Clarifications to SOW
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ABSTRACT 10 PMVA12 REPAIR WHARF.pdf | ||
| SF30Amd 0003 3WCA12.pdf | ||
| AMENDMENT 002 PMVA12.pdf | ||
| AMENDMENT 001 PMVA12.pdf | ||
| IFB WHARF PMVA12 new 10.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLARIFICATIONS:
Question: Government Furnished Property, Item 3: 4'x4'x4' approximately 2000 lbs, is this 4 Ft Square Plate 1/4" thick? Need plate size and type of attachment required.
Response: Box of fasteners, bolts and nuts on pallet is 4'x4'x4'. Size of steel-checkered plate 1/4-inch thick, see Section 01 11 00 paragraph 1.1.2 Option Item No. 1. Attachments shall be in accordance with shop drawings required in Section 05 50 13 MISCELLANEOUS METAL FABRICATIONS.
Question: Section 316219.00 Timber Piles, 2.1.1 Piles, there is no size for pile or length shown, no bearing data.
Response: Size and length of new piles shall be as determined by the test pile.
Question: The exhibit "E" of specifications show the last time wharf repaired to have piles 12" diameter and 45 feet long, will this hold true for this project? Also, will load bearing be required?
Response: Size and length indicated in Exhibit "E" listed for permit. However, size and length of new piles shall be as determined by the test pile.
Question: Will these materials be ordered by the Government for this project?
Response: Contractor shall furnish any additional quantities required above items furnished by the Government.
Question: Are these materials existing materials already on site specifically for this project?
Response: Government-furnished materials and equipment are located at the jobsite for this project.
Question: Are they in good condition and acceptable for use?
Response: yes
Question: If I utilize a site visit will I be able to see these materials?
Response: yes
Question: Drawing E-1 calls for the demo of three 15’ light poles. I do not see these on the photos. Are they existing?
Response: Light poles indicated on drawing E-1 removed during previous work.
Clarifications continued: Page 2 of 2
Question: Will a boat, pontoon, or platform be provided by the government for work under the dock for example installation of the conduit below the dock surface? If not, we will capture this cost in our bid.
Response: Government will NOT furnish a boat, pontoon or platform to execute work.
Question: This project requires six (6) total lights on four (4) poles and per the government furnished items and those required for the project, my electrical subcontractor will need to provide the remaining two (2) poles/lights. Two (2) of the poles have double heads and two (2) of the poles have single heads. The Government furnished item listing does not identify the manufacture or model number and we need this information to ensure the ones we provide will match the GFM.
Response: Government-Furnished Material and Equipment confirmed at jobsite include four light poles, six floodlights, and two "bullhorn" mounting brackets for dual floodlight installation. Floodlights are Hubbell MVK-0400S-268-L MAGNULITER 400W HIGH PRESSURE SODIUM.
Question: The GFM does not state if the arms for which the lights are to be mounted are to be supplied? We need to verify if these arms are provided and if not, we will provide for these in our bid.
Response: Government-Furnished Material and Equipment confirmed at jobsite include two "bullhorn" mounting brackets for dual floodlight installation.
Question: The specifications mention “Shorelight” receptacle is supplied but the drawings state a “Shoretie” receptacle and gives the model number. Are these two (2) descriptions referring to the same receptacle and are they government furnished?
Response: The "Shorelight" listed in Appendix C Government-Furnished Material and Equipment and confirmed at the jobsite is in fact the "Shoretie" receptacle required by the NEW WORK ITEM NOTE Number 9 of sheet number E-2. "Shoretie" is Russellstoll Thomas + Betts, CAT NO. DBRS240417500 200A 3 PHASE 480V 60HZ 175A.