USCGC EAGLE (WIX-327) DOCKSIDE REPAIRS SPECIFICATION REVISION 4 DATED JULY 7 2009
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EAGLE BLANK SETION B.pdf | ||
| EAGLE DS 10Q3FA003 SOLICITATION.DOC | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC EAGLE (WIX-327)
295 FOOT BARQUE
SPECIFICATIONS FOR DOCKSIDE REPAIRS
Developed By:
ALLISON BETRO
Commander (v) Maintenance and Logistics Command, Atlantic 300 E. Main Street, Suite (600) Norfolk, VA 23510-9102
(July 7, 2009 / Revision 4)
USCGC EAGLE (WIX-327) DOCKSIDE AVAILABILITY 2010
TABLE OF CONTENTS
Work Item Title Page
List of Sketches iii
Revisions Record iv
List of Applicable References v
List of Government-furnished Property ix
List of Critical Inspection Items x
Specification Feedback xi
Principal Characteristics xii
General Requirements 1
1 Renew Structural Closures 9
2 Renew Handrail 01 Deck Fantail 13
3 Renew Liferaft Support Brackets 17
4 Renew Exhaust Stack Partial 20
5 Clean Laundry Ventilation Systems 24
6 Clean Galley & Scullery Ventilation Systems 26
7 Overhaul Vaneaxial Fans and Motor Assemblies 29
8 Clean, Inspect and Test Hot Water Accumulator Tank 35
9 Perform Crescent Boat Davit Maintenance 39
10 Perform Vertical Capstan Maintenance 42
11 Modify Oily Water Separator System Discharge Piping 45
12 Renew Padeyes for Foremast Backstays Partial 49
13 Renew Passage Way Deck Covering System 52
Page i (Rev 4)
14 Clean and Inspect Emergency Diesel Generator In- Place 55
15 Renew Teak Caulk 57
16 Perform Ultrasonic Thickness Measurements 59
17 Renew Electrical Grade Deck Covering System 61
18 Preserve Gallows 64
19 Renew #1 A/C Sea Strainer 67
Page ii (Rev 4)
List of Sketches
Work Item Sketch Number Page
11 Sketch 1 48
Page iii (Rev 4)
Revisions Record
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package.
Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK ITEM# CHANGES MADE
6/9/09 1 GFE Revised the list of GFP to Match w/i-1 6/9/09 1 2 Section 3.2.2 – Revised such that
Contractor furnished and install 316 stainless steel.
6/9/09 1 3 Section 3.2.2 – Revised such that Contractor furnished and install 316 stainless steel.
6/9/09 1 4 Added section 3.6.4 to reinstall teak deck previously removed.
6/9/09 1 9 Revised static load test weight and rated load weight test. Deleted task 4 service & inspect block assemblies & NDI boat cradle.
6/9/09 1 11 Section 3.1.2.2 Revised quantity of fluid removals. Section 3.2 revised to dirty waste oil & oily water system. Added Sketch 1.
6/9/09 1 17 Table 1, Corrected compartment name to EM Shop.
6/9/09 1 18 Section 3.2 Added the removal and reinstallation of teak deck. Section 5.2 deleted.
6/12/09 2 15 Sect 3.1.1 Deleted Related W/I “Preserve Gallows” since this is an optional item.
6/17/09 3 19 Changed CG Drawing from 3801-3 to 3803-1 7/7/09 4 GFP Revised GFP Table on page IX to reflect
Work Item 1.
7/7/09 4 7 Changed Title by deleting the word “and
Renew” – “Overhaul Vaneaxial Fans and Motor Assemblies”
NOTE: All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Page iv (Rev 4)
List of Applicable References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution. Electronic copies of the latest Editions of MLCA Standard Specifications are available on the Internet and may be accessed at the following Internet Uniform Resource Locator (URL) address:
http://www.uscg.mil/mlclant/vdiv/standard_specifications.asp.
Guidance for obtaining copies of all other documents referenced herein is provided in the solicitation.
Order of precedence. In the event of conflicts between text of this specification and the applicable references specified herein, order of precedence shall be in accordance with MLCA Standard Specification 0000_STD, paragraph 3.2 (Order of precedence), unless otherwise specified by the Contracting Officer (KO). The Contractor shall immediately notify the KO in writing of any perceived conflicts contained herein. Nothing in these documents, however, supersedes applicable laws and regulations, unless a specific exemption has been obtained.
FEDERAL AND MILITARY SPECIFICATIONS AND STANDARDS
MIL-R-6855, 2001, Elastomer, Synthetic, Sheets, Strips, Molded or Extruded Shapes, General Specification For
MIL-STD-1623, Dec 1981, Fire Performance Requirements and Approved Specifications for Interior Finish Materials and Furnishings
OTHER GOVERNMENT DOCUMENTS, DRAWINGS, AND PUBLICATIONS
DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Page v (Rev 4) http://www.uscg.mil/mlclant/vdiv/standard_specifications.asp
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 2350_STD, 2004 Edition, Clean, Inspect, Varnish-Treat, and Test Propulsion Generators and Motors, Ship Service and Emergency Generators in-Place
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 3141_STD, 2004 Edition, Overhaul Electrical Rotating Machines
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 5000_STD, 2004 Edition, Auxiliary Machinery Systems
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 5100_STD, 2004 Edition, Clean Shipboard Ventilation Systems
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 6341_STD, 2004 Edition, Renew Deck Covering Systems
DRAWINGS
Coast Guard Drawing 327 WIX 1107-1, Rev A, New Pilot House
Coast Guard Drawing 327 WIX 1112-14, Rev-, FND INCID TO BOAT
DAVIT MOD
Coast Guard Drawing 327 WIX 1401-001, Rev-, Peak Decking, Focsle, Main, Poop Deck and House Top
Coast Guard Drawing 327 WIX 1702-1, Rev-, Foremast
Coast Guard Drawing 327 WIX 1702-5, Rev-, Foremast
Coast Guard Drawing 327 WIX 3803-1, Rev -, Berg A/C Chillers
Coast Guard Drawing 327 WIX 3801-014, Rev-, Galley Vent. Mods.
Coast Guard Drawing 327 WIX 3801-100, REV -, Ventilation Diagram
Coast Guard Drawing 327 WIX 3801-111, Rev-, Ventilation System Arrangement & Details, FWD FR 37, MN DK & Below
Coast Guard Drawing 327 WIX 3801-112, Rev-, Ventilation System Arrangement & Details, FR 37-63, MN DK & Below
Coast Guard Drawing 327 WIX 4105-1, Rev -, Emerg Diesel Generator Installation
Page vi (Rev 4)
Coast Guard Drawing 327 WIX 4804-3, Rev – Potable Water Mods Incid to 400 Gallon Heater Instl
Coast Guard Drawing 327 WIX 4105-3, Rev -, Emerg Diesel Generator Installation (Manufacturer’s Drawing)
Coast Guard Drawing 327-WIX 4823-1, Rev A, PIPING DIAGRAM - OILY
WATER SEP SYS
Coast Guard Drawing 327-WIX 4823-2, Rev -, DIAGRAM OILY WATER
SEPARATOR SYS
Coast Guard Drawing 327 WIX-5200-2, Rev B, Stack A & D
Coast Guard Drawing 327-WIX 8201-3, Rev B, ASSEMBLY 20 H.P.
DOUBLE GYPSY HOIST
Coast Guard Drawing 327 WIX 8201-2, REV B, BOAT DAVIT
INSTALLATION PLAN
Coast Guard Drawing 327-WIX 8201-4, REV -, DAVIT MODIFICATION
Coast Guard Drawing 327-WIX 8201-6, REV -, HYD PIPING MODS INCID
BOAT DAVIT MODS
Coast Guard Drawing 327-WIX 8201-7, REV -, RIGGING MODS INCID
BOAT DAVIT MODS
Coast Guard Fleet Drawing FL-1204-3, Rev A, Welded Pad Eyes and Links
Coast Guard Drawing FL 8220-109, Rev -, Encapsulated Liferaft Stowage
NAVSEA Drawing 803-6397272, Rev A, Life boat Encapsulated Stowage Deck Edge Mount Type 1
PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Jun 2006, Coatings and Color Manual
Coast Guard Technical Publication (TP) 3483, 4, Mar 2001, Vertical Capstan – Instructions
INDUSTRY STANDARDS
Page vii (Rev 4)
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-69, 2003, Pipe Hangers and Supports - Selection and Application
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-89, 2003, Pipe Hangers and Supports – Fabrication and Installation Practices
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 1999, Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric
International Standard Organization (ISO) 2953, 1999, Mechanical Vibration, Balancing Machines, Description and Evaluation
ASTM International (ASTM) A36, 2008, Standard Specification for Carbon Structural Steel
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D3951, Reapproved 2004, Standard Practice for Commercial Packaging
ASTM International (ASTM) E797, 2005, Standard Practice for Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method
Page viii (Rev 4)
List of Government-furnished Property
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
N
26” x 66” Quick-Acting Watertight Door, Left Hand, 10-dogs
2040-01-440-1903 2 1,800
N
26” x 66” Quick-Acting Watertight Door, Right Hand, 10-dogs
2040-01-440-5971 1 1,800
N
26” x 66” Quick-Acting Watertight Door, Left Hand, 8-dogs
2040-01-448-5165 1 2,200
N
30” x 66” Quick-Acting Watertight Door, Left Hand, 10-dogs
2040-01-441-3154 3 2,200
N
30” x 66” Quick-Acting Watertight Door, Right Hand, 10-dogs
2040-01-441-3152 1 1,500
N
22” x 60” Watertight Door, Steel, Left Hand, 8-Dog
None 1 1,200
19 N A/C Sea Strainer
Kraissel Co.
Model - #7239 2BB6
1 ea. 1,000.00
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel, Electronic Systems Support Unit (ESU) or local Electronic Support Detachment (ESD).
Page ix (Rev 4)
List of Critical Inspection Items
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see Std Spec 0000_STD, paragraph 3.6.2 (Inspection report particulars)):
Work Item Title
4 Renew Exhaust Stack Partial
9 Perform Crescent Boat Davit Maintenance
10 Perform Vertical Capstan Maintenance
16 Perform Ultrasonic Thickness Measurements
Page x (Rev 4)
Specification Feedback
The intent of this section is to inform all users that a spec feedback mechanism is in place, and is located on the MLCA Naval Engineering Division’s website. Spec feedback is a very important part of our overall continuous improvement process, and is crucial to specification development. It will allow spec writers to capture all specification-related lessons learned, and avoid mistakes or ambiguities in follow-on availabilities.
All feedback will be reviewed, evaluated, and responded to in a timely manner.
If you have access to the CGWeb (Intranet), please use the following link, which will connect you to the MLCA(v) Naval Engineering website, for submitting your feedbacks:
http://webapps.mlca.uscg.mil/vdiv/specifications/feedback/default.cfm
If you do not have access to the CGWeb (Intranet), you may still submit your feedbacks, using the following web link:
http://www.uscg.mil/mlclant/vdiv/specfeedback.asp
Page xi (Rev 4) http://webapps.mlca.uscg.mil/vdiv/specifications/feedback/default.cfm http://www.uscg.mil/mlclant/vdiv/specs/specfeedback.htm
PC_327_WIX_Eagle (07 Jan 2004)
Principal Characteristics
295’ WIX ”Eagle” Barque
Length Overall 295’ 0”
Depth (main deck at side to baseline) N/A
Maximum Beam 39’ 5”
Height of Highest Projection (above DWL) N/A
Frame Spacing 1’- 11 5/8”
Full Load Draft 17’ 0”
Full Load Displacement 1816 long tons
Shore Tie Voltage Requirements N/A
PROPELLERS / SHAFT
Number of Propellers 1
Number of Blades per Propeller 5
Diameter of Propeller 4’ 8”
Pitch Fixed
Revolutions per Minute (RPM) N/A
Shaft Diameter N/A
Page xii (Rev 4)
00000_DLA_FLT (23 Oct 2008)
General Requirements
1. SCOPE
1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Jun 2006, Coatings and Color Manual
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in Std Spec 0000_STD and in this item, as applicable, during the performance of this availability.
NOTICE!
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire extinguishers. The Contractor
shall provide portable fire extinguishers.
3.3 Welding and brazing requirements. The Contractor shall
perform all welding and allied processes, and nondestructive inspection (NDI), in accordance with Std Spec 0740_STD.
Page 1 (Rev 4)
3.4 Term substitution – COTR for COR. The Contractor shall be aware that the term “COR” (Contracting Officer’s Representative) has been discontinued in favor of “COTR” (Contracting Officer’s Technical Representative); consequently, whenever “COR” is encountered in this specification package, including referenced standard specifications and other referenced documents, it shall refer to “COTR”, explicitly.
4. NOTES
4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may
be accessed at the following URL address:
http://www.uscg.mil/directives/cim.asp
4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in Std Spec 0000_STD to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this item.
Page 2 (Rev 4) http://www.uscg.mil/directives/cim.asp
QA-1: QUALITY ASSURANCE INSPECTION FORM - PRESERVATION CHECKLIST
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10…).
Verify surface anchor profile (1.5-3.5 mils for abrasive-blasted steel surfaces;
1.0 mil (minimum) for power-tool cleaned surfaces; 1.0-1.5 mils for abrasive-blasted aluminum surfaces); and 1.5 –2.5 for surfaces to be coated w/single coat of inorganic zinc).
Measure soluble salt conductivity (5 measurements per 1000 sqft) – maximum threshold: 70 microsiemens/cm for non-submerged surfaces and 30 microsiemens/cm for submerged surfaces.
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the Coating Manufacturer(s).
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness.
Verify system cure for service resumption - U/W Body surfaces: 5-8 hours @ 77 degrees F; Potable water tanks: 7 days @ 77 degrees F.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure (minimum 7 days @ 77 degrees F.), to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
CHECKPOINT 10 – RECORD KEEPING
Page 3 (Rev 4)
Complete, sign, and submit all provided QA Inspection Forms.
Signature of Inspector:______________________________________________________Date:________
Page 4 (Rev 4)
QA-2. QUALITY ASSURANCE INSPECTION FORM
ENVIRONMENTAL READINGS
(Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat)
DATE TIME
ENTER ACTIVITY
(Surface preparation, primer coat, barrier coat, top coat, etc…)
LOCATION DEW
POINT
SURFACE
TEMP.
% REL.
HUMIDITY
SIGNATURE
OF
INSPECTOR
.Signature of Inspector:__________________________________________________Date:____________
Page 5 (Rev 4)
QA-3 QUALITY ASSURANCE INSPECTION FORM
SURFACE PROFILE LOG
Vessel Name And Hull Number:__________________________________________________
Work Item Title:_______________________________________________________________
Location Of Work (Including Frame Numbers):_____________________________________
Area (Square Feet):_____________
Surface Preparation Method:_____________________________________________________
Abrasive Manufacturer And Size:_________________________________________________
Degreasing Method Used:________________________________________________________
Number Of Hours Surfaces (Steel Only) Left Unpainted:______________________________
Sweep blasting performed to remove flash rusting (steel)?
Yes/No:_____________________
Place Surface Profile Replica Tapes In The Spaces Provided Below, To Serve As Permanent QA record.
Maintain separate log for each area/location. When an Area Is Divided Into Separate Sections, Maintain A Separate Log for Each Section.
AVERAGE MILS
(IAW ASTM D4417,
METHOD C)
Place Surface Profile Replica Tape Here
Reading:__________ mils
• Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Date and Time:__________________________________________________
Location of Surface Profile Measurements:___________________________________________________________
Signature of Inspector:____________________________________________________________________________
Page 6 (Rev 4)
QA-4. QUALITY ASSURANCE INSPECTION FORM
SURFACE SOLUBLE SALT CONDUCTIVITY LOG
Vessel Name and Hull Number:__________________________________________________
Work Item Title:_______________________________________________________________
Location of Work (including frame numbers):_______________________________________
Area (square feet):____________
DATE TEST LOCATIONS CONDUCTIVITY
(microsiemens/cm)
Date and Time:_________________________________________
Signature of Inspector:___________________________________
Page 7 (Rev 4)
QA-5. QUALITY ASSURANCE DATA FORM
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC PA-2
(Use one sheet for each sequence)
Vessel Name and Hull Number:__________________________________________________
Work Item Title:______________________________________________________________
Coating Manufacturer:_________________________________________________________
Product Name:________________________________________________________________
Batch Number:________________________________________________________________
Induction Time:_______________________________________________________________
Coating System Sequence (Indicate whether: primer, touch-up primer, barrier coat, 3rd coat…):__________________
DFT
MEASUREMENT
NUMBER
LOCATION OF READINGS MEASURED DFT
Application Method (Airless, Conventional Spray, Rolled):____________________
Average DFT: __________________________________________________________
Date and Time: _________________________________________________________
Signature of Inspector: ___________________________________
Page 8 (Rev 4)
S_16700_TEF_SWIT (07 Oct 2008)
327_ADB (13 April 09)
WORK ITEM 1: Renew Structural Closures
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew the following structural closures:
CLOSURE
IDENTIFICATION LOCATION DESCRIPTION
WTD 1-26-1 1-24-1-Q Fan Room
22” x 60” Watertight Door, Steel, Left Hand, 8-Dog
QAWTD 1-34-1 1-30-0-Q
Galley
30” x 66” Quick-Acting Watertight Door, Steel, Right Hand, 10-Dog
QAWTD 1-38-2 1-37-0-L
Passage
30” x 66” Quick-Acting Watertight Door, Steel, Left Hand, 10-Dog
QAWTD 1-42-1 1-41-0-Q
Scullery
30” x 66” Quick-Acting Watertight Door, Steel, Left Hand, 10-Dog
QAWTD 1-47-2 1-47-2-Q Fan Room
26” x 66” Quick-Acting Watertight Door, Steel, Left Hand, 10-Dog
QAWTD 1-51-0 1-46-0-Q
Laundry
30” x 60” Quick-Acting Watertight Door, Steel, Left Hand, 10-Dog
QAWTD 1-103-2 1-103-0-L
Passage
26” x 66” Quick-Acting Watertight Door, Steel, Right Hand, 10-Dog
QAWTD 2-25-1 2-10-0-L Male Crew Berthing
26” x 66” Quick-Acting Watertight Door, Steel, Left Hand, 8-Dog
QAWTD 3-25-1 3-25-0-Q Gym 26” x 66” Quick-Acting Watertight Door, Steel, Left Hand, 10-Dog
1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/Unit)
N
26” x 66” Quick- Acting Watertight Door, Left Hand, 10-dogs
2040-01-440-
2 1,800
N
26” x 66” Quick- Acting Watertight Door, Right Hand, 10-dogs
2040-01-440-
1 1,800
N
26” x 66” Quick- Acting Watertight Door, Left Hand, 8-dogs
2040-01-448-
1 2,200
Page 9 (Rev 4)
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/Unit)
N
30” x 66” Quick- Acting Watertight Door, Left Hand, 10-dogs
2040-01-441-
3 2,200
N
30” x 66” Quick- Acting Watertight Door, Right Hand, 10-dogs
2040-01-441-
1 1,500
N 22” x 60” Watertight Door, Steel, Left Hand, 8-Dog
None 1 1,200
NOTICE!
Dimension and tolerance will vary with minor hardware differences to be expected for the Government-furnished closures. These variances and differences include (but are not limited to): location and physical size of the hinge assemblies; location, physical size, and number of flush mounted pockets; location, size, and orientation of securing devices.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and Color Manual
3. REQUIREMENTS
3.1 General. The Contractor shall perform the following:
3.1.1 Interferences. The Contractor shall be aware that
interferences in way of work include, but are not limited to the following:
• Sheathing.
• Bulkhead insulation.
• Piping.
• Cables.
Page 10 (Rev 4) http://isddc.dot.gov/OLPFiles/USCG/010968.pdf
• Overhead panels.
• Deck covering.
3.2 Protective measures. The Contractor shall provide
protective covering while the doors are removed. Ensure that covering is installed at the end of the each workday.
3.3 Renewal. The Contractor shall accomplish the following:
3.3.1 Crop, remove, and dispose of the designated doors
(including associated door frame) in accordance with Standard Specification 0740_STD. Retain and store the location labels on the existing doors.
3.3.2 Install the new Government-furnished door assemblies in place of the ones removed, in accordance with Standard Specification 0740_STD . Perform all necessary modifications to ensure a proper fit. Provide and install new gaskets and fasteners, as applicable, with the new installations. Attach the location label plates that were retained for use on new doors.
NOTICE!
Securing latches, both integral to the closure and/or mounted to the ship's structures, may require modification or relocation to achieve proper form, fit and function of the closure. These modifications may include, but are not limited to, relocating latch fixtures, adjusting the position of the closure, or the fabrication and installation of a new securing device. Relocation and modification of securing latches shall be directed by the Coast Guard Inspector.
3.4 Preservation. The Contractor shall preserve the new doors and all other disturbed surfaces to match existing adjacent surfaces, in accordance with COMDTINST M10360.3.
3.4.1 Weather exposed surfaces. Coat both interior and
exterior surfaces using the system specified for “Freeboard/Superstructure/Mast (Freeboard/Superstructure, Steel), Option I”, in Appendix A (Cutter and Boat Exterior Painting Systems).
NOTICE!
Do not paint knife-edges, gaskets, or any moving parts; including dogs, nuts, wedges, spindles, yokes, packing, connecting rods and hinge pins.
Page 11 (Rev 4)
3.5 Closure. The Contractor shall demonstrate 100 percent
gasket contact and proper dog operation by means of a chalk test for each renewal. Ensure that initial contact between gasket and knife edge occurs throughout extent of gasket before final securing of dogs, and without use of excessive closing force.
If the mark on the gasket is not uniform, adjust as necessary to achieve uniform contact and retest. Submit a CFR.
3.6 Operational test. In the presence of the Coast Guard
Inspector, the Contractor shall thoroughly test and prove all closure securing latches to be in satisfactory operating condition, and submit a CFR. In addition, ensure the following:
• Closures are properly secured, so as to prevent accidental or unintentional movement.
• Securing latches adequately engage closures and positively lock into place without excessive force or manipulation by the operator.
4. NOTES
4.1 Damage control markings. The ship’s force will apply
appropriate damage control decals onto all newly installed doors, as appropriate.
Page 12 (Rev 4)
S61210_ADB_327 (13 April 2009)
WORK ITEM 2: Renew Handrail 01 Deck Fantail
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew the handrail on 01 deck fantail.
1.2 Government-furnished property.
None
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and Color Manual
3. REQUIREMENTS
3.1 General. The contractor shall perform the following:
3.1.1 Related work item. Perform this work in conjunction with "Renew Life Raft Support brackets” which is a separate work item in this specification package.
3.1.2 Interferences. Be aware that interferences in way of
work include, but are not limited to the following:
• Light fixtures.
• Sheathing.
• Coaming.
Page 13 (Rev 4)
• Teak deck.
• Foundations.
• Deck gear brackets.
• Rigging.
• Flag poles.
• Gooseneck piping.
• Deck stowage boxes.
• Fire hose/gear.
• Chocks/cleats.
3.2 Renew handrails. The Contractor shall renew approximately 60 feet of handrail, location on 01 level fantail to be specified by the COTR.
3.2.1 Removal. Crop and discard existing steel handrail
verticals, cross rails and diagonal supports (see pictures below). Remove, retain and store existing teak wood Taff rail that is in good condition. Discard any warped/damaged/rotted teak wood rail. Retain and store all existing brass fixtures.
All handrails are located outboard on 01 deck fantail.
3.2.2 Install. The Contractor shall furnish and install
handrail vertical, cross rails and diagonal supports, made of 316 stainless steel in place of discarded. The configuration of handrail spacing shall remain as found on ship by design. New handrails shall be fabricated and installed using existing handrails as template, (see pictures below). Renew, in kind, all teak wood Taff rails that were discarded due to the condition, warped/damaged/rotted. Install all existing brass fixtures to previous configuration.
3.3 Nondestructive inspection (NDI). The Contractor shall
perform NDI of the newly welded handrail components in accordance with Std Spec 0740_STD, Appendix C.
Page 14 (Rev 4)
Page 15 (Rev 4)
3.4 Surface preservation. The Contractor shall prepare and
coat the handrail surfaces, using the system specified for “Freeboard/Superstructure/Mast (Freeboard/Superstructure, Steel), Option I” in COMDTINST M10360.3, Appendix A (Cutter and Boat Exterior Painting Systems). Select finish/top coat color to match existing adjacent surfaces.
3.4.3 Touch-up preservation. Prepare and touch-up coat all
disturbed surfaces to match existing adjacent surfaces, in accordance with COMDTINST M10360.3, Appendix A (Cutter and Boat Exterior Painting Systems). Abide by all touch-up requirements outlined in paragraph 3.11.9 (Touch-ups and minor coating repairs)) of Std Spec 0000_STD.
3.4.4 Wood Taff rail preservation. Only for renewed teak wood, stain and preserve teak wood Taff Handrail with varnish and high gloss polyurethane or acrylic coating to match existing, as specified for “Wood, Exterior” in COMDTINST M10360.3, Appendix A (Cutter and Boat Exterior Painting Systems).
4. NOTES
This section is not applicable to this work item.
Page 16 (Rev 4)
S186000_ADB_327 (13 April 2009)
WORK ITEM 3: Renew Liferaft Support Brackets
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew the foundation and support brackets for two
(2) liferafts on aft 01 level Poop Deck at fantail.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Drawing FL 8220-109, Rev -, Encapsulated Liferaft Stowage
NAVSEA Drawing 803-6397272, Rev A, Life boat Encapsulated Stowage Deck Edge Mount Type 1
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and Color Manual
3. REQUIREMENTS
3.1 General. The Contractor shall renew the foundation and
support brackets for the two (2) encapsulated life rafts, in accordance with Standard Specification 0740_STD, on fantail.
3.1.1 Related work item. Perform this work in conjunction with "Renew Handrail 01 Deck Fantail" which is a separate work item in this specification package.
Page 17 (Rev 4) http://isddc.dot.gov/OLPFiles/USCG/010968.pdf
3.1.2 Interferences. Be aware that interferences in way of
work include, but are not limited to the following:
• Light fixtures.
• Navigational equipment.
• Deck coaming.
• Teak deck.
• Foundations.
• Rigging.
• Flag poles.
• Chocks/cleats.
3.2 Renew support brackets. The Contractor shall renew the
life raft brackets by performing the following:
3.2.1 Removal of the brackets. The existing brackets shall be cropped out and removed, including the foundation framework and support brackets. Perform removal in accordance with Standard Specification 0740_STD.
3.2.2 Fabrication of brackets. The brackets and foundation
shall be fabricated from 316 stainless steel, using Coast Guard Drawing FL 8220-109 and NAVSEA 803-6397272 as guidance.
Page 18 (Rev 4)
3.2.3 Installation of new brackets. Install new support
brackets in the same position as existing brackets. Perform all welding in accordance with Standard Specification 0740_STD.
3.3 Surface preservation. The Contractor shall prepare and
coat the handrail surfaces, using the system specified for “Freeboard/Superstructure/Mast (Freeboard/Superstructure, Steel), Option I” in COMDTINST M10360.3, Appendix A (Cutter and Boat Exterior Painting Systems). Select finish/top coat color to match existing adjacent surfaces.
3.4 Touch-up preservation. Prepare and touch-up coat all
disturbed surfaces to match existing adjacent surfaces, in accordance with COMDTINST M10360.3, Appendix A (Cutter and Boat Exterior Painting Systems). Abide by all touch-up requirements outlined in paragraph 3.11.9 (Touch-ups and minor coating repairs)) of Std Spec 0000_STD.
4. NOTES
Page 19 (Rev 4)
S162010_ADB_327(14 April 2009)
WORK ITEM 4: Renew Exhaust Stack Partial
1. SCOPE
1.1 Scope. This work item describes the requirements for the
Contractor to renew portions of the exhaust stack, joiner sleeve and spacers at the overhead and on the deck above the pilot house.
1.2 Government-furnished property.
None
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, Welding and Allied Processes, 2001 Edition
Coast Guard Drawing 327 WIX-5200-2, Rev B, Stack A & D
Coast Guard Drawing 327 WIX-1107-1, Rev A, New Pilot House
Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and Color Manual
3. REQUIREMENTS
3.1 General. The Contractor shall perform the following in
process of renewing the joiner sleeve, spacers and exhaust stack at the overhead of the pilot house:
3.1.1 Related work items. The Contractor shall perform this
work item in conjunction with “Renew Teak Caulk” which is a separate work item in this specification package.
Page 20 (Rev 4)
3.1.2 Critical Inspection Report. The Contractor shall submit a critical inspection report (CIR) for inspections listed in the following paragraphs:
• 3.3.2 Deck and stack inspection
3.1.3 Interferences. The Contractor shall be aware that
interferences in way of work include, but are not limited to the following:
• Insulation.
• Electronic Equipment.
• Chart Table.
• Teak Deck.
• Overhead panels.
• Electric Cables.
3.2 Protective measures. The Contractor shall furnish and
install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work.
Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces where contamination is discovered, if any, which was caused by improper protection or performance of work, to the original condition of cleanliness.
3.3 Remove exhaust stack joiner sleeve. The Contractor shall
refer to Coast Guard Drawing 327 WIX 5200-2 and 327 WIX 1107-1 to perform the following:
3.3.1 Removal. Remove and retain to reinstall the sections of teak deck (reinstall with proper caulking techniques, see work item “Renew Teak Caulk”) that surrounds the coaming and joiner sleeve around the exhaust stack. Remove and retain to reinstall the overhead panels and sheeting that surround the exhaust stack in the pilot house. Remove the insulation/lagging materials surrounding the exhaust stack inside the pilot house.
3.3.2 Nondestructive inspection (NDI). The Contractor shall
perform NDI, by conducting U/T shots as directed by the Coast Guard Inspector, of the deck and stack structure in accordance with Std Spec 0740_STD, Appendix C. Submit a CIR.
3.3.3 Removal. If a Change Request has been authorized and
released by the KO, the Contractor shall crop and discard the deck plate, coaming and stack plate discovered to be corroded/wasted material, in accordance with Std Spec 0740_STD.
Page 21 (Rev 4)
3.4 Stack renewal. The Contractor shall furnish, fit and
install new steel and all associated materials as shown on Coast Guard Drawing 327 WIX 5200-2 and 327 WIX 1107-1 for the fabrication of new deck/overhead, coaming, joiner sleeve, spacers and exhaust stack through pilot house overhead, keeping the same configuration as designed.
3.5 Nondestructive inspection. The Contractor shall conduct a non-destructive inspection of the welded components on installed deck/overhead, coaming, joiner sleeve and exhaust stack, in accordance with Std Spec 0740_STD, Appendix C.
3.6 Surface preservation. The Contractor shall:
3.6.1 Interior surface preservation. The Contractor shall
prepare and coat the interior pilot house overhead and stack surfaces using the “Bulkheads and Overheads, Uninsulated Steel” system specified in COMDTINST M10360.3, Appendix B (Cutter and Boat Interior Painting Systems) and “Smoke Stack Casing, Steel Interior (containing insulated exhaust piping)” system specified in COMDTINST M10360.3, Appendix A (Cutter and Boat Exterior Painting Systems). Finish/top coat color to match existing adjacent surfaces. If surface preparation involves the removal of lead paint, ensure that no visible coatings remain on any part of the substrate, including pitted areas.
3.6.1.1 Touch-up preservation. The Contractor shall prepare
and touch-up coat all disturbed surfaces to match existing adjacent surfaces in accordance with COMDTINST M10360.3, Appendix B (Cutter and Boat Interior Painting Systems). Abide by all touch-up requirements outlined in paragraph 3.11.9 (Touch-ups and minor coating repairs)) of Std Spec 0000_STD.
3.6.2 Exterior surface preservation. The Contractor shall
prepare and coat the exterior deck, coaming and stack surfaces, using the “Freeboard/Superstructure/Mast (Freeboard/Superstructure, Steel), Option I” “Smoke Stack Casing, Steel Exterior” system specified in COMDTINST M10360.3, Appendix A (Cutter and Boat Exterior Painting Systems). Select finish/top coat color to match existing adjacent surfaces.
3.6.2.1 Touch-up preservation. The Contractor shall prepare
and touch-up coat all disturbed surfaces to match existing adjacent surfaces, in accordance with COMDTINST M10360.3, Appendix A (Cutter and Boat Exterior Painting Systems). Abide by all touch-up requirements outlined in paragraph 3.11.9 (Touch-ups and minor coating repairs)) of Std Spec 0000_STD.
Page 22 (Rev 4)
3.6.3 In-process quality control measures. The Contractor
shall abide by all the safety, preservation, and quality control requirements specified in Std Spec 0000_STD, paragraph titled “General preservation requirements”.
NOTICE!
Surfaces being preserved are considered “critical-coated surfaces”.
3.6.4 Reinstall previously removed teak deck upon completion of all preservation.
4 NOTES
Page 23 (Rev 4)
51000_JMS_FLT (02 Oct 2008)
327 WIX_ADB (2 April 2009)
WORK ITEM 5: Clean Laundry Ventilation Systems
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean the laundry ventilation systems.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 5100_STD, 2004 Edition, Clean Shipboard Ventilation Systems
Coast Guard Drawing 327 WIX 3801-112, Rev-, Ventilation System Arrangement & Details FR 37-63
3. REQUIREMENTS
3.1 General.
3.1.1 Related work item. The Contractor shall accomplish this work item in conjunction with "Renew Teak Caulk", which is a separate work item in this specification package.
3.1.2 Interferences. The Contractor shall be aware that
interferences in way of work include, but are not limited to the following:
• Ducting screens.
• Laundry ducting.
• Ceiling tiles and supports.
• Overhead sheathing.
Page 24 (Rev 4)
3.1.2 Operational test - initial. Prior to commencement of
work, the Contractor shall witness an operational pre-test, operated by Coast Guard personnel, of the ventilation systems included in this work item, to demonstrate existing operational condition. Submit a CFR.
3.2 Cleaning requirements. The Contractor shall clean the
following ventilation systems, shown on Coast Guard Drawing 327 WIX 3801-112, in accordance with Std Spec 5100_STD:
SYSTEM LOCATION TYPE
1-46-0-Q Laundry
3.3 Additional requirements. In addition to the above, the
Contractor shall accomplish the following:
3.3.1 Notification. Give written notification to the COTR, 48 hours before starting ventilation cleaning work.
3.3.2 Additional protective covering. In addition to providing protective covering as specified in Std Spec 5100_STD, subsection 3.1.3 (Protective measures), provide additional protective covering for all machines, teak deck and working surfaces in the immediate work area, as applicable, to prevent contamination.
3.4 Operational test – final. In the presence of the Coast
Guard Inspector, the Contractor shall thoroughly test and prove the disturbed ventilation systems to be in satisfactory operating condition (see 4.1 (Equipment operation)). Repair all leaks. Submit a CFR.
4. NOTES
4.1 Equipment operation. Coast Guard personnel will operate
all shipboard machinery and equipment during all operational tests.
Page 25 (Rev 4)
51000_JMS_FLT (02 Oct 2008)
327 WIX_ADB (2 April 2009)
WORK ITEM 6: Clean Galley & Scullery Ventilation Systems
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean the Galley & Scullery ventilation systems.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 5100_STD, 2004 Edition, Clean Shipboard Ventilation Systems
Coast Guard Drawing 327 WIX 3801-112, Rev-, Ventilation System Arrangement & Details, FR 37-63, MN DK & Below
Coast Guard Drawing 327 WIX 3801-111, Rev-, Ventilation System Arrangement & Details, FWD FR 37, MN DK & Below
Coast Guard Drawing 327 WIX 3801-014, Rev-, Galley Vent. Mods.
3. REQUIREMENTS
3.1 General.
3.1.1 Interferences. The Contractor shall be aware that
interferences in way of work include, but are not limited to the following:
• Ducting screens.
• Dishwasher/laundry ducting.
• Ceiling tiles and supports.
• Overhead sheathing.
Page 26 (Rev 4)
3.1.2 Operational test - initial. Prior to commencement of
work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of the ventilation systems included in this work item, to demonstrate existing operational condition.
Submit a CFR.
3.2 Cleaning requirements. The Contractor shall clean the
following ventilation systems, shown on Coast Guard Drawings 327 WIX 3801-111, 327 WIX 3801-112, and 327 WIX 3801-014, in accordance with Std Spec 5100_STD:
SYSTEM LOCATION TYPE
1-40-0-Q Scullery
1-30-0-Q Galley
3.3 Additional requirements. In addition to the above, the
Contractor shall accomplish the following:
3.3.1 Notification. Give written notification to the COTR, 48 hours before starting ventilation cleaning work.
3.3.2 Additional protective covering. In addition to providing protective covering as specified in Std Spec 5100_STD, subsection 3.1.3 (Protective measures), provide additional protective covering for all food preparation and serving surfaces in the immediate work area, as applicable, to prevent contamination. Protective covering shall include the teak decking on boat deck around exhaust screen.
3.3.3 Avoidance of meal preparation and service. Ensure that
cleaning of galley ventilation systems is scheduled between 1900 and 0530 so that it WILL NOT interfere with meal preparation and service.
3.4 Operational test – final. In the presence of the Coast
Guard Inspector, the Contractor shall thoroughly test and prove the disturbed ventilation systems to be in satisfactory operating condition (see 4.1 (Equipment operation)). Repair all leaks. Submit a CFR.
Page 27 (Rev 4)
4. NOTES
4.1 Equipment operation. Coast Guard personnel will operate
all shipboard machinery and equipment during all operational
Page 28 (Rev 4)
51220_JMS_FLT (28 Oct 2008)
327 WIX_ADB (3APRIL 2009)
WORK ITEM 7: Overhaul Vaneaxial Fans and Motor Assemblies
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to overhaul the below-designated vaneaxial fans and motor assemblies:
TYPE DESIGNATION DESCRIPTION
EXHAUST 1-23-1
U.S. NAVY STANDARD VANEAXIAL FAN
SIZE: A2A4W6
CONTRACT# N00024-83-C-2033
STOCK# : SYN NO. 4025
ITEM: 5
FAN DRAWING: FF9633
AMPS: 2.2
HP: 1 1/2
RPM: 3450
FRAME: P56CZ
EXHAUST 1-24-2
U.S. NAVY STANDARD VANEAXIAL FAN
SIZE: A2A4W6
CONTRACT# N00024-83-C-2033
STOCK# : SYN NO. 4025
ITEM: 5
FAN DRAWING: FF9633
AMPS: 2.2
HP: 1 1/2
EXHAUST 1-47-1
SIZE: A2A4W6
CONTRACT# N00024-83-C-2033
STOCK# : SYN NO. 4025
ITEM: 5
FAN DRAWING: FF9633
AMPS: 2.2
HP: 1 1/2
Page 29 (Rev 4)
TYPE DESIGNATION DESCRIPTION
SUPPLY 1-41-2
U.S. NAVY STANDARD VANEAXIAL FAN
SIZE: A1-12A4W6
NSN: 4140-00-045-4586
CONTRACT #: SP0430-94-C-5181
RPM: 3500
HP: 1.25
FRAME: 56
AMP: 1.7
MAN. PLAN# D1-02179
SUPPLY 1-41-4
SIZE: A1-12A4W6
NSN: 4140-00-045-4586
CONTRACT #: SP0430-94-C-5181
RPM: 3500
HP: 1.25
FRAME: 56
AMP: 1.7
MAN. PLAN# D1-02179
SUPPLY 1-49-2
NSN: 4140-00-554-8143
MAN DRAWING: D1-42395
FAN CODE: A41/2A4W6
FRAME: 215TNY
AMPS: 6.2 HP: 5
RON: 3535
EXHAUST 1-49-1
NSN: 4140-00-554-8143
MAN DRAWING: D1-42395
FAN CODE: A41/2A4W6
FRAME: 215TNY
AMPS: 6.2 HP: 5
RON: 3535
SUPPLY 1-75-2 N/A
EXHAUST 1-80-1
U.S. NAVY STANDARD VANEAXIAL FAN
NSN: 4140-00-289-8863
SIZE: A3A4W0
HP: 1/3
PRM: 1800/7200
FAN DRAWING: FF16099
CONTRACT# DLA400-80-C-2731
1.2 Government-furnished property.
None.
Page 30 (Rev 4)
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 3141_STD, 2004 Edition, Overhaul Electrical Rotating Machines
Coast Guard Drawing 327 WIX 3801-100, REV -, Ventilation Diagram
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
MIL-R-6855, 2001, Elastomer, Synthetic, Sheets, Strips, Molded or Extruded Shapes, General Specification For
ASTM International (ASTM) D3951, Reapproved 2004, Standard Practice for Commercial Packaging
International Standard Organization (ISO) 2953, 1999, Mechanical Vibration, Balancing Machines, Description and Evaluation
3. REQUIREMENTS
3.1 General.
3.1.1 Related work items. The Contractor shall accomplish this work item in conjunction with the following, which are separate work items in this specification package:
• “Clean Shipboard Ventilation Systems”.
3.1.2 Interferences. The Contractor shall be aware that
interferences in way of work include, but are not limited to the following:
• Duct work.
• Electrical wiring.
• Manhole access cover.
• Piping.
3.2 Initial operational test. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of each fan and motor assembly, to demonstrate
Page 31 (Rev 4) existing operational condition. Measure and record each fan’s CFM output; compare readings against manufacturer’s rated tolerances and submit a CFR.
3.4 Removal. The Contractor shall remove each designated fan
and motor assembly from the vessel and package it for delivery to and from a suitable repair facility, in accordance with ASTM D3951.
3.5 Overhaul requirements. The Contractor shall accomplish the following tasks for each ventilation fan and motor assembly, using Coast Guard Drawing 327 WIX 3801-100 as guidance.
3.5.1. Cleaning. Clean the interior and exterior fan assembly surfaces, including housing, fan blade, and end bell surfaces by first using suction, then with a soapy water solution, and followed by a thorough rinsing of all metal surfaces. Ensure that there are no cleaning fluid residues or injurious effects on cleaned surfaces.
3.5.2 Fan casing preservation. Prepare and coat the fan casing surfaces in accordance with Std Spec 0000_STD, paragraph titled “General preservation requirements” using the coating system specified for “Machinery, Operating Temperatures Under 200oF, Unmachined Surfaces”, in COMDTINST M10360.3, Appendix B (Cutters and Boats Interior Painting Systems).
3.5.3 Inspection and documentation. After surface preparation and before surface coating, visually inspect the fan assembly surfaces including bearing surfaces for cracks, areas of distortion, and deterioration. Submit a CFR.
3.6 Motor overhaul requirements. Accomplish the following
tasks for each designated motor:
3.6.1 Cleaning and inspection. Clean, inspect, and test the
motor, in accordance with Std Spec 3141_STD.
3.6.2 Preservation. Preserve the motor casing in accordance
with Std Spec 0000_STD, paragraph titled “General preservation requirements” using the coating system specified for “Machinery, Operating Temperatures Under 200oF”, in COMDTINST M10360.3, Appendix B (Cutters and Boats Interior Painting Systems).
3.6.3 Additional tasks. Accomplish each of following
additional tasks, if a Change Request has been released and authorized by the KO:
• Varnish-treat the motor.
Page 32 (Rev 4)
• Rewind the rotor.
• Rewind the stator.
3.7 Fan and motor assembly restoration. The Contractor shall
reassemble each fan and motor assembly; couple the fan to the motor assembly using new stainless steel hardware.
NOTICE!
Angular misalignment of shaft couplings shall not exceed a total indicator reading of 0.001 inch for each inch of radius of the coupling hub.
3.7.1 Dynamic balancing and documentation. Dynamically balance the rotating elements along with associated equipment as a unit (i.e. fan blade and motor installed and in casing), in accordance with ISO 2953. Submit a written balance report.
3.7.2 Reinstallation. Reinstall the fan/motor assembly into
its associated fan space using new rubber vibration dampers, gaskets, resilient mounts, fan connectors and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .