DECISIVE_WMEC_210B_DD_FY11_BLANK_SOSS.pdf

PDF 19 KB Posted

Attached to
DRYDOCK AND REPAIR USCGC DECISIVE
Solicitation number
HSCG8011QP45C39
Issued by

About this file

SECTION b FOR WORK ITEMS

View the file

Other files

File Type Posted
629_DECISIVE_DD_FY11_SOSS_Blank_Rev-1.pdf PDF
SF30Amendment0002.doc DOC document
SF30Amendment0001.doc DOC document
DECISIVE —
DECISIVE_WMEC_210B_DD_JLH_11R0.pdf PDF
DECISIVE.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUPPLIES/SERVICES AND PRICES/COSTS FOR:

USCGC DECISIVE (WMEC-629) DRYDOCK REPAIRS 2011

ITEM DESCRIPTION UNIT PRICE UNIT QTY EXTENDED PRICE

1-D Hull Plating (Side Scan), Ultrasonic Testing JOB 1

2-D Appendages (U/W), Leak Test JOB 1

3-D Propulsion Shaft Fairwaters and Rope Guards, Inspect JOB 1

4-D Appendages (U/W) - Internal, Preserve JOB 1

5-D Tanks (MP Fuel Service), Clean and Inspect JOB 1

6-D Tanks (MP Fuel Stowage and Overflow), Clean and Inspect JOB 1

7-D Tanks (Potable Water), Preserve 100% JOB 1

8-D Voids (Accessible), Clean and Inspect JOB 1

9-D Tanks (Dirty Oil and Waste), Clean and Inspect JOB 1

10-D Propulsion Shafting, Renew JOB 1

11-D Propeller Shaft Sleeve(s), Renew JOB 1

12-D Propulsion Shaft Bearings (External) , Renew JOB 1

13-D Propulsion Stern Tube Bearings , Renew JOB 1

14-D CPP System , General Maintenance JOB 1

15-D Controllable Pitch Propeller Hub Assembly , General Maintenance JOB 1

16-D Main Diesel Engine (MDE) Exhaust Stack Uptakes , Clean JOB 1

17-D Ship Service Diesel Generator (SSDG) Exhaust Piping , Clean JOB 1

18-D Boiler Exhaust Stack Uptakes , Clean JOB 1

19-D Fathometer Transducer , Renew JOB 1

20-D Doppler Speed Log Transducer(s), Renew JOB 1

21-D Vent Ducts (Engine and Motor Room All), Commercial Cleaning JOB 1

22-D Vent Ducts (Galley and Pantry Room All), Commercial Cleaning JOB 1

23-D Vent Ducts (Laundry Exhaust), Commercial Cleaning JOB 1

24-D Strainers - Duplex (All Sizes), Overhaul JOB 1

25-D Rudder Assembly, Remove, Inspect and Reinstall JOB 1

26-D U/W Body, Preserve ( “100%” ) JOB 1

27-D Stern Tube Interior Surfaces , Preserve 100% JOB 1

28-D Drydocking JOB 1

29-D Temporary Services JOB 1

30-D Upgrade Single Point Davit Control Console JOB 1

([12/11/2009] Rev 0)

SUPPLIES/SERVICES AND PRICES/COSTS FOR:

USCGC DECISIVE (WMEC-629) DRYDOCK REPAIRS 2011

ITEM DESCRIPTION UNIT PRICE UNIT QTY EXTENDED PRICE

31-D Sea Valves and Waster Pieces, Overhaul or Renew JOB 1

32-D Propulsion Shaft Seals, Overhaul JOB 1

33-D Anchor Windlass Foundations, Renew JOB 1

34-D Box Beam, Repair JOB 1

35-D Oily Wtr Holding Tank & Oily Wtr Seperator Suction Piping, Renew JOB 1

36-D Fuel Oil Piping, Renew JOB 1

37-D Interior Bilge, Preserve JOB 1

38-D Deck Plating, Renew JOB 1

39-D Hull Plating, Renew JOB 1

40-D Chain Locker, Preserve 100% JOB 1

Gantt Chart JOB

JOB

A-O Composite Labor Rate 58.00$ Hour 0 -$

B-D GFP Report NSP EA 1 NSP

Total Price of Definite Items -$

Total Price of Option Items -$

Total Price of Definite and Optional Items -$ ota ce o e te a d Opt o a te s

([12/11/2009] Rev 0)

SOS&S

File details come from the government source that posted it. Updated .