WASHINGTON_(WPB_110B)_DD_FY16_REV0_GRH.pdf
PDF 3 MB Posted
- Attached to
- USCGC WASHINGTON - DRYDOCK REPAIRS (FY16)
- Solicitation number
- HSCG80-16-Q-P45005
About this file
USCGC Washington - Specification
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC WASHINGTON (WPB 1331)
SPECIFICATION FOR DRYDOCK REPAIRS
FY2016
Developed By: George R Haithcock
(REV 0, 30 June 2015)
USCGC WASHINGTON (WPB-110B) DRYDOCK AVAILABILITY FY2016
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record .......................................................................................................................................... iv Consolidated List of References .................................................................................................................... v Consolidated List of Government-furnished Property ............................................................................... xii Consolidated List of Critical Inspection Items ............................................................................................ xv Principal Characteristics ............................................................................................................................. xvi General Requirements WORK ITEM 1: Hull Plating (Side Scan), Ultrasonic Testing WORK ITEM 2: Aluminum Hull and Structural Repairs - 1/4" Plate (O) WORK ITEM 3: Aluminum Hull and Structural Repairs - 3/16" Plate (O) WORK ITEM 4: Aluminum Hull and Structural Repairs - 5/16" Plate (O) WORK ITEM 5: Hull and Structural Plating Repairs -Crack (Aluminum) (O) WORK ITEM 6: Hull and Structural Plating Repairs - Crack (Steel) (O) WORK ITEM 7: Hull and Structural Plating Repairs - Eroded Weld (Aluminum) (O) WORK ITEM 8: Steel Hull and Structural Plating Repairs (5-Pound) (O) WORK ITEM 9: Steel Hull and Structural Plating Repairs (7.0 Pound, 7.5-Pound or 7.65-Pound) (O) ... 32 WORK ITEM 10: Steel Hull and Structural Plating Repairs, Corrugated Plate (4.0-Pound) (O) WORK ITEM 11: Hull and Structural Plating Repairs (6.0-Pound or 5.63-Pound) (O) WORK ITEM 12: Hull and Structural Plating – 10.0-Pound Steel, Repair (O) WORK ITEM 13: Appendages (U/W), Leak Test (O) WORK ITEM 14: Appendages (U/W) - Internal, Preserve (O) WORK ITEM 15: Voids (Non-Accessible), Leak Test (O) WORK ITEM 16: Tanks (Fuel Stowage and Overflow), Clean and Inspect WORK ITEM 17: Voids (Non-Accessible), Internal Surfaces, Preserve (O) WORK ITEM 18: Tanks (MP Fuel Service), Clean and Inspect WORK ITEM 19: Tanks (Potable Water), Clean and Inspect WORK ITEM 20: Voids (Accessible), Clean and Inspect WORK ITEM 21: Tanks (Dirty Oil and Waste), Clean and Inspect WORK ITEM 22: Main Diesel Engine, Renew WORK ITEM 23: Propulsion Shafting, Remove, Inspect, and Reinstall WORK ITEM 24: Mechanical Shaft Seal Assemblies, Overhaul WORK ITEM 25: Propulsion Shaft Bearings (External), Renew (O) WORK ITEM 26: Propulsion Shaft, Stern Tube Forward Bearing, Renew (O) WORK ITEM 27: Propulsion Shaft, Forward Bearing Housing, Renew (O) WORK ITEM 28: Propellers; Remove, Inspect, and Reinstall WORK ITEM 29: Temporary Services, Provide - Cutter WORK ITEM 30: Speed Doppler, Remove, Inspect, and Reinstall - Doppler Valve, Overhaul WORK ITEM 31: Sea Valves and Waster Pieces, Overhaul or Renew WORK ITEM 32: Sea Strainers - Duplex (All Sizes), Overhaul WORK ITEM 33: Fuel System Valves, Renew and Overhaul WORK ITEM 34: Steering Gear (General), Overhaul WORK ITEM 35: Rudder Assembly, Remove, Inspect and Reinstall WORK ITEM 36: Fin Stabilizers (General), Overhaul WORK ITEM 37: Grey Water Holding Tank(s), Clean and Inspect WORK ITEM 38: Sewage Holding Tank, Clean and Inspect WORK ITEM 39: Grey Water Piping, Clean and Flush WORK ITEM 40: Sewage Piping, Clean and Flush WORK ITEM 41: Forward Peak Compartment, Preserve (O) WORK ITEM 42: Forward Void, Preserve iii (Rev-0)
WORK ITEM 43: Tank (Dirty Oil), Preserve “100%” (O) WORK ITEM 44: Tank (Oily Water), Preserve “100%” (O) WORK ITEM 45: Tanks (Potable Water), Preserve “100%” WORK ITEM 46: Bilge Surfaces, Preserve WORK ITEM 47: U/W Body, Preserve (“100%”) Used with Side Scan) WORK ITEM 48: Stern Tube Interior Surfaces, Preserve 100% (O) WORK ITEM 49: Impressed Current Cathodic Protection System, Inspect and Maintain WORK ITEM 50: Impressed Current Cathodic Protection System Anodes, Renew (O) WORK ITEM 51: Impressed Current Cathodic Protection System Reference Cells, Renew (O) WORK ITEM 52: CAPAC Anode Assembly, Renew (O) WORK ITEM 53: Drydock WORK ITEM 54: Sea Trial Performance, Support, Provide WORK ITEM 55: Firemain Valves, Overhaul or Renew WORK ITEM 56: Auxiliary Sea Water System Valves, Overhaul Or Renew WORK ITEM 57: Shaft Alignment Check (O) WORK ITEM 58: Exhaust Piping System, Inspect WORK ITEM 59: SW Heat Exchangers, Clean, Inspect and Hydro WORK ITEM 60: Ship Service Diesel Generators (CAT), Renew, Both WORK ITEM 61: Tank (Aft Grey Water), Preserve “100%” (O) WORK ITEM 62: Tank (Sewage Vacuum Collection), Preserve “100%” WORK ITEM 63: Hull Plating Freeboard, Preserve “100%” WORK ITEM 64: Cathodic Protection System (Bilge and Sea Chest), Renew WORK ITEM 65: Impressed Current Cathodic Protection System Dielectric Shield (Capastic Fairing), Renew WORK ITEM 66: Ventilation System(s), Renew Insulation and Clean (CSMP 2015007) WORK ITEM 67: Deck Covering System in Galley and Mess Deck, Renew WORK ITEM 68: Deck Covering, (Interior Wet/Dry), Renew (CSMP 2015-02,03,04,11) WORK ITEM 69: Forward Auxiliary Bilge, Preserve 100% (CSMP 2015-006) WORK ITEM 70: Sewage System, Structural and Piping Repairs, (CSMP 2015-001; 2015-010) WORK ITEM 71: Structural Analysis, 3D Laser Scan, Perform WORK ITEM 72: Cradle Assemble, Disassemble and Transport (O) iv (Rev-0)
Revisions Record
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
v (Rev-0)
Consolidated List of References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:
• MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
• Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
• Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::
www.gpoaccess.gov
The Government is aware of the following internet web links where contractors may procure commercial specifications:
• American Welding Society (AWS): http://www.awspubs.com/index.php
• ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
• NFPA: http://www.nfpa.org
• SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 110 WPB 074-002, Rev -, Welding Details Handbook Coast Guard Drawing 110B WPB 085-001, Rev A, Tank Capacity Curves Coast Guard Drawing 110 WPB 085-002, Rev 1, Docking Plan Coast Guard Drawing 110B WPB 085-002, Rev B, Docking Plan (General Location Layout) Coast Guard Drawing 110C WPB 085-007, Rev B; Booklet of Gen Drawings (List of Particulars) Coast Guard Drawing 110 WPB 085-009, Rev A, Master Material / Equipment List Coast Guard Drawing 110B WPB 085-010, Rev -, Docking Plan (SUPERCEDES 110B-WPB-085-2) Coast Guard Drawing 110 WPB 085-010, Rev C, Docking Plan Coast Guard Drawing 110 WPB 085-010, Rev C, Docking Plan, Docking/Lifting Cradle (110-WPB, 110B-WPB, 110C-WPB)
Coast Guard Drawing 110 WPB 085-010, Rev C, Docking Plan/Lifting Cradle(110-WPB,110B-
WPB,110C-WPB)
Coast Guard Drawing 110-WPB 085-012, Rev A; Docking & Cradle Arrangements & Details Coast Guard Drawing 110B WPB 085-012, Rev B, Booklet of General Drawings (Supersedes 110B-
WPB-085-7)
Coast Guard Drawing 110B WPB 85-012, Rev A, Booklet of General Plans Coast Guard Drawing 110-WPB 085-014, Rev-; Bolted Docking/Lifting Cradle for Transport Coast Guard Drawing 110-WPB 085-016, Rev-; Lifting ARTGT & Spreader Bar Details
Coast Guard Drawing 110B WPB 111-003, Rev H, Shell Expansion (Supersedes 110B-WPB-111-1) http://www.assistdocs.com/search/search_basic.cfm http://www.uscg.mil/directives/default.asp http://www.gpoaccess.gov/ http://www.awspubs.com/index.php http://www.techstreet.com/ http://www.nfpa.org/ http://shopping.netsuite.com/sspcmarketplace vi (Rev-0)
Coast Guard Drawing 110B WPB 113-001, Rev K, Inner Bottom Plating Coast Guard Drawing 110 WPB 114-001, Rev B, Stern Flap Coast Guard Drawing 110 WPB 114-002, Rev A, Spray Rail Coast Guard Drawing 110B WPB 115-001, Rev D, Longitudinal Girders Coast Guard Drawing 110B WPB 117-001, Rev H, Transverse Sections (Frames 0 thru 4) Coast Guard Drawing 110B WPB 121-001, Rev D, Longitudinal Bulkheads Coast Guard Drawing 110B WPB 131-001, Rev J, Deck Construction Plan Coast Guard Drawing 110B WPB 151-005, Rev F, Superstructure Details Coast Guard Drawing 110B WPB 161-001, Rev C, Main Shaft Strut Details Coast Guard Drawing 110B WPB 161-002, Rev D, Main Shaft Strut Installation Coast Guard Drawing 110B WPB 161-003, Rev C, Intermediate Shaft Strut Details Coast Guard Drawing 110B WPB 161-004, Rev C, Intermediate Shaft Strut Installation Coast Guard Drawing 110C WPB 161-005, Rev G, Stern Tube Installation Details Coast Guard Drawing 110B WPB 163-002, Rev C, Auxiliary Sea Chest Details Coast Guard Drawing 110C WPB 183-001, Rev C, Generator Foundations Coast Guard Drawing 110 WPB 183-002, Rev-, Generator Resilient Mount Installation Coast Guard Drawing 110B WPB 201-002, Rev A, Propulsion Configuration Coast Guard Drawing 110 WPB 201-003, Rev -, Machinery Arrangement Coast Guard Drawing 110B WPB 201-003, Rev C, Machinery Arrangement (List of Components) Coast Guard Drawing 110B WPB 233-001, Rev A, Main Engine Bolting & Pads Coast Guard Drawing 110B WPB 233-002, Rev B, Remote Emergency Main Engine Shutdown Coast Guard Drawing 110B WPB 241-001, Rev A, Reduction Gear Bolting & Chocking Coast Guard Drawing 110B WPB 243-002, Rev F, Propulsion Shafting Details Coast Guard Drawing 110C WPB 243-002, Rev B, Propulsion Shafting & Details Coast Guard Drawing 110B WPB 243-005, Rev B, Shaft Locking Device Coast Guard Drawing 110 WPB 243-006, Rev C, Propulsion Shaft Details Coast Guard Drawing 110B WPB 245-002, Rev B, Assembly of Oil Injection Equipment Coast Guard Drawing 110 WPB 245-004, Rev A, Propeller Details Coast Guard Drawing 110B WPB 256-001, Rev G, Main Engine SW Cooling System A&D Coast Guard Drawing 110B WPB 256-003, Rev -, Auxiliary Seawater Cooling Arrangement and Details Coast Guard Drawing 110B WPB 256-003, Rev -, Main Engine Sea Water Cooling Coast Guard Drawing 110B WPB 256-003, Rev -, Main Engine SW Cooling (Supersedes 110B-WPB
0256-002) Coast Guard Drawing 110B WPB 256-004, Rev -, Mods to SW Cooling Incidental to Install of Charge
Air Cooler Diverter Coast Guard Drawing 110B WPB 259-001, Rev D, Main Engine Exhaust Piping System Coast Guard Drawing 110B WPB 259-002, Rev D, Genset Exhaust Piping System Coast Guard Drawing 110C WPB 259-002, Rev -, Genset Exhaust Piping System
Coast Guard Drawing 110 WPB 259-005, Rev C, 18” Raw Water Discharge Spray Ring Assembly w/
Companion Flanges & Gaskets vii (Rev-0)
Coast Guard Drawing 110 WPB 259-006, Rev D, MDE 8” Exhaust Flapper Valve Assembly (w/Companion Flanges & Gaskets)
Coast Guard Drawing 110 WPB 259-007, Rev A, SSDG Exhaust Piping Mod (Ripout and Install) Coast Guard Drawing 110B WPB 261-001 Rev C, Fuel Oil Service Piping A & D Coast Guard Drawing 110C WPB 320-001, Rev C, Ships Service Power 1-Line Diagram Coast Guard Drawing 110B WPB 437-002, Rev C, Tank Level Indicators Installation Coast Guard Drawing 110B WPB 501-001, Rev H, Piping System Schematics Coast Guard Drawing 110B-WPB 501-002, Rev 0, Piping Standards Coast Guard Drawing 110B WPB 514-001, Rev F, Air Conditioning/Heating System (Schematic) Coast Guard Drawing 110 WPB 514-001, Rev 0, Aft Berthing ventilation Mods Coast Guard Drawing 110B WPB 521-001, Rev H, Firemain Piping Arrg’t & Details Coast Guard Drawing 110B WPB 526-001, Rev M; Scuppers & Deck Drains Piping Arrangement Coast Guard Drawing 110B WPB 528-002, Rev E, Sewage Piping Arrangement & Details Coast Guard Drawing 110B WPB 541-001, Rev D, Fuel Oil Transfer Piping A&D Coast Guard Drawing 110B WPB 561-001, Rev A, Steering System Details Coast Guard Drawing 110B WPB 561-004, Rev B, Steering System Details – Piping Coast Guard Drawing 110C WPB 562-001, Rev G, Rudder Details (Stock & Blade Details) Coast Guard Drawing 110C WPB 562-001, Rev G, Rudder Details (Stock and Blade Details) Coast Guard Drawing 110C WPB 565-001, Rev D, Fin Stabilization System (Struct Locs & Dets) Coast Guard Drawing 110C WPB 565-001, Rev D, Fin Stabilizer System (Struct Locs & Dets) Coast Guard Drawing 110B WPB 565-002, Rev B, Fin Stabilization Dets – Piping Coast Guard Drawing 110C WPB 581-002, Rev B, Anchor HDLG and Hawse Pipe Details Coast Guard Drawing 110 WPB 601-002, Rev D, Outboard Profile and Weather Decks Coast Guard Drawing 110B-WPB-602-2, Rev D, Visual Identification Coast Guard Drawing 110B WPB 633-001, Rev A, Cathodic Protection Plan and Details Coast Guard Drawing 110B WPB 633-002, Rev C, Cathodic Protection Installation, Schematic, & Layout Coast Guard Drawing 110-WPB-634-001, Rev-D, Floating Deck Replacement with Sound Abatement
Coating Coast Guard Drawing 110C WPB 635-001, Rev D, Linings and Insulation Plan Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem Coast Guard Fleet Drawing FL 2804-22, Rev-, Consolidated Visual ID for Cutters
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual Coast Guard Commandant Instruction (COMDTINST)_MI0360.3 (series), Coatings and Color Manual Coast Guard Technical Manual (TP) 3223, May 1985, SWBS 420, Section G, Doppler Service Manual Coast Guard Technical Manual (TP) 3990, Aug 2002, SWBS 426, Section A, NAVIKNOT 400 -
SINGLE-AXIS DOPPLER SPEED LOG Service Manual Coast Guard Technical Publication (TP) 2924, Jun 1990, General Information Book and Operating
Manual for USCG 110 Foot Patrol Boat, Annex 1B, Propeller Renewal Procedure Coast Guard Technical Publication (TP) 3094, Jan 2002, Manufacturer’s O&M Instruction Book, Paxman
Diesels Limited viii (Rev-0)
Coast Guard Technical Publication (TP) 3095, July 2005, Manufacturer’s O&M Instruction Book, Paxman Diesels Limited
Coast Guard Technical Publication (TP) 3220, May 1993, Manufacturer’s Instruction Book - SWBS Group 311, Ships Service Diesel Generator
Coast Guard Technical Publication (TP) 3495, May 2002, Chapter 243, Installation Duramax Shaft Seal System
Coast Guard Technical Publication (TP) 3906, Oct 2008, Ship's Steering Gear System Coast Guard Technical Publication (TP) 3907, Feb 2007, SWBS 565, Ship's Fin Stabilizing System Coast Guard Technical Publication (TP) 4655, Aug 2007, Section 633-A, Cathodic Protection System Coast Guard Technical Publication (TP) 4655, Sep 2007, Cathodic Protection System Coast Guard Technical Publication (TP)-3906, Oct 2002, Ship’s Steering Gear System Coast Guard Technical Publication (TP)-4666, Feb 2008, Steering System Coast Guard Technical Publications 3095, Jul 2005, Manufacturer’s O&M Instruction Book, Paxman
Diesels Limited Coast Guard Technical Publications 3096, Jan 2001, Main Diesel Engine and Reduction Gear Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, Jan 2009, General
Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2014, Overhaul AC
Electrical Motors Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary
Machine Systems Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2014, Clean
Shipboard Ventilation Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2014, Drydocking Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2014, Temporary
Hull Accesses Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), Jan 2009, Temporary Hull Accesses
OTHER REFERENCES
American National Standards Institute/American Society of Mechanical Engineers (ANSI/ASME), B4.1-
1967, (reaffirmed 2009), Preferred Limits and Fits for Cylindrical Parts American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System
Components - Health Effects ix (Rev-0)
American National Standards Institute/NSF International (ANSI/NSF) 61, 2013, Drinking Water System Components - Health Effects
American Society for Nondestructive Testing (ASNT) SNT-TC-1A, 2006, Recommended Practice for Nondestructive Testing Personnel Qualification and Certification
American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and Welding End
ASTM International (ASTM) 6966, 2008, Standard Practice for Collection of Settled Dust Samples Using Wipe Sampling Methods for Subsequent Determination of Metals
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D5363, 2003, Standard Specification for Anaerobic Single Component
Adhesives ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component
Adhesives (An) ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates ASTM International (ASTM), D3951, Re-approved 2004, Standard Practice for Commercial Packaging Code of Federal Regulations (CFR) Title 29, Part 1910, Jul 2008, Occupational Safety and Health
Standards Code of Federal Regulations (CFR) Title 33 CFR, Jul 2013 Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, 2013, Protection of the Environment Code of Federal Regulations (CFR) Title 49, Oct 2013, Transportation Commercial Item Description (CID) A-A-59588, 2013, Rubber Silicone Commercial Item Descriptions (CID) A-A-59316, Nov 2003 Abrasive Materials for Blasting Commercial Item Descriptions (CID) A-A-59323 A, 2005, Cloths, Cleaning, Low-Lint DOD-STD-2187, Aug 1987, Chemical Cleaning of Salt Water Piping Systems Federal Specification (Fed Spec) HH-P-151, Mar 1991, Packing; Rubber-Sheet, Cloth-Insert Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement Institute of Electrical and Electronic Engineers (IEEE), Standard 45, 2002, Recommended Practice for
Electrical Installations on Shipboard International Organization for Standardization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller -
Manufacturing tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50m, Inclusive International Standard Organization (ISO) 4406, 1999, Hydraulic Fluid Power – Fluids – Method for
Coding Level of Contamination by Solid Particles Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2003 Edition, Bronze Gate, Globe, Angle and Check Valves x (Rev-0)
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008 Edition, Bronze Gate, Globe, Angle and Check Valves
MIL PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut Back, Cold Application MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning MIL-DTL-1222, Dec 2000, Studs, Bolts, Screws and Nuts for Applications Where a High Degree of
Reliability Is Required MIL-G-24716, Apr 1993, Gaskets, Metallic-Flexible Graphite, Spiral Wound MIL-G-6032D(1), Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code #G-636 MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application MIL-PRF-24635, 2009, Coating Systems, Weather-Resistant, Exterior Use MIL-PRF-24647, Apr 2013, Paint System, Anticorrosive and Antifouling, Ship Hull MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant MIL-S-8660C(2), Silicone Compound, NATO Code # S-736 Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA-
PRO-160, Jan 2006, Chapter 16, Cofferdams Naval Ships Systems Command Drawing 803-2145518, Rev G, Sprayshields for Mechanical Joints NAVSEA Drawing 803-921865, Rev P; Cathodic Protection Hull Zinc Anodes Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and
Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2013, Cork and
Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2013, Cork and
Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 2014 Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, 2004, Near-White Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 12/NACE No.5, 2002, Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP WJ-2/NACE WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Blast Cleaning xi (Rev-0)
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No. SSPC-SP 12/NACE No.5, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting Prior to Recoating
Vosper Thornycroft Technical Bulletin No. 49, Jul 1992, Procedure for Fitting New Tiller Rod Eye Bearings to Actuators and Removing Redundant Grease Hose On BMS Island Class USCG Cutters xii (Rev-0)
Consolidated List of Government-furnished Property
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM
DESCRIPTION
NSN/PN QTY ESTIMATED
COST
($/UNIT)
22 Y Paxman Valenta
Diesel Engine – Model 16RP200M
NSN: 2815-99-739-4949 2 ea. 368,000.00
22 Y Engine Mounts NSN: 5340-99-737-1267 4 ea. 1,791.96 22 Y Engine Mounts NSN: 5340-99-735-6320 4 ea. 1,791.96 22 N Engine Install Kit NSN: 2815-01-481-1241 2 ea. 4,300.00 22 Y Lifting Bracket N/A 1 ea. 20,000.00 22 Y Engine Stands N/A 2 sets 4,000.00 23 N 4" Diameter x 28'
Long, Aquamet-17 propulsion shaft
NSN: 2010-01-445-7940 2 ea. 8,700.00
23 N *Oil Injection Equipment Kit
N/A 1 set 6,000.00
24 N Shaft seal assembly kit
NSN: 5330-01-497-8095 2 ea. 859.48
24 N Shaft seal assembly NSN: 4320-01-497-8057 2 ea. 3,111.84 24 N Emergency Shaft
Seal Inflator Kit NSN: 5330-01-497-9866 2 ea. 175.00
25 N Main Shaft Strut Bearing, Bronze and rubber cutlass bearing, 4" ID x 5"
OD x 16” Long
NSN: 3120-01-222-3927 2 ea. 200.00
25 N Intermediate Shaft Strut Bearing, Bronze and rubber cutlass bearing, 4" ID x 5"
OD x 16” Long
NSN: 3120-01-222-3927 2 ea. 200.00
26 N Stern Tube Bearing, Bronze and Rubber cutlass bearing, 4" ID x 5" OD x 8”
Long
NSN: 3120-01-238-0689 2 ea. 150.00
27 N Forward Bearing Housing
NSN: 3130-01-442-2863 2 ea. 2,472.11
28 Y Propeller, LH NSN: 2010-01-222-2440 1 ea. 23,445.00 28 Y Propeller, RH NSN: 2010-01-222-2441 1 ea. 22,800.00
30 N ***CELZ-SRD-331
Doppler speed log NSN: 5845-01-302-4161 1 ea. 3,255.08
32 Y Kraissl 2 ½” Duplex NSN: 4730-01-394-9731 4 ea. 3,900.00 xiii (Rev-0) strainer 32 Y Kraissl 4” duplex strainer NSN: 4730-01-173-1413 2 ea. 4,700.00
32 Y Kraissl 1 ½” Duplex strainer for RO
PN:72-38F 1 ea. 600.00
33 N 2” Butterfly Wafer Valve 150# (Iron)
ACN: 4820-01-629-1166 11 96.79
33 N 3” Butterfly Wafer Valve 150# (Iron)
ACN: 4820-01-F12-2859 1 112.50
35 Y Rudder NSN: 2040-01-223-2674 2 ea. 25,000.00 35 N Lower Rudder
Bearing NSN 3120-01-477-8696 2 ea. 1,364.00
36 N Spherical Roller Bearing
NSN: 3110-00-902-7288 2 ea. 314.80
36 N Spherical Roller Bearing
NSN: 3120-99-806-7289 4 ea. 221.07
36 N Bolt, Trunnion, Special
NSN: 5325-01-394-7933 4 ea. 367.67
36 N Tiller Pin (Bolt) NSN: 5306-99-538-1451 4 ea. 145.44 36 N Tiller Spacer Flange
Bush NSN: 5365-99-807-4040 4 ea. 163.73
36 N Trunnion Spacer Flange Bush
NSN: 3120-01-396-1724 4 ea. 159.25
36 N Circlip NSN: 5365-99-902-2593 8 ea. 2.76 36 N Fin 25/32 Washer NSN: 5310-99-538-1450 4 ea. 4.44 36 N Actuator seals NSN: 5330-99-729-7570 4 ea. 128.87 36 N Fin Rod Eye
Bearings (Assy) NSN: 3120-01-377-1940 4 ea. 1,190.95
36 N Rod Eye Lock nut NSN: 5310-01-468-7665 4 ea. 23.76 36 N Tiller Pin nylock nut NSN: 5315-01-485-3148 4 ea. 20.86 36 Y **Fin Stabilizer assembly NSN: 2040-99-726-4768 2 ea. 19,987.00
36 N Fin Stabilizer Lower Bearing/Bushing
NSN: 3120-99-726-2345 2 ea. 1,091.25
36 N Fin Stabilizer Cooler NSN: 4420-99-820-3141 2 ea. 706.71 36 N Fin Stabilizer Sealing
Kit consists of (5) pre-cut rings of Slade
3300 packing material
(DELAMAR)
NSN: 2040-01-566-3198 2 ea. 499.80
38 N Transmitter, Liquid Quantity
NSN: 6680-01-233-9518 1 ea. 1,458.91
50 N Anode, rectangular, platinum, 25/40 A
Siemens Water Technologies W3T105296 (Electrocatalytic 50825)
NSN 5340-01-206-2354
2 ea. 5,511.96
51 N Reference electrode, silver & silver chloride
Siemens Water Technologies W3T105054 (Electrocatalytic 35754D)
2 ea. 3,647.23 xiv (Rev-0)
NSN 5977-01-203-7800
52 N Anode NSN 5340-01-206-2354 1ea. 4163.00 53 Y *Transducer Cover
Plate N/A 1 ea. 50.00
58 N Port spray ring NSN: 2990-01-475-9621 1 ea. 1,584.00 58 N Starboard spray ring NSN: 2990-01-475-9620 1 ea. 1,584.00 58 N Port 8” flapper valve NSN: 4810-01-475-8648 1 ea. 2,072.00 58 N Starboard 8” flapper valve NSN: 4810-01-475-8415 1 ea. 2,072.00
58 N MDE gasket kit NSN: 5330-01-475-8157 2 ea. 389.45 58 N MDE gasket kit NSN: 5330-01-475-8169 2 ea. 312.52 58 N Exhaust gasket kit NSN: 5330-01-475-8804 4 ea. 128.24 58 N Turbo Charger gasket NSN: 5330-01-424-6806 2 ea 283.01 58 N Expansion bellows and flower pot to bellows
NSN 5330-01-394-8528 6 ea 96.84
60 Y Caterpillar GenSet Engine Assy
NSN: 01F101739 PN:
D3304BT/91572-01 ASSY
2 ea. 40,500.00
60 N Engine Resilient Mount
45 P/N 6050231 4 ea. 169.70
60 N Generator Resilient Mount
55 P/N 6050232 4 ea. 169.70
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xv (Rev-0)
Consolidated List of Critical Inspection Items
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
Work Item Title
Hull Plating (Side Scan), Ultrasonic Testing
Appendages (U/W), Leak Test
15 Voids (Non-Accessible), Leak Test
18 Tanks (MP Fuel Service), Clean and Inspect
Tanks, Potable Water, Clean and Inspect
Propulsion Shafting, Remove, Inspect, and Reinstall
28 Propellers; Remove, Inspect, and Reinstall
32 Sea Strainers - Duplex (All Sizes), Overhaul
35 Rudder Assembly, Remove, Inspect and Reinstall
Fin Stabilizers (General), Overhaul
Sewage System, Structural and Piping Repair
41 Forward Peak Compartment, Preserve
46 Bilge Surfaces, Preserve
Impressed Current Cathodic Protection System, Inspect and Maintain
Exhaust Piping System, Inspect
Heat Exchangers, Clean, Inspect, Hydro
Deck Covering System in Galley and Mess Deck, Renew
71 Structural Analysis, 3D Laser Scan, Perform xvi (Rev-0)
Principal Characteristics
110’ WPB (B-CLASS)
PHYSICAL
Length overall 110' 0" or 113' if stern flap present Length between perpendiculars 104' 1/2" Depth 10' 1/2" Beam, molded 21' 3" Depth, molded N/A Full load draft 6' 5-3/4" Height of highest projection 55' Full load displacement 165 long tons Anchor 150 lb Danforth with 450 ft. 3" nylon rope Shore tie voltage requirements 450VAC 400A 3PH, 60Hz ungrounded
HULL
Hull BS-4360, GR 43A Steel Main weatherdeck & superstructure 5086 Aluminum Alloy Frame spacing Various Bulkheads Seven watertight transverse Fin stabilizers Frame 22-1/2
MACHINERY
Main propulsion Two Paxman Type 16 RP200M (Valenta) V-16 Diesel; 2880 BHP each @ 1500
RPM (max) Reduction gears Two ZF Model BW 1500 reversible reduction gearboxes; 1.839:1 ratio Number of propellers 2 Number of blades 5 Diameter of bropeller 49.6" Pitch 61.4" Rpm N/A Shaft AQUAMET 17 Shaft diameter 4" Shaft seal Johnson Duramax split face seal Shaft bearings Rubber Cutless or Thordon Rudders Twin underslung type, 5 sq ft each Ship's service generators Two Caterpillar Type 3304BT diesel; 99KW, 460V, 60Hz, 3-phase, 3-wire @ 1800
RPM
TANK
Fuel oil (95%) 9,306 gal.
Fresh water (100%) 940 gal.
Lubricating oil (95%) 109 gal.
1 (Rev-0)
00000_0215_FLT
REC_00000_FLT_ Commercial Project @ Contractor’ Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST)_MI0360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
ASTM International (ASTM) 6966, 2008, Standard Practice for Collection of Settled Dust Samples Using
Wipe Sampling Methods for Subsequent Determination of Metals Code of Federal Regulations (CFR) Title 29, Part 1910, Jul 2008, Occupational Safety and Health
Standards The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal Code of Federal Regulations (CFR) Title 33 CFR, Jul 2013 Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, 2013, Protection of the Environment Code of Federal Regulations (CFR) Title 49, Oct 2013, Transportation
2 (Rev-0)
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with (COMDTINST)_MI0360.3C , Chapter 11 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 5 of COMDTINST MI0360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility
3 (Rev-0)
Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to adequately accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Local Policy. None.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:
• None.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
4 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
Vessel Name Hull # Work Item # Work Item Title
Location of Work (incl. frame #’s) Area (sqft)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max.
threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
Name of QP-1/NACE Inspector Signature Cert. # Date / Time
5 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE &
TIME
ACTIVITY
(Surface preparation, primer coat, barrier coat, top coat, etc…)
LOCATION
(Frame & Deck, relation to equipment, etc.)
TEMPERATURE
% REL.
HUMID-
ITY DEW
PT. SURFACE AMBIENT
ΔT
| DP -
Surface |
6 (Rev-0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
Location of Work (Frame References) Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils) Min Max Mean
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________
Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________
7 (Rev-0)
8 (Rev-0)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils) Min Max Mean
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________
Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings (by column):
_____ mils _____ mils _____ mils _____ mils _____ mils
9 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15
DATE TEST LOCATIONS CONDUCTIVITY
(microsiemens/cm)
10 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
Coating Mfg Product Name Batch # Induction Time
Coating System Sequence (Primer/Touchup/3rd Coat, etc.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2
SPOT 1 2 3 4 5 AVERAGE
VALUE
*BASE METAL
READING (BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation 3 Before
Adjustments After Adjustments
Avg.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation 3 Before
Adjustments After Adjustments
Avg.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation 3 Before
Adjustments After Adjustments
Avg.
Application Method (Airless, Conventional Spray, Rolled) Average DFT
11 (Rev-0)
11000_Sidescan_ENV_0812_110WPB REC_11000_Side_Scan_110_110B’ WPB - ALL (0614)
WORK ITEM 1: Hull Plating (Side Scan), Ultrasonic Testing
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform thickness measurements of underwater (u/w) hull plating and freeboard up to the data couple by ultrasonic side scan method.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 110B WPB 111-003, Rev H, Shell Expansion (SUPERCEDES
110B-WPB-111-1)
Coast Guard Drawing 110B WPB 085-010, Rev -, Docking Plan (SUPERCEDES 110B-
WPB-085-2)
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
OTHER REFERENCES
American Society for Nondestructive Testing (ASNT) SNT-TC-1A, 2006, Recommended Practice for Nondestructive Testing Personnel Qualification and Certification
3. REQUIREMENTS
3.1 General. The Contractor shall use drawings listed in Section 2 herein as guidance during the performance of work specified herein.
3.1.1 CIR. . The Contractor shall submit a CIR for the inspections listed in the following paragraph:
• 3.2 Notify the COR at least 3 days prior to completion for an onsite review of readings and repair areas.
http://www.techstreet.com/index.tmpl http://www.techstreet.com/index.tmpl http://www.techstreet.com/index.tmpl
12 (Rev-0)
None.
3.1.2 Tech Rep. The Contractor shall provide the services of a qualified ultrasonic testing company, with suitable side scan equipment, to conduct a “Scanning Crawler Automated Test” of the vessel’s u/w hull plating and entire freeboard up to the data couple for the presence of metal corrosion and deterioration. Ensure the following:
• Follow the ASNT Recommended Practice No. SNT-TC-1A 2006 for all personnel qualification and certification.
• All scanning shall be completed by a certified automated scanner with a proven history and certificate of qualifications.
• Provide an ASNT Level III analyst on site during the entire scanning process to oversee the project and evaluate all data obtained during scanning.
• Provide an ASNT Level III or II analyst to verify with a hand held meter all areas on the hull identified as thinner than the criteria…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .