HADDOCK_WPB_87_DD_JLS_12R0.pdf
PDF 2 MB Posted
- Attached to
- USCGC HADDOCK - Dry Dock Repairs
- Solicitation number
- HSCG80-12-Q-P45004
About this file
Specification for Dry Dock Repairs 2012 06 MAY 2011 / Rev 0.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation-HADDOCK.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC HADDOCK (WPB 87347)
87 FOOT COASTAL PATROL BOAT (USCG)
SPECIFICATION FOR DRYDOCK REPAIRS
Developed By: Jennifer L Smith, MKCS
(Rev-0, 06 May 2011)
USCGC HADDOCK (WPB-87347) DRYDOCK AVAILABILITY 2012
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ....................................................................................................................................... iv Consolidated List of References ................................................................................................................. v Consolidated List of Government-furnished Property ............................................................................... ix Consolidated List of Critical Inspection Items .......................................................................................... xi Principal Characteristics ........................................................................................................................... xii General Requirements WORK ITEM 1: Hull Structure, Repair (D) WORK ITEM 2: Perform Ultrasonic Thickness Measurements (D) WORK ITEM 3: Perform Ultrasonic Thickness Measurements (O) WORK ITEM 4: Forepeak, Modify (EC 087-A-033) (D) WORK ITEM 5: Bilge Surfaces (Engine Room), Preserve (Partial) (D) WORK ITEM 6: Dirty Oil Tank, Clean and Inspect (D) WORK ITEM 7: Oily Water Tank, Clean and Inspect (D) WORK ITEM 8: Tanks (MP Fuel Service), Clean and Inspect (D) WORK ITEM 9: Superstructure, Preserve (100%) (D) WORK ITEM 10: Pilothouse Deck (Aluminum), Inspect, Preserve and Renew Electrical Matting (D) 40 WORK ITEM 11: Forward RHIB Notch Skid Pad, Install (EC 087-A-038) (D) WORK ITEM 12: Depth Sounder, Capastic Fairing, Renew (O) WORK ITEM 13: Weather Tight Door, Fuel Station, Install (TCTO TB6000.0) (D) WORK ITEM 14: Hatch Coaming’s, Renew (EC 087-A-027) (D) WORK ITEM 15: Main Engine/Reduction Gear, Realign (O) WORK ITEM 16: Propulsion Shafts, Remove, Inspect and Reinstall (D) WORK ITEM 17: Propulsion Shaft, Repair (O) WORK ITEM 18: Propulsion Shaft, Straighten (O) WORK ITEM 19: Intermediate Water-Lubricated Propulsion Shaft Bearing, Renew (O) WORK ITEM 20: Aft Water-Lubricated Propulsion Shaft Bearing, Renew (O) WORK ITEM 21: Intermediate Bearing Carrier, Renew (O) WORK ITEM 22: Aft Bearing Carrier, Renew (O) WORK ITEM 23: Stern Tube, Interior Surfaces, Preserve 100% (O) WORK ITEM 24: Stern Tube, Interior Surfaces, Repair (O) WORK ITEM 25: Propellers, Remove, Inspect and Reinstall (D) WORK ITEM 26: Propeller, Minor Reconditioning and Repairs, Perform (O) WORK ITEM 27: Pilothouse to Mast Multi-Cable Transit, Renew (D) WORK ITEM 28: Fathometer Transducer, Renew (D) WORK ITEM 29: Speed Log, Skin Valve Assembly, Clean and Inspect (D) WORK ITEM 30: Install Dirty Oil Tank Level Indicator (EC 087-B-039) (D) WORK ITEM 31: HVAC System, Ducting, Clean (D) WORK ITEM 32: Sea Water System (Sea Valves, Strainers, Piping), Clean, Inspect and Repair (D) . 111 WORK ITEM 33: Raw Water Piping, Repair (D) WORK ITEM 34: Bilge Piping, Repair (D) WORK ITEM 35: Rudder Assemblies, Remove, Inspect and Reinstall (D)
WORK ITEM 36: Mooring Bits, Renew (EC 087-B-037) (D) WORK ITEM 37: RHIB Notch Skid Pads, Inspect (D) WORK ITEM 38: RHIB Notch Skid Pad Studs, Renew (O) WORK ITEM 39: Stern Launch Door, Remove, Inspect and Reinstall (D) WORK ITEM 40: Grey Water Holding Tank, Clean and Inspect (D) WORK ITEM 41: Sewage Holding Tank, Clean and Inspect (D) WORK ITEM 42: Grey Water Piping, Clean and Flush (D) WORK ITEM 43: Sewage Piping, Clean and Flush (D) WORK ITEM 44: U/W Body, Preserve (100%) (O) WORK ITEM 45: U/W Body, Preserve (Partial–33%) (O) WORK ITEM 46: Hull Plating Freeboard, Preserve (Partial) (D) WORK ITEM 47: Cathodic Protection/Zincs, Renew (D) WORK ITEM 48: Interior Deck Covering System, Renew (D) WORK ITEM 49: Interior Deck Covering System, Reseal (D) WORK ITEM 50: Drydocking (D) WORK ITEM 51: Temporary Services, Provide (D) WORK ITEM 52: Telephone Service, Provide (D) iii (Rev-0) iv (Rev-0)
Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM# CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Consolidated List of References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free or charge. Other Government documents may be accessed – free of charge – as follows:
• MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
• Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
• Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::
www.gpoaccess.gov
The Government is aware of the following internet web links where contractors may procure commercial specifications:
• American Welding Society (AWS): http://www.awspubs.com/index.php
• ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
• NFPA: http://www.nfpa.org
• SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 87 WPB 085-001, Rev-, Tank Capacity Curves Coast Guard Drawing 87 WPB 085-010, Rev D, Docking Plan Coast Guard Drawing 87 WPB 085-011, Rev B, Lifting Slings Coast Guard Drawing 87 WPB 085-012, Rev-, Lifting Cradle Coast Guard Drawing 87 WPB 111-001, Rev E, Shell Expansion Coast Guard Drawing 87 WPB 113-001, Rev E, Platform Plating & Framing Coast Guard Drawing 87 WPB 116-001, Rev-, Longitudinal Girders & Bulkheads Coast Guard Drawing 87 WPB 122-001, Rev C, Watertight Bulkheads Coast Guard Drawing 87 WPB 131-001, Rev J, Deck Construction Plan Coast Guard Drawing 87 WPB 131-002, Rev-, Forepeak Void New Watertight Flat Coast Guard Drawing 87 WPB 151-001, Rev M, Superstructure Details Coast Guard Drawing 87 WPB 161-001, Rev C, Skeg Construction Coast Guard Drawing 87 WPB 163-001, Rev G, Sea Chest Details Coast Guard Drawing 87 WPB 165-001, Rev D, Transducer Details Coast Guard Drawing 87 WPB 167-001, Rev G, Schedule Of Doors, Manholes, Windows And Hatches Coast Guard Drawing 87 WPB 167-002, Rev A, CG Schedule Of Doors, Manholes, Windows & Hatches Coast Guard Drawing 87 WPB 167-003, Rev-, Weather Tight Door for Fuel Station Access Coast Guard Drawing 87 WPB 171-001, Rev L, Mast Details Coast Guard Drawing 87 WPB 182-001, Rev A, Main Engine & Generator Foundations Coast Guard Drawing 87 WPB 185-001, Rev AD, Auxiliary Foundation Booklet Coast Guard Drawing 87 WPB 243-001, Rev M, Propulsion Shaft Details Coast Guard Drawing 87 WPB 245-002, Rev-, Propeller Details Coast Guard Drawing 87 WPB 245-003, Rev A, Propeller Details v (Rev-0) http://www.assistdocs.com/search/search_basic.cfm http://www.uscg.mil/directives/default.asp http://www.gpoaccess.gov/ http://www.awspubs.com/index.php http://www.techstreet.com/ http://www.nfpa.org/ http://shopping.netsuite.com/sspcmarketplace
Coast Guard Drawing 87 WPB 252-001, Rev D, Pilothouse Console Arrangement Coast Guard Drawing 87 WPB 252-002, Rev L, Alarm Monitoring System Coast Guard Drawing 87 WPB 256-001, Rev U , Sea Water Cooling Piping Coast Guard Drawing 87 WPB 302-001, Rev T, Misc. Controls Wiring Diagram, sheets 1, 2, 3, 36, 39, & 42 Coast Guard Drawing 87 WPB 302-001, Rev T, Misc. Controls Wiring Diagram Coast Guard Drawing 87 WPB 304-001, Rev D, Wireways Arrangement Coast Guard Drawing 87 WPB 305-001, Rev-, Electrical Label Plates Coast Guard Drawing 87 WPB 310-001, Rev F, Ship's Service One-Line Diagram Coast Guard Drawing 87 WPB 324-001, Rev B, Switchboard Wiring Diagram & Details Coast Guard Drawing 87 WPB 324-002, Rev C, Switchboard Wiring Diagram & Details (BOATS 13 & ON ) Coast Guard Drawing 87 WPB 324-003, Rev B, Switchboard Wiring Diagram & Details (BOATS 52 & P52) Coast Guard Drawing 87 WPB 324-004, Rev B, Switchboard Wiring Diagram & Details (BOATS 67 & ON) Coast Guard Drawing 87 WPB 331-001, Rev N, Lighting System Deck Plan Coast Guard Drawing 87 WPB 423-001, Rev U, Speed Log & Depth Sounder System Coast Guard Drawing 87 WPB 437-004, Rev D, Dirty Oil Tank Level Indication System Coast Guard Drawing 87 WPB 506-002, Rev E, Vent Fills and Sounds Piping Coast Guard Drawing 87 WPB 514-001, Rev M, HVAC Duct & Piping System Coast Guard Drawing 87 WPB 526-001, Rev H, Scuppers & Deck Drains Piping Coast Guard Drawing 87 WPB 529-001, Rev F, Bilge Piping Coast Guard Drawing 87 WPB 561-001, Rev H, Steering System Details Coast Guard Drawing 87 WPB 562-001, Rev A, Rudder Details Coast Guard Drawing 87 WPB 581-001, Rev F, Anchor Handling & Hawse Pipe Details Coast Guard Drawing 87 WPB 582-001 , Rev J, Mooring and Towing Coast Guard Drawing 87 WPB 583-001, Rev R, RIB Deployment Structure Coast Guard Drawing 87 WPB 593-001, Rev K, Sewage Piping Coast Guard Drawing 87 WPB 601-001, Rev G, Outboard Profile & General Arrangements Coast Guard Drawing 87 WPB 634-001, Rev C, Deck Coverings & Details Coast Guard Drawing 87 WPB 635-001, Rev C, Linings And Insulation Plan & Details Coast Guard Drawing 87 WPB 640-001, Rev M, Interior Furnishings Coast Guard Drawing 87 WPB 664-001, Rev B, Damage Control Equipment Arrangement & Details Coast Guard Drawing FL 2804-11, Rev D, Visual ID Numeral & Letter for Ships Coast Guard Drawing FL 2804-12, Rev-, U.S.C.G. Emblem Coast Guard Drawing FL 2804-13, Rev G, Visual ID Kit Sched Coast Guard Drawing FL 2804-15, Rev-, Draft Figs
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction Manual (COMDTINST) M10360.3C, Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), Jan 2009, Clean Shipboard Ventilation Systems Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341 ), Jan 2009, Install Interior Deck Covering Systems Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), Jan 2009, Drydocking Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), Jan 2009, Temporary Services Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), Jan 2009, Temporary Hull Accesses Coast Guard Technical Publication (TP) 4506, Wartsila TM-EL-68839, Issue A, Mar 2005, Rudderstock Seal vi (Rev-0)
Type EL Coast Guard Technical Publication (TP) 4593B, Mar 2003, SWBS 562, Rudderstock Seal-Type EJ Coast Guard Technical Publication (TP) 4593C , Feb 2002, SWBS 243, Manufacturer's Instruction Book, 87' WPB Propulsion Shaft Seals, John Crane Type F.S.E.
Coast Guard Technical Publication (TP) E-424-0230, SWBS 424, June 2006, Electromagnetic Log User’s Manual Coast Guard Technical Publication (TP), 4516A , March 2003, Ship's Service Diesel
OTHER REFERENCES
American Bureau of Shipping (ABS), 2, Rules for Survey After Construction, 2008, Part 7, Appendix Section 10, Guide for Bronze and Stainless Steel Propeller Castings ASTM International (ASTM) D 4138, 2007, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component Adhesives (An) ASTM International (ASTM) E797, 2005, Standard Practice for Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates ASTM International (ASTM), D3951, Re-approved 2004, Standard Practice for Commercial Packaging Bollinger Shipyard, USCG CPB Project MTU-FA 771903, 07 Feb 2000, Engine/Gearbox Plant Alignment Instructions 8V396 TE94/Flange mounted BW 255 Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Antiseize, Zinc Dust- Petrolatum Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting DOD-STD-2187, Aug 1987, Chemical Cleaning of Salt Water Piping Systems Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections International Standard For Organization (ISO) 484/2, First Edition 1981, Shipbuilding - Ship Screw Propeller - Manufacturing Tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50 m, Inclusive MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning MIL-D-16791, Jan 1993, Detergents, General Purpose (Liquid, Nonionic) MIL-DTL-15562, May 1996, Matting or Sheet, Floor Covering Insulating for High Voltage requirements MIL-PRF-16173, Sep 2006, Corrosive Preventive Compound, Solvent Cutback, Cold Application MIL-PRF-23236, Aug 2003, Coating Systems for Ship Structures MIL-PRF-24613, Dec 1990, Deck Covering Materials, Interior, Cosmetic Polymeric MIL-PRF-24647, Jun 2006, Paint System, Anticorrosive and Antifouling, Ship Hull MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant MIL-STD-167-1, Nov 2005, Mechanical Vibrations of Shipboard Equipment (Type I - Environmental and Type II - Internally Excited) MIL-STD-1687, Sep 1994, Thermal Spray Processes For Naval Ship Machinery Application MIL-STD-2191, Nov 1992, Repair Welding, Weld Cladding, Straightening, and Cold Rolling of Main Propulsion Shafting NAVSEA Drawing 803-921865, Rev R, Cathodic Protection Hull Zinc Anodes Owners Manual for BG Series Bargraph Instruments vii (Rev-0)
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2002, Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2007, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 7/NACE No.4, 2007, Brush-Off Blast Cleaning The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No. SSPC-SP 12/NACE No.5, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting Prior to Recoating viii (Rev-0) ix (Rev-0)
Consolidated List of Government-furnished Property The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY
ESTIMATED
COST
($/UNIT)
10 N Anti-fatigue matting 556 Cushion-Ease Solid (3’x3’ stock) 15 pc $45.15
11 N Forward skid pad N/A 1 ea. $300.00
13 N 87WPB Fuel Door Kit (see note 4.1 below for kit contents)
PN: 87WPB-167-003
NSN: 2040-01-F11-2172
1 ea $1,300.00
14 N 24” x 24” QA Raised
Hatch Coaming Fabricated by ISC Miami 3 ea. $1,300.00
14 N 24” x 24” QA Flush
Hatch PN: 2424-H[K] (Freeman Marine) 1 ea. $3,566.50
15 Y Alignment Kit N/A 1 ea $5,000.00 16 N **Propeller shaft NSN: 2010-01-458-9175 2 ea. $9,566.14
16 N Type FSE Face (split)
PN: H75440-01-2-2
NSN: 5330-01-521-3559
2 ea. $1,995.07
16 N Type FSE Seal (split)
PN: H75440-01-1-1
NSN: 2040-01-521-2654
2 ea. $4,070.35
16 N Type FSE Seal Cup
(split)
PN: H75440-01-1-3
NSN: 3120-01-521-2390
2 ea. $188.24
16 N Type FSE O-Cord
PN: H75440-01-1-4
NSN: 3120-01-521-2268
2 ea. $252.84
16 N Type FSE Emergency
Seal
PN: H75440-01-3-6
NSN: 5330-01-521-4855
2 ea. $260.92
16 N **Shaft Seal Bellow
PN: H75440-01-2-1
NSN: 5340-01-521-3573
2 ea. $270.45
16 N *Compression Tool
Assembly N/A 1 ea. $200.00
16 N *Alignment Kit N/A 1 set $3,000.00
19 N
**Thordon bearing, Grade Orange
(5.5" OD x 4" ID x 7.87" (200mm) LG)
PN: F54615-02-8-1
NSN: 3120-21-914-2012
2 ea. $325.47
20 N
**Thordon bearing, Grade Orange
(5.5" OD x 4" ID x 11.41" (290mm) LG)
PN: F54615-02-8-0
NSN: 3120-21-914-2011
2 ea. $399.50
25 Y **Starboard Propeller
(RH)
PN: RH706-3350.00
NSN: 2010-01-457-0573
1 ea. $12,498.00
25 Y **Port Propeller (LH)
PN: LH706-3350.00
NSN: 2010-01-459-0421
1 ea. $12,498.00
25 N *Propeller Nut Wrench N/A 1 ea $200.00 25 N **Propeller Nut NSN: 2010-01-458-9217 2 ea. $281.00
25 N **Propeller Nut, Locking NSN: 5310-01-458-9125 2 ea. $252.94
25 N Anode, Propeller Nut NSN: 5342-01-481-8403 2 ea. $272.00
28 N *** Fathometer transducer, shallow water, 50-200 kHz
NSN: 5845-01-531-2648 1 ea. $441.70
29 Y Doppler Speed Log Measurement Rod
NSN: 6605-01-470-1266 1 ea. $4,645.09
30 N Flash ROM Assembly
NSN: 6320-01-F09-1474
PN: 9702Z0030-1
1 ea $162.39
30 N Signal Conditioner
NSN: 5895-01-470-5302
PN: 112300
1 ea $187.00
30 N Transmitter, Liquid, Quantity
NSN: 6680-01-537-6489
PN: 602120
1 ea $499.00
30 N Meter, Dirty Oil Tank
NSN: 6320-01-F09-1473
PN: CDT4A00101
1 ea $826.00
35 Y **Rudder Assembly, port NSN: 2040-01-461-1944 1 ea. $2,000.00
35 Y **Rudder Assembly, starboard NSN: 2040-01-461-1943 1 ea. $2,000.00
35 N Upper Roller Bearing NSN: 3110-01-512-5534 2 ea. $244.62 35 N Wartsila EL Seals Kit NSN: 2040-01-565-9776 2 ea. $6,300.00 50 Y *Transducer Cover Plate N/A 2 ea. $50.00
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter x (Rev-0) xi (Rev-0)
Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000_STD, paragraph
3.2.6.5 (Inspection report particulars)):
Work Item Title 2 Perform Ultrasonic Thickness Measurements (D) 4 Forepeak, Modify (EC 087-A-033) (D) 5 Bilge Surfaces (Engine Room), Preserve (Partial) (D) 10 Pilothouse Deck (Aluminum), Inspect, Preserve and Renew Electrical Matting (D) 16 Propulsion Shafts, Remove, Inspect and Reinstall (D) 25 Propellers, Remove, Inspect and Reinstall (D) 32 Sea Water System (Sea Valves, Strainers, Piping), Clean, Inspect and Repair (D) 35 Rudder Assemblies, Remove, Inspect and Reinstall (D) 37 RHIB Notch Skid Pads, Inspect (D) 50 Drydocking (D)
Principal Characteristics
87' WPB
PHYSICAL CHARACTERISTICS
Length Overall 87' Length between Perpendiculars 81' 7" Depth 10' 11" Maximum Beam 19.4' Draft, Mean to Design Waterline 5' 9" Height of Highest Projection 50.2' Full Load Displacement 93.5 long tons Minimum Operating Displacement 83.9 long tons Displacement, Light Ship 77.9 long tons Framing Longitudinal Bulkheads Four watertight bulkheads located below the Main Deck Anchor 40 lb Fortress with 480 ft. 3 strand 5/8" dia. Line stayset
HULL CHARACTERISTICS
Hull/Main Weatherdeck Material BS-4360, GR 43A Steel Superstructure 5086 Aluminum
MACHINERY CHARACTERISTICS
Main Propulsion Two MTU 8V396TE94, sequential turbo-charged diesels
Reduction Gears Two ZF Type BW 255 Propulsion Shaft Two AQUAMET 22, 101.6mm Shaft Diameter 4" Shaft Seal Two John Crane mechanical seals Shaft Bearing, Intermediate Thordon Elastomeric Bearing Shaft Bearing, Aft Thordon Elastomeric Bearing Number of Propellers 2 Number of Blades 5 Diameter of Propeller 1040mm Pitch 1230 mm fixed Shaft RPM 828 Rudders Two 316L Stainless Steel Ship's Service Generators Two Man Model D08241F01 diesel with Stanford
60KW Generator
TANK CAPACITIES
3-9-1-F (Fuel Oil) 1402 gal 3-9-2-F (Fuel Oil) 1402 gal 3-12-2-F (Waste Oil) 86 gal 3-12-1-F (Oily Water) 86 gal 3-7-0-Q (Sewage Collection) 352 gal 3-7-1-Q (Grey Water) 52 gal 3-12-1-W (Fresh Water) 200 gal 3-12-2-W (Fresh Water) 200 gal xii (Rev-0)
00000_PWB_0211_FLT
REC_0000_FLT_ Commercial Project @ Contractor’ Facility (0211)
General Requirements
1. SCOPE
1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.
2. REFERENCES
COAST GUARD DRAWINGS
None.
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction Manual (COMDTINST) M10360.3C, Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General
Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
OTHER REFERENCES
ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface
Profile of Blast Cleaned Steel Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety
Administration, Department Of Transportation MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel
Surfaces Prepared by Dry Abrasive Blast Cleaning
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
1 (Rev-0)
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.4 HW disposal. The Contractor is considered as the generator of all contract-generated hazardous wastes and shall use its facility’s EPA generator ID number for management, transportation, and disposal of said hazardous wastes. Ensure the following:
3.4.1 Contractor’s hazardous waste handlers shall comply with applicable requirements of 40 CFR 262.
3.4.2 All contract generated hazardous wastes shall be packaged in 49 CFR-compliant containers.
3.4.3 The designated wastes shall be disposed of at a state or Federally-approved and permitted HW TSDF.
3.4.4 Name of destination TSDF shall be submitted to the KO at the Arrival Conference.
3.5 Pre-surface preparation test coupon. In order to ensure production of required surface profile, the Contractor shall accomplish the following tasks, whenever abrasive-blasting is required in a work item that is deemed a ”critical-coated’ surface:
3.5.1 Coupon material and test set-up particulars.
3.5.1.1 Conduct a performance test on all abrasive blasting operations on a Contractor- provided test coupon, prior to starting abrasive blasting operations on the vessel. Ensure the following:
• The coupon shall be a new metal plate, of the same metal type and material properties as the vessel area to be blasted - steel or aluminum plate, as applicable, and shall have no existing anchor profile - other than the surface irregularities from the manufacturing process.
• The test coupon shall be flat, with nothing welded to the side used for the anchor profile test, no thinner than a 1/8-inch plate and measuring no smaller than 1-foot by 1-foot.
• For steel substrates, the coupon shall have the mill scale intact, and be in a Rust Grade "A" condition, in accordance with SSPC-VIS 1.
• The test coupon shall be affixed so as to not permit excessive movement during the performance test, but shall not be affixed to the vessel.
3.5.1.2 Ensure that the abrasive-blasting operation for the test coupon is conducted with the identical setup and parameters that will be used blasting the designated vessel surfaces – including, but not limited to:
• The abrasive media type and media size selected to achieve the anchor profile range, as specified in the applicable work items.
• Nozzle size and type (straight bore, high velocity nozzle, angle nozzle...).
2 (Rev-0)
• Delivery rate and pressure settings.
3.5.1.3 Blast a one-square foot area on one side of the test coupon to the abrasive surface preparation standard specified in the work item, and perform an anchor profile test of the blasted surface in accordance with ASTM D4417, Method B or C. Notify the COTR in advance of the abrasive blasting operation test, to permit the witnessing of the test by the COTR. Submit a CFR documenting the results of the abrasive blasting operation test. The CFR shall include at a minimum, the following:
• Area of the vessel for which the verified setup will be used to abrasive blast.
• The selected abrasive media type and size.
• The nozzle size and type.
• The delivery rate and pressure.
• The test coupon starting properties (material type and surface conditions).
• The resultant anchor profile readings from the test (a minimum of 3 locations, separated by a minimum of
2 inches shall be recorded).
NOTES
1. A performance test of the abrasive blasting operations on a test coupon and measuring the resultant anchor profile prior to performing the abrasive blasting operation on the cutter is required. The test coupon will be used to evaluate the anchor profile produced by the equipment setup and selected abrasive media.
2. The reverse side of the test coupon may be used for the subsequent test, provided that the conditions in paragraph 3.5.1 (Coupon material and test set-up particulars) are met.
3. Ultra high pressure water jetting does not create an anchor profile and is exempt from the anchor profile test coupon check.
3.5.1.4 Repeat the abrasive blasting operation test in the following instances:
• The equipment setup, that was evaluated during the test coupon abrasive blasting performance test in paragraph 3.5.1 (Coupon material and test set-up particulars), has changed.
• The resultant anchor profile readings observed on the vessel are outside the specified anchor profile range.
• Media is changed from MIL-A-22262 to CID A-A-59316 or vice versa.
• The supplier of the abrasive blasting media changes, regardless if the new source for the media has the same specifications.
• When Directed by the COTR.
CAUTION!
Ensure that blast media from the performance test does not strike the vessel during the test.
3.6 Interim changes to SFLC Std Spec 0000. The Contractor shall be aware of the fact that the requirements of paragraph 3.3.2.1.1 (Water depth) have been revised to read as follows:
“3.3.2.1.1 Water depth. Ensure that water depth is sufficient at the pier to allow the vessel's lowest underwater appendage to clear the bottom by at least two feet at:
• Ordinary low water mark on non-tidal rivers.
• At all tide conditions predicted during the availability for tidal rivers and other navigable waterways (Bay, 3 (Rev-0)
Lake, etc.).”
4. NOTES
4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may be accessed at the following URL address: http://www.uscg.mil/directives/cim.asp
4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 0000 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
4 (Rev-0) http://www.uscg.mil/directives/cim.asp
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
Vessel Name Hull # Work Item # Work Item Title
Location of Work (incl. frame #’s) Area (sqft)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10…).
Verify surface anchor profile using ASTM D4417-Methods B or C against COMDTINST M10360.3. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max.
threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
Name of QP-1/NACE Inspector Signature Cert. # Date / Time
5 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE &
TIME
ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…)
LOCATION
(Frame &
Deck, relation to equipment, etc.)
TEMPERATURE % REL.
HUMID-
ITY DEW PT. SURFACE AMBIENT ΔT
DP - Surface
6 (Rev-0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
Location of Work (Frame References) Area (sqft)
SURFACE PREPARATION METHOD PROFILE ACHIEVED (mils) Min Max Mean
SSPC-SP-10/NACE No. 2 SSPC-SP-12/NACE No. 5
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________ Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________
7 (Rev-0)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
SURFACE PREPARATION METHOD PROFILE ACHIEVED (mils) Min Max Mean
SSPC-SP-10/NACE No. 2 SSPC-SP-12/NACE No. 5
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________ Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings (by column):
_____ mils _____ mils _____ mils _____ mils _____ mils
8 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15
DATE TEST LOCATIONS CONDUCTIVITY
(microsiemens/cm)
9 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
Coating Mfg Product Name Batch # Induction Time
Coating System Sequence (Primer/Touchup/3rd Coat, etc.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2
SPOT 1 2 3 4 5 AVERAGE
VALUE
*BASE METAL
READING (BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation 3 Before
Adjustments After Adjustments
Avg.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation 3 Before
Adjustments After Adjustments
Avg.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation 3 Before
Adjustments After Adjustments
Avg.
Application Method (Airless, Conventional Spray, Rolled) Average DFT
10 (Rev-0)
11 (Rev-0)
10002_JLW_0411_87WPB
WORK ITEM 1: Hull Structure, Repair (D)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform miscellaneous structural repairs on the hull structure.
1.2 Government-furnished property.
None.
1.3 List of Repairs. The repair items described below are designated for completion.
REPAIR ITEMS
Crop and remove three brackets (see image below paragraph 4.1), as located by a COTR, on 2nd deck in the vestibule between the engine room and the mess decks.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 87 WPB 113-001, Rev E, Platform Plating & Framing Coast Guard Drawing 87 WPB 131-001, Rev J, Deck Construction Plan Coast Guard Drawing 87 WPB 151-001, Rev M, Superstructure Details Coast Guard Drawing 87 WPB 167-001, Rev G, Schedule Of Doors, Manholes, Windows And Hatches Coast Guard Drawing 87 WPB 167-002, Rev A, Cg Schedule Of Doors, Manholes, Windows & Hatches Coast Guard Drawing 87 WPB 167-003, Rev-, Weather Tight Door For Refueling At Sea Locker Coast Guard Drawing 87 WPB 171-001, Rev L, Mast Details Coast Guard Drawing 87 WPB 185-001, Rev AD, Auxiliary Foundation Booklet Coast Guard Drawing 87 WPB 331-001, Rev N, Lighting System Deck Plan Coast Guard Drawing 87 WPB 601-001, Rev G, Outboard Profile & General Arrangements Coast Guard Drawing 87 WPB 635-001, Rev C, Linings And Insulation Plan & Details
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General
Requirements
OTHER REFERENCES
None.
3. REQUIREMENTS
3.1 General. The Contractor shall refer to Coast Guard Drawings 87 WPB 113-001, 87 WPB 131-001, 87 WPB 151-001, 87 WPB 167-001, 87 WPB 167-002, 87 WPB 167-003, 87 WPB 171-001, 87 WPB 185-001, 87 WPB 331-001, 87 WPB 601-001, 87 WPB 635-001, as applicable.
3.1.2 Interferences. The Contractor shall be aware that interferences in way of work may include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences):
• See paragraph 1.3 above.
3.2 Operational test - initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (performed by Coast Guard personnel) of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR describing any additional repairs that may be required.
3.3 Scope of work. The Contractor shall perform repairs and renewals to hull structure described beneath paragraph 1.3 above.
3.4 Operational test – post repairs. After completion of all work, the Contractor shall witness an operational test (by Coast Guard personnel) of all items or shipboard devices that have been disturbed, used, repaired, altered, or installed, to prove that they are in satisfactory operating condition.
3.5 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with COMDTINST M10360.3, Appendix A (Cutter and Boat Exterior Painting Systems) and Appendix B (Cutter and Boat Interior Painting Systems), respectively, and as applicable. Abide by all touch-up requirements outlined in SFLC Std Spec 0000, Appendix A (Requirements for Preservation of Ship Structures).
3.6 Insulation. The Contractor shall repair, renew, or reinstall all bulkhead and overhead insulation damaged or remove/disturbed as an interference during the performance of this work item, as appropriate.
4. NOTES
4.1 Existing 3 brackets for removal.
12 (Rev-0)
13 (Rev-0)
14 (Rev-0)
11000 _JLW_1210_87WPB
WORK ITEM 2: Perform Ultrasonic Thickness Measurements (D)
1.1 Intent. This work item describes the requirements for the Contractor to perform up to 250 thickness measurements (UT shots) of hull plating, decks, bulkheads and frames, by ultrasonic methods.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
None.
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
OTHER REFERENCES
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
• 3.2 (UT measurements).
3.1.2 Technical Representative.
Not applicable.
3.1.3 Protective measures.
Not applicable.
3.1.4 Interferences.
3.1.4.1 If UT measurements cannot be obtained due to interferences, the Contractor shall submit a CFR that details all necessary interference removal/reinstallation work. After the KO has released a CR, remove the interferences and reinstall after completion of associated work.
3.2 UT measurements. The Contractor shall perform up to 250 UT measurements in locations designated by the COTR, in accordance with SFLC Std Spec 0740, Appendix C. Create a sketch to show all locations selected for measurement and record all measurements in Table 1 (UT Measurements Summary Sheet - Port/Stbd Shell) provided at the end of this item. Submit a CIR that contains the sketch and completed Table I.
4. NOTES
This section is not applicable to this work item.
15 (Rev-0)
TABLE I - UT MEASUREMENTS SUMMARY SHEET PORT/STBD SHELL
SHOT # STRAKE # FWD/MID/AFT ORIG PL MEASURED PL PERCENT
PLATE # TOP/MID/BOT THICKNESS THICKNESS WASTAGE
16 (Rev-0)
17 (Rev-0)
11001 _JLW_1210_87WPB
WORK ITEM 3: Perform Ultrasonic Thickness Measurements (O)
1.1 Intent. This work item describes the requirements for the Contractor to perform up to 250 thickness measurements (UT shots) of hull plating, decks, bulkheads and frames, by ultrasonic methods, in 10 lots of 25 measurements.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
None.
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
OTHER REFERENCES
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
Not applicable.
3.1.2 Technical Representative.
Not applicable.
3.1.3 Protective measures.
Not applicable.
3.1.4 Interferences.
3.1.4.1 If UT measurements cannot be obtained due to interferences, the Contractor shall submit a CFR that details all necessary interference removal/reinstallation work. After the KO has released a CR, remove the interferences and reinstall after completion of associated work.
3.2 UT measurements. The Contractor shall perform up to 250 UT measurements in locations designated by the Coast Guard Inspector, in accordance with SFLC Std Spec 0740, Appendix C. Create a sketch to show all locations selected for measurement and record all measurements in Table 1 (UT Measurements Summary Sheet - Port/Stbd Shell) provided at the end of this item. Submit a CFR that contains the sketch and completed Table I.
4. NOTES
18 (Rev-0)
TABLE I - UT MEASUREMENTS SUMMARY SHEET PORT/STBD SHELL
SHOT # STRAKE # FWD/MID/AFT ORIG PL MEASURED PL PERCENT
PLATE # TOP/MID/BOT THICKNESS THICKNESS WASTAGE
19 (Rev-0)
20 (Rev-0)
11100_JLW_1110_87WPB
WORK ITEM 4: Forepeak, Modify (EC 087-A-033) (D)
1.1 Intent. This work item describes the requirements for the Contractor to modify and preserve the Forepeak (2- 0-0-V), creating a sealed, lower forepeak void and a separate, upper forepeak compartment.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 87 WPB 111-001, Rev E, Shell Expansion Coast Guard Drawing 87 WPB 131-002, Rev-, Forepeak Void New Watertight Flat Coast Guard Drawing 87 WPB 252-001, Rev D, Pilothouse Console Arrangement Coast Guard Drawing 87 WPB 252-002, Rev L, Alarm Monitoring System Coast Guard Drawing 87 WPB 302-001, Rev T, Misc. Controls Wiring Diagram, sheets 1, 2, 3, 36, 39, &
Coast Guard Drawing 87 WPB 529-001, Rev F, Bilge Piping Coast Guard Drawing 87 WPB 581-001, Rev F, Anchor Handling & Hawse Pipe Details Coast Guard Drawing 87 WPB 635-001, Rev C, Linings and Insulation Plan & Details
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General
Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), Jan 2009, Temporary Hull Accesses
OTHER REFERENCES
ASTM International (ASTM) E797, 2005, Standard Practice for Measuring Thickness by Manual
Ultrasonic Pulse-Echo Contact Method MIL-PRF-16173, Sep 2006, Corrosion Preventive Compound, Solvent Cutback, Cold Application
3.1 General.
3.1.1 Critical inspection report. The Contractor shall submit a critical inspection report (CIR) for the inspections listed in the following paragraphs:
• 3.4 (Substrate inspection).
3.1.2 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the following:
• Anchor.
• Anchor chain.
• Anchor line.
• Anchor line drum.
• Anchor line holder.
• Anchor windlass.
• Anchor windlass hydraulic components (as applicable).
• Bulkhead insulation on aft side of bulkhead 2.
• Deck grating.
• Electric switches.
• False bulkheads.
• Float switches.
• Hydraulic piping.
• Ladder.
• Lights.
• Lockers.
• Racks.
• Bilge discharge check valve.
• Bilge overboard discharge valve.
• Electrical boxes (J-box).
• Wiring.
• Piping.
• Piping hangers.
3.1.3 Operational test - initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of the bilge discharge valves, anchor windlass system, bilge pump, and Forepeak bilge level sensors and switches to demonstrate existing operational condition. Submit a CFR.
3.1.4 Temporary access openings. Due to limited access to work areas, the Contractor may, with express permission of the KO (via submission of a CFR), cut access holes to facilitate accomplishment of the work
21 (Rev-0) specified herein. Perform all work required to open and close the access openings in accordance with SFLC Std Spec 8636.
3.1.5 Surface preparation particulars. The Contractor shall prepare all bilge, bulkhead, overhead, and shell surfaces of the Forepeak Compartment, including structural members and the ladder; use the system specified for preparation for “Bilges, Cofferdams, and Forepeaks, Option 1”, in COMDTINST M10360.3. Appendix B (Cutter and Boat Interior Painting Systems).
3.2 Removals. The Contractor shall accomplish the following as shown on Coast Guard Drawing 87 WPB 131- 002 and using Coast Guard Drawing 87 WPB 529-001 for guidance:
3.2.1 Crop out and retain for reuse the bilge overboard hull penetration with six-inch stainless steel insert.
3.2.2 Remove and discard the following:
• Bilge pump.
• Bilge pump discharge hose.
• Serrated deck grating.
• All deck grating support structures including the angle on bulkhead 2. See Figure 1 below.
• All stand offs and foundations located below the spray chine.
3.3 Preparation. The Contractor shall remove all water from the bilge and prepare all shell, bilge, and associated structural member surfaces; use the system specified for “Bilges, Cofferdams, and Forepeaks, Option I” (surface preparation only) in COMDTINST M10360.3, Appendix B (Cutter and Boat Interior Painting Systems).
3.4 Substrate inspection. The Contractor shall perform a total of 75 thickness measurements of Forepeak surfaces, in locations designated by the Coast Guard Inspector. Submit CIR. The ultrasonic apparatus, procedure requirements, and report shall be in accordance with ASTM E797. The report results shall additionally include, for each test point:
• Location.
• Original metal thickness.
• Measured metal thickness.
• Percent deterioration (calculation is based on the original metal thickness).
3.5 Electrical disconnections. The Contractor shall disconnect and retain for reuse the following; using Coast Guard drawings 87 WPB 252-001, 87 WPB 252-002 and 87 WPB 302-001…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .