.

2. QUALITY ASSURANCE:

2.1. Use adequate numbers of skilled work personnel who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and the methods needed for proper performance of all work covered under this specification.

2.2. The general contractor shall coordinate the work of all trades to insure no conflicts occur that will prevent a complete operational installation.

2.3. All materials and methods of construction for site work shall comply with the New Jersey Department of Transportation Standard Specifications for Road and Bridge Construction, 2001, with revisions, hereon referred to as the NJDOT Specifications. The contractor and his/her subcontractors shall be responsible to familiarize themselves with this document.

3. WORKING CONDITIONS: Work on this contract shall be performed while the unit is in full operational status. No work can begin until the “Notice to Proceed for Site Work” is issued by the Contracting Officer (KO).

4. PERMITTED WORKING HOURS: The Contractor will be permitted to perform construction work through the hours of 8:00 am and 4:30 PM Mondays through Fridays, excluding Saturdays, Sundays and Federal Holidays, and Fridays between the hours of 10:30 am to 1:30 during graduation ceremonies. Work performed other than in these periods of time will only be allowed after approval of the Contracting Officer following a 48 hour (72 hours for Sundays and Mondays) advance request

5. BARRICADES: Any stored debris, equipment and all areas dangerous to foot or vehicular traffic shall be barricaded by the Contractor. At night and during other times of poor visibility, barricades shall be illuminated. All barricading, including night illumination shall be maintained by the Contractor. All barricades shall be constructed in accordance with ANSI D6-1.

6. PEDESTRIAN TRAFFIC:

The Contractor shall arrange his equipment and/or progression of work, so as not to interfere with the normal flow of pedestrian traffic. Where interference is unavoidable, the contractor shall provide a marked, safe, and clean route around the obstruction.

7. AVAILABILITY OF UTILITIES:

7.1. ELECTRICAL: The Contractor may utilize electrical power from the nearest electrical substation, subject to availability. OSHA requirements will govern the use of such utility. All equipment used shall be supplied by the Contractor. US Coast Guard does not make any guarantee against any voltage variation or service interruption.

7.2. WATER: Water will be made available at the nearest hydrant or exterior hose bib. The contractor will be responsible for supplying all hose and adapters including a backflow preventer.

7.3. SANITARY FACILITIES: The contractor shall be responsible for furnishing and maintaining temporary toilet facilities for their employees.

8. SAFETY AND HEALTH STANDARDS: The contractor shall comply with all the requirements in the Occupational Safety and Health Act (OSHA) 29 CFR 1910 and the U.S. Army Corps of Engineers (USACE) Safety and Health Requirements Manual No. 385-1-1.

9. EQUIPMENT: The contractor shall supply all equipment necessary to perform all work including but not limited to, pumps, cleaning materials, ladders, means for lifting manhole covers, etc.

10. RECEIPT OF MATERIALS: Shipments of equipment, materials, and supplies shall be addressed to the Contractor - not the Coast Guard. The contractor shall provide all equipment, materials and labor for off-loading. The Coast Guard will not accept shipments for the Contractor.

11. DEFINITIONS: Whenever in this specification the following abbreviations are used, they shall be as follows:

11.1. AAN:

American Association of Nurserymen

1250 I St., NW, Suite 500

Washington, DC 20005

(202) 789-2900

11.2. AA:

Aluminum Association

900 19th Street NW

Washington, DC 20006

(202) 862-5100

11.3. AASHTO:

American Association of State Highway and

Transportation Officials

444 North Capital St., Suite 249

Washington, DC 20001

11.4. ACI:

American Concrete Institute

P.O. Box 19150

Detroit, MI 48219

(313) 532-2600

11.5. AI:

Asphalt Institute

Research Park Dr.

P.O. Box 14052

Lexington, KY 40512-4052

(606) 288-4960

11.6. AISI:

American Iron and Steel Institute

1101 17th St. NW

Washington, DC 20036-4700

(202) 452-7100

11.7. ANSI:

American National Standards Inst. Inc.

11 W. 42nd St.

New York, NY 10036

(212) 642-4900

11.8. ASA:

American Standards Association

10 E 40th Street

New York, N.Y. 10016

11.9. ASC:

Adhesive and Sealant Council

1627 K St., Suite 1000

Washington, DC 20006-1707

(202) 452-1500

11.10. ASSE:

American Society of Sanitary Engineering

P.O. Box 40362

Bay Village, OH 44140

(216) 835-3040

11.11. ASTM:

American Society for Testing and Materials

1916 Race Street

Philadelphia, PA 19103-1187

(215) 299-5400

11.12. AWPA:

American Wood Preservers Association

P. O. Box 286

Woodstock, MD 21163-0786

(410) 465-3169

11.13. AWPI:

American Wood Preservers Institute

1945 Gallows Road

Vienna, VA 22182

(703) 893-4005

11.14. AWS:

American Welding Society

P.O. Box 351040

Miami, FL 33135

(305) 443-9353

11.15. AWWA:

American Water Works Association

6666 W. Quincy Ave.

Denver, CO 80235

(303) 794-7711

11.16. BHMA:

Builders' Hardware Manufacturers Association

355 Lexington Avenue

New York, NY 10017

(212) 661-4261

11.17. BOCA:

Building Officials and Code Administer, Int'l.

4051 Flossmoor Road

Club Hills, IL 60478

(708) 799-2300

11.18. CFR:

Code of Federal Regulations

(Usually published in the “Federal Register")

11.19. CPSC:

Consumer Product Safety Commission

East West Towers

4330 East-West Hwy

Bethesda, MD 20814

(800) 638-2772

11.20. CS:

Commercial Standard

(U.S. Department of Commerce)

Government Printing Office

Washington, DC 20402

(202) 512-0000

11.21. CRS:

Concrete Reinforcing Steel Institute

933 Plum Grove Rd.

Schaumburg, IL 60173

(708) 517-1200

11.22. EJMA:

Expansion Joint Manufacturers Assoc.

25 N. Broadway

Tarrytown, NY 10591

(914) 332-0040

11.23. FM:

Factory Mutual Engineering Corp.

1151 Boston-Providence Turnpike

Norwood, MA 02062

11.24. GS:

Green Seal

1001 Connecticut Ave. NW

Suite 827

Washington, DC 20036-5525

(202) 872-6400

11.25. ICBO:

International Conf. of Building Officials

5360 S. Workman Mill Road

Whittier, CA 90601

(310) 699-0541

11.26. ICC

International Code Council

500 New Jersey Avenue

NW, 6th Floor

Washington, DC 20001-2070

(888) 422-7233

11.27. IPCEA:

Insulated Power Cable Engineers Ass.

283 Valley Road

Montclair, NJ

11.28. MSS:

Manufacturers Standardization Society of the Valve and

Fittings Industry

127 Park Street NE

Vienna, VA 22180

(703) 281-6613

11.29. NAPA:

National Asphalt Pavement Assoc.

NAPA Building

5100 Forbes Blvd.

Lanham, MD 20706-4413

(301) 731-4748

11.30. NEC:

National Fire Protection Association National Electrical

Code

1 Batterymarch Park

Quincy, MA 02269-9101

(617) 770-3000

11.31. NECA:

National Electrical Contractors Association

3 Bethesda Metro Center

Bethesda, MD 20814

(301) 657-3110

11.32. NEMA:

National Electrical Manufacturers Association

2102 L St. NW

Washington, DC 20037

(202) 457-8400

11.33. NJDOT:

New Jersey Department of Transportation

Regional Operations South

One Executive Plaza

Route 70 West

Cherry Hill, NJ 08002

(856) 486-6600

11.34. OSHA:

Occupational Safety Health Administration

U.S. Dept. of Labor

Govt. Printing Office

Washington DC 20210

(202) 219-5000

11.35. PCA:

Portland Cement Assoc.

5420 Old Orchard Rd.

Skokie, IL 60077-1083

(708) 966-6200

11.36. PCI:

Precast/Prestressed Concrete Institute

175 W. Jackson Blvd.

Chicago, IL 60604

(312) 786-0300

11.37. PS:

Product Standard of NBS

Government Printing Office

Washington DC 20402

11.38. UL:

Underwriters Laboratory

333 Pfingsten Road

Northbrook, IL 60062-2096

(708) 272-8800

11.39. USACE

U.S. Army Corps of Engineers

Civil Works Office

U.S. Army Engineer District, Philadelphia

Wanamaker Building

100 Penn Square East

Phila, Pa. 19107-3390

(215) 656-6500

11.40. USAS:

United States of America Standard Institute

345 East 47th Street

New York, NY 10017

12. OFFICE AND STORAGE SHED:

The Contractor shall provide his own office and storage shed or trailer, if necessary. No equipment or material storage will be provided by the Coast Guard.

13. POWER OUTAGE: Needed power outages shall be arranged only with prior approval from the Contracting Officer’s Technical Representative (COTR), with duration and affected areas held to a minimum.

14. SPECIAL WORKING CONDITIONS: Contractor's personnel shall wear outer garments consisting of at least a tee shirt, long trousers, (down to the ankles), and shoes at all times while at the job site. They shall not communicate with recruits or the instructors.

15. SITE VISIT: Offerers or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

16. PREVENTIVE MAINTENANCE PROGRAM: The Contractor shall instruct Coast Guard personnel in the proper operation and maintenance of all completed systems. This shall include a demonstration of the systems, supply of technical manuals including a recommended preventative maintenance schedule, and a list of essential spare parts.

17. FINAL INSPECTION: Final inspection will not be made until all work under the contract is completed. The contractor shall notify the Contracting Officer, in writing 48 hours prior to the date on which the project will be ready for final inspection.

18. DUMPING AREA: All discarded material shall be removed from the Coast Guard property and disposed of at an approved site complying with Local, State, and Federal regulations. The contractor shall obtain local regulations from the Cape May County Municipal Utilities Authority (CMCMUA) at US Hwy 9, Cape May Court House. The phone number for CMCMUA is (609) 465-9026. No trash (Type 10) or construction debris (Type 13) shall contain more than 5% by volume of designated recyclables. All dumpsters/containers shall be supplied by the Contractor. The Contractor shall provide appropriate signs or covers to prevent use by Coast Guard personnel [or local residents]. Burning of any materials will not be permitted on Government property. No material shall be washed or swept out of equipment or vehicles (including concrete from chutes of trucks, loose debris, etc.) onto government property. Any material spilled from cleaning vehicle operations into contractor furnished dumpsters/containers shall be immediately cleaned up by the contractor.

18.1. RECYCLABLES: Recycling is mandatory law of the State of New Jersey. The contractor shall recycle or reuse all material designated as recyclable or prohibited from landfilling. Definitions for recyclables and landfill prohibited material can be obtained from the CMCMUA regulations. Certified weight tickets shall be supplied to the Contracting Officer within 15 days of the date of removal from the facility for all material recycled, reused, or landfill prohibited material.

19. CONTRACTING OFFICER’S TECHNICAL REPRESENTATIVE: Wherever in this specification the term ENGINEER or OWNER appears it shall be construed to mean CONTRACTING OFFICER’S TECHNICAL REPRESENTATIVE (COTR).

20. RECORD DRAWINGS:

20.1. The Government will furnish one complete set of black and white prints of all drawings which shall be used to indicate any changes from contract set. Each sheet shall be marked "RECORD DRAWING" in red pencil, and all changes or modifications shall be noted thereon by the contractor.

20.2. Changes shall be noted during the construction process for all trades.

20.3. Keep "RECORD DRAWINGS" current. Do not permanently conceal any work until the required information has been accurately recorded.

20.4. Use red colored pencils or pens for graphic work.

20.5. Use a blue pen for written work.

20.6. Submit a complete set of "RECORD DRAWINGS" to the Contracting Officer when all work has been completed, or as directed.

+++ END OF SECTION +++

DIVISION 1

SECTION 01305

ACCESS PROTOCOL

PART 1 - GENERAL

1.1 DESCRIPTION

1.1.1 In compliance with Homeland Security Presidential Directive 12 (HSPD12) Coast Guard Training Center (TRACEN) Cape May has a standardized entry protocol called the RAPIDGate Program for all vendors, suppliers, and contractors who require access to the Training Center to perform unclassified work for five (5) days or more.

The RAPIDGate Program, from Eid Passport, provides a standardized background check, identification badge and entry procedures for vendors, suppliers, and contractors that require access to TRACEN Cape May. Companies and individuals can register for the program at the TRACEN Security Office using the self-service RAPIDGate Registration Station. Based on the information collected the RAPIDGate Program runs a 10-year felony background screen, other criminal screens, validates the individual’s social security number, verifies that the individual is either a U.S. Citizen or is legally eligible to work in the United States. Upon passing the screening process, participants will be issued a personalized RAPIDGate identification badge that when verified by a security officer will allow the participant to enter TRACEN Cape May unescorted. To enroll see the guidelines below.

1.2 RAPIDGate Program Enrollment:

1.2.1 Enroll your company by calling Eid Passport at 877-RAPIDGATE (877-727-4342) and provide a TRACEN Cape May sponsor point of contact that includes a name, phone number, and email address. Once your request is received, final authorization to enroll in the RAPIDGate Program will be granted by the TRACEN Cape May Security Office.

1.2.2 Once your company has been approved for enrollment and paid the enrollment fee, instruct your employees who need access to TRACEN Cape May to register for the RAPIDGate Program using the self-service Registration Station in the TRACEN Security Office. Each employee should be ready to provide your company’s RAPIDGate company code, his or her address, phone number, date of birth, and Social Security number for proof of identification and background screening. The Registration Station will capture the employees photograph and fingerprints for identity verification and badging during the application process. Subcontractor employees may register under the Prime Contractor’s company enrollment.

1.2.3 Once your company has approved each employee for participation, and paid the registration fee, the employee will undergo a background screen. Upon passing the screen, your employees will be contacted by TRACEN Cape May Security Office to pick up their personalized RAPIDGate Badge. The employees can show one form of identification from List A, or two forms of identification from List B when picking up their RAPIDGate Badge.

1.2.3.1 List A (One required if using this list)

· U.S. Passport

· Certificate of U.S. Citizenship (Form N-560 or N-561)

· Unexpired Temporary Resident Card (Form I-688)

· Unexpired Employment Authorization Card (Form I-688A)

· Permanent Resident Card or Alien Registration Receipt

· Card with photograph (Form I-151 or I-551)

1.2.3.2 List B (Two required if using this list)

· Driver’s license or ID card issued by a state

· Voter’s registration card

· U.S. Military card or draft record

· U.S. Coast Guard Merchant Mariner Card

· U.S. Social Security card issued by the Social Security Administration

· Original or certified copy of a birth certificate issued by a state, county, municipal authority or outlying possession of the United States bearing an official seal

· U.S. Citizen ID Card (Form I-197)

· ID Card for use of Resident Citizen in the United States (Form I-179)

1.2.4 Once a RAPIDGate Badge is issued, employees will be required to present their badge to gain entry to TRACEN Cape May facilities, and must wear and display the badge at all times while on the base. Questions about the CG TRACEN Cape May program should be addressed to rapidgate@tracencm.uscg.mil with the subject line re: RAPIDGate Program.

+++ END OF SECTION +++

DIVISION 1

SECTION 01310

CONSTRUCTION SCHEDULES

PART 2 - GENERAL

2.1 DESCRIPTION

2.1.1 The intention of this Section is to adequately plan and execute the Work of the Construction Contract so that it is completed within the number of calendar days allowed, and to assist the Contracting Officer in appraising the reasonableness of the proposed schedule and in evaluating progress of the Work. Prepare and maintain the schedules and reports described in this Section.

2.1.2 The Contractor is requested to use Microsoft Project to prepare construction schedules.

2.1.3 Definitions:

2.1.3.1 "Day," as used throughout the Contract unless otherwise stated, means "calendar day."

2.2 QUALITY ASSURANCE

2.2.1 The construction schedule as submitted by the Contractor and approved by the Contracting Officer will be an integral part of the Contract and will establish interim completion dates for the various activities under Contract.

2.2.2 Should any activity not be completed within 15 days after the stated schedule date, the Contractor shall explain in writing how this portion of the project can be expedited so as to not affect the remaining portions of the Contract.

2.3 SUBMITTAL OF CONSTRUCTION SCHEDULING

2.3.1 Construction schedule: Within 10 calendar days after the Contractor has received the “Notice to Proceed for Submittals”, submit one paper copy and one electronic file copy (on 3 1/2" floppy) of a construction schedule prepared in accordance with Paragraph 1.3.3 of this Section.

2.3.2 Graphically show by bar-chart the order and interdependence of all activities necessary to complete the Work, and the sequence in which each activity is to be accomplished, as planned by the Contractor and his project field superintendent in coordination with all subcontractors whose work is shown on the diagram.

2.3.3 Include, but do not necessarily limit indicated activities to:

2.3.3.1 Project mobilization;

2.3.3.2 Submittal and approval of Shop Drawings and Samples;

2.3.3.3 Demolition;

2.3.3.4 Procurement of equipment and critical materials;

2.3.3.5 Fabrication of special material and equipment, and its installation and testing;

2.3.3.6 Final cleanup;

2.3.3.7 Final inspecting and testing; and

2.3.3.8 All activities by the Contracting Officer that affect progress, required dates for completion, or both, for all and each part of the work.

2.3.4 Schedule of Values-This schedule shall be prepared as a detailed cost breakdown of the contract price and be submitted with the Construction Schedule. This schedule shall include but not be limited to costs of materials, equipment, and labor for all major work categories shown on the Construction Schedule. The Contractor shall adhere to the following guidelines when developing the Schedule of Values.

2.3.4.1 Format-The line items in the Schedule of Values shall be the same as that of the Construction Schedule.

2.3.4.2 Bonds-Bonding costs will only be paid in a lump sum if they are broken out separately and included with the schedule of values. The Contractor shall provide evidence that he has furnished full payment to the surety.

2.3.4.3 RAPIDGate costs will only be paid in a lump sum if they are broken out separately and included with the schedule of values. The Contractor shall provide evidence that he has furnished full payment to RAPIDGate.

2.3.4.4 Materials-To request progress payments for materials delivered to the construction or fabrication site, the particular category of work associated with the materials must be broken down into separate material and labor costs.

+++ END OF SECTION +++

DIVISION 1

SECTION 01401

QUALITY CONTROL

1. GENERAL: The purpose of this Section is to set forth the requirements controlling the materials and methods proposed for use in Contract.

2. DEFINITIONS:

2.1. Factory Tests: Tests made on various products and component parts prior to shipment to the job site, including but not limited to such items as transformers, boilers, air conditioning equipment, electrical equipment, and precast concrete.

2.2. Field Test: Tests or analysis made at, or in the vicinity of the job site in connection with the actual construction

2.3. Products: The term "product" includes the plural thereof and means a type or a category of manufactured goods, construction, installations and processed materials or those associated services whose characterization, classification or functional performance determination is specified by standards.

2.4. Person: The term "person" means associations, companies corporations, educational institutions, firms, government agencies at the Federal, State and local level, partnership, and societies, as well as divisions thereof, and individuals.

2.5. Testing Laboratory: The term "testing laboratory" means any person, as defined above, whose functions include testing, analyzing, or inspecting "products", as defined above, and/or evaluating the designs or specifications or such "products" according to the requirements of applicable standards.

2.6. Certified Test Reports: Certified reports, performed by a testing laboratory regularly engaged in the business, attesting that the tests were performed in accordance with the method specified, that the results reported are accurate, and that items tested either meet or fail to meet the stated minimum requirements. Those test reports include tests performed by Factory Mutual, Underwriters Laboratories, Inc., and others.

2.7. Certified Inspection Reports: Certified inspections reports are those signed by approval inspectors attesting that the item inspected meets the specification requirements other than any exception included in the report.

2.8. Manufacturer's Certificate of Conformance or Compliance: A certificate signed by an authorized manufacturer's official attesting that the material or equipment delivered meets the specification requirements.

2.9. Contractor's Daily Report: A report of man-hours expended work accomplished, etc., filled out on a daily basis by the Contractor's Job Superintendent and submitted through the Contracting Officer's Authorized Representative.

3. SUBMITTALS:

3.1. SUBMITTAL SCHEDULE: The Contractor shall review, revise and submit the Submittal Schedule within 5 calendar days after the Notice to Proceed for Submittals is issued.

3.2. SUBMITTAL PREPARATION: Within 10 calendar days after Notice to Proceed for Submittals, the Contractor shall submit for approval, all Material Submittals being used on this Contract. No materials shall be installed at the job site until approval of the submittal has been made. The contractor shall furnish the Contracting Officer a minimum of three (3) copies of information called out in the respective sections of this Contract. Any deviations from the specification shall be so noted on the submittal. Stamp each sheet with the Contractor's certification stamp. Data submitted in a bound volume or on one sheet printed on two sides may be stamped on the front of the first sheet only. The Contractor's certification stamp shall be as follows:

"It is hereby certified that the (equipment) (material) shown and marked in this submittal is that proposed to be incorporated into Contract Number ____________, is in compliance with the Contract drawings and specifications, can be installed in the allocated spaces, and is submitted for Government approval. Certified by _______________________ Date ____________________"

The person signing the certification shall be the same person designated in writing by the contractor as having that authority. The signature shall be an original (signed in ink). Stamped signatures are not acceptable.

3.3. SUBMITTAL MATERIAL REQUIRED: The contractor shall submit the following material as specified by the respective Divisions of this Specification:

3.3.1. MANUFACTURER'S DATA: Manufacturer's data shall be catalog cuts, technical data sheets, and descriptive literature, submitted to represent the items proposed for use in the construction.

3.3.2. SAMPLES: Samples shall be physical examples which illustrate materials, equipment or workmanship for the purpose of establishing standards by which the work will be judged.

3.3.3. SHOP DRAWINGS: Shop drawing submittals shall be drawings, diagrams, schedules and other data specially prepared for the work of this contract by the contractor or any subcontractor, manufacturer, supplier or distributor to illustrate a portion of work to be installed under this contract.

3.3.4. CERTIFIED TEST REPORTS: Submit certified copies of the reports of all tests listed in the technical SECTIONS of these Specifications. The testing shall have been performed in a laboratory meeting the requirements specified herein. The tests shall have been performed within three years of submittal of the reports for approval. Test reports shall be accompanied by the certificates from the manufacturer certifying that the material and equipment proposed to be supplied is of the same type, quality, manufacture, and make as tested.

3.3.5. MANUFACTURER'S CERTIFICATES of CONFORMANCE or COMPLIANCE: Manufacturer's certification furnished by the Contractor on items of materials and equipment incorporated into the work will be accepted only when this method will assure full compliance with the provisions of the contract, as determined by the Contracting Officer. Pre-printed certificates will not be acceptable. All certifications shall be in the original. The original of all manufacturers’ certifications shall name the appropriate item of equipment or material, specification, standard, or other document specified as controlling the quality of that item and shall have attached thereto certified copies of test data upon which the certifications are based. All certificates shall be signed by the manufacturer's official authorized to sign certificates of conformance or compliance.

3.3.6. LABORATORY REPORTS: Reports shall cite the contract requirements, the test or analysis procedures used, the actual test results, and include a statement that the item tested or analyzed conforms or fails to conform to the specification requirements. Each report shall be conspicuously stamped on the cover sheet in large red letters "CONFORMS" or "DOES NOT CONFORM" to the specification requirements as the case may be. All test reports shall be signed by a representative of the testing laboratory authorized to sign certified test reports. The Contractor shall arrange for immediate and direct delivery of the signed original of all reports, certifications, and other documentation to the Contracting Officer.

3.3.7. SAFETY PLAN: Submit a safety plan that is tailored to the project and is based on the requirements identified in the OSHA Manual 29 CFR 1910 and the USACE Safety and Health Requirements #385-1-1. The General Contractor shall be responsible for the safety of all personnel at the project site for the duration of the Contract.

4. QUALITY CONTROL REQUIREMENTS: Inspect and test all work under the contract and maintain records of the inspections and tests. Approvals, except those required for field applications, and field test, shall be obtained before delivery of materials and equipment to the site. Surveillance of the inspection system will be performed by the COTR.

4.1. Factory Tests: Unless otherwise specified, the Contractor shall arrange for factory tests when they are required under the contract.

4.2. Factory Inspection: Unless otherwise specified, the Contractor shall arrange for factory inspections when required under the contract.

4.3. Field Inspections and Tests by the Contractor: The Contractor shall furnish all equipment, instruments, qualified personnel and facilities necessary to inspect all work and perform all tests required by the contract. All inspections and tests performed and test results received each day shall be included in the Daily Report to the Inspector.

4.4. Field Inspections and Tests by the Government: Field inspections and tests conducted by the Government will be made in accordance with FAR 52.246-12 entitled Inspection of Contracts.

4.5. Approved Testing Laboratories: All laboratory work under this contract shall be performed by a laboratory approved by the Government, whether the laboratory is employed by the Contractor, or is owned and operated by the Contractor. The basis of approval includes the following:

4.5.1. Testing Laboratories performing work not in connection with concrete, steel, or bituminous materials shall comply with sections 3 and 4 of ASTM E329, except that the Contracting Officer will perform the functions of paragraphs 3.4 and 3.5 therein in the absence of other Government approval.

4.6. Repeated Tests and Inspections: Repeat tests and inspections after corrections have been made to nonconforming materials and workmanship until tests and inspections indicate the materials, equipment, and workmanship conform to the contract requirements. The re- testing and re-inspections shall be performed at no additional cost to the Government.

5. CONTRACTOR'S DAILY REPORTING:

5.1. Submit the "Contractor's Daily Report" through the Contracting Officer's Technical Representative (COTR) by 10:00 AM on the first working day following the day the work was performed. The report shall be filled out and submitted by the Contractor's Job Superintendent. A sample format of an acceptable form is included at the end of this section. While the use of this sample format is not required, any other format must contain the same information as shown on the sample. DAILY REPORT FORMS WILL NOT BE SUPPLIED BY THE COAST GUARD.

This page intentionally left blank

USCG TRAINING CENTER FACILITIES ENGINEERING (609) 898-6945

CONTRACTOR'S DAILY REPORT TO INSPECTOR

CONTRACT NUMBER:

REPORT NUMBER:

DATE:

CONTRACTOR:

TITLE & LOCATION:

CONTRACT COMPLETION DATE:

NUMBER OF REMAINING WORK DAYS:

WEATHER CONDITIONS:
AM

TEMP.

PM

TEMP.

PERCENT OF COMPLETION (in fiscal terms):
%

WORK FORCE INFORMATION:

TRADE
NUMBER
WORK-HOURS
EMPLOYER
WORK PERFORMED

MATERIALS DELIVERED TO THE JOB SITE:

(Record quantity per load and number of loads if applicable)

MAJOR EQUIPMENT ON THE JOB SITE
HOURS OPERATED

LOCATION & DESCRIPTION OF DEFICIENCIES:

(Materials, Equipment, Safety, and/or Workmanship)

ACTION TAKEN OR TO BE TAKEN:

REMARKS:

Signature of authorized contractors on site superintendent printed name signature date

FOR CONTRACTING OFFICER'S AUTHORIZED REPRESENTATIVES USE ONLY

Submittal Schedule

PROJECT:
Gravel Road Drainage & Paving
DATE:

PAGE:

CONTRACT NO.

CONTRACTOR

STATUS:

NR: NOT RECEIVED; AN: APPROVED AS NOTED; A: APPROVED; RR: DISAPPROVED, REVISE AND RESUBMIT

SPECIFICATION
SUBMITTAL

DESCRIPTION

DATA REQUIRED
PROPOSED DATE OF SUBMITTAL
STATUS
DATE RETURNED

TO CONTRACTOR

DIVISION NO.
SECTION NO.
ARTICLE NO.
PRODUCT DATA
SHOP DRAWINGS
SAMPLES
TEST REPORTS
MFGR’S CERT.
LABORATORY RPRT.
MANUF. INSTRUCT.
WARRANTY
SCHEDULES & PLANS
1
01310
2.3.1
Construction Project Schedule

X

2.3.4
Schedule of Values

X

1
01999
2.1.1
Safety Plan

X

2.1.2
Confined Space Entry Plan

X

2
02220
1.3
Select Fill & Sub-Base Material
X
X
X
2
02221
1.3.1
Geotechnical Fabrics
X
1.3.2
Bedding Material

X

X
X
X
2
02445
1.3
Pipe, Tubes, Rails, Posts, Slats, Hardware & Accessories
X

PROJECT:

DATE:

PAGE:

SPECIFICATION
SUBMITTAL

DESCRIPTION

DATA REQUIRED
PROPOSED DATE OF SUBMITTAL
STATUS
DATE RETURNED

TO CONTRACTOR

DIVISION NO.
SECTION NO.
ARTICLE NO.
PRODUCT DATA
SHOP DRAWINGS
SAMPLES
TEST REPORTS
MFGR’S CERT.
LABORATORY RPRT.
MANUF. INSTRUCT.
WARRANTY
SCHEDULES & PLANS
2
02490
1.5.1
Plant Material, Fertilizer, Lime, Pesticides, Soil Fumigant, Antidesiccants & Tree Wound Dressing
X

X

1.5.2
Topsoil

X

1.5.3
Metal Edging, Erosion Control Materials, Metal Anchors
X
1.5.5
Pesticide Control Plan

X

2
02513
1.4.1
Base Course and Fill
X

X

1.4.2, 3
Prime & Tack Coats
X
1.4.2.4
Bituminous Concrete
X

X

1.4.5, 6
Pavement Markings & Signs
X
2
02630
1.3
Pipe, Inlets, Frames, Grates & Covers
X
2
02820
1.2
Grass Seed
X
3
03301
1.3
Concrete Mix
X

X

1.3
Reinforcing
X
2.3.2
Compressive Strength Test

X

PROJECT:

DATE:

PAGE:

SPECIFICATION
SUBMITTAL

DESCRIPTION

DATA REQUIRED
PROPOSED DATE OF SUBMITTAL
STATUS
DATE RETURNED

TO CONTRACTOR

DIVISION NO.
SECTION NO.
ARTICLE NO.
PRODUCT DATA
SHOP DRAWINGS
SAMPLES
TEST REPORTS
MFGR’S CERT.
LABORATORY RPRT.
MANUF. INSTRUCT.
WARRANTY
SCHEDULES & PLANS
3.3.1
Slump Test

X

16
16100
1.3
Circuit Breaker, Conduit Wire, Tap Connector & Cover
X
16
16500
1.3
Light Fixtures, Photocell, Lighting Contractor, Grounding Rod
X

X

1.3
Poles & Arms, Foundation Design, Wind Load Calculations
X
X

X

This page intentionally left blank.

DHS-USCG

TRAINING CENTER

CAPE MAY, NJ

MATERIAL APPROVAL REQUEST

NOTE:
Instructions for completion of form on reverse side. All entries will be filled in by typewriter or pen. Ref: Para. 2 on reverse – submit to the Contracting Officer with attachments.

Contract Number

Submission Number
Submittal

( ) New

( ) Re-submittal Date

Previous

Submission No.

Project Number
Are More Forms Needed?

( ) New

( ) Re-submittal

FOR GOVERNMENT USE ONLY

Item No.
Specification

Sect. & Para.

DESCRIPTION OF MATERIAL

(Include Type, Model No., Catalog No., Mfg., etc.)

Ap-

Prov.

Disap.
As Noted
Init.

Materials Marked

Properly

( ) YES ( ) NO

Contractor
By: (Signature and Date)

Request as indicated above was received in this office on ______________________________________ .

Recommend approval or disapproval as indicated above and subject to any applicable comments on the reverse side.

Name and Grade

Signature
Date

Approved/disapproved as indicated above and subject to any applicable comments on the reverse side.

Name and Grade

Signature
Date

1. The term “material is defined as supplies, raw materials, equipment, parts components, and end items that are to be incorporated into the work required by the contract.

2. This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer’s Literature and Certificates, and Samples of Materials to the Government for approval in accordance with the provisions of the contract. Unless otherwise specified, it is to be prepared in five (5) copies, signed, and provided to the Contracting Officer with appropriate attachments. All documents submitted by contractors shall clearly indicate which Item(s) is/are to be approved.

3. Requests submitted shall be numbered consecutively, by contract, in the space entitled “Submission No.” This number, in addition to the Contract No., will be indicated in the appropriate block and the insertion of previous submission number and date in addition to a new submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted on a separate form and so marked across the face of the form.

4. Nothing contained in this Material Approval Request when approved by the Contracting Officer shall restrict the Government’s rights to reject materials at a later date when inspection reveals latent defects, departures from requirements of the contract; use of damaged materials or prejudice to the Government’s rights of rejecting any work during the Final Inspection and Acceptance.

5. This form will not be used for submittals requiring contract changes within the meaning of the Changes clause.

Comments:

(For use by the Government – Item numbers to correspond with reverse side.)

Item No.
Specification

Sect. & Para.

Comments

DIVISION 1

SECTION 01710

GENERAL CLEANING

PART 1 - GENERAL

1.1 DESCRIPTION

1.1.1 Work included: Throughout the construction period, maintain the building and site in a standard of cleanliness as described in this Section.

1.1.2 Related work: In addition to standards described in this Section, comply with requirements for specific cleaning as may be described in pertinent other specific sections of these Specifications.

PART 2 - PRODUCTS

2.1 CLEANING MATERIALS AND EQUIPMENT

2.1.1 Provide required personnel, equipment, and materials needed to maintain the specified standard of cleanliness.

2.2 COMPATIBILITY

2.2.1 Use only the cleaning materials and equipment which are compatible with the surface being cleaned, as recommended by the manufacturer of the material.

PART 3 - EXECUTION

3.1 PROGRESS CLEANING

3.1.1 General:

3.1.1.1 Retain stored items in an orderly arrangement allowing maximum access, not impeding traffic or drainage, and providing required protection of materials.

3.1.1.2 Do not allow accumulation of scrap, debris, waste materials, and other items not required for construction of this Work. Maintain the site in a neat and orderly condition at all times.

3.1.1.3 Provide adequate storage for all items awaiting removal from the job site, observing requirements for fire protection and protection of the ecology.

3.2 FINAL CLEANING

3.2.1 "Clean," for the purpose of this paragraph, and except as may be specifically provided otherwise, shall be interpreted as meaning the level of cleanliness generally provided by skilled cleaners using commercial quality building maintenance equipment and materials.

3.2.2 Prior to completion of the work, remove from the job site all tools, surplus materials, equipment, scrap, debris, and waste.

3.2.3 Schedule final cleaning as approved by the COTR for final inspection.

+++ END OF SECTION +++

DIVISION 1

SECTION 01999

FIRE PREVENTION AND LIFE SAFETY PROTECTION

PART 1 - GENERAL

1.1 DESCRIPTION

1.1.1 This Section of the specifications contains the Contractor's fire prevention and protection responsibilities.

PART 2 - CONTRACTOR REQUIREMENTS

2.1 CONTRACTOR RESPONSIBILITIES: This chapter identifies and outlines the responsibilities of contractors performing work on the Training Center and in Coast Guard owned housing or for any tenant organization as pertaining to fire prevention and life safety practices.

2.1.1 Job Site Safety: The contractor and his subcontractors, vendors and suppliers shall comply with OSHA 29CFR1910 and the USACE Safety and Health Requirements 385-1-1. All safety and health requirements shall be adhered to for the life of the contract.

2.1.2 Confined Space Entry: Prior to entering the confined space, the contractor is responsible for having a permit issued for entering the confined space and for notifying the Training Center Fire Department that they will be entering a confined space. The contractor is responsible for complying with all OSHA regulations pertaining to confined space entry.

2.1.3 Dig Request: At least five (5) business days prior to any excavation greater than 6 inches deep, the contractor shall submit a completed Dig Request form. The Training Center will then provide utility mark-outs in the project area. The Contractor shall maintain the mark-outs through out construction. A copy of the approved Dig Request shall be posted at the job site throughout construction for the benefit of subcontractors.

2.1.4 Hot Work: Prior to performing "Hot Work" (welding, burning, lead melting, blowtorches, tar pots, etc.) or operating other flame-producing devices, the contractor shall request a Hot Work permit. This permit will be issued by the Training Center Fire Department through the Contracting Officer's Representative. This permit will be issued only after job site inspection by a member of the Fire Department for a specific task.

2.1.4.1 All Hot Work will be shut down 30 minutes before the end of work and a fire watch shall be kept at the scene of operation during this 30 minutes.

2.1.5 Extinguishers and Fire Watch Personnel: The contractor shall furnish, in accordance with all applicable requirements of the NFPA (National Fire Protection Association) Standards, sufficient fire extinguishers and fire watch personnel to protect the area in which his work is being performed. The size and type of fire extinguisher used will be subject to review by the Training Center Fire Department through the Contracting Officer's Representative.

2.1.6 Burning: The burning of trash or other waste material shall be prohibited.

2.1.7 HEATING:

2.1.7.1 All sources of temporary heat shall carry an "Underwriters Laboratory" label and portable heaters shall be located so as to avoid ignition of combustible materials.

2.1.7.2 Electrical heaters shall not be connected to extension cords.

2.1.7.3 Open drumfires are prohibited.

2.1.8 Electrical:

2.1.8.1 All portable electric devices (saws, sanders, compressors, lights, extension cords) not required to be left on shall be disconnected at the close of work each day.

2.1.8.2 All wires plugged into electrical outlets shall be equipped with male plugs. The inserting of the bare ends of wires into outlets is prohibited.

2.1.9 Flammables:

2.1.9.1 Oil painting materials (paint, brushes, empty paint cans, rags, paint clothes, drop cloths, etc.) and flammable liquids shall be removed from the building at the close of work each day.

2.1.9.2 Highly flammable liquids such as paints, thinner, etc. that are to be kept inside buildings shall be held to an absolute minimum except in buildings authorized and designed for such storage.

2.1.9.3 Storage of gasoline in excess of (5) gallon containers shall be permitted only by specific approval from the Training Center Fire Chief through the Contracting Officer's Representative.

2.1.9.4 All storage areas containing flammable liquids shall be marked with signs indicating "FLAMMABLES" and "NO SMOKING".

2.1.10 Fire Hydrants:

2.1.10.1 Fire hydrants shall not be used without approval of the Training Center Fire Department through the Contracting Officer's Representative. Where permission is granted for the use of fire hydrants, the contractor shall be required to furnish a gate valve and backflow preventer to fit the 2 1/2-inch outlets.

2.1.10.2 The Training Center Fire Department through the Contracting Officer's Representative will have control of the opening and closing of fire hydrants.

2.1.10.3 A clear space of 15 feet on both sides of fire hydrants shall be maintained at all times.

2.1.11 Existing Fire Devices: Fire hose or extinguishers in existing buildings shall not be removed from their locations, unless specifically indicated to be relocated or removed by the plans and specification for the project. No fire hose or extinguishers shall be used for any purpose other than combating a fire.

2.1.12 Smoking: Smoking is strictly prohibited in or near areas where flammable liquids, highly combustible materials or explosives are stored, handled or processed. All existing smoking regulations in occupied areas shall be complied with. "NO SMOKING" signs shall be observed and restrictions complied with. Smoking is also restricted in hangars and within 50 feet of all aircraft.

2.1.13 Fire Reporting: All contractors providing office space or trailers with telephone service shall place or post the fire reporting phone number by the phone. All contractor personnel shall be instructed how to report a fire. Any fire, no matter how small, shall be reported, including those already extinguished, to the Training Center Fire Department immediately. If a Training Center telephone is used, dial extension 6333. If any other telephone is used, dial 911.

2.1.14 Shut down: Prior to quitting time, a person, specifically designated by the contractor, shall make a check of the building and contract limits, to ensure compliance with all safety conditions of this specification insuring that the building and or area is in a fire safe condition.

*** END OF SECTION ***

DIVISION 2

SECTION 02220

EXCAVATING, BACKFILLING, AND COMPACTION

PART 1. GENERAL

1.1. DESCRIPTION

1.1.1. Work included: Providing and installing clean select fill, structural fill, sub-base material and topsoil; excavating existing material; backfilling; compact; and grade the site to the elevations shown on the Contracting Drawings, as specified herein, and needed to meet the requirements of the construction shown in the Contract Documents.

1.2. QUALITY ASSURANCE

1.2.1. Use adequate numbers of skilled workmen who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and the methods needed for proper performance of the work of this Section.

1.2.2. Use equipment adequate in size, capacity, and numbers to accomplish the work of this Section in a timely manner.

1.2.3. Material and execution shall comply with New Jersey Department of Transportation Standard Specifications for Road and Bridge Construction, 2001, with revisions, hereon referred to at the NJDOT Specifications.

1.3. SUBMITTALS: The following items shall be submitted in accordance with Division I, Section 01401.

1.3.1. Select Fill & Sub-Base Material

CERTIFIED TEST REPORTS

1.3.2. Select Fill & Sub-Base Material

MANUFACTURER'S

CERTIFICATE

OF CONFORMANCE

1.3.3. Select Fill & Sub-Base Material

LABORATORY REPORTS

PART 2. PRODUCTS

2.1. SOIL MATERIALS

2.1.1. Sub base material shall be I-5 or Dense Graded Aggregate as specified in the New Jersey Department of Transportation Standard Specifications for Road and Bridge Construction, 2001, with revisions.

2.1.2. Fill materials shall be subject to the approval of the COTR, and may be materials that have been removed from on site excavation, (where suitable for reuse), or imported from off-site borrow areas.

2.1.2.1. Excavated material from the job site may be reused if it is free from clay and organic materials.

2.1.2.2. All imported materials shall be predominantly granular, non-expansive soils free from roots and other deleterious matter and shall conform to New Jersey Department of Transportation Standard Specifications for Road and Bridge Construction designation I-6 thru I-8 paragraph 901.09.

2.2. WEED KILLER

2.2.1. Provide a dry, free-flowing, dust-free chemical compound, soluble in water, capable of inhibiting growth of vegetation, and approved for this kind of use.

2.3. TOPSOIL

2.3.1. Where and if shown on the Contracting Drawings or otherwise required, provide topsoil consisting of friable, fertile soil of loamy character, containing an amount of organic matter normal to the region, capable of sustaining earthly plant life, and reasonably free from subsoil, roots, heavy or stiff clay, stones larger than 2" in the greatest dimension, noxious weeds, sticks, brush, litter, and other deleterious matter.

2.3.2. Topsoil; obtained from on site excavation within the construction site limits may be utilized when suitable.

2.4. OTHER MATERIALS

2.4.1. Provide other materials, not specifically described but required for a complete and proper installation, as selected by the Contractor subject to the approval of the Contracting Officer.

PART 3. EXECUTION

3.1. FINISH ELEVATIONS AND LINES

3.1.1. All site layout and grades shall be established by the Contractor from grades shown on the Contract Drawings.

3.2. PROCEDURES

3.2.1. Utilities:

3.2.1.1. Unless shown to be removed, protect all active utility lines shown on the Contract Drawings or otherwise made known to the Contractor prior to excavation.

3.2.1.2. If active utility lines are encountered, and are not shown on the Contract drawings or otherwise made known to the Contractor, promptly take necessary steps to assure that the service is not interrupted.

3.2.1.3. If service is interrupted as a result of work under this Section, immediately restore service by repairing the damaged utility at no additional cost to the Coast Guard.

3.2.1.4. If existing utilities are found to interfere with the permanent facilities being constructed under this Section, immediately notify the COTR and secure his instructions.

3.2.2. Protection of property:

3.2.2.1. Take particular care in protecting structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, washout, and other hazards created by operations under this Section.

3.2.3. Dewatering:

3.2.3.1. Remove all water, including rainwater, encountered during trench and substructure work by use of pumps, drains, and other COTR approved methods.

3.2.3.2. Keep excavations and site construction area free from water.

3.2.4. Use means necessary to prevent dust becoming a nuisance to the public, to neighbors, and to other work performed on or near the site.

3.2.5. Maintain access to adjacent areas at all times.

3.3. EXCAVATION

3.3.1. Perform excavating of every type of material encountered within the limits of the Work to lines, grades, and elevations indicated on the Contract Drawings or specified herein.

3.3.2. Satisfactory…