SOSS_MANOWAR_DD_FY14.pdf

PDF 69 KB Posted

Attached to
USCGC MANOWAR DRYDOCK REPAIRS FY14
Solicitation number
HSCG80-14-Q-P45E16
Issued by

About this file

Schedule of Supplies/Services (SOSS) MANOWAR DD FY14

View the file

Other files

File Type Posted
RFQ_MANOWAR_DD_FY14.pdf PDF
SPEC_REV0_030714_MANOWAR_DD_FY14.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF SUPPLIES/SERVICES

USCGC MANOWAR (WPB-87330) DRYDOCK REPAIRS FY14

ITEM DESCRIPTION UNIT PRICE UNIT QTY EXTENDED

PRICE

D-001 Ultrasonic Thickness Measurements, Perform (D) $ JOB 1 $

O-002 Ultrasonic Thickness Measurements, Perform (O) $

SHOTS

10 $

D-003 Dirty Oil Tank, Clean and Inspect (D) $ JOB 1 $

D-004 Oily Water Tank, Clean and Inspect (D) $ JOB 1 $

D-005 Tanks (MP Fuel Service), Clean and Inspect (D) $ JOB 1 $

O-006 Main Engine/Reduction Gear, Realign (O) $ JOB 1 $

D-007 Propulsion Shafts, Remove, Inspect, and Reinstall (D)

$ JOB 1 $

O-008 Propulsion Shaft, Repair (O) $ JOB 1 $

O-009 Propulsion Shaft, Straighten (O) $ JOB 1 $

O-010 Intermediate Water-Lubricated Propulsion Shaft Bearing, Renew (O)

$ JOB 1 $

O-011 Aft Water-Lubricated Propulsion Shaft Bearing, Renew (O)

$ JOB 1 $

O-012 Intermediate Bearing Carrier, Renew (O) $ JOB 1 $

O-013 Aft Bearing Carrier, Renew (O) $ JOB 1 $

O-014 Stern Tubes, Interior Surfaces, Preserve 100% (O) $ JOB 1 $

O-015 Stern Tubes, Interior Surfaces, Repair (O) $ JOB 1 $

D-016 Propellers, Remove, Inspect, and Reinstall (D) $ JOB 1 $

D-017 Speed Log, Skin Valve Assembly, Clean and Inspect (D)

$ JOB 1 $

D-018 Sea Water System (Sea Valves, Strainers, Piping), Clean, Inspect and Repair (D)

$ JOB 1 $

D-019 Rudder Assemblies, Remove, Inspect and Reinstall (D)

$ JOB 1 $

D-020 RHIB Notch Skid Pads, Inspect (D) $ JOB 1 $

O-021 RHIB Notch Skid Pad Studs, Renew (O) $

STUDS

10 $

D-022 Stern Launch Door, Remove, Inspect and Reinstall (D)

$ JOB 1 $

D-023 Grey Water Holding Tank, Clean and Inspect (D) $ JOB 1 $

D-024 Sewage Holding Tank, Clean and Inspect (D) $ JOB 1 $

D-025 Grey Water Piping, Clean and Flush (D) $ JOB 1 $

D-026 Sewage Piping, Clean and Flush (D) $ JOB 1 $

O-027 Hull Plating Freeboard, Preserve -“100%” (O) $ JOB 1 $

O-028 Main Mast, Preserve, 100% (O) $ JOB 1 $

O-029 Superstructure, Preserve “100%” (O) $ JOB 1 $

O-030 Superstructure, Preserve “Partial” (O) $ JOB 1 $

D-031 Cathodic Protection / Zinc Anodes, Renew (D) $ JOB 1 $

D-032 Drydocking (D) $ JOB 1 $

D-033 Temporary Services, Provide (D) $ JOB 1 $

D-034 Install Stainless Steel Hull Inserts and Renew BMDE Concentric Rings.(D)

$ JOB 1 $

O-035 Decks - Exterior (Main Deck), Preserve (O) $ JOB 1 $

O-036 Depth Sounder, Capastic Fairing, Renew (O) $ JOB 1 $

O-037 U/W Body, Preserve (100%) (O) $ JOB 1 $

O-038 Hull Plating Freeboard, Preserve - Partial (O) $ JOB 1 $

O-00A Composite Labor Rate $ HOUR 210 $

D-00B GFP Report NSP EA 1 NSP

O-00Z Laydays $ DAY 5 $

TOTAL OF DEFINITE ITEMS $

TOTAL OF OPTIONAL ITEMS $

TOTAL OF DEFINITE AND OPTIONAL ITEMS $

File details come from the government source that posted it. Updated .