SPECIFICATION FOR USCGC ALERT DOCKSIDE REPAIRS

Text of this file

USCGC ALERT (WMEC 630)

210 FOOT "B CLASS" MEDIUM ENDURANCE CUTTER

SPECIFICATION FOR DOCKSIDE REPAIRS

Developed By: Jason Hayes, LT

(Rev-1, 29 November 2010) i (Rev-1) ii (Rev-1)

TABLE OF CONTENTS

General Requirements ................................................................................................................................ ix WORK ITEM 1: Anchor Windlass, Level 2 Inspect and Repair WORK ITEM 2: Main Diesel Engine (MDE) Exhaust Piping , Clean and Inspect WORK ITEM 3: Ship Service Diesel Generator (SSDG) Exhaust Piping, Clean and Inspect WORK ITEM 4: Boiler Exhaust Piping , Clean and Inspect WORK ITEM 5: Fuel Valves, Overhaul or Renew WORK ITEM 6: Compressed Air System Valves , Inspect and Test WORK ITEM 7: Helo Talon Grids, Inspect and Test WORK ITEM 8: Forward Urinal Drain System, Clean and Flush WORK ITEM 9: Firemain Valves, Overhaul or Renew WORK ITEM 10: Steam Valves, Renew WORK ITEM 11: Piping Insulation, Renew WORK ITEM 12: Warping Capstan , Level 2 Inspect and Repair WORK ITEM 13: Tanks (Potable Water), Preserve “ 100% ” WORK ITEM 14: Signal Lights, Install WORK ITEM 15: Mast Lighting Multi Cable Transit Block, Renew WORK ITEM 16: Deck Covering (Wet/Dry), Seal WORK ITEM 17: Deck Covering (Interior Wet/Dry) , Renew WORK ITEM 18: Davit, Single Point, Level 2 Inspect and Repair WORK ITEM 19: Starboard Laundry Bulkhead, Inspect, Preserve, and Re-insulate WORK ITEM 20: SW Heat Exchangers; Clean, Inspect and Hydro WORK ITEM 21: Ship Service Diesel Generator, Clean & Inspect WORK ITEM 22: General Stores Compartment, Preserve and Repair WORK ITEM 23: Compressed Air System Valves,Renew iii (Rev-1)

Revisions Record

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

29 November

1 9 Changed List of Critical Inspection to reflect change in table of content WI 9 Helo Talon Grids, Inspect and Test to WI 7 Helo

Talon Grids, Inspect and Test.

29 November

1 19 Changed List of Critical Inspection to reflect change in table of content WI 19 Davit, Single Point, Level 2 Inspect and Repair to WI 18 Davit, Single Point, Level 2 Inspect and Repair

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

iv (Rev-1)

Consolidated List of References

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free or charge. Other Government documents may be accessed – free of charge – as follows:

• MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm

• Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp

• Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::

www.gpoaccess.gov

The Government is aware of the following internet web links where contractors may procure commercial specifications:

• American Welding Society (AWS): http://www.awspubs.com/index.php

• ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/

• NFPA: http://www.nfpa.org

• SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace

COAST GUARD DRAWINGS

Coast Guard Drawing 627 WMEC 581-005, Anchor Windlass Coast Guard Drawing 627 WMEC 252-001, Rev F, Control Air Piping Arrangement Coast Guard Drawing 627 WMEC 551-002, Rev D, Arrangement of Compressed Air in Machinery Space Coast Guard Drawing 627 WMEC 593-001, Rev B, Diagram MSD System Coast Guard Drawing 627 WMEC 593-002, Rev D, Arrangement MSD System Coast Guard Drawing 627 WMEC 259-001, Rev D, Arrangement Exhaust Piping Coast Guard Drawing 627 WMEC 186-002, Rev C, Talon Grid Foundations and Structural Modifications 01 Level Coast Guard Drawing 627 WMEC 252-001, Rev F, Control Air Piping Arrangement Coast Guard Drawing 627 WMEC 259-001, Rev D, Arrangement Exhaust Piping Coast Guard Drawing 627 WMEC 551-002, Rev D, Arrangement of Compressed Air in Machinery Space Coast Guard Drawing 627 WMEC 85-301, Rev A, Booklet of General Plans Coast Guard Drawing FL-588-001, Rev C, Talon Grid Support Skirt Replacement Coast Guard Drawing FL-8301-002, Rev A, Talon Helo Landing Grid Stanchion Bolt with Locknut

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and Color Manual Coast Guard Technical Publication (TP) Coast Guard Technical Publication (TP) 3368, Feb 2006, Technical Documentation Helicopter Land Grid TYPE 18-22-01 Surface Forces Logistics Center (SFLC), Standard Specification 0000_STD, 2009 Edition, General Requirements Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements http://www.assistdocs.com/search/search_basic.cfm http://www.uscg.mil/directives/default.asp http://www.gpoaccess.gov/ http://www.awspubs.com/index.php http://www.techstreet.com/ http://www.nfpa.org/ http://shopping.netsuite.com/sspcmarketplace v (Rev-1)

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), Jan 2009, Overhaul AC Electrical Motors In-Shop Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), Jan 2009, Inspect, Repair, and Test Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), Jan 2009, Temporary Hull Accesses

OTHER REFERENCES

American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities

American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System Components - Health Effects American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and Welding End American Society of Mechanical Engineers (ASME), PTC 25, 2001, Pressure Relief Devices

ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D5363, 2003, Standard Specification for Anaerobic Single Component Adhesives ASTM International (ASTM) F683, 2003, Standard Practice for Selection and Application of Thermal Insulation for Piping and Machinery ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates

Code of Federal Regulations (CFR) Title 29, Part 1915, Jul 2008, Occupational Safety and Health Standards for Shipyard Employment

Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency

Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation

DOD-STD-2187, Aug 1987, Chemical Cleaning of Salt Water Piping Systems Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure

Testing Of Steel Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly

Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball

Valves with Flanged or Butt-Welding Ends for General Service Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008 Edition, Bronze

Gate, Globe, Angle and Check Valves MIL-DTL-24244, May 2000, Insulation Material, With Special Corrosion, Chloride, and Fluoride Requirements

MIL-G-24716, Apr 1993, Gaskets, Metallic-Flexible Graphite, Spiral Wound MIL-I-16411, Nov 1988, Insulation Felt, Thermal, Glass Fiber

MIL-PRF-16173, 2006, Corrosion Prevention Compound, Solvent Cutback, Cold-Application MIL-Y-1140, Sep 1985, Yarn, Cord, Sleeving, Cloth, And Tape- Glass

NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments Installation Details NAVSEA Drawing 804-5959214, Rev-, Piping Insulation - Installation Details.

vi (Rev-1)

Consolidated List of Government-furnished Property

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

7 N M16 Bolts NSN: 5305-01-393-1827 24 ea. 25.65 7 N M12 Bolts PN: MDD-204 12 ea. 33.75 7 N **Talon Grid

Stanchion Bolt Assembly, Including Locking Nut

NSN: 5340-01-481-3786 60 ea. 96.30

14 N Search Light, Signaling

NSN: 6230-00-412-9375 2 ea. 5914.15

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter vii (Rev-1)

Consolidated List of Critical Inspection Items

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000_STD, paragraph

3.2.6.5 (Inspection report particulars)):

Work Item Title 1 Anchor Windlass, Level 2 Inspect and Repair 7 Helo Talon Grids, Inspect and Test 12 Warping Capstan , Level 2 Inspect and Repair 18 Davit, Single Point, Level 2 Inspect and Repair viii (Rev-1)

Principal Characteristics

210' WMEC (B-Class)

PHYSICAL CHARACTERISTICS

Length Overall 210' 6" Length, Design Waterline 200' 0" Depth (main deck at side to baseline) 19' 6" Maximum Beam 34' 0" Height of Highest Projection 88' 0" Full Load Draft 4,000 lbs Height of FM Antenna Above Baseline 90' 0" Light Ship Displacement 875 long tons Full Load Displacement 1100 long tons Shore Tie Voltage Requirements 400A / 440V Frame Spacing 1' 0"

MACHINERY CHARACTERISTICS

Main Propulsion 2 Alco Model 251B Diesel Engines, 5,000 BHP total

Ship's Service Generators 2 Caterpillar Model 3406B Diesel-driven SR4. 250 KW each @ 0.8 power factor, 440V AV, 3 phase, 60 cycle

Emergency Generator Caterpillar Model D333B Diesel-Driven. Century Synchronous Model, ACR-507, 100KW

Number of Propellers 2 Number of Blades 4 Diameter 7' 6" Pitch Controllable Shaft RPM 300 Shaft Diameter 8.25"

TANK CAPACITIES

Diesel Fuel (95%) 48,375 gal Fresh Water (95%) 11, 108 gal JP-5 Fuel (95%) 4,697 gal Lube Oil (95%) 1,942 gal ix (Rev-1)

00000_0310_FLT

REC_0000_FLT_ Commercial Project @ CG Facility (1209)

General Requirements

1. SCOPE

1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.

2. REFERENCES

COAST GUARD DRAWINGS

None.

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and

Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General

Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes

OTHER REFERENCES

Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety

Administration, Department Of Transportation

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.

• Provide fire watch personnel and fire extinguishers for the duration of the availability period.

x (Rev-1)

3.3 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.

3.4 HW disposal. The Contractor shall be responsible for all hazardous wastes generated by work under this contract. Label and package all hazard wastes in 49 CFR-approved containers, and in accordance with all other applicable Federal, state, and local laws and regulations. In addition, comply with applicable parts of 40 CFR 262, applicable to handling of hazardous wastes.

3.4.1 Along with the Government, the Contractor shall be contractually considered the co-generator of all hazardous wastes; be aware that the Government will make available its facility’s EPA Generator Identification (ID) Number for manifesting of hazardous wastes.

3.4.2 The Contractor shall identify, arrange, and be responsible for the turnover of all hazardous wastes, within the confines of the Coast Guard shore facility, to the facility’s HM/HW Coordinator. Notify the ship’s HW Coordinator prior to any transfers of HW from ship to shore.

3.4.3 The Contractor shall prepare a manifest of hazardous waste to be reviewed and signed by the HM/HW Coordinator. Contact the HM/HW Coordinator for turnover of any hazardous waste; in addition, notify the COTR 24 hours prior to any waste removals, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).

3.4.4 The Contractor shall be aware of the following:

3.4.4.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COTR or KO-approval.

3.4.4.3 Local environmental regulations at the Government facilities may be more stringent than in many jurisdictions. As with all environmental regulations, it is the Contractor's responsibility to research, prepare for, and comply with, the local and state regulations.

3.4.4.4 Coast Guard facilities do not have Facilities Response Plans (see 33 CFR 154 Subpart F). It is the Contractor’s responsibility to furnish the Facility Response Plan (FRP) when required for over-the-water liquids transfers to and from vessels. This requirement is applicable to transfers to/from vessels with an oil/fuel capacity of 250 barrels or more.

4. NOTES

4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may be accessed at the following URL address: http://www.uscg.mil/directives/cim.asp

4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 0000 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

http://www.uscg.mil/directives/cim.asp xi (Rev-1)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________ Specific Area Being Preserved: ___________________________________________________________

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating manufacturer(s).

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating manufacturer(s).

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10…).

Verify surface anchor profile (1.5-3.5 mils for abrasive-blasted steel surfaces; 1.0 mil (minimum) for power-tool cleaned surfaces; 1.0-1.5 mils for abrasive-blasted aluminum surfaces); and 1.5 –2.5 for surfaces to be coated w/single coat of inorganic zinc). Conduct 5 sets of 3 readings for the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Measure soluble salt conductivity (5 measurements per 1000 sqft) – maximum threshold: 70 microsiemens/cm for non-submerged surfaces and 30 microsiemens/cm for submerged surfaces.

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application:_________/_________; Return to service or removal from environment controls: _______/_______

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________ xii (Rev-1)

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________

(Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat)

DATE &

TIME

ENTER ACTIVITY

(Surface preparation, primer coat, barrier coat, top coat, etc…)

LOCATION

TEMPERATURE

% REL.

HUMIDITY

SIGNATURE

OF

INSPECTOR DEW

POINT SURFACE AMBIENT

ΔT

| DP - Surface

Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________ xiii (Rev-1)

QA-3 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG)

Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________ Location of Surface Profile Measurements: ___________________________________________________________

SURFACE PREPARATION METHOD PROFILE

(mils)

Min Max Avg.

SSPC-SP-10/NACE No. 2 SSPC-SP-12/NACE No. 5

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

Abrasive Manufacturer and Sieve Size: _________________________________ Place Surface Profile Replica Tapes In The Spaces Provided Below, To Serve As Permanent QA record. Maintain separate log for each area/location. When an Area Is Divided Into Separate Sections, Maintain A Separate Log for Each Section.

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils Average Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________

Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________ xiv (Rev-1)

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________

Location of Work (including frame numbers): _______________________________________ Area (square feet): ____________

DATE TEST LOCATIONS CONDUCTIVITY

(microsiemens/cm)

Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________ xv (Rev-1)

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence) Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________

Coating Manufacturer: ___________________Product Name: _______________________Batch Number: ____________ Induction Time: _______________________________________________________________ Coating System Sequence (Indicate Whether: Primer, Touch-Up Primer, Barrier Coat, 3rd Coat…): __________________

DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC PA-2

SPOT 1 2 3 4 5 AVERAGE

VALUE

*BASE METAL

READING (BMR)

*Required, If Magnetic Pull-Of (Type I/Banana) Gauge Is Used.

Location (Frame Reference): ___________________

SPOT 1 2 3 4 5

Overall Avg. DFT

ADJUSTMENTS

1 Avg. BMR Deviation 3 Before

Adjustments After Adjustments

Avg.

Location (Frame Reference): ___________________

SPOT 1 2 3 4 5

Overall Avg. DFT

ADJUSTMENTS

1 Avg. BMR Deviation 3 Before

Adjustments After Adjustments

Avg.

Location (Frame Reference): ___________________

SPOT 1 2 3 4 5

Overall Avg. DFT

ADJUSTMENTS

1 Avg. BMR Deviation 3 Before

Adjustments After Adjustments

Avg.

Application Method (Airless, Conventional Spray, Rolled):____________________ Average DFT: __________________________________________________________

Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________ xvi (Rev-1)

1 (Rev-1)

8100_MWS_0610_210_270

REC_58100_210_270_210’ WMEC ‘B’ Class (ALL) (0809)

WORK ITEM 1: Anchor Windlass, Level 2 Inspect and Repair

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to perform maintenance on a designated anchor windlass.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 627 WMEC 581-005, Anchor Windlass

COAST GUARD PUBLICATIONS

Coast Guard Technical Publication (TP) 3240A Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), Jan 2009, Overhaul

AC Electrical Motors In-Shop Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), Jan 2009, Inspect, Repair, and Test Auxiliary Machine Systems

OTHER REFERENCES

None.

3. REQUIREMENTS

3.1 General.

3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraphs:

• 3.2.1 (Level 1 Maintenance).

• 3.2.2 (Level 2 Maintenance).

3.1.2 Technical Representative.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of

2 (Rev-1) contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.

3.1.4 Interferences.

None.

NOTE

The windlass assembly is mounted on a bed of chockfast, without a releasing agent; significant effort will be required to remove mounting bolts and break foundation plate from the chockfast material. Chockfast must be renewed, in accordance with manufacturer’s recommendation, upon windlass reinstallation.

3.2 Maintenance particulars. The Contractor shall perform the work described herein in accordance with SFLC Std Spec 5000 (see paragraph number relationships, 4.1), and TP 3240A, and as shown on Coast Guard Drawing 627 WMEC 581-005, Anchor Windlass.

3.2.1 Level 1 maintenance.

ADDITION REQUIREMENTS

# TASK

TYPE

QTY COMPONENT OR

ASSEMBLY

APPENDIX AND

PARA. FROM

SFLC STD SPEC

OTHER

1 Operate and Inspect

1 Anchor Windlass Assembly

N/A Submit CIR.

2 OP Test 1 Anchor Windlass Assembly

B-2.5 Submit CIR.

3 Fabricate and Install

1 Label plate B-2.9 System: Anchor Windlass

3 (Rev-1)

3.2.2 Level 2 maintenance.

ADDITION REQUIREMENTS

# TASK

TYPE

QTY COMPONENT OR

ASSEMBLY

APPENDIX AND

PARA. FROM

SFLC STD SPEC

OTHER

4 Overhaul, Inspect, and Preserve

1 Main Reduction Gear Box

D-2.4 Submit CIR.

5 Overhaul, 1 Main shaft assembly N/A Submit CIR.

6 Service, Inspect, and Preserve

1 Electric Motor Assembly

N/A Perform paragraph 3.1 and 3.2 of SFLC Std Spec 3020.

Submit CIR.

7 Overhaul and Inspect 1 Disc Brake Assembly D-2.3 Submit CIR.

8 Overhaul and Inspect

1 Band Brake Assembly

D-2.3 Submit CIR.

9 Overhaul, Inspect, and Preserve

1 Band Brake Hand- Wheel, Bevel Gear Stand, and Linkage Assembly

N/A Submit CIR.

10 Overhaul, Inspect, and Preserve

1 Axial Dog Clutch Mechanism

N/A Submit CIR.

11 Overhaul, Inspect, and Preserve

1 Control Station N/A Submit CIR.

12 Renew All Chock-Fast between windlass assembly and deck.

N/A N/A

13 Renew All Fasteners that Attach each windlass assembly to the deck

D-2.1 N/A

14 Groom and Lubricate

1 Anchor Windlass Assembly

N/A N/A

4. NOTES

4.1 Paragraph number relationships. The appendix and paragraph number for each appendix and paragraph listed in Section 3 relates directly to the identical appendix and sub-paragraph number in SFLC Std Spec 5000.

4 (Rev-1)

25901_JAH_1109_FLT

REC_25901_FLT_210' WMEC 'B' Class (ALL) (1109)

WORK ITEM 2: Main Diesel Engine (MDE) Exhaust Piping , Clean and Inspect

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean the Main Diesel Engine (MDE) exhaust stacks.

1.2 Government-furnished equipment.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 627 WMEC 259-001, Rev D, Arrangement Exhaust Piping

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General

Requirements

OTHER REFERENCES

Code of Federal Regulations (CFR) Title 29, Part 1915, Jul 2008, Occupational Safety and Health

Standards for Shipyard Employment

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Technical Representative.

Not applicable.

5 (Rev-1)

3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences):

• Access covers.

• Exhaust stack.

• MDE.

• Piping.

• Pipe insulation.

• Vent ducting.

• Wiring.

• Exhaust pipe expansion joints.

• Exhaust insulation blankets. To be renewed by contractor.

• “Chalk” compound over exhaust connections (in order to remove bolts from expansion joints).

3.1.5 Scaffolding. The Contractor shall, in accordance with 29 CFR 1915, Subpart E, erect suitable staging or scaffolding.

3.1.6 Safety precaution. The Contractor shall rig suitable safety netting, to protect workers during possible falls, and to protect the Engine Room and machinery from falling tools.

3.1.7 Access openings.

3.1.7.1 Work site access. The Contractor shall gain access to both MDE exhaust stacks via existing accesses; the Engine Room, 4-108-0-E or 01-99-0-Q.

3.2 Work plan. The Contractor shall develop and submit, to the COTR, a plan for collecting and disposing of waste extracted during cleaning process. Ensure that the proposed plan shall detail how and where exhaust piping will be disconnected, how entire length of exhaust piping will be divided/sectioned for cleaning, and precautions to protect the MDE. The Contractor shall perform this work upon receiving Coast Guard approval of the plan.

6 (Rev-1)

3.3 Operational test - initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of the exhaust stack system, to demonstrate existing operational condition.

Submit a CFR.

3.4 Cleaning. The Contractor shall clean the interior surfaces of the exhaust piping to the MDE, shown on Coast Guard Drawings 627 WMEC 295-001, Rev D, to a condition free from soot, tar, and any other foreign matter as follows:

3.4.1 Remove insulation from flex joints, inspect flex joints and associated hardware for leaks, submit CFR.

3.4.2 Disconnect the exhaust piping as necessary to facilitate cleaning

3.4.3 Remove and retain the existing exhaust mufflers.

3.4.4 Thoroughly sweep, mechanically clean, and vacuum the interior of each exhaust pipe system, including the mufflers, from the exhaust outlet to the topmost location outside the vessel. Ensure that all tar deposits, soot deposits, and all other surface contaminants are completely removed.

3.4.5 Upon completion of cleaning, do the following:

3.4.5.1 Remove all debris from the pipe surfaces, stack deck, and Engine Room areas by vacuuming. Dispose of all cleaning materials and generated debris in accordance with all applicable Federal, state, and local regulations.

3.4.5.2 Reassemble exhaust piping; renew all flange connection gaskets with suitable high temperature, non-asbestos-containing gasket materials, exhaust insulation blankets and renew all fasteners.

3.5 Inspection and report. The Contractor shall perform a visual inspection of the following components; submit a CFR:

• Exhaust stack access hatches, including all associated studs and nuts.

• All cleaned exhaust stack surfaces.

• All exhaust expansion joints, including associated bolts.

3.6 Touch-up preservation. The Contractor shall prepare and touch-up coat all disturbed surfaces to match existing adjacent surfaces in accordance with COMDTINST M10360.3, Appendix B (Cutter and Boat Interior Painting Systems). Abide by all touch-up requirements outlined in SFLC Std Spec 0000, Appendix A (Requirements for Preservation of Ship Structures).

3.7 Operational test – post repairs. After completion of work, the Contractor shall witness an operational test (by Coast Guard personnel) of the exhaust stack system to prove satisfactory operating condition. Submit a CFR.

4. NOTES

This section is not applicable to this work item.

7 (Rev-1)

25902_JAH_1109_FLT

REC_25902_FLT_210' WMEC 'B' Class (ALL) (1109)

WORK ITEM 3: Ship Service Diesel Generator (SSDG) Exhaust Piping, Clean and Inspect

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean the Ship Service Diesel Generator (SSDG) exhaust piping.

1.2 Government-furnished equipment.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 627 WMEC 259-001, Rev D, Arrangement Exhaust Piping

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General

Requirements

OTHER REFERENCES

Code of Federal Regulations (CFR) Title 29, Part 1915, Jul 2008, Occupational Safety and Health

Standards for Shipyard Employment

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Technical Representative.

Not applicable.

8 (Rev-1)

3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences):

• Access covers.

• Exhaust stack.

• SSDG.

• Vent ducting.

• Wiring.

• Exhaust pipe expansion joints.

• Exhaust insulation blankets. To be renewed by contractor.

3.1.5 Safety precaution. The Contractor shall rig suitable safety netting, to protect workers during possible falls, and to protect the Engine Room and machinery from falling tools.

3.1.6 Access openings. Work site access. The Contractor shall gain access to both MDE exhaust stacks via existing accesses; the Engine Room, 4-108-0-E or 01-99-0-Q.

3.2 Work plan. The Contractor shall develop and submit, to the COTR, a plan for collecting and disposing of waste extracted during cleaning process. Ensure that the proposed plan shall detail how and where exhaust piping will be disconnected, how entire length of exhaust piping will be divided/sectioned for cleaning, and precautions to protect the SSDG. The Contractor shall perform this work upon receiving Coast Guard approval of the plan.

3.3 Operational test - initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of the exhaust stack system, to demonstrate existing operational condition.

Submit a CFR.

3.4 Cleaning. The Contractor shall clean the interior surfaces of the exhaust piping to the SSDG, shown on Coast Guard Drawings 627 WMEC 295-001, Rev D, to a condition free from soot, tar, and any other foreign matter as follows:

3.4.1 Remove insulation from flex joints, inspect flex joints and associated hardware for leaks, submit CFR.

3.4.2 Disconnect the exhaust piping as necessary to facilitate cleaning.

3.4.3 Remove and retain the existing exhaust mufflers.

9 (Rev-1)

3.4.4 Thoroughly sweep, mechanically clean, and vacuum the interior of each exhaust pipe system, including the mufflers, from the exhaust outlet to the topmost location outside the vessel. Ensure that all tar deposits, soot deposits, and all other surface contaminants are completely removed.

3.4.5 Upon completion of cleaning, do the following:

3.4.5.1 Remove all debris from the pipe surfaces, stack deck, and Engine Room areas by vacuuming. Dispose of all cleaning materials and generated debris in accordance with all applicable Federal, state, and local regulations.

3.4.5.2 Reassemble exhaust piping; renew all flange connection gaskets with suitable high temperature, non-asbestos-containing gasket materials, and renew all fasteners.

3.5 Inspection and report. The Contractor shall perform a visual inspection of the following components; submit a CFR:

• Exhaust stack access hatches, including all associated studs and nuts.

• All cleaned exhaust stack surfaces.

• All exhaust expansion joints, including associated bolts.

3.6 Touch-up preservation. The Contractor shall prepare and touch-up coat all disturbed surfaces to match existing adjacent surfaces in accordance with COMDTINST M10360.3, Appendix B (Cutter and Boat Interior Painting Systems). Abide by all touch-up requirements outlined in SFLC Std Spec 0000, Appendix A (Requirements for Preservation of Ship Structures).

3.7 Operational test – post repairs. After completion of work, the Contractor shall witness an operational test (by Coast Guard personnel) of the exhaust stack system to prove satisfactory operating condition. Submit a CFR.

10 (Rev-1)

25903_MWC_1109_FLT

REC_25903_FLT_210' WMEC 'B' Class (ALL)

WORK ITEM 4: Boiler Exhaust Piping , Clean and Inspect

1.1 Intent. This work item describes the requirements for the Contractor to clean the Boiler exhaust stack uptakes.

1.2 Government-furnished equipment.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 627 WMEC 259-001, Rev D, Arrangement Exhaust Piping

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center (SFLC), Standard Specification 0000_STD, 2009 Edition, General

Requirements

OTHER REFERENCES

None.

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Technical Representative.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the

11 (Rev-1) performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences):

• Access covers.

• Exhaust stack.

• Boiler.

• Exhaust pipe expansian joints.

• Exhaust insulation blankets. To be renewed by contractor.

3.1.5 Safety precaution. The Contractor shall rig suitable safety netting, to protect workers during possible falls, and to protect the Engine Room and machinery from falling tools.

3.2 Operational test - initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of the exhaust stack system, to demonstrate existing operational condition.

Submit a CFR.

3.3 Cleaning. The Contractor shall clean the interior surfaces of the exhaust piping to the Boiler, shown on Coast Guard Drawing 627 WMEC 295-001, Rev D, to a condition free from soot, tar, and any other foreign matter as follows:

3.3.1 Remove insulation from flex joints, inspect flex joints and associated hardware for leaks, submit CFR.

3.3.2 Disconnect the exhaust piping as necessary to facilitate cleaning.

3.3.3 Remove and retain the existing exhaust mufflers.

3.3.4 Thoroughly sweep, mechanically clean, and vacuum the interior of each exhaust pipe system, including the mufflers, from the exhaust outlet to the topmost location outside the vessel. Ensure that all tar deposits, soot deposits, and all other surface contaminants are completely removed.

3.3.5 Upon completion of cleaning, do the following:

3.3.5.1 Remove all debris from the pipe surfaces, stack deck, and Engine Room areas by vacuuming. Dispose of all cleaning materials and generated debris in accordance with all applicable Federal, state, and local regulations.

3.3.5.2 Reassemble exhaust piping; renew all flange connection gaskets with suitable high temperature, non-asbestos-containing gasket materials, and renew all fasteners.

12 (Rev-1)

3.4 Inspection and report. The Contractor shall perform a visual inspection of the following components; submit a CFR:

• Exhaust stack access hatches, including all associated studs and nuts.

• All cleaned exhaust stack surfaces.

• All exhaust expansion joints, including associated bolts.

3.5 Touch-up preservation. The Contractor shall prepare and touch-up coat all disturbed surfaces to match existing adjacent surfaces in accordance with COMDTINST M10360.3, Appendix B (Cutter and Boat Interior Painting Systems). Abide by all touch-up requirements outlined in SFLC Std Spec 0000, Appendix A (Requirements for Preservation of Ship Structures).

3.6 Operational test – post repairs. After completion of work, the Contractor shall witness an operational test (by Coast Guard personnel) of the exhaust stack system to prove satisfactory operating condition. Submit a CFR.

13 (Rev-1)

54100_MWC_0509_FLT

WORK ITEM 5: Fuel Valves, Overhaul or Renew

1.1 Intent. This work item describes the requirements for the Contractor to overhaul or renew fuel valves, designated as follows:

1.1.1 Valves designated for overhaul or renewal.

TYPE

SIZE

(inch es)

MATERIAL DESCRIPTION

FRAME

LOCATION/VALVE

NO.

CONNECTION

RATED

PRESSURE

CLASS (#)

Gate 2" Cast Steel Fuel Oil 3--142-3 Welded Gate 2" Cast Steel Fuel Oil 3--142--6 Welded

3-way globe 1 1/4" Carbon Steel Fuel Oil Engine Room Welded

Gate 3/8 Carbon Steel Fuel Oil 2-111-1 Welded Gate 3/8 Carbon Steel Fuel Oil 2-111-2 Welded Gate 3/8 Carbon Steel Fuel Oil 2-111-3 Welded Gate 3/8 Carbon Steel Fuel Oil 2-111-4 Welded

Lift Check Valve 3/8” Carbon Steel Fuel Oil Engine Room Welded

Lift Check Valve 3/8” Carbon Steel Fuel Oil Engine Room Welded

Lift Check Valve 3/8” Carbon Steel Fuel Oil Engine Room Welded

Lift Check Valve 3/8” Carbon Steel Fuel Oil Engine Room Welded

1.2 Government-furnished property.

None.

2. APPLICABLE DOCUMENTS

COAST GUARD DRAWINGS

Coast Guard Drawing 627 WMEC 261-001, Rev C Diagram Fuel Oil System Coast Guard Drawing 627 WMEC 261-002, Rev E Arrangement of Fuel Oil System

14 (Rev-1)

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General

Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes

OTHER REFERENCES

American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and

Welding End ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates MIL-G-24716, Apr 1993, Gaskets, Metallic-Flexible Graphite, Spiral Wound Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008 Edition, Bronze Gate, Globe, Angle and Check Valves

3. REQUIREMENTS

3.1 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences):

• Insulation.

• Fuel piping.

• Electrical wiring.

• Diesel Fuel Tank 4-143-1-F (5766-gallon capacity, 500 gallons at low suction point).

• Diesel Fuel Tank 4-143-2-F (5766-gallon capacity, 500 gallons at low suction point).

3.2 Fluid handling. The Contractor shall remove up to 1000 gallons of diesel fuel to facilitate tank gas-freeing.

Dispose of removed diesel fuel in accordance with all applicable Federal, state, and local regulations. Stow lube oil in suitable stowage facility, immediately after removal, and re-stow all tank contents, upon completion of work.

3.3 Removal. The Contractor shall remove all designated valves in Section 1.1 (Intent). Immediately after valve removal, install blank flanges and gaskets over all openings and secure each flange with at least two bolts, 180 degrees apart.

3.4 Contractor’s option for valve renewal. The Contractor may, at no additional cost to the Government, opt to renew valves designated for overhaul if preferable for the Contractor. If the Contractor elects to renew valves designated for overhaul, ensure all new valves are commercial-standard type valves, conforming to the applicable

15 (Rev-1) standard listed in Table I (Valve Standards). New valves shall be equivalent (including identical material) to the valve being renewed. Visually inspect the piping and mounting arrangements; and submit a CFR detailing any required modifications to accommodate the new valve(s).

3.5 Overhaul. The Contractor shall accomplish the following as required for each valve designated for overhaul (not including valves the Contractor has opted to renew) to meet the specified valve testing standard:

3.5.1 Disassembly. Disassemble the valve to the extent necessary to perform the required work.

NOTE

Complete disassembly of some valves may not be necessary to accomplish overhaul.

3.5.2 Cleaning. Clean all internal surfaces and visually inspect for defects in body and structural material.

Inspect the surface finish and condition of seats, disks, parting faces, plugs, and sealing surfaces.

3.5.3 Machining. As applicable; machine, grind, lap and spot-in seat-to-disk to obtain an acceptable leakage rate at or below valve testing standards (see Table I below).

3.5.4 Reassembly. Reassemble the valve using new hardware and software (packing, O-rings, gaskets, seal rings, non-metallic seats, pins, washers, inserts, etc.).

3.5.5 Testing. Test the overhauled valves in accordance with the applicable standards listed in Table I (Valve Standards). Submit a CFR.

TABLE I - VALVE STANDARDS

VALVE TYPE INDUSTRY STANDARD

Steel Valves MSS SP-61

Butterfly Valve MSS SP-67 Ball Valves, Flanged or Butt-Welded

Ends MSS SP-72 Bronze Gate, Globe, Angle and Check

Valves MSS SP-80 All others ASME B16.34

3.6 Renewal. The Contractor shall renew all designated with commercial-standard type valves, conforming to the applicable standard listed in Table I (Valve Standards).

NOTE

The Contractor shall replace any mil-std valves listed for renewal with equivalent commercial standard valves.

3.7 Valve reinstallation/installation. Upon completion of all authorized work, the Contractor shall accomplish the following:

• Remove and dispose of all blank flanges and associated gaskets.

• Reinstall/install all overhauled and new valves with new gaskets.

• Renew all missing or damaged valve label plates.

16 (Rev-1)

• Renew all bolting hardware, in kind.

• Prepare and touch-up coat all disturbed surfaces to match existing adjacent surfaces in accordance with COMDTINST M10360.3, Appendix B (Cutter and Boat Interior Painting Systems). Abide by all touch-up requirements outlined in SFLC Std Spec 0000, Appendix A (Requirements for Preservation of Ship Structures).

3.8 Valve labeling. The Contractor shall install valve label plates on all new valves in accordance with ASTM F992.

3.9 Leak test. After all authorized repairs of mechanical (i.e. threaded, bolted, etc.) joints, the Contractor shall perform an operational test of the applicable system using the system fluid at normal operating pressure. Be aware that no visible leakage or deformation is acceptable. Repair all leaks and discrepancies found. Submit a

CFR.

3.10 Hydrostatic test. After all authorized repairs of welded joints, the Contractor shall hydrostatically test all new and disturbed piping and components of the applicable system in accordance with SFLC Std Spec 0740, Appendix C, “Hydrostatic Test”. Be aware that no leakage or permanent deformation of pressure-containing parts is permissible. Repair all leaks and discrepancies found. Submit a CFR.

17 (Rev-1)

55101_MWC_0709_FLT

REC_55101_FLT_210 WMEC ‘B’ Class (ALL) (0709)

WORK ITEM 6: Compressed Air System Valves , Inspect and Test

1.1 Intent. The work item describes the requirements for the Contractor to inspect and test the below designated compressed air system valves:

TYPE SIZE DESIGNATION QTY SET PRESSURE

(PSI)

Relief ½” Start Air Receiver 2 275 Relief ½” Start Air Receiver 1 110 Relief ½” Start Air Compressor 2 275 Relief ½” Start Air Receiver 1 165 Relief ¾” Ship Service Air

Compressor 2 138

Relief ½” Ship Service Air Receiver 1 125

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 627 WMEC 252-001, Rev F, Control Air Piping Arrangement Coast Guard Drawing 627 WMEC 551-002, Rev D, Arrangement of Compressed Air in Machinery Space

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series),…

This is the start of the file's text. The full file is on GovTribe.

Other files

File Type Posted
ALERT RFQ.doc DOC document
630_ ALERT_DS_FY11_BLANK_SOSS_.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .