AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT
1.CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0002 03/29/2013 21-13-822PMV108 4088550
6. ISSUED BY CODE 7. ADMINISTERED BY (If otherthan Item 6) CODE
CEU MIAMI
15608 Sw 117TH AVE
MIAMI, FL33177
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION
Prospective Bidders
HSCG82-1 3-B-PMV1 08
9B. DATED (SEE ITEM I I)
• 03/07/2013 iDA. MODIFICATION OF CONTRACT/ORDER NO.
D lOB. DATED (SEE ITEM 13)
CODE FACILITY CODE
II. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOlICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and dale specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTSIORDERS.
IT MODIFIES THE CONTRACTIORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM iDA.
D
D B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return Copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
AMENDMENT REASON: Correct Specifications and Drawings
Please see page 2
Except as provided herein, all terms and conditions of the document referenced in Item 9A or iDA, as heretofore changed, remains unchanged and in full 15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or, LESIA K. MOYER, CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT 0002 HSCG82-13-B-PMV 108 PAGE 2
A. Delete Specification Section 07 14 13 - Standing Seam Roof Panels, 2.5 A. 1 Steel Panel Systems B. Drawings AOl, A02, and A03 are for reference only, showing existing conditions and typical details. The bidder may select any seam connection that meets the requirements of Specification Section 07 41 13 - Standing Seam Roof Panels C. Specification Section 01 11 00, 1.2.4 b. is corrected to read: After contract award -
Obtain the current SPCC plan for CG SECTOR Mobile from SECTOR personnel.
D. The May 2007 USCG Base Mobile SPCC plan is attached for reference.
E Specification Section 13 34 21, 2.2 A.2.b. is corrected to read: Thickness: As appropriate to meet or exceed the engineering design criteria in Specification Section 13 34 21, 1.7.B Engineering Design Criteria F. All other Terms and Conditions remain unchanged.