USCGC KEY BISCAYNE (WPB 1339)
110 FOOT "C CLASS" PATROL BOAT (USCG)
SPECIFICATION FOR DRYDOCK REPAIRS
FY2013
Developed By: Jeffrey Mitchell
(Rev-0, 11 February 2013)
USCGC KEY BISCAYNE (WPB-110C) DRYDOCK AVAILABILITY FY2013
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ...................................................................................................................................................... iv Consolidated List of References ................................................................................................................................ v Consolidated List of Government-furnished Property ............................................................................................. xi Consolidated List of Critical Inspection Items ....................................................................................................... xiv Principal Characteristics .......................................................................................................................................... xv General Requirements WORK ITEM 1: Hull Plating, U/W Body, Inspect WORK ITEM 2: Hull Plating (U/W Body), Ultrasonic Testing WORK ITEM 3: Aluminum Hull and Structural Repairs - 1/4" Plate WORK ITEM 4: Aluminum Hull and Structural Repairs - 3/16" Plate WORK ITEM 5: Aluminum Hull and Structural Repairs - 5/16" Plate WORK ITEM 6: Hull and Structural Plating Repairs -Crack (Aluminum) WORK ITEM 7: Hull and Structural Plating Repairs - Crack (Steel) WORK ITEM 8: Hull and Structural Plating Repairs - Eroded Weld (Aluminum) WORK ITEM 9: Steel Hull and Structural Plating Repairs (5-Pound) WORK ITEM 10: Steel Hull and Structural Plating Repairs (7.0 Pound, 7.5-Pound or 7.65-Pound) WORK ITEM 11: Steel Hull and Structural Plating Repairs, Corrugated Plate (4.0-Pound) WORK ITEM 12: Hull and Structural Plating Repairs (6.0-Pound or 5.63-Pound) WORK ITEM 13: Hull and Structural Plating – 10.0-Pound Steel, Repair WORK ITEM 14: Tanks (Fuel Service), Clean and Inspect WORK ITEM 15: Voids (Non-Accessible), Leak Test WORK ITEM 16: Tanks (Fuel Stowage and Overflow), Clean and Inspect WORK ITEM 17: Voids (Non-Accessible), Preserve Internal Surfaces WORK ITEM 18: Tanks, Air Test WORK ITEM 19: Tanks (Potable Water), Clean and Inspect WORK ITEM 20: Tanks (Dirty Oil and Waste), Clean and Inspect WORK ITEM 21: Propulsion System, Alignment Check WORK ITEM 22: Propulsion Shafting, Remove, Inspect, and Reinstall WORK ITEM 23: Mechanical Shaft Seal Assemblies, Overhaul WORK ITEM 24: Propulsion Shaft Bearings (External), Renew WORK ITEM 25: Propulsion Shaft, Stern Tube Forward Bearing, Renew WORK ITEM 26: Propellers; Remove, Inspect, and Reinstall WORK ITEM 27: Exhaust System, MDE, Inspect WORK ITEM 28: SW Heat Exchangers; Clean, Inspect and Hydro WORK ITEM 29: Fathometer Transducer, Renew WORK ITEM 30: Speed Doppler, Renew, Doppler Valve, Overhaul WORK ITEM 31: Sea Valves and Waster Pieces, Overhaul or Renew WORK ITEM 32: Sea Strainers - Duplex (All Sizes), Overhaul WORK ITEM 33: Steering Gear (General), Overhaul WORK ITEM 34: Rudder Assembly, Remove, Inspect and Reinstall WORK ITEM 35: Fin Stabilizers (General), Overhaul WORK ITEM 36: Single Point Davit (Appleton SEB) Level 2, Inspection WORK ITEM 37: Tanks, (Grey Water) Clean and Inspect WORK ITEM 38: Tanks, (Sewage Holding) Clean and Inspect WORK ITEM 39: Grey Water Piping, Clean and Flush WORK ITEM 40: Sewage Piping, Clean and Flush WORK ITEM 41: Forward Peak Compartment, Preserve WORK ITEM 42: Forward Head, Preserve WORK ITEM 43: Tanks (Sewage Holding), Preserve “100%” iii (Rev-0)
WORK ITEM 44: Tanks (Sewage Holding), Preserve “Partial” WORK ITEM 45: Tanks (Aft Grey Water), Preserve “100%” WORK ITEM 46: Tanks (Aft Grey Water), Preserve “Partial” WORK ITEM 47: Tanks (Dirty Oil), Preserve “100%” WORK ITEM 48: Tanks (Dirty Oil), Preserve “Partial” WORK ITEM 49: Tank (Oily Water), Preserve “100%” WORK ITEM 50: Tanks (Oily Water), Preserve “Partial” WORK ITEM 51: Tanks (Potable Water), Preserve “100%” WORK ITEM 52: Tanks (Potable Water), Preserve “Partial” WORK ITEM 53: U/W Body, Preserve “100%” WORK ITEM 54: U/W Body, Preserve “Partial – Condition A” WORK ITEM 55: U/W Body, Preserve “Partial - Condition B” WORK ITEM 56: U/W Body, Preserve “Partial - Condition C” WORK ITEM 57: Cathodic Protection System (Bilge and Sea Chest), Renew WORK ITEM 58: Cathodic Protection System, Inspect and Maintain WORK ITEM 59: Renew Floating Deck System in Aft Berthing WORK ITEM 60: Drydocking WORK ITEM 61: Temporary Services, Provide WORK ITEM 62: Data Service, Provide WORK ITEM 63: Sea Trial Performance, Provide Support WORK ITEM 64: Firemain Valves, Overhaul Or Renew WORK ITEM 65: Bilge and Ballast Valves, Overhaul or Renew WORK ITEM 66: Ship Service Diesel Generators Isolation Mounts, Install New WORK ITEM 67: Appendages (U/W), Leak Test WORK ITEM 68: Appendages (U/W) - Internal, Preserve WORK ITEM 69: Decks - Exterior, Preserve (“Non-Skid Broadcast Grit” System) WORK ITEM 70: Deck Covering (Interior), Renew WORK ITEM 71: Fin Stabilizers, Lower Bearing Housings, Renew WORK ITEM 72: Insulation, Aft Berthing, Renew WORK ITEM 73: Insulation, Overhead, CO‟s and XO‟s Stateroom, Renew WORK ITEM 74: Joiner Bulkhead Panels, CPO Passageway, Renew WORK ITEM 75: Joiner Bulkhead Panels, Passageway and Galley, Renew WORK ITEM 76: Piping, Potable Water Brominator, Renew WORK ITEM 77: Racks and Lockers, Renew WORK ITEM 78: Stern Tubes, Renew WORK ITEM 79: Structural Closures, Renew WORK ITEM 80: Superstructure, F/O Transfer Station, Repairs WORK ITEM 81: Ventilation Ducting, CO and XO Staterooms, Electronics Room, Renew WORK ITEM 82: Sewage Holding Tank Renew Vent Pipe WORK ITEM 83: Shelving, Aft Steering, Renew iv (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
v (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:
MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::
www.gpoaccess.gov
The Government is aware of the following internet web links where contractors may procure commercial specifications:
American Welding Society (AWS): http://www.awspubs.com/index.php
ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
NFPA: http://www.nfpa.org
SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 110 WPB 074-002, Rev -, Welding Details Handbook
Coast Guard Drawing 110 WPB 085-002, Rev -, Docking Plan
Coast Guard Drawing 110 WPB 085-007, Rev D, Booklets of Genral Plans
Coast Guard Drawing 110 WPB 085-010, Rev B, Docking Plan
Coast Guard Drawing 110 WPB 114-001, Rev B, Stern Flap
Coast Guard Drawing 110 WPB 114-002, Rev A, Spray Rail Arrangement and Details
Coast Guard Drawing 110 WPB 183-002, Generator Resilient Mount Installation
Coast Guard Drawing 110 WPB 243-006, Rev C, Propulsion Shaft Details
Coast Guard Drawing 110 WPB 245-004, Rev A Propeller Details
Coast Guard Drawing 110 WPB 259-006, Rev D, MDE 8” Exhaust Flapper Valve Assembly
(w/Companion Flanges & Gaskets)
Coast Guard Drawing 110B WPB 163-002, Rev C, Auxiliary Sea Chest Details
Coast Guard Drawing 110C WPB 085-001, Rev -, Tank CAPACITY - 95% Curves
Coast Guard Drawing 110C WPB 085-002, Rev A, Docking Plan (General Location Layout)
Coast Guard Drawing 110C WPB 085-007, Rev C, Booklet of General Drawings
Coast Guard Drawing 110C WPB 111-001, Rev C, Shell Expansion
Coast Guard Drawing 110C WPB 113-001, Rev C, Inner Bottom Plating
Coast Guard Drawing 110C WPB 117-001, Rev D, TRANSV SECTIONS (FRAMES 0 THRU 4)
Coast Guard Drawing 110C WPB 121-001, Rev -, Longitudinal Bulkheads
Coast Guard Drawing 110C WPB 131-001, Rev B, Deck Construction Plan http://www.assistdocs.com/search/search_basic.cfm http://www.uscg.mil/directives/default.asp http://www.gpoaccess.gov/ http://www.awspubs.com/index.php http://www.techstreet.com/ http://www.nfpa.org/ http://shopping.netsuite.com/sspcmarketplace vi (Rev-0)
Coast Guard Drawing 110C WPB 151-005, Rev B, Superstructure Details
Coast Guard Drawing 110C WPB 151-006, Rev F, Superstruct FNDN Layout & Location Plan
Coast Guard Drawing 110C WPB 151-007, Rev D, Superstruct FNDN Detail (TITLE)
Coast Guard Drawing 110C WPB 161-001, Rev A, Main Shaft Strut Details
Coast Guard Drawing 110C WPB 161-002, Rev B, Main Shaft Strut Installation
Coast Guard Drawing 110C WPB 161-003, Rev A, Intermediate Shaft Strut Details
Coast Guard Drawing 110C WPB 161-004, Rev B, Intermediate Shaft Strut Installation
Coast Guard Drawing 110C WPB 161-005, Rev F, Stern Tube Installation Details
Coast Guard Drawing 110C WPB 163-002, Rev A; Auxiliary Sea Chest Detail
Coast Guard Drawing 110C WPB 167-002, Rev A, Manhole Details
Coast Guard Drawing 110C WPB 167-005, Rev E, Manhole and Hatch Key Plan
Coast Guard Drawing 110C WPB 243-002, Rev B, Propulsion Shafting & Details
Coast Guard Drawing 110C WPB 243-005, Rev C, Shaft Locking Details
Coast Guard Drawing 110C WPB 245-002, Rev A, Assembly of Oil Injection Equipment
Coast Guard Drawing 110C WPB 256-001, Rev E, Main Engine Sea Water Cooling System
Coast Guard Drawing 110C WPB 256-002, Rev A, Water Cooling System Arrangement & Details
Coast Guard Drawing 110C WPB 256-003, Rev A, SSDG SW Cooling
Coast Guard Drawing 110C WPB 259-001, Rev E, Main Engine Exhaust Piping System
Coast Guard Drawing 110C WPB 259-003, Rev E, MDE 18” Raw Water Discharge Exhaust Flapper
Valve Assembly
Coast Guard Drawing 110C WPB 261-001, Rev C, Fuel Oil Service Piping A&D
Coast Guard Drawing 110C WPB 501-001, Rev J, Piping System Schematics
Coast Guard Drawing 110C WPB 514-001, Rev B, Air Conditioning/Heating System Schematic
Coast Guard Drawing 110C WPB 521-001, Rev B, Firemain Piping Arrg‟t & Details
Coast Guard Drawing 110C WPB 526-001, Rev C; Scuppers & Deck Drains Piping Arrangement
Coast Guard Drawing 110C WPB 528-002, Rev-, Sewage Piping Arrangement & Details
Coast Guard Drawing 110C WPB 533-003, Rev A, Potable Water Brominator System, A & D
Coast Guard Drawing 110C WPB 541-001, Rev A, Fuel Oil Transfer Piping A&D
Coast Guard Drawing 110C WPB 558-001, Rev C, Vent, Fills and Sound Tube Details
Coast Guard Drawing 110C WPB 561-001, Rev -, Steering System Details
Coast Guard Drawing 110C WPB 561-004, Rev A, Steering System Details - Piping
Coast Guard Drawing 110C WPB 562-001, Rev G, Rudder Details (Stock & Blade Details)
Coast Guard Drawing 110C WPB 565-001, Rev D, Fin Stabilizer System
Coast Guard Drawing 110C WPB 565-002, Rev -, Fin Stabil Details - Piping
Coast Guard Drawing 110C WPB 581-002, Rev B, Anchor HDLG and Hawse Pipe Details
Coast Guard Drawing 110C WPB 601-017, Rev -, Aft Peak Layout
Coast Guard Drawing 110C WPB 601-023, Rev -, Forward Crews Quarters BHD Layout
Coast Guard Drawing 110C WPB 601-026, Rev -, Aft Crews Quarters BHD Layout
Coast Guard Drawing 110C WPB 604-001, Rev B, Door and Hatch Key Plan & Lock Out Details
Coast Guard Drawing 110C WPB 621-002, Rev A, Joiner Work Details (CPO & Crew Area)
Coast Guard Drawing 110C WPB 621-004, Rev -, JOINER WORK MAIN DECK HALLWAY
SUPERSTRUCTURE BHD DETAILS
vii (Rev-0)
Coast Guard Drawing 110C WPB 621-005, Rev B, Joiner Work Detail Galley Mess and Aft Crews
Coast Guard Drawing 110C WPB 633-001, Rev-, Cathodic Protection Plan and Details
Coast Guard Drawing 110C WPB 633-002, Rev D, Cathodic Protection Installation, Schematic, & Layout
Coast Guard Drawing 110C WPB 635-001, Rev D, Linings and Insulation Plan and Details
Coast Guard Drawing 110C WPB 643-001, Rev -, Furniture Details (Enlisted Men Quarters)
Coast Guard Drawing FL 6713-203, Rev -, CRP-V850, SST XDCR (SS505) Adapter Assembly
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, (series), Coatings and Colors Manual
Coast Guard Technical Manual (TP) 3223, May 1985, SWBS 420, Section G, Doppler Service Manual
Coast Guard Technical Publication (TP) 2924, Jun 1990, General Information Book and Operating
Manual for USCG 110 Foot Patrol Boat, Annex 1B, Propeller Renewal Procedure
Coast Guard Technical Publication (TP) 2937, Manufacturer's Instruction Book - SWBS Group(s) 558-
Coast Guard Technical Publication (TP) 3108, Manufacturer's Instruction Book - SWBS Group(s) 581-
Coast Guard Technical Publication (TP) 3246, Manufacturer's Instruction Book - SWBS Group(s) 581-
Coast Guard Technical Publication (TP) 3495, May 2002, Chapter 243, Installation Duramax Shaft Seal
System
Coast Guard Technical Publication (TP) 3906, Oct 2008, Ship's Steering Gear System
Coast Guard Technical Publication (TP) 3907, Feb 2007, SWBS 565, Ship's Fin Stabilizing System
Coast Guard Technical Publication (TP) 4655, Aug. 2007, Chapter 633-A, Cathodic Protection System
Coast Guard Technical Publication (TP)-4666, Feb 2008, Steering System
Coast Guard Technical Publication (TP) 4691, December 1985, Manufacturer‟s Instruction Book, SWBS
Group(s) 593, Section E, Sewage System
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, Jan 2009, General
Requirements
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, Jan 2009, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 3141 (SFLC Std Spec 3141), Jan 2009, Overhaul
Electrical Rotating Machines
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 5000, Jan 2009, Inspect, Repair, And Test Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), Jan 2009, Install
New Deck Covering Systems
Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), Jan 2009, Drydocking
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), Jan 2009, Provide
Temporary Services
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), Jan 2009, Temporary Hull Accesses
Coast Guard Preventive Maintenance Manual, 110 WPB PMS Manual (Series), E-Q-624 viii (Rev-0)
OTHER REFERENCES
American National Standards Institute/American Society of Mechanical Engineers (ANSI/ASME), B4.1-
1967, (reaffirmed 2009), Preferred Limits and Fits for Cylindrical Parts
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities
American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System
Components - Health Effects
American Petroleum Institute (API) Specification 9A, 2004, Specification for Wire Rope
American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and
Welding End
ASTM International (ASTM) B209, 2004, Standard Specification for Aluminum and Aluminum-Alloy
Sheet and Plate
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D 4138, 2007, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means
ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface
Profile of Blast Cleaned Steel
ASTM International (ASTM) D5363, 2003, Standard Specification for Anaerobic Single Component
Adhesives
ASTM International (ASTM) E797, 2005, Standard Practice for Measuring Thickness by Manual
Ultrasonic Pulse-Echo Contact Method
ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates
ASTM International (ASTM), D3951, Re-approved 2004, Standard Practice for Commercial Packaging
Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters
Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency
Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety
Administration, Department Of Transportation
Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting
Commercial Item Description (CID) A-A-59588, Jul 2005, Rubber Silicone
Commercial Item Descriptions (CID) A-A-59316, Nov 2003; Abrasive Materials for Blasting
Commercial Item Descriptions (CID) A-A-59323 A, 2005, Cloths, Cleaning, Low-Lint
DOD-STD-2187, Aug 1987, Chemical Cleaning of Salt Water Piping Systems
Federal Specification (Fed Spec) HH-P-151, Mar 1991, Packing; Rubber-Sheet, Cloth-Insert
Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections
Federal Specification (Fed Spec), MMM-A-121, Oct 1999, Adhesive Bonding Vulcanized Synthetic
Rubber to Steel
Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement
Furuno Operators Manual RDP-139/148/149
International Organization for Standardization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller -
Manufacturing tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50m, Inclusive
International Standard Organization (ISO) 4406, 1999, Hydraulic Fluid Power – Fluids – Method for
Coding Level of Contamination by Solid Particles ix (Rev-0)
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008 Edition, Bronze Gate, Globe, Angle and Check Valves
MIL PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut Back, Cold Application
MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-G-24716, Apr 1993, Gaskets, Metallic-Flexible Graphite, Spiral Wound
MIL-G-6032D(1), Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code #G-636
MIL-PRF-24647, Jun 2006, Paint System, Anticorrosive and Antifouling, Ship Hull
MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
MIL-S-8660C(2), Silicone Compound, NATO Code # S-736
Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA-
PRO-160, Jan 2006, Chapter 16, Cofferdams
NAVSEA Drawing 7379842, Rev A, Procedure & Welding Sequence for Non-Ballistic, Watertight &
Airtight Quick Acting or Individually Dogged Personnel Doors
NAVSEA Drawing 803-921865, Rev P; Cathodic Protection Hull Zinc Anodes
NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments Installation
Details
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) 4348, Core, 1995, Honeycomb, Aluminum Alloy, Corrosion Inhibited for Sandwich Construction 5052, 350 (177)
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) A 25463, 1999, Adhesive, Film Form, Metallic Structural Sandwich Construction
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and
Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 1999, Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 7/NACE No.4, 2007, Brush-Off Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, 2004, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 12/NACE No.5, 2007, Surface Preparation and Cleaning of Steel & Other Hard
Materials by High and Ultrahigh Pressure Water Jetting
The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel
Surfaces Prepared by Dry Abrasive Blast Cleaning x (Rev-0)
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC), June 1996, Paint Application Specification No. 2 (PA-2), Measurement of Dry Coating Thickness with Magnetic Gages
Vosper Thornycroft Technical Bulletin No. 49, Jul 1992, Procedure for Fitting New Tiller Rod Eye
Bearings to Actuators and Removing Redundant Grease Hose On BMS Island Class USCG Cutters xi (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM
DESCRIPTION
NSN/PN QTY ESTIMATED
COST
($/UNIT)
22 N **4" Diameter x 28'
Long, Aquamet-17 propulsion shaft
NSN: 2010-01-445-7940 2 ea. 8,700.00
22 N *Oil Injection
Equipment Kit
N/A 1 set 6,000.00
23 N Shaft seal assembly kit
NSN: 5330-01-497-8095 2 ea. 859.48
23 N **Shaft seal assembly
NSN: 4320-01-497-8057 2 ea. 3,111.84
23 N Emergency Shaft
Seal Inflator Kit
NSN: 5330-01-497-9866 2 ea. 175.00
24 N Main Shaft Strut
Bearing, Bronze and rubber cutlass bearing, 4" ID x 5"
OD x 16” Long
NSN: 3120-01-222-3927 2 ea. 200.00
24 N Intermediate Shaft
Strut Bearing, Bronze and rubber cutlass bearing, 4" ID x 5"
OD x 16” Long
NSN: 3120-01-222-3927 2 ea. 200.00
25 N Stern Tube Bearing, Bronze and Rubber cutlass bearing, 4" ID x 5" OD x 8”
Long
NSN: 3120-01-238-0689 2 ea. 150.00
26 Y **Propeller, LH NSN: 2010-01-222-2440 1 ea. 23,445.00
26 Y **Propeller, RH NSN: 2010-01-222-2441 1 ea. 22,800.00
27 N 8-inch flapper valve, port
NSN: 4810-01-475-8648 1 ea. 2,072.00
27 N 8-inch flapper valve, starboard
NSN: 4810-01-475-8415 1 ea. 2,072.00
27 N 18-inch flapper valve, port
NSN: 4320-01-475-8271 1 ea. 9,010.14
27 N 18-inch flapper valve, stbd
NSN: 4320-01-475-7855 1 ea. 9,549.16
27 N 18” Exhaust Gasket
Kit
NSN: 5330-01-475-8157 4 ea. 389.45
27 N 18” Exhaust Gasket
Kit
NSN: 5330-01-475-8169 4 ea. 312.52 xii (Rev-0)
27 N 8” Exhaust Gasket
Kit
NSN: 5330-01-475-8804 4 ea. 128.24
29 Y ***V850 Color Echo
Sounder
NSN: 5845-01-518-7245 1 ea. 1,423.41
30 Y ***CELZ-SRD-331
Doppler speed log
NSN: 5845-01-302-4161 1 ea. 3,255.08
32 Y **2 ½” Duplex
Strainer
4730-01-394-9731/72-42F 2 $3817.00
32 Y **4” Duplex Strainer 4730-01-173-1413/ 72-48F 2 $7088.27
32 Y **1 1/2” Duplex
Strainer
4730-01-600-9049/72-38F 1 $ 2648.00
34 Y **Rudder NSN: 2040-01-223-2674 2 ea. 25,000.00
34 N **Lower Rudder
Bearing
NSN 3120-01-477-8696 2 ea. 1,364.00
35 N Spherical Roller
Bearing
NSN: 3110-00-902-7288 2 ea. 314.80
35 N Spherical Roller
Bearing
NSN: 3120-99-806-7289 4 ea. 221.07
35 N Bolt, Trunnion, Special
NSN: 2030-99-538-1449 4 ea. 45.00
35 N Tiller Pin (Bolt) NSN: 5306-99-538-1451 4 ea. 145.44
35 N Tiller Spacer Flange
Bush
NSN: 5365-99-807-4040 4 ea. 163.73
35 N Trunnion Spacer
Flange Bush
NSN: 3120-01-396-1724 4 ea. 159.25
35 N Circlip NSN: 5365-99-902-2593 8 ea. 2.76
35 N Fin 25/32 Washer NSN: 5310-99-538-1450 4 ea. 4.44
35 N Actuator seals NSN: 5330-99-729-7570 4 ea. 128.87
35 N Fin Rod Eye
Bearings (Assy)
NSN: 3120-01-377-1940 4 ea. 1,190.95
35 N Rod Eye Lock nut NSN: 5310-01-468-7665 4 ea. 23.76
35 N Tiller Pin nylock nut NSN: 5315-01-485-3148 4 ea. 20.86
35 Y **Fin Stabilizer assembly
NSN: 2040-99-726-4768 2 ea. 19,987.00
35 N **Fin Stabilizer
Lower
Bearing/Bushing
NSN: 3120-99-726-2345 2 ea. 1,091.25
35 N Fin Stabilizer Cooler NSN: 2930-99-729-7562 2 ea. 399.59
35 N Fin Stabilizer Sealing
Kit consists of (5) pre-cut rings of Slade
3300 packing material
(DELAMAR)
NSN: 2040-01-566-3198 2 ea. 499.80
40 N **Valve, Check, Non return
NSN: 4820-01-206-4069 1 ea. 1,198.00
40 Y **Sewage Pump NSN: 4320-01-219-1442 1 ea. 13,601.00
40 N **Eductor NSN: 4320-01-262-3288 1 ea 5640.12
40 N Flex Coupling NSN: 4730-01-415-1061 1 ea 930.10 xiii (Rev-0)
58 N Shaft Ground
Assembly
NSN: 5977-01-204-9914 2 ea. 912.00
58 N **Reference
Electrode
NSN: 5977-01-203-7800 2 ea. 2,093.90
58 N **Anode Kit NSN: 5340-01-206-2354 2 ea. 3,922.00
60 Y *Transducer Cover
Plate
N/A 1 ea. 50.00
66 N ENGINE
RESILIENT
MOUNT
NSN: 5340-01-597-0654 4 ea. 170.00
66 N GENERATOR
RESILIENT
MOUNT
NSN: 2990-01-597-3399 4 ea 170.00
71 N Bearing Housing 3130-01-485-3132 2 ea 18,378.00
77 N Triple Staggered
Bunk Port
ACN: 7195-01-F12-2853 1 ea. 7,414.00
77 N Triple Staggered
Bunk Starboard
ACN: 7195-01-F12-2855 1 ea. 7,414.00
77 N Clothes Locker Port ACN: 7195-01-F12-2854 1 ea. 4,050.00
77 N Clothes Locker
Starboard
ACN: 7195-01-F12-2857 1 ea. 4,050.00
78 N Forward Bearing
Housing
NSN: 3130-01-442-2863 2 ea. 2,472.11
79 N 6 Dog, Port Light, Quick Acting, Weathertight, 26”x54”, Aluminum, Right Hand Door
NSN: 2040-01-297-2213 1 ea. $2,611.94
79 N 6 Dog, Port Light, Quick Acting, Weathertight, 26”x54”, Aluminum, Left Hand Door
NSN: 2040-01-304-6448 1 ea. $2,367.95
79 N 4 Dog, Quick Acting, Weathertight, 24”x24”, Aluminum, Raised Hatch
NSN: 2040-01-293-5642 2 ea. $2,092.06
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xiv (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000_STD, paragraph
3.2.6.5 (Inspection report particulars)):
Work
Item Title
2 Hull Plating (U/W Body), Ultrasonic Testing
15 Voids (Non-Accessible), Leak Test
18 Tanks, Air Test
19 Tanks (Potable Water), Clean and Inspect
22 Propulsion Shafting, Remove, Inspect, and Reinstall
26 Propellers; Remove, Inspect, and Reinstall
34 Rudder Assembly, Remove, Inspect and Reinstall
35 Fin Stabilizers (General), Overhaul
41 Forward Peak Compartment, Preserve
59 Renew Floating Deck System in Aft Berthing
67 Appendages (U/W), Leak Test
70 Deck Covering (Interior), Renew xv (Rev-0)
PRINCIPAL CHARACTERISTICS
PC_110C_WPB_0909
110‟ WPB (“C”-CLASS) PATROL BOAT
PHYSICAL CHARACTERISTICS
Length Overall 110' 0" or 113' if stern flap present
Length between Perpendiculars 104' 0"
Depth 10' 1/2"
Beam, Molded 21' 3"
Depth, Molded N/A
Full Load Draft 6' 5-3/4"
Height of Highest Projection 55'
Full Load Displacement 165 long tons
Anchor 150 lb Danforth with 450 ft. 4" nylon rope
Shore Tie Voltage Requirements 450VAC 400A 3PH, 60Hz ungrounded
HULL CHARACTERISTICS
Hull BS-4360, GR 43A Steel
Main Weatherdeck & Superstructure 5086 Aluminum Alloy
Frame Spacing
Frames 9-10; 24" Frames 10-13; 48"
Frames 13-16; 47" Frames 16-17; 23"
Frames 17-22; 47" Frames 22-28; 49"
Frames 28-33; 47" Frames 33-36; 24"
Bulkheads Seven watertight transverse
Fin Stabilizers Frame 22 xvi (Rev-0)
110‟ WPB (“C”-CLASS) PATROL BOAT
MACHINERY CHARACTERISTICS
Main Propulsion Two Caterpillar 3516 DITA V-16 diesel; 2730 BHP each @ 1910 RPM
Reduction Gears Two ZF Model BW 755 reversible reduction gearboxes, 2.330:1 ratio
Number of Propellers 2
Number of Blades 5
Diameter of Propeller 49.6"
Pitch 61.4"
RPM N/A
Shaft Monel Alloy K500, or AQUAMET 17
Shaft Diameter 4"
Shaft Seal Shaft Packing
Shaft Bearings Stern tube, Rubber Cutless or Thordon
Rudders Twin underslung type, 5 sq ft each
Ship's Service Generators Two Caterpillar Type 3304BT diesel; 99KW, 460V, 60Hz, 3-phase, 3-wire @ 1800 RPM
TANK CAPACITIES
Fuel Oil (95%) 9,306 gal
Fresh Water (100%) 940 gal
Lubricating Oil (95%) 109 gal
1 (Rev-0)
00000_PWB_0312_FLT
REC_0000_FLT_ Commercial Project @ Contractor‟ Facility (0212)
General Requirements
1. SCOPE
1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.
2. REFERENCES
COAST GUARD DRAWINGS
None.
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and
Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
OTHER REFERENCES
ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface
Profile of Blast Cleaned Steel
Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting
Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement
MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning
The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel
Surfaces Prepared by Dry Abrasive Blast Cleaning
Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters
Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency
Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety
Administration, Department Of Transportation
2 (Rev-0)
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.4 HW disposal. The Contractor is considered as the generator of all contract-generated hazardous wastes and shall use its facility‟s EPA generator ID number for management, transportation, and disposal of said hazardous wastes. Ensure the following:
3.4.1 Contractor‟s hazardous waste handlers shall comply with applicable requirements of 40 CFR 262.
3.4.2 All contract generated hazardous wastes shall be packaged in 49 CFR-compliant containers.
3.4.3 The designated wastes shall be disposed of at a state or Federally-approved and permitted HW TSDF.
3.4.4 Name of destination TSDF shall be submitted to the KO at the Arrival Conference.
3.5 Interim changes and additions to SFLC Std Spec 0000. The Contractor shall be aware of the following interim changes and additions to the 2009 Edition of SFLC Std Spec 0000:
3.5.1 Acronyms and term definitions – paragraph 1.3 (Acronym and term definitions).
3.5.1.1 The term “COTR” has been replaced with “COR”, which is defined as follows:
“COR”: Contracting Officer‟s Representative – the person delegated by the KO as the on-scene representative for matters concerning performance of work; this includes correctness, timeliness, and quality of the Contractor‟s work. Normally, the CO/OINC is designated the COR.”
3.5.1.2 Definition addition for the term “Ungrounded, as follows:
“Ungrounded”: A power system where all of the current-carrying conductors and windings
(including any neutral connection) are insulated from ground. In contrast, a generator or transformer in which at least one conductor or point (usually the midpoint or corner of a delta winding or the common center of a wye winding) is intentionally grounded, either solidly or through an impedance, is considered grounded. Note that the distinction concerns only current-carrying conductors; for both ungrounded and grounded power systems, non-current carrying metal parts and equipment grounding conductors are always bonded to earth ground for personnel safety. At non-Governmental facilities, dockside wye connected transformer secondary windings are almost always grounded and are generally not suitable for connection to a Coast Guard cutter without a separate Contractor furnished
3 (Rev-0) isolation transformer.”
3.5.2 Changes to paragraph 3.2.4 2.3 (QP-1 Inspector or Tech Rep duties).
“3.2.4.2.3 QP 1 Inspector or Tech Rep duties.
3.2.4.2.3.1 The Coating Inspector for the “QP 1-certified” Contractor or the Contractor-provided
NACE-certified Tech Rep shall remain on site, to perform the following duties, as applicable, for each work item that involves preservation of “critical-coated surfaces”:
Verify inspection instrument calibration.
Verify and approve the suitability of ambient conditions before surface preparation is begun, and before each coat of paint is applied.
Verify all aspects of surface preparation – including, but not limited to:
o Cleanliness of compressed air.
o Adequacy of solvent cleaning.
o Proper handling of blast media.
o Actual surface preparation procedure.
Inspect and approve final surface preparation, before application of primer coat.
Supervise and approve coating system preparation and application procedures, including but not limited to: mixing and thinning, stripe coating application, spray techniques, and film thickness measurements and recordings.
Determine when applied coats have sufficiently cured for overcoating, or for system service resumption (see paragraph A2.1.18 (Critical drying time requirements)).
Complete and sign the quality assurance (QA) inspection forms (see QA-1 thru QA-5), provided in Appendix A (Requirements for Preservation of Ship Structures) of this document.
Submit all completed QA inspection forms to the COR (through the Contractor), upon completion of work.
3.2.4.2.3.2 The Contractor shall ensure the NACE Inspector is formally informed - via suitable subcontract documentation- and is willing and able to perform of all duties listed above. Submit documentation of this contract and assumption of duties to the KO at the Arrival Conference.”
3.5.3 Changes to contents of paragraph 3.2.5 (Planning document).
“3.2.5 Planning document. The Contractor shall generate a legible Planning Document (PD) with the following characteristics:
Graphical in format (see Fig. 1 (Sample Planning Document Submittal)).
Shows overall period of performance for each CLIN, with start and stop dates of major sub-tasks.
Contains due dates for Critical Inspection Reports (CIR) and any events requiring Coast
Guard Inspector presence.
Identifies all work item time periods that require OEM Tech Rep assistance.
Identifies the “critical paths” for the project.
Shows calculations for the “float” along the critical paths and labels the critical paths with the number of delay days the critical paths can absorb without affecting the final delivery
4 (Rev-0) date.
NOTE
Float is the number of days that the critical paths can be delayed without affecting the final delivery date.
3.2.5.1 Ensure that the PD also includes the names, contact information, and written commitment from all
Tech Reps required by the Contract - indicating they are available for work during the proposed time period.
3.2.5.2 Submit a preliminary electronic copy of the PD to the COR - for Government review - no later than one week after contract award.
3.2.5.3 Submit 3 copies of the PD to the COR, 15 days prior to the start of the performance period, and at all weekly Progress Meetings.
NOTE
A separate document, specifically prepared for the Government is not desired or required. A copy or summary of the Contractor‟s internal scheduling document is preferred.
FIG. 1 - SAMPLE PLANNING DOCUMENT SUBMITTAL
3.2.5.4 When the critical path extends beyond or encroaches upon the final delivery date, provide a resource constraint and scheduling evaluation of the critical path before any request for extension will be entertained. Submit the resource constraint and scheduling evaluation via a CFR.
NOTE
The intent of the resource constraint and scheduling evaluation is to identify the resources necessary to
„crash‟ the critical path or make adjustments to the production schedule to meet the delivery date in lieu of a project extension.”
3.5.4 Additional sub-paragraphs to paragraph to 3.2.6.5 (Inspection report particulars).
“3.2.6.5.3 CFR tracking system. The Contractor shall create and maintain a CFR tracking system for the project. At a minimum, ensure that the CFR tracking system shall list all required reports, broken down by the following:
Work item and paragraph number.
Due dates.
Submission dates.
CFR/CIR submission number.
5 (Rev-0)
3.2.6.5.3.1 Be aware that the COR will respond via the CFR reply as to whether the CIR/CFR „fully‟ or
„partially‟ satisfied the inspection and reporting requirements in the associated work item.
3.2.6.5.3.2 When submitting a CFR, ensure that the applicable work item and paragraph number for which the inspection report is being submitted is included on the CFR.
3.2.6.5.3.3 Submit a copy of the CFR tracking sheet to the COR at the arrival conference.
3.2.6.5.3.4 At a minimum the Contractor shall update and submit a copy of the CFR tracking sheet to the
COR the day before each weekly progress meeting. At the required CFR due date, submit the CFR tracking sheet to the COR via a CFR for review and formal archiving with the project records.”
3.5.5 Changes to contents of paragraph 3.2.11.1 (Sanitary facilities for vessel-personnel due to disruption of grey water and sewage systems).
“3.2.11.1 (Sanitary facilities for vessel-personnel due to disruption of grey water and sewage systems.
When the shipboard grey water and sewage systems are disrupted due to repairs required by contract work, the Contractor shall provide vessel-personnel with a sanitary facility, within a five minute walking distance from the vessel, to include the amenities listed in Table II (Sanitary Facility Amenities). Ensure the following:
Shower stalls are equipped with privacy screens.
Sinks are provided with fresh hot and cold water.
Electrical convenience GFI receptacles, in accordance with NFPA 70, National Electric
Code (NEC), are located in vicinity of sinks.
Toilets have doors or privacy dividers.
Lockers are capable of being locked.”
3.5.6 Changes to contents of paragraph 3.3.2.1.1 (Water depth).
“3.3.2.1.1 Water depth. Ensure that water depth is sufficient at the pier to allow the vessel's lowest underwater appendage to clear the bottom by at least two feet at:
Ordinary low water mark on non-tidal rivers.
At all tide conditions predicted during the availability for tidal rivers and other navigable waterways (Bay, Lake, etc.).”
3.5.7 Electrical compliance planning.
“3.3.14 Electrical compliance planning. For cutter availabilities, the Contractor shall submit to the KO the following electrical compliance planning documentation during the pre-award phase of the contract.
3.3.14 1 Shore power. When ungrounded shore power is to be provided per SFLC Std Spec 8635, provide a one line electrical diagram showing how such power will be supplied, including the winding and grounding configuration and rating of any generator or isolation transformer. For drydock availabilities, separate diagrams should be submitted for waterborne and non-waterborne periods.
3.3.14.2 Arc welding. When electric arc welding is to be performed per SFLC Std Spec 0740 while the vessel is waterborne, provide a diagram showing the general proposed location of each welding machine, the grounding configuration of each machine, and the return current conductor size and length. For drydock availabilities, separate diagrams may be necessary for waterborne and non-waterborne periods.
6 (Rev-0)
3.3.14.3 Hull bonding and lightning protection. For work periods while the vessel is not waterborne, provide a diagram showing how the hull grounding straps required by SFLC Std Spec 8635 will be sized
(length and gauge) and connected.
3.3.14.4 Tool and equipment power. Provide a diagram showing how Contractor tool and equipment power will be supplied and distributed for dockside and shipboard use in accordance with SFLC Std Spec
0450. For drydock availabilities, separate diagrams should be submitted for waterborne and non-waterborne periods.”
3.5.8 Changes to paragraph to A2.1.1.3 (Document submission).
A1.1 “A2.1.1.3 Document submission.
A1.2 A2.1.1.3.1 For all work involving preservation of “critical-coated surfaces”, ensure the following is submitted to the COR at the Arrival Conference, for each coating system intended to be applied:
Coating system manufacturer‟s name.
Product data sheets.
MSDS.
COC.
A1.3 A2.1.1.3.2 Documentation shall be broken out by work item, to also include the following information:
Brand name.
Color.
Intended mil thickness.
Time between coats.
Intended final cure time prior to immersion or full duty rating, as applicable.
A1.4 A2.1.1.3.3 For work involving preservation of surfaces not designated as “critical-coated surfaces”, submit all product data sheets, MSDS, and COC to the COR, prior to commencement of work.”
3.5.9 Requirements changes to paragraphs A2.1.5 (Tenting) and A2.1.6 (Ambient condition control).
“A2.1.5 Tenting and ambient condition control – “for critical-coated surfaces”.
A2.1.5.1 When the ambient condition parameters necessary for full paint cure or to meet environmental conditions, as required in paragraph A.2.1.4 (Ambient condition parameters), cannot be met for successful application and curing of “critical-coated” surface coating systems, the Contractor shall provide the following, at no additional cost to the Government:
Suitable tenting, as applicable, for exterior surface preservation.
Suitable ambient condition control equipment, which may include, but not be limited to the below-listed, to create and maintain ambient conditions recommended by the coating system‟s manufacturer, and facilitate successful coating application and curing.
o AC system.
o Heaters.
o Blowers.
7 (Rev-0) o Dehumidifiers.
A2.1.5.2 Submit an ambient condition control plan to the COR within 24 hours prior to initiating ambient condition control process
NOTE
The Contractor is expected to be aware of the advent of environmental conditions that are adverse to preservation of critical-coated surfaces and include all costs in
3.5.10 Pre-surface preparation requirements – additional to paragraph A2.1.7 (Pre-surface preparation requirements).
“A2.1.7.4 Coupon test. In order to ensure production of required surface profile, the Contractor shall accomplish the following, tasks, whenever abrasive-blasting is required in a work item:
A2.1.7.4.1 Conduct a performance test on all abrasive blasting operations on a Contractor- provided test coupon, prior to starting abrasive blasting operations on the vessel. Use a new metal plate, of the same metal type and material properties as the area to be blasted, steel or aluminum plate, as applicable. For steel plates, the new plate shall have the mill scale intact and the plate will be in a Rust Grade "A" condition, per the SSPC-VIS 1 visual standard cards. No existing anchor profile, other than the surface irregularities from the manufacturing process are permitted on the test coupon. The test coupon shall be flat, with nothing welded to the side used for the anchor profile test, no thinner than a 1/8-inch plate and measuring no smaller than 1-foot by 1-foot. The test coupon shall be affixed so as to not permit excessive movement during the performance test.
CAUTION!
Do not affix the coupon to the vessel nor shall the blast media from the performance test strike the vessel during the test
A2.1.7.4.2 Ensure that the abrasive blasting operation test on the test coupon is with the very same setup that will be used to blast the vessel. The setup shall include, but not be limited to:
The abrasive media to be used (material and media size).
Nozzle size and type (straight bore, high velocity nozzle, angle nozzle...).
Delivery rate and pressure settings.
A2.1.7.4.3 Blast an one-square foot area on one side of the test coupon to the abrasive surface preparation standard specified in the applicable work item and perform an anchor profile test of the blasted surface in accordance with ASTM D4417, method A or C. Notify the COR in advance of the abrasive blasting operation test, to permit the witnessing of the test by appropriate Coast Guard personnel. Submit a CFR documenting the results of the abrasive blasting operation test. CFR shall include at a minimum, the following:
Area of the vessel that the verified setup will be used to abrasive blast with.
The abrasive media used.
The nozzle size and type.
The delivery rate and pressure.
The test coupon starting properties (material type and surface conditions).
The resultant anchor profile readings from the test.
8 (Rev-0)
NOTES
1. ULTRA HIGH PRESSURE WATER JETTING DOES NOT CREATE AN ANCHOR PROFILE
AND IS EXEMPT FROM THE ANCHOR PROFILE TEST COUPON CHECK.
2. THE REVERSE SIDE OF THE TEST COUPON MAY BE USED FOR THE SUBSEQUENT
TEST, PROVIDED THAT THE CONDITIONS IN PARAGRAPH A2.1.7.4 (COUPON TEST) ARE
MET.
A2.1.7.4.3 Repeat the abrasive blasting operation test in the following instances:
The setup, as defined in paragraph A2.1.7.4.1 is changed.
The resultant anchor profile readings observed on the vessel are outside the specified anchor profile range.
Media is changed from MIL-A-22262 to CID A-A-59316 or vice versa.
The supplier of the abrasive blasting media changes, regardless if the new source for the media has the same specifications.
When Directed by the COR.
NOTE
A performance test of the abrasive blasting operations on a test coupon and measuring the anchor profile prior to performing the operation on the cutter, in order to confirmed that the anchor profile range that the operation is going to produce. An abrasive blasting operation test is prudent, as there are enough variables in the equipment setup and media properties that the resulting anchor profiles from one contractor to the next vary significantly.
3.5.11 Post-surface preparation requirements - additional to paragraph A2.1.8 (Post-surface preparation requirements).
A2.1.8.8 Substrate profile measurements - during and post-surface preparation. In order to ensure production of required surface profile, the Contractor shall accomplish the following tasks, whenever abrasive-blasting is required in a work item for complete preservation of a ”critical-coated” surface:
A2.1.8.8.1 During surface preparation by abrasive blasting or waterjetting operations, spot check the existing anchor profile per 500-square feet, in order to 'project' the need to manage the excessive anchor inspect for both excessive and insufficient anchor profiles . When the Contractor elects to prepare a substrate by waterjetting, the Contractor shall inspect the substrate for areas of insufficient or excessive anchor profile, both visually and in accordance with ASTM D4417, Method A or C. Submit a CFR detailing the location, square footage, measured anchor profiles, and the anchor profile range required for the applicable coating system.
A2.1.8.8 2 Post completion of surface preparation, measure the profile of the resultant bare surfaces, in accordance with ASTM D4417, Method A or C.”
3.5.12 Caution verbiages – additional to paragraph A2.1.18 (Critical drying and cure time requirements).
9 (Rev-0)
“CAUTIONS!
1. Hard cure times or cure time prior to immersion for any “critical coated system” shall be met as published on the Product Data Sheets available online. No early undocking or relaxation of these published requirements is permitted without prior approval from the KO. Coating system manufacturer‟s Sales or Technical
Representatives may not relax these requirements. Painting and curing of all tank coating systems (except for tanks that are inboard and not touching the skin of the vessel (side and/or bottom) shall occur while the cutter is out of the water.
2. CAPAC systems shall not be energized until full cure of all underwater paint systems has occurred.”
3.5.13 Preservation Plan.
“A2.2 Preservation Plan (PP). The contractor shall submit a PP to the COR at the arrival conference, to allow for review of all work items pertaining to the preservation of the vessel. At a minimum, PP shall include the following and be broken down by work item:
Coatings to be applied – listed by manufacturer and product identification numbers.
Target wet and dry film thickness values.
Authorized reducers/solvents - including maximum percent by volume for reducers/solvents.
Colors by FED-STD-595 color number.
Application method for each coat.
Application pressure and nozzle size requirements listed on the manufacturer‟s product data sheet(s).
Minimum recoat windows for applying subsequent coats, maximum recoat windows to apply subsequent coats, adjusted for anticipated temperatures.
Any special instructions or environmental limits listed by the coating manufacturer.
Intended final cure times prior to immersion or full duty rating (as applicable).”
3.5.14 Changes to paragraph B2.2.3.3.1.
“B2.2.3.3.1 Do not release lead or lead-contaminated materials into the environment.