270 WMEC_Sewage controller DS_JMS_12R0.pdf
PDF 294 KB Posted
- Solicitation number
- HSCG80-12-Q-P45116
About this file
USCGC 270 WMEC CUTTERS -SPECIFICATION FOR DOCKSIDE REPAIRS 270 WMEC SEWAGE CONTROLLER UPGRADE REV. 0 DATED 30 SEPTEMBER 2011
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation QP45116.doc | DOC document | |
| Past Perf Questionaire 02-0607.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC 270 WMEC CUTTERS
SPECIFICATION FOR DOCKSIDE REPAIRS
270 WMEC SEWAGE CONTROLLER UPGRADE
2012 - 2014
Developed By: Joanna M Skaredoff
(Rev-0, 30 September 2011)
USCGC 270 WMEC SEWAGE CONTROLLER UPGRADE DOCKSIDE 2012-2014
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ....................................................................................................................................... iii Consolidated List of References ................................................................................................................ iv Consolidated List of Government-furnished Property ............................................................................... vi Consolidated List of Critical Inspection Items ......................................................................................... vii Principal Characteristics .......................................................................................................................... viii General Requirements WORK ITEM 1: Sewage Control System, Upgrade WORK ITEM 2: Sewage Holding Tanks, Clean and Inspect (A-Class) WORK ITEM 3: Sewage Holding Tanks, Clean and Inspect (B-Class) WORK ITEM 4: Grey Water Holding Tanks, Clean and Inspect (A-Class) WORK ITEM 5: Grey Water Holding Tanks, Clean and Inspect (B-Class) WORK ITEM 6: Sewage System Valves, Renew iii (Rev-0)
Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-0)
Consolidated List of References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free or charge. Other Government documents may be accessed – free of charge – as follows:
• MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
• Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
• Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::
www.gpoaccess.gov
The Government is aware of the following internet web links where contractors may procure commercial specifications:
• American Welding Society (AWS): http://www.awspubs.com/index.php
• ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
• NFPA: http://www.nfpa.org
• SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 901 WMEC-320-035 Rev T, As-Built Electrical One-Line Diagram Coast Guard Drawing 901 WMEC-320-073, Rev -, Power System Mods Incidental to Sewage Control Panels Replacement Coast Guard Drawing 901 WMEC 593-003, Rev G, Sewage Xfr Sy Diag (for A Class vessels) Coast Guard Drawing 901 WMEC 593-004, Rev H, Sewage Transfer System A&D (for A Class vessels) Coast Guard Drawing 901 WMEC 593-005, Rev H, Sewage Vacuum System Diagram Coast Guard Drawing 901 WMEC 593-006, Rev J, Sewage Vacuum System Below Main Deck Coast Guard Drawing 901 WMEC 593-007, Rev F, Sewage Vacuum System, Main Deck and Above – A&D Coast Guard Drawing 905 WMEC-320-014, Rev M, Electrical One-Line Diagram Coast Guard Drawing 905 WMEC-320-054, Rev -, Power System Mods Incidental to Sewage Control Panels Replacement Coast Guard Drawing 905 WMEC 593-001, Rev C, Vacuum Flush Collection System Electrical Schematic Diagram Coast Guard Drawing 905 WMEC 593-002, Rev A, Vacuum Sewage System Comp Installation A&D Coast Guard Drawing 905 WMEC 593-003, Rev D, Sewage Transfer System Diagram Coast Guard Drawing 905 WMEC 593-004, Rev D, Sewage Transfer System A&D Coast Guard Drawing 905 WMEC 593-005, Rev B, Sewage Vacuum System Diagram Coast Guard Drawing 905 WMEC 593-006, Rev F, Sewage Vacuum System Below Main Deck Coast Guard Drawing 905 WMEC 593-007, Rev D, Sewage Vacuum System, Main Deck and Above – A&D v (Rev-0)
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and Color Manual Coast Guard Technical Publication (TP) 2723, Jun 2007, Manufacturer’s Instruction Book—SWBS Group(s) 593, Section C Coast Guard Technical Publication (TP) 2839, Jun 2007, Manufacturer’s Instruction Book—SWBS Group(s) 588-593, Sections A and B Coast Guard Technical Publication (TP) 4645, Jul 2011, Manufacturer’s Instruction Book—SWBS Group(s) 593, Section A Gems Sensors Form 143, Warrick Series 3S Fitting Installation and Operation Bulletin.
NAVSEA S9AA0-AB-GOS-010/GSO, Nov 2004, General Specifications for Ships Overhaul of Surface Ships
- Section 305, Electrical and Electronic Designating and Marking Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
OTHER REFERENCES
American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and Welding End ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008 Edition, Bronze Gate, Globe, Angle and Check Valves MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning MIL-DTL-24643C, Oct 2009, Cables, Electric, Low Smoke Halogen-Free, for Shipboard Use, Specification for MIL-STD-2003A, Sept 2009, Electric Plant Installation Standard Methods for Surface Ships and Submarines MIL-STD-1310 (H), Sept 2009, Shipboard Bonding, Grounding and Other Techniques for Electromagnetic Compatibility, Electromagnetic Pulse Mitigation, and Safety The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning vi (Rev-0)
Consolidated List of Government-furnished Property The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
1 N Vacuum sewage control panel PN: TBD 1 ea. 20,000.00
1 N Sewage holding tank control panel
PN: TBD 1 ea. 13,000.00
1 N Fwd grey water control panel
PN: TBD 1 ea. 10,000.00
1 N Aft grey water control panel
PN: TBD 1 ea. 12,500.00
1 N Gems sewage holding tank sonic level sensors
PN: 3S5A44 1 ea. 340.00
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter vii (Rev-0)
Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000_STD, paragraph
3.2.6.5 (Inspection report particulars)):
Work Item Title
This section is not applicable to this package.
viii (Rev-0)
Principal Characteristics
PC_270A_WMEC_0909
270' WMEC (A Class)
PHYSICAL CHARACTERISTICS
Length Overall 270' 0" Depth 33' 3" Maximum Beam 37' 9-3/8" Frame Spacing 1' 0" Full Load Draft 13.85' Full Load Displacement 1825.64 long tons Shore Tie Voltage Requirements 450 vac, 400A, 3 phase cables
MACHINERY CHARACTERISTICS
Number of Propellers 2 Number of Blades 4 Diameter of Propeller 9' Pitch Controllable
RPM 260
Shaft Diameter 10.55" at exit of hull
PC_270B_WMEC_0909
270' WMEC (B Class)
PHYSICAL CHARACTERISTICS
Length Overall 270' 0" Depth 33' 3" Maximum Beam 38' 5/8" Frame Spacing 1' 0" Full Load Draft 13.85' Full Load Displacement 1825.64 long tons Shore Tie Voltage Requirements 450 vac, 400A, 3 phase cables
MACHINERY CHARACTERISTICS
Number of Propellers 2
Number of Blades 4
Diameter of Propeller 9' Pitch Controllable
RPM 260
Shaft Diameter 10.55" at exit of hull
1 (Rev-0)
00000_PWB_0111_FLT
REC_0000_FLT_ Commercial Project @ CG Facility (0110)
General Requirements
1. SCOPE
1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.
2. REFERENCES
COAST GUARD DRAWINGS
None.
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and
Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General
Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
OTHER REFERENCES
ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface
Profile of Blast Cleaned Steel Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety
Administration, Department Of Transportation MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel
Surfaces Prepared by Dry Abrasive Blast Cleaning
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
2 (Rev-0)
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire extinguishers. The Contractor shall provide portable fire extinguishers.
3.3 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.4 HW disposal. The Contractor shall be responsible for all hazardous wastes generated by work under this contract. Label and package all hazard wastes in 49 CFR-approved containers, and in accordance with all other applicable Federal, state, and local laws and regulations. In addition, comply with applicable parts of 40 CFR 262, applicable to handling of hazardous wastes.
3.4.1 Along with the Government, the Contractor shall be contractually considered the co-generator of all hazardous wastes; be aware that the Government will make available its facility’s EPA Generator Identification (ID) Number for manifesting of hazardous wastes.
3.4.2 The Contractor shall identify, arrange, and be responsible for the turnover of all hazardous wastes, within the confines of the Coast Guard shore facility, to the facility’s HM/HW Coordinator. Notify the ship’s HW Coordinator prior to any transfers of HW from ship to shore.
3.4.3 The Contractor shall prepare a manifest of hazardous waste to be reviewed and signed by the HM/HW Coordinator. Contact the HM/HW Coordinator for turnover of any hazardous waste; in addition, notify the COTR 24 hours prior to any waste removals, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.4.4 The Contractor shall be aware of the following:
3.4.4.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COTR or KO-approval.
3.4.4.3 Local environmental regulations at the Government facilities may be more stringent than in many jurisdictions. As with all environmental regulations, it is the Contractor's responsibility to research, prepare for, and comply with, the local and state regulations.
3.4.4.4 Coast Guard facilities do not have Facilities Response Plans (see 33 CFR 154 Subpart F). It is the Contractor’s responsibility to furnish the Facility Response Plan (FRP) when required for over-the-water liquids transfers to and from vessels. This requirement is applicable to transfers to/from vessels with an oil/fuel capacity of 250 barrels or more.
3.5 Pre-surface preparation test coupon. In order to ensure production of required surface profile, the Contractor shall accomplish the following, tasks, whenever abrasive-blasting is required in a work item that is deemed a ”critical-coated’ surfaces:
3.5.1 Coupon material and test set-up particulars.
3.5.1.1 Conduct a performance test on all abrasive blasting operations on a Contractor- provided test coupon, prior to starting abrasive blasting operations on the vessel. Ensure the following:
3 (Rev-0)
• The coupon shall be a new metal plate, of the same metal type and material properties as the vessel area to be blasted - steel or aluminum plate, as applicable, and shall have no existing anchor profile - other than the surface irregularities from the manufacturing process.
• The test coupon shall be flat, with nothing welded to the side used for the anchor profile test, no thinner than a 1/8-inch plate and measuring no smaller than 1-foot by 1-foot.
• For steel substrates, the coupon shall have the mill scale intact, and be in a Rust Grade "A" condition, in accordance with SSPC-VIS 1.
• The test coupon shall be affixed so as to not permit excessive movement during the performance test, but shall not be affixed to the vessel.
3.5.1.2 Ensure that the abrasive-blasting operation for the test coupon is conducted with the identical setup and parameters that will be used blasting the designated vessel surfaces – including, but not limited to:
• The abrasive media type and media size selected to achieve the anchor profile range, as specified in the applicable work items.
• Nozzle size and type (straight bore, high velocity nozzle, angle nozzle...).
• Delivery rate and pressure settings.
3.5.1.3 Blast a one-square foot area on one side of the test coupon to the abrasive surface preparation standard specified in the work item, and perform an anchor profile test of the blasted surface in accordance with ASTM D4417, Method B or C. Notify the COTR in advance of the abrasive blasting operation test, to permit the witnessing of the test by the COTR. Submit a CFR documenting the results of the abrasive blasting operation test. The CFR shall include at a minimum, the following:
• Area of the vessel for which the verified setup will be used to abrasive blast.
• The selected abrasive media type and size.
• The nozzle size and type.
• The delivery rate and pressure.
• The test coupon starting properties (material type and surface conditions).
• The resultant anchor profile readings from the test (a minimum of 3 locations, separated by a minimum of
2 inches shall be recorded).
NOTES
1. A performance test of the abrasive blasting operations on a test coupon and measuring the resultant anchor profile prior to performing the abrasive blasting operation on the cutter is required. The test coupon will be used to evaluate the anchor profile produced by the equipment setup and selected abrasive media.
2. The reverse side of the test coupon may be used for the subsequent test, provided that the conditions in paragraph 3.5.1 (Coupon material and test set-up particulars) are met.
3. Ultra high pressure water jetting does not create an anchor profile and is exempt from the anchor profile test coupon check.
3.5.1.4 Repeat the abrasive blasting operation test in the following instances:
• The equipment setup, that was evaluated during the test coupon abrasive blasting performance test in paragraph 3.5.1 (Coupon material and test set-up particulars), has changed.
4 (Rev-0)
• The resultant anchor profile readings observed on the vessel are outside the specified anchor profile range.
• Media is changed from MIL-A-22262 to CID A-A-59316 or vice versa.
• The supplier of the abrasive blasting media changes, regardless if the new source for the media has the same specifications.
• When Directed by the COTR.
CAUTION!
Ensure that blast media from the performance test does not strike the vessel during the test.
3.6 Interim changes to SFLC Std Spec 0000. The Contractor shall be aware of the fact that the requirements of paragraph 3.3.2.1.1 (Water depth) have been revised to read as follows:
“3.3.2.1.1 Water depth. Ensure that water depth is sufficient at the pier to allow the vessel's lowest underwater appendage to clear the bottom by at least two feet at:
• Ordinary low water mark on non-tidal rivers.
• At all tide conditions predicted during the availability for tidal rivers and other navigable waterways (Bay, Lake, etc.).”
4. NOTES
4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may be accessed at the following URL address: http://www.uscg.mil/directives/cim.asp
4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 0000 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
5 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: _______________________________ Area Being Preserved: ___________________________________
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10…).
Verify surface anchor profile using ASTM D4417-Methods B or C against COMDTINST M10360.3. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000 sqft area (maximum threshold: 70 microsiemens/cm ,for non-submerged surfaces and 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application:_________/_________; Return to service or removal from environment controls: _______/_______
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________
6 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________
(Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat)
DATE &
TIME
ENTER ACTIVITY
(Surface preparation, primer coat, barrier coat, top coat, etc…)
LOCATION
TEMPERATURE
% REL.
HUMIDITY
SIGNATURE
OF
INSPECTOR DEW
POINT SURFACE AMBIENT
ΔT
| DP - Surface
Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________
7 (Rev-0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________ Location of Surface Profile Measurements: __________________________________________________________________
SURFACE PREPARATION METHOD
PROFILE ACHIEVED
(mils) Min Max Mean
SSPC-SP-10/NACE No. 2 SSPC-SP-12/NACE No. 5
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________ Place Surface Profile Replica Tapes In The Spaces Provided Below, To Serve As Permanent QA record. Maintain separate log for each area/location. When an Area Is Divided Into Separate Sections, Maintain A Separate Log for Each Section.
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________ Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________
8 (Rev-0)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________ Location of Surface Profile Measurements: __________________________________________________________________
SURFACE PREPARATION METHOD
PROFILE ACHIEVED
(mils) Min Max Mean
SSPC-SP-10/NACE No. 2 SSPC-SP-12/NACE No. 5
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________ Record Measurements Taken In The Spaces Provided Below, To Serve As Permanent QA record. Maintain separate log for each area/location. When an Area Is Divided Into Separate Sections, Maintain A Separate Log for Each Section.
Reading: __________ mils __________ mils __________ mils __________ mils __________ mils
Reading: __________ mils __________ mils __________ mils __________ mils __________ mils
Reading: __________ mils __________ mils __________ mils __________ mils __________ mils
Reading: __________ mils __________ mils __________ mils __________ mils __________ mils
Reading: __________ mils __________ mils __________ mils __________ mils __________ mils
Reading: __________ mils __________ mils __________ mils __________ mils __________ mils
Reading: __________ mils __________ mils __________ mils __________ mils __________ mils
Reading: __________ mils __________ mils __________ mils __________ mils __________ mils
Reading: __________ mils __________ mils __________ mils __________ mils __________ mils
Reading: __________ mils __________ mils __________ mils __________ mils __________ mils
Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings:
By Column: __________ mils __________ mils __________ mils __________ mils __________ mils
Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________
9 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________
Location of Work (including frame numbers): _______________________________________ Area (square feet): ____________
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15
DATE TEST LOCATIONS CONDUCTIVITY
(microsiemens/cm)
Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________
10 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence) Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________
Coating Manufacturer: ___________________Product Name: _______________________Batch Number: ____________ Induction Time: _______________________________________________________________ Coating System Sequence (Indicate Whether: Primer, Touch-Up Primer, Barrier Coat, 3rd Coat…): _______________________
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2
SPOT 1 2 3 4 5 AVERAGE
VALUE
*BASE METAL
READING (BMR)
*Required, If Magnetic Pull-Of (Type I/Banana) Gauge Is Used.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation 3 Before
Adjustments After Adjustments
Avg.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation 3 Before
Adjustments After Adjustments
Avg.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation 3 Before
Adjustments After Adjustments
Avg.
Application Method (Airless, Conventional Spray, Rolled):____________________ Average DFT: __________________________________________________________
Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________
11 (Rev-0)
EC_TM3020_59311_JMS_0911_270
WORK ITEM 1: Sewage Control System, Upgrade
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to upgrade the sewage system control panels, located in the Aux Machinery Space #1 2-82-0-E, Aux Machinery Space #2 3-82-0-E and Engine Rm. 3- 103-0-E, and the CHT TLI, located in Aux Machinery Space #2.
1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
N Vacuum sewage control panel PN: TBD 1 ea. 20,000.00
N Sewage holding tank control panel
PN: TBD 1 ea. 13,000.00
N Fwd grey water control panel
PN: TBD 1 ea. 10,000.00
N Aft grey water control panel PN: TBD 1 ea. 12,500.00 N Gems sewage holding tank sonic level sensors PN: 3S5A44 1 ea. 340.00
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 901 WMEC-320-035 Rev T, As-Built Electrical One-Line Diagram (for A Class vessels) Coast Guard Drawing 901 WMEC-320-073, Rev -, Power System Mods Incidental to Sewage Control
Panels Replacement (for A Class vessels) Coast Guard Drawing 905 WMEC-320-014, Rev M, Electrical One-Line Diagram (for B Class vessels) Coast Guard Drawing 905 WMEC-320-054, Rev -, Power System Mods Incidental to Sewage Control
Panels Replacement (for B Class vessels)
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Coast Guard Technical Publication (TP) 2723, Jun 2007, Manufacturer’s Instruction Book—SWBS
Group(s) 593, Section C Coast Guard Technical Publication (TP) 2839, Jun 2007, Manufacturer’s Instruction Book—SWBS
Group(s) 588-593, Sections A and B Coast Guard Technical Publication (TP) 4645, Jul 2011, Manufacturer’s Instruction Book—SWBS
Group(s) 593, Section A
12 (Rev-0)
Gems Sensors Form 143, Warrick Series 3S Fitting Installation and Operation Bulletin NAVSEA S9AA0-AB-GOS-010/GSO, Nov 2004, General Specifications for Ships Overhaul of Surface
Ships - Section 305, Electrical and Electronic Designating and Marking Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General
Requirements
OTHER REFERENCES
MIL-DTL-24643C, Oct 2009, Cables, Electric, Low Smoke Halogen-Free, for Shipboard Use, Specification for MIL-STD-2003A, Sept 2009, Electric Plant Installation Standard Methods for Surface Ships and
Submarines MIL-STD-1310 (H), Sept 2009, Shipboard Bonding, Grounding and Other Techniques for
Electromagnetic Compatibility, Electromagnetic Pulse Mitigation, and Safety
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Technical Representative.
Not applicable.
3.1.3 Protective measures.
Not applicable.
3.1.4 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences):
• Piping.
• Pumps.
• Tight spaces.
• Wiring.
3.1.5 Temporary sanitary and sewage facilities. The Contractor shall provide temporary sanitary and sewage facilities in accordance with SFLC Std Spec 0000 for the complete duration of time in which the sewage system is disrupted.
3.1.6 Water provision. The Contractor shall provide 150 bottles of water (16-20 oz ea) per day for the crew for the complete duration of time in which the sewage system is disrupted.
13 (Rev-0)
3.2 Operational test - initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of the existing sewage system, to demonstrate existing operational condition.
Submit a CFR.
3.3 Upgrade particulars. The Contractor shall accomplish the following tasks, using Coast Guard Drawings 901 WMEC 320-035 and 901 WMEC 320-073 (A Class), or Coast Guard Drawings 905 WMEC 320-014 and 905 WMEC 320-054 (B Class) as guidance, and in accordance with TP 2723, TP 2839 and TP 4645 as applicable.
3.3.1 Level sensor inspection – initial. The level sensors in the wastewater, seal water, and vacuum collection tanks shall be inspected and reused if possible. After tanks are opened, verify quantity and condition of level sensors. Submit a CFR.
3.3.2 Removals.
3.3.2.1 Label, disconnect and pull back four electric cables that connect to the MPCMS: K-PC12, K-PC17, K- PC21 and K-PC61. These will be reused in the new installation.
3.3.2.2 Remove and retain the MPCMS resistors. These will be reused in the new installation.
3.3.2.3 Remove the four existing control panels, one sonic level control box, five sonic level sensors, and the electric cables identified as being “ripped out” on Coast Guard Drawings 901 WMEC 320-073 (A Class) or 905 WMEC 320-054 (B Class), as applicable. Dispose of material in accordance with applicable Federal, state and local regulations.
3.3.3 New installations.
3.3.3.1 Modify existing control panel foundations to suit new equipment, if required. Submit a CFR for approval prior to making modifications.
3.3.3.2 Seal openings left in CHT tank by removal of original level sensors utilizing a welded insert.
3.3.3.3 Install new control panels and cables.
3.3.3.4 Install new level sensor flange on CHT tank top as shown on Coast Guard Drawing 901 WMEC 320-073 (A Class) or Coast Guard Drawing 905 WMEC 320-054 (B Class), as applicable.
3.3.3.5 Prepare and touch-up coat all disturbed surfaces of the tank interior and exterior to match existing adjacent surfaces in accordance with COMDTINST M10360.3, Appendix B (Cutter and Boat Interior Painting Systems). Abide by all touch-up requirements outlined in SFLC Std Spec 0000, Appendix A (Requirements for Preservation of Ship Structures).
3.3.3.6 Install the new sonic level sensor in the CHT tank using Gems Sensors Form 143 for guidance. Due to lack of clearance above the CHT tank, it may be necessary to enter the tank through the pipe and bulb assembly, and finish assembly of the pipe to the flange from there.
3.3.3.7 Re-install (4) MPCMS cables and resistors.
3.3.3.8 Secure the existing level sensors in the vacuum, seal water, fwd and aft wastewater tanks by sliding a (approximately) 4” piece of PVC tubing up over the threaded joint between the electrode and the fitting. Fasten this in place using 2 hose clamps per connection.
14 (Rev-0)
3.4 Cable compliance. The Contractor shall ensure the following:
• All new cables shall be in accordance with MIL-DTL-24643B.
• Newly installed electric cables shall be bundled and secured in accordance with MIL-STD-2003A.
• All cables shall be tagged in accordance with NAVSEA S9AA0-AB-GOS-010/GSO, Section 305.
3.5 Touch-up preservation. The Contractor shall prepare and touch-up coat all disturbed surfaces to match existing adjacent surfaces in accordance with COMDTINST M10360.3, Appendix B (Cutter and Boat Interior Painting Systems). Abide by all touch-up requirements outlined in SFLC Std Spec 0000, Appendix A (Requirements for Preservation of Ship Structures).
3.6 Insulation resistance measurements. The Contractor shall perform insulation resistance measurements on all newly installed power cables using a 500 volt DC megger, before energizing circuit(s). Correct any defects noted, to ensure that reading of conductors to ground and between conductors is of 1 megohm, minimum. Submit a
CFR.
3.7 Operational test – post repairs. After completion of work, the Contractor shall, in the presence of the Coast Guard Inspector, thoroughly test and prove the sewage system to be in satisfactory operating condition. The testing shall be documented on Coast Guard Test Memo (see paragraph 4.1 (Test memo)). Submit a CFR.
3.8 “Red-lined drawing deliverables. For the first installation on an A Class vessel and a B Class vessel, the Contractor shall “red-line” the Coast Guard Drawings listed in Section 2 herein, to clearly reflect the as-built condition of the work specified in this work item. All subsequent installations shall match the first installation in configuration.
3.8.1 Within 24 hours after completion of this work item, submit a draft copy of the marked-up drawings to the COTR for review and approval.
3.8.2 Within 10 calendar days after receiving Coast Guard comments or completion of the availability, whichever occurs first, incorporate all comments and deliver one set of the final red-lined drawings to the COTR.
4. NOTES
4.1 Test memo. The following test memo will be used during the final operational test.
15 (Rev-0)
CUTTER: _________________
TEST DATE: ______________
TITLE: SEWAGE SYSTEM CONTROL PANELS OPERATIONAL TEST
REFERENCES:
(a) Dwg. 901-WMEC-320-73 Power System Mods Incidental to Sewage Control Panels Replacement
(b) Dwg. 905-WMEC-320-54 Power System Mods Incidental to Sewage Control Panels Replacement
(c) SFLC Std Specification 3041 Shipboard Electrical Cable Test
(d) Maintenance Procedure Card (MPC) A-C-9823 Inspect Tanks and Voids.
METHOD OF CONDUCTING TEST:
I. OPERATIONAL TEST
1. Perform preliminary checks.
a. Test all new and disturbed electrical cables IAW Reference (c).
b. Inspect all new and disturbed equipment for missing/broken parts, accessories, proper alignment and installation including location, mounting, cable tags, label plates and electrical supply to the equipment.
c. Test control panels (if metallic) and backplanes for proper grounding (0.1 ohms or less between case and hull ground)
d. Set motor overloads IAW motor nameplate data.
e. Verify that level probes are installed, and that seal water, vacuum collection, sewage holding (CHT), forward and aft wastewater tanks are closed IAW Reference (d).
f. Align sewage and wastewater valves for “Shore Discharge” Mode of operation.
Conducted by: __________________
2. Test operation of vacuum collection system.
a. Fill seal water tank ¾ full, with fresh water.
b. Prime vacuum pumps by pouring 1 quart of water down pump suction piping. Do not energize pump with water above shaft seal.
16 (Rev-0)
c. At the vacuum collection tank discharge pump assembly, close all suction and discharge valves.
d. Apply electrical power to the vacuum collection system control panel.
e. Check rotation on the two vacuum pumps by operating in “Manual” mode.
Conducted by: _______________________
f. Turn either vacuum pump selector switch to the “Auto” position. The pump will start and begin to evacuate the tank. An observable vacuum should be indicated on the vacuum gauge within 30 seconds. If no vacuum is apparent, re-check water level and pump rotation. Repeat for other pump.
g. Check the vacuum pump cut-out point by placing both selector switches in the “Auto” position. When the vacuum in the collection tank rises to 18” Hg, the vacuum pumps should stop automatically. If the vacuum fails to reach 18” Hg, or the pump doesn’t stop at 18” Hg, adjust vacuum switch VSI and repeat. Manually shut off vacuum pumps before reaching 20” Hg.
h. Check the lead vacuum pump cut-in point by opening the vacuum release ball valve and slowly bleed air into the tank. One vacuum pump should restart when the vacuum falls to 14” Hg. Close the valve and allow this pump to run until it shuts off automatically. If the pump does not start at 14” Hg adjust the cut-in point of VS1 and repeat test.
i. Check the standby vacuum pump operation set point. Slowly bleed air into the tank and confirm that the second pump will start at 13” Hg. If the pump does not start, adjust VS2 and repeat test.
j. Check the vacuum leak rate of the vacuum collection tank. If all previous steps have been taken, the tank pressure should read approximately 18” Hg. Observe the pressure gauge for a period of 15 minutes. In that time the tank vacuum should drop by no more than 1” Hg. If the rate exceeds that amount, repair leaks and repeat test.
Conducted by: ________________________
k. Check rotation on the two vacuum collection system discharge pumps by momentarily jogging the pumps.
Conducted by: ________________________
l. Align valves to allow for pumping vacuum collection tank (VCT) to sewage holding tank
(CHT).
m. Fill vacuum collection tank above the low tank level probe. If necessary, prime the discharge pumps.
17 (Rev-0)
n. Continue filling the vacuum collection tank. Check automatic discharge from the vacuum collection tank by placing both vacuum system discharge pump selector switches in the “Auto” position. The motorized ball valves and the discharge pumps will be controlled by the start/stop electrodes in the vacuum collection tank (at approximately the 33% for start and 5% for stop, levels). Pump start coincides with the opening of the motorized ball valve and the pumps will operate on alternate cycles.
Conducted by: ________________________
o. Check manual operation of vacuum pumps by placing selector switch for each pump in “Manual”, then “Off”. Pumps should start and stop regardless of vacuum level.
Conducted by: ________________________
p. Run each vacuum pump in “Manual” and record data in Table 2.
q. Check manual operation of vacuum system discharge pumps by placing selector switch for each pump in “Manual”. Press and hold the corresponding “Jog” button until motorized ball valve for that pump opens and the pump starts.
Conducted by: ________________________
r. Run each vacuum system discharge pump in “Manual” and record data in Table 2.
s. Record vacuum collection system nameplate data in Table 1.
3. Test operation of sewage holding system.
a. Fill sewage holding tank (CHT) approximately 60% full with clean water.
b. Align valves to allow shore tie discharge.
c. Check rotation on the two sewage holding system discharge pumps by momentarily jogging the pumps.
Conducted by: ___________________
d. Run each discharge pump in “Manual” and record data in Table 4.
e. Place discharge pump selector switches in “Auto”. Fill tank until a pump runs (at pump start electrode level). Stop filling tank. The pump should run until tank level reaches the pump stop electrode level.
Conducted by: __________________
f. Fill tank again until the alternate pump starts. Stop filling tank. The pump should run until tank level reaches the pump stop electrode level.
18 (Rev-0)
Conducted by: __________________
g. Record sewage holding system nameplate data in Table 3.
4. Test operation of forward wastewater system.
a. Fill forward wastewater tank approximately 2/3 full.
b. Align valves to allow shore tie discharge.
c. Check rotation of the forward (#1) wastewater discharge pump by momentarily jogging the pump.
Conducted by: __________________
d. Run discharge pump in “Manual” and record data in Table 6.
e. Place discharge pump selector switch in “Auto”. Fill tank until pump runs (at pump start electrode level). Stop filling tank. The pump should run until tank level reaches the pump stop electrode level.
Conducted by: _________________
f. Record forward wastewater system nameplate data in Table 5.
5. Test operation of aft wastewater system.
a. Fill aft wastewater tank approximately 2/3 full.
b. Align valves to allow shore tie discharge.
c. Check rotation of the aft (#2 and #3) wastewater discharge pumps by momentarily jogging the pumps.
Conducted by: _________________
d. Run discharge pumps in “Manual” and record data in Table 6.
e. Place discharge pump selector switches in “Auto”. Fill tank until a pump runs (at pump start electrode level). Stop filling tank. The pump should run until tank level reaches the pump stop electrode level.
Conducted by: __________________
f. Fill tank again until the alternate pump starts. Stop filling tank. The pump should run until tank level reaches the pump stop electrode level.
Conducted by: __________________
19 (Rev-0)
g. Record aft wastewater system nameplate data in Table 5.
II. TEST SEWAGE SYSTEM ALARMS
Caution: Verify tank levels by a method other than the tank level indicators until they have been proven accurate. Do not overfill tanks.
1. Test vacuum system alarms.
a. Secure all power to vacuum sewage collection system control panel.
b. Prevent vacuum and discharge pumps from running, by marking and disconnecting motor leads, or removing fuses, as applicable. Set all pump selector switches to “Auto”. Restore power to unit.
c. Open vacuum pump seal water tank siphon drain valve, and cut out valve on vacuum collection tank. When vacuum pump seal water tank level goes down to approximately 2/3 level, the “Low Cooling Water” alarm should sound. When the alarm sounds, open the vacuum pump seal water tank water supply, and bring seal water level up to a normal level. Leave siphon drain valve open to test vacuum collection tank high level, and discharge pump excess run alarms.
Conducted by: _________________________
d. Make note of the time that the discharge pump discharge valves open and the pump run indicator lights. “Discharge Pump Excess Run” alarm should sound in approximately 15 minutes.
Conducted by: ________________________
e. When vacuum collection tank high level alarm sounds, silence alarm, and check to ensure that vacuum pumps are disabled, by venting tank and allowing vacuum to drop to 5”Hg without vacuum pumps energizing. Secure seal water tank siphon drain valve, vacuum collection tank isolation valve, and water supply valve, (when seal water tank is normal).
f. Verify that the alarms listed in Table 7, and indicators listed in Table 8 have activated in the vacuum system control panel and the MPCMS, as applicable.
Conducted by: ________________________
g. Secure all power to vacuum sewage collection system control panel.
h. Replace fuses or re-connect motor leads. Restore power to unit.
i. Energize discharge pumps and vacuum pumps in automatic. Test vacuum pump excess run alarms by opening vacuum collection tank vent to keep vacuum pumps running continuously. “Vacuum Pump Excess Run” alarm should sound in approximately 5 minutes.
20 (Rev-0)
Conducted by: _________________________
j. Reset all alarms and restore system to normal operation.
k. Witness one complete fill/discharge cycle of vacuum sewage collection system and insure that equipment operates properly.
Conducted by: ________________________
2. Test sewage holding system alarms.
l. Secure all power to sewage holding system control panel.
a. Prevent sewage holding system discharge pumps from running, by marking and disconnecting motor leads, or removing fuses, as applicable. Set all pump selector switches to “Auto”. Restore power to unit.
b. Fill sewage holding tank with clean water, while observing indicator lights and alarms.
c. Verify that the alarms listed in Table 7, and indicators listed in Table 8 have activated in the sewage holding control panel and the MPCMS, as applicable
Conducted by: ________________________
d. Secure all power to sewage holding system control panel.
e. Replace fuses or re-connect motor leads. Restore power to unit.
f. Reset all alarms and restore system to normal operation.
g. Witness one complete fill/discharge cycle of sewage holding system and insure that equipment operates properly.
Conducted by: ________________________
21 (Rev-0)
III. ACCEPTANCE/REJECTION CRITERIA:
System should be capable of unattended automatic operation during all normal operating conditions.
DEVIATION, IF ANY, AND AUTHORITY:
REMARKS (Indicate any unusual conditions encountered):
TEST/INSPECTIONS CONDUCTED:
TEST CONDUCTOR DATE TEST SUPERVISOR/QC VERIFICATION
EQUIPMENT USED SERIAL NUMBER CALIBRATION DATE
PROJECT STAFF ACCEPTANCE/REVIEW: _____________________________
22 (Rev-0)
Vacuum Pump
#1 Vacuum Pump
#2 Vacuum
Discharge Pump #1
Vacuum Discharge Pump
#2
Pump Make
Pump Model
Pump GPM
Pump Discharge Pressure
Pump Serial #
Motor Make
Motor HP or KW
Motor Amps
Motor Volts
Motor RPM
Motor Model
Control Panel Make Model Serial # Input Voltage
Vacuum Sys Table 1: Nameplate Data Vacuum System
Vacuum Pump
#2 Vacuum
Discharge Pump #1
Vacuum Discharge Pump
#2 Amps (expected) Amps (actual)
(2.8-2.7) (2.8-2.7) (3.6-3.4) (3.6-3.4)
Volts (expected) Volts (actual)
(440-460) (440-460) (440-460) (440-460)
Table 2: Electrical Data Vacuum System
23 (Rev-0)
CHT Discharge
Pump #1 CHT Discharge
Pump #2
Pump Make
Pump Model
Pump GPM
Motor HP or KW
Motor Amps
Motor…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .