SUPPLIES/SERVICES AND PRICES/COSTS FOR:
USCGC CUSHING (WPB-1321) DRYDOCK AVAILABILITY 2011
ITEM DESCRIPTION UNIT PRICE UNIT QTY EXTENDED PRICE
| ITEM |
| DESCRIPTION |
| UNIT PRICE |
| UNIT |
| QTY |
| EXTENDED PRICE |
| 1-D |
| Hull Plating (U/W Body), Ultrasonic Testing |
| 2-O |
| Steel Hull and Structural Plating Repairs (5-Pound) |
| 3-O |
| Steel Hull and Structural Plating Repairs (7.5-Pound or 7.65-Pound) |
| 4-D |
| Appendages (U/W), Leak Test |
| 5-D |
| Propulsion Shaft Rope Guards, Inspect and Repair |
| 6-O |
| Appendages (U/W) - Internal, Preserve |
| 7-D |
| Tanks (MP Fuel Service), Clean |
| 8-D |
| Tanks (MP Fuel Stowage and Overflow), Clean |
| 9-D |
| Tanks (MP Fuel Service), Inspect |
| 10-D |
| Tanks (MP Fuel Stowage and Overflow), Inspect |
| 11-D |
| Tanks (Potable Water), Clean and Inspect |
| 12-D |
| Tanks (Dirty Oil and Waste), Clean and Inspect |
| 13-D |
| Propulsion System, Alignment Check |
| 14-D |
| Propulsion Shafting, Remove, Inspect, and Reinstall |
| 15-D |
| Mechanical Shaft Seal Assemblies, Overhaul |
| 16-D |
| Propulsion Shaft Bearings (External), Check Clearances |
| 17-O |
| Propulsion Shaft Bearings (External), Renew |
| 18-D |
| Propellers, Remove, Inspect, and Reinstall |
| 19-O |
| Propeller, Repair Root Erosion |
| 20-D |
| Exhaust System, MDE, Inspect |
| 21-D |
| SW Heat Exchangers, Clean, Inspect and Hydro |
| 22-D |
| Fathometer Transducer, Renew |
| 23-D |
| Speed Doppler, Renew, Doppler Valve, Overhaul |
| 24-D |
| Sea Valves and Waster Pieces, Overhaul or Renew |
| 25-D |
| Sea Strainers - Duplex (All Sizes), Overhaul |
| 26-D |
| Firemain Valves, Renew |
| 27-D |
| Bilge and Ballast Valves, Renew |
| 28-D |
| Rudder Assemblies, Remove, Inspect and Reinstall |
| 29-D |
| Fin Stabilizers (General), Overhaul |
| 30-D |
| Grey Water Holding Tanks, Clean and Inspect |
| 31-D |
| Sewage Holding Tanks, Clean and Inspect |
| 32-D |
| Grey Water Piping, Clean and Flush |
| 33-D |
| Sewage Piping, Clean and Flush |
| 34-D |
| Battery Space, Preserve and Insulate |
| 35-D |
| Aft Steering Compartment, Preserve and Insulate |
| 36-D |
| Forward Void, Preserve |
| 37-O |
| Tanks (Dirty Oil and Waste), Preserve "100%" |
| 38-O |
| Tanks (Grey Water Holding), Preserve "100%" |
| 39-O |
| Tanks (Potable Water), Preserve "100%" |
| 40-O |
| Tanks (Sewage Holding), Preserve "100%" |
| 41-D |
| Bilge Surfaces, Preserve |
| 42-D |
| Decks - Exterior, Preserve ("Non-Skid Broadcast Grit" System) |
| 43-D |
| U/W Body, Preserve ("100%") |
| 44-O |
| Stern Tube Interior Surfaces, Preserve 100% |
| 45-D |
| Cathodic Protection System (Bilge and Sea Chest), Renew |
| 46-D |
| Cathodic Protection System, Inspect and Maintain |
| 47-D |
| Impressed Current Cathodic Protection System Dielectric Shield, Renew |
| 49-D |
| Temporary Services, Provide |
| 50-D |
| Sea Trial Performance, Provide Support |
| 51-D |
| Hull Plating and Structural Members, Inspect and Repair |
| 52-D |
| Deck Plating, Renew (Aluminum) |
| 53-D |
| Canopy Mounts, AMIO, Fabricate and Install |
| 54-D |
| CCTV Security System, Install |
| 55-D |
| Main Reduction Gear Assembly, Remove, Reinstall and Realign |
| 56-D |
| Through-Deck Packing Gland, Insulation and Carpeting, Renew |
| 57-D |
| Deck Covering (Interior Wet/Dry) , Renew |
| 58-D |
| Deck Covering (Wet/Dry), Seal |
| B-D |
| GFP Report |
| NSP |
| EA |
| 1 |
| NSP |
Total Price of Definite Items
$0