552_DS_MWC_09ER0_BLANK 1 .pdf
PDF 11 KB Posted
- Solicitation number
- HSCG80-09-Q-3FA528
About this file
Schedule of Supplies/Services
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 Amendment A00001 | — | |
| 552_DS_MWC_09R0 1 .pdf | ||
| RFQ | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUPPLIES/SERVICES AND PRICES/COSTS FOR:
USCGC KATHERINE WALKER (WLM-552) DOCKSIDE AVAILABILITY 2009
ITEM DESCRIPTION UNIT PRICE UNIT QTY EXTENDED PRICE
1-D Clean and Inspect Sewage Collection and Holding Tanks JOB 1
2-D Clean Shipboard Ventilation Systems - Engine Room JOB 1
3-D Clean Shipboard Ventilation Systems - Laundry Room and Galley JOB 1
4-D Clean, Inspect and Test Hydro-Pneumatic Tank JOB 1
5-D Preserve Buoy Working Areas JOB 1
6-D Clean Main Diesel Engine Exhaust Stacks JOB 1
7-D Clean Ship Service Diesel Generator Exhaust Stacks JOB 1
8-D Perform Buoy Crane Maintenance JOB 1
9-D Preserve Machine Shop Bilge Surfaces – Partial (Pier Side) JOB 1
10-D Preserve Bow Thruster Room Bilge Surfaces – Partial (Pier Side) JOB 1
11-D Preserve Pump Room Bilge Surfaces – Partial (Pier Side) JOB 1
12-D Renew Deck Covering Systems – Mess Deck JOB 1
13-D Renew Deck Covering Systems - Change Room and Laundry Room JOB 1
14-D Modify Fuel Service Tank Overflow Piping JOB 1
15-D Renew Bow Thruster Room Insulation JOB 1
16-D Perform Buoy Chain Winch Maintenance and EC 175-A-050 Modification JOB 1
17-D Install Window Wiper Modifications JOB 1
18-D Modify Sewage Tank Vent Piping JOB 1
19-D Install Buoy Deck Control Room Deck Drains JOB 1
20-D Install HVAC Upgrade in Chartroom and ECC JOB 1
A-O Composite Labor Rate Hour 210
B-D GFP Report NSP EA 1 NSP
C-D Travel and Perdiem JOB 1
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items
(11/7/2008 REV-0)
File details come from the government source that posted it. Updated .