USCGCMACKDS2008SPECS.doc

DOC document 487 KB Posted

Attached to
USCGC MACKINAW - DOCKSIDE REPAIRS
Solicitation number
HSCG8008Q3FAH36
Issued by

About this file

CORRECT SPECIFICATION UPLOAD

View the file

Other files

File Type Posted
USCGCMACKDS2008(3).doc DOC document
USCGCMACKDS2008(2).pdf PDF
USCGCMACKINAWDS2008.doc DOC document
USCGCMACKDS2008(1).doc DOC document
USCGCMACKDS2008(2).pdf PDF
USCGCMACKDS2008(3).doc DOC document
USCGCMACKDS2008(1).doc DOC document
USCGCMACKDS2008SPECS.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC MACKINAW (WLBB-30)

240 FOOT ICEBREAKER

SPECIFICATIONS FOR DOCKSIDE REPAIRS

Developed By:

LOUIS MIKEDIS

Commander (v) Maintenance and Logistics Command, Atlantic 300 E. Main Street, Suite (600) Norfolk, VA 23510-9102

TABLE OF CONTENTS

Work Item Title Page iiList of Sketches

Revisions Record iii List of Applicable References iv List of Government-furnished Property viii List of Critical Inspection Items ix Specification Feedback x Principal Characteristics xi General Requirements Hydrostatic Test Fire Hoses Weight Test C02 Bottles Inspect and Weight Test Loose Rigging Gear Fabricate Enclosure for Auxiliary Generator Radiator Clean and Inspect Main Diesel Generators Air In-Takes Clean Exhaust Stack Piping and Spark Arrestors Clean Sewage and Grey Water Piping Systems Inter-Compartment Noise Abatement Survey Modify Cooling System for ICS/GCMS Space (EC No. 07-002) Modify Potable Water System (EC No.240-07-003)

List of Sketches

Work

Item Sketch Number Page

This section is not applicable to this package.

Revisions Record

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE
REV#
WORK ITEM#
CHANGES MADE
4/9/08
1
2
Added List of Interferences
4/9/08
1
2
Revised Testing of the APC System in Galley
4/9/08
1
3
Revised Pull Test Load Based on Ratings of Fittings
4/9/08
1
7
Sect 3.3 Note Section added MSDS requirement.
4/9/08
1
10
Sect 3.1 Revised Comp # to 3-36-0-Q
5/23/08
2
App Doc
Applicable documents listed in various work items now listed in the app doc sect.
5/23/08
2
2
Sect 3.1.4 Tech Rep – Added manufacturer’s name
5/23/08
2
5
Sect 3.2 made sentence plural. Sect 3.4 grammar

NOTE: All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

List of Applicable References

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution. Electronic copies of the latest Editions of MLCA Standard Specifications are available on the Internet and may be accessed at the following Internet Uniform Resource Locator (URL) address: http://www.uscg.mil/mlclant/vdiv/specs/default.htm . Guidance for obtaining copies of all other documents referenced herein is provided in the solicitation.

Order of precedence. In the event of conflicts between text of this specification and the applicable references specified herein, order of precedence shall be in accordance with MLCA Standard Specification 0000_STD, paragraph 3.2 (Order of precedence), unless otherwise specified by the Contracting Officer (KO). The Contractor shall immediately notify the KO in writing of any perceived conflicts contained herein. Nothing in these documents, however, supersedes applicable laws and regulations, unless a specific exemption has been obtained.

FEDERAL AND MILITARY SPECIFICATIONS AND STANDARDS

MIL-DTL-24643, Aug 2002, Cable and Cord, Electrical, Low Smoke, for Shipboard Use, Specification for

DOD-STD-2003, Dec 1990, Electric Plant Installations, Standard Methods FOR surface Ships and Submarines, Fig. Fig. 1B1 and 1B5.

OTHER GOVERNMENT DOCUMENTS, DRAWINGS, AND PUBLICATIONS

DOCUMENTS

Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements

Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes

Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 5000_STD, 2004 Edition, Auxiliary Machinery Systems

DRAWINGS

Coast Guard Drawing 240 WLBB 251-001, Rev A, Combustion Air In-Take Diagram

Coast Guard Drawing 240 WLBB 259-001, Rev C, Combustion Exhaust Diagram

Coast Guard Drawing 240 WLBB 259-004, Rev C, Combustion Exhaust Arrangements and Details

Coast Guard drawing 240 WLBB 320-001, Rev H, Single Line Diagram

Coast Guard drawing 240 WLBB 320-006, Rev B, Power System Deck Plan, 02 Level

Coast Guard Drawing 240 WLBB 512-001, Rev C, HVAC Diagram

Coast Guard Drawing 240 WLBB 512-006, Rev A, HVAC Standard Details & General Instructions

Coast Guard Drawing 240 WLBB 514-001, Rev B Chilled Water System Diagram

Coast Guard Drawing 240 WLBB 514-003, Rev B Chilled Water System Arrangements & Details

Coast Guard Drawing 240 WLBB 521-001, Rev B, Firemain System Diagram Coast Guard Drawing 240 WLBB 528-001, Rev B, Plumbing and Interior Deck Drains Diagram Coast Guard Drawing 240 WLBB 533-001, Rev B, Potable Water System Diagram

Coast Guard Drawing 240 WLBB 533-002, Rev A, Potable Water System, Arrangements & Details

Coast Guard Drawing 240 WLBB 555-001. Rev C, Fire Extinguishing System Diagram C02 Coast Guard Drawing 240 WLBB 593-001, Rev B, Sewage System Diagram Coast Guard Drawing 240 WLBB 637-003, Rev B, Joiner Composite Main Deck

Coast Guard Drawing 240 WLBB 637-004, Rev B, Joiner Composite 01 Deck

Coast Guard Drawing 240 WLBB 637-003, Rev -, Joiner Composite 02 Deck

Coast Guard Drawing 240 WLBB 637-003, Rev B, Joiner Composite 03 Deck

NAVSEA Drawing 803-1385866, Rev E, MLCA Distribution Date 18 Aug 1999, Penetration, Bulkhead and Deck

PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series) Jun 2006, Coatings and Color Manual Coast Guard Technical Publication (TP) 3834, Section 611-A, Accommodation Ladder - Model 611-005, July 2006 Naval Ships' Technical Manual (NSTM) Chapter 555, July 2006, Volume 1, Revision 12, Surface Ship Firefighting

Coast Guard Technical Publication (TP) 3710, Buoy Handling System Operating Manual (BHSOM), 02 Feb 2005

Coast Guard Technical Publication (TP) 3811, CO2 Fire Extinguishing System - Model 95206, Rev -

INDUSTRY STANDARDS

ASTM International (ASTM) A36, 2005, Standard Specification for Carbon Structural Steel

ASTM International (ASTM) A666, 2003, Standard Specification for Austenitic Stainless Steel Sheet, Strip, Plate, and Flat Bar

ASTM International (ASTM) D1330, 2000, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) F593, 2002, Standard Specification for Stainless Steel Bolts, Hex Cap Screws, and Studs

ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-69, 2003, Pipe Hangers and Supports - Selection and Application

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service

Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2003 Edition, Bronze Gate, Globe, Angle and Check Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-89, 2003, Pipe Hangers and Supports – Fabrication and Installation Practices

National Fire Protection Association (NFPA) 1962, 2007, Standard for Inspection, Care, and Use of Fire Hose, Couplings, and Nozzles and the Service Testing of the Fire Hose

List of Government-furnished Property

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK ITEM
MTI
ITEM DESCRIPTION
NSN/PN
QTY
ESTIMATED COST

($/Unit)

NONE

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel, Electronic Systems Support Unit (ESU) or local Electronic Support Detachment (ESD).

List of Critical Inspection Items

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see Std Spec 0000_STD, paragraph 3.6.2 (Inspection report particulars)):

Work Item Title

5 Clean and Inspect Main Diesel Engine Air Intakes 6 Clean Exhaust Stack Piping and Spark Arrestors

Specification Feedback

The intent of this section is to inform all users that a spec feedback mechanism is in place, and is located on the MLCA Naval Engineering Division’s website. Spec feedback is a very important part of our overall continuous improvement process, and is crucial to specification development. It will allow spec writers to capture all specification-related lessons learned, and avoid mistakes or ambiguities in follow-on availabilities. All feedback will be reviewed, evaluated, and responded to in a timely manner.

If you have access to the CGWeb (Intranet), please use the following link, which will connect you to the MLCA(v) Naval Engineering website, for submitting your feedbacks:

http://webapps.mlca.uscg.mil/vdiv/specifications/feedback/default.cfm If you do not have access to the CGWeb (Intranet), you may still submit your feedbacks, using the following web link:

http://www.uscg.mil/mlclant/VDiv/specs/specfeedback.htm PC_240_WLBB_(26 Apr2007 Principal Characteristics

240’ WLBB “Mackinaw” Icebreaker

Length Overall
240’ 0”
Depth (main deck at side to baseline)
24' 0"
Maximum Beam
58’ 0”
Height of Highest Projection (above DWL)
95' 6"
Frame Spacing
FR 19-25 = 19"

FR 33-39 = 21"

ALL Else = 20"

Full Load Draft
16’ 0”
Full Load Displacement
3625 LT Freshwater
Shore Tie Voltage Requirements
1,200 Amp total

3EA 400A 450VAC 3PH

Ungrounded forward/aft stations

PROPELLER / SHAFT

Number of Propellers
2
Number of Blades per Propeller
4
Diameter of Propeller
10.25'
Pitch
96.98"
Revolutions per Minute (RPM)
226 rated 270 max
Shafting/Propulsion System
Azipod

00000_PWB_FLT (17 Mar 2008)

General Requirements

1. SCOPE

1.1 Scope. This item describes the general requirements to be followed by the Contractor while conducting this availability.

2. APPLICABLE DOCUMENTS

Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements

Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Jun 2006, Coatings and Color Manual

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in Std Spec 0000_STD and in this item, as applicable, during the performance of this availability.

NOTICE!

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.

3.3 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and nondestructive inspection (NDI), in accordance with Std Spec 0740_STD.

3.4 Term substitution – COTR for COR. The Contractor shall be aware that the term “COR” (Contracting Officer’s Representative) has been discontinued in favor of “COTR” (Contracting Officer’s Technical Representative); consequently, whenever “COR” is encountered in this specification package, including referenced standard specifications and other referenced documents, it shall refer to “COTR”, explicitly.

4. QUALITY ASSURANCE

No additional requirements.

5. NOTES

5.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may be accessed at the following URL address:

http://www.uscg.mil/directives/cim.asp

5.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in Std Spec 0000_STD to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this item.

QA-1: QUALITY ASSURANCE INSPECTION FORM - PRESERVATION CHECKLIST

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating manufacturer(s).

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating manufacturer(s).

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10…).

Verify surface anchor profile (1.5-3.5 mils for abrasive-blasted steel surfaces; 1.0 mil (minimum) for power-tool cleaned surfaces; 1.0-1.5 mils for abrasive-blasted aluminum surfaces); and 1.5 –2.5 for surfaces to be coated w/single coat of inorganic zinc).

Measure soluble salt conductivity (5 measurements per 1000 sqft) – maximum threshold: 70 microsiemens/cm for non-submerged surfaces and 30 microsiemens/cm for submerged surfaces.

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the Coating Manufacturer(s).

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness.

Verify system cure for service resumption - U/W Body surfaces: 5-8 hours @ 77 degrees F; Potable water tanks: 7 days @ 77 degrees F.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure (minimum 7 days @ 77 degrees F.), to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

Signature of Inspector:______________________________________________________Date:____________

QA-2. QUALITY ASSURANCE INSPECTION FORM

ENVIRONMENTAL READINGS

(Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat)

DATE
TIME
ENTER ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…)
LOCATION
DEW POINT
SURFACE TEMP.
% REL. HUMIDITY
SIGNATURE OF INSPECTOR

.Signature of Inspector:__________________________________________________Date:____________

QA-3 QUALITY ASSURANCE INSPECTION FORM

SURFACE PROFILE LOG

Vessel Name And Hull Number:__________________________________________________

Work Item Title:_______________________________________________________________

Location Of Work (Including Frame Numbers):_____________________________________

Area (Square Feet):_____________

Surface Preparation Method:_____________________________________________________

Abrasive Manufacturer And Size:_________________________________________________

Degreasing Method Used:________________________________________________________

Number Of Hours Surfaces (Steel Only) Left Unpainted:______________________________

Sweep blasting performed to remove flash rusting (steel)? Yes/No:_____________________

Place Surface Profile Replica Tapes In The Spaces Provided Below, To Serve As Permanent QA record.

Maintain separate log for each area/location. When an Area Is Divided Into Separate Sections, Maintain A Separate Log for Each Section.

AVERAGE MILS

(IAW ASTM D4417, METHOD C)

Place Surface Profile Replica Tape Here

Reading:__________ mils

· Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Date and Time:__________________________________________________

Location of Surface Profile Measurements:___________________________________________________________

Signature of Inspector:____________________________________________________________________________

QA-4. QUALITY ASSURANCE INSPECTION FORM

SURFACE SOLUBLE SALT CONDUCTIVITY LOG

Vessel Name and Hull Number:__________________________________________________

Work Item Title:_______________________________________________________________ Location of Work (including frame numbers):_______________________________________

Area (square feet):____________

DATE
TEST LOCATIONS
CONDUCTIVITY

(microsiemens/cm)

Date and Time:_________________________________________

Signature of Inspector:___________________________________

QA-5. QUALITY ASSURANCE DATA FORM

DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC PA-2

(Use one sheet for each sequence)

Vessel Name and Hull Number:__________________________________________________

Work Item Title:______________________________________________________________

Coating Manufacturer:_________________________________________________________

Product Name:________________________________________________________________

Batch Number:________________________________________________________________

Induction Time:_______________________________________________________________

Coating System Sequence (Indicate whether: primer, touch-up primer, barrier coat, 3rd coat…):__________________

DFT

MEASUREMENT NUMBER

LOCATION OF READINGS
MEASURED DFT

Application Method (Airless, Conventional Spray, Rolled):____________________

Average DFT: __________________________________________________________

Date and Time: _________________________________________________________

Signature of Inspector: ___________________________________ 55551O_30(13Feb 2008)

WORK ITEM 1: Hydrostatic Test Fire Hoses

1. SCOPE

1.1 Scope. This work item describes the requirements for the Contractor to perform a hydrostatic test of the fire hoses listed in Table 1 herein.

2. APPLICABLE DOCUMENTS

Coast Guard Drawing 240 WLBB 521-001, Rev B, Firemain System Diagram National Fire Protection Association (NFPA) 1962, 2007, Standard for Inspection, Care, and Use of Fire Hose, Couplings, and Nozzles and the Service Testing of the Fire Hose

3. REQUIREMENTS

3.1 General. The Contractor shall perform a hydrostatic test, and report the material condition of all fire hoses listed in Table 1 in accordance with NFPA 1962, Section 5-1.2.1, Service Test and the requirements herein.

NOTICE!

Installed stations consist of 1-1/2 inch diameter hose, with two lengths of 50 foot fire hose (except in the machinery space station with only one length). Coast Guard Drawing 240 WLBB 521-001 details the fire station locations and arrangements onboard.

3.1.1 The Contractor shall perform work in a manner that minimizes the overall impact on the cutter's firefighting capability.

TABLE 1- Fire Hose Stations

Space
Station Designation
Port/Stbd

Centerline(CL) Frame

Generator Room (Lower Level)
FP 3-64-1
S
65
CHT Equipment Room
FP 3-84-2
P
84
Hydraulic Machinery Room
FP 2-29-4
P
30
Cargo Hold
FP 2-41-2
CL
41
Generator Room (Upper Level)
FP 2-57-2
P
57
Generator Room (Upper Level)
FP 2-63-1
S
65
Passage 1-6-2-L
FP 1-8-4
CL
9
Buoy Deck (Crane Pedestal)
FP 1-11-2
P
12
Buoy Deck
FP 1-45-2
P
45
Buoy Deck
FP 1-45-1
S
45
Buoy Deck Change Room (Mud Area)
FP 1-53-2
P
53
Passage (ECC/DC Door) 1-53-0-L
FP 1-54-1
S
53
Passage 1-60-2-L
FP 1-84-2
CL
84
Enlisted Mess
FP 1-87-2
CL
87
Enlisted Mess
FP 1-106-2
P
103
Focsle (Weather Deck)
FP 01-8-2
P
7
Focsle (Weather Deck)
FP 01-8-1
S
7
Passage 01-46-0-L
FP 01-70-2
P
71
Passage 01-46-0-L
FP 01-72-1
S
71
Passage 02-54-1-L
FP 02-69-2
P
70
Passage 02-54-1-L
FP 02-69-1
S
70
Ship Training Room 03-70-1-Q
FP 03-75-1
S
76
Passage 03-51-0-L
FL 03-65-2
P
63
Weather Deck
FP 04-67-2
P
67
Weather Deck
FP 04-72-1
S
74

3.2 Detailed requirements. The Contractor shall accomplish the following:

3.2.1 Notify COTR prior to commencing tests and upon completion.

3.2.2 Paint a test date markings area with suitable white paint on the male fitting end of each hose, including over any existing test date markings that may be present. Upon completion of testing, the Contractor shall stencil the successful new test date within the confines of this painted white area with black painted letters.

3.2.3 Make or record a reference mark next to or adjacent to each hose coupling with permanent markings. Measure the distance from reference marks to couplings and record.

3.2.4 In a suitable location not onboard the vessel, hydrostatically test fire hoses to a pressure of 250 psi for 5 minutes, using fresh water. Inspect for leaks. Ensure all air is bled from hoses during testing. Test location shall allow for clearance to property and safety of personnel should a hose burst during testing.

3.2.5 Inspect the material condition of the hoses prior to and after testing. Report the material condition found and results of testing in a condition found report (CFR) to the COR, noting possible unsuitability for service if any of the following conditions are present:

· Inner jacket is chafed.

· Chafing of outer jacket encircles hose.

· House under pressure takes an unnatural set.

· Any observed movement of measured reference marks to couplings.

Hoses identified by the COR as unsuitable for service due to leaks or material condition shall be disposed of in accordance with all applicable Federal, state, and local regulations.

3.2.6 Restow hose(s) to original locations, drained and thoroughly dried, upon conclusion of testing.

3.3 Additional hose testing. The Contractor shall perform additional hose testing to hydrostatically test, inspect, and report the material condition, to the detailed requirements of section 3.2, as follows:

3.3.1 Test a maximum of twenty repair locker fire hoses consisting of 1-1/2 and 2-1/2 inch diameter hose, with lengths of 50 foot, as designated by the COR.

3.3.2 Test rubber hose reel station hoses located as follows:

· Passage (1-53-0-L) – hose length 100 ft

· Generator Room (3-57-0-E) upper level – hose length 125 ft

· Generator Room (3-57-0-E) lower level – hose length 100 ft

· Service Reel Locker No. 2 (01-91-0-A) – hose length 100 ft

4. QUALITY ASSURANCE

No additional requirements.

5. NOTES

This section is not applicable to this work item.

55552O_30(13 Feb 2008)

WORK ITEM 2: Weight Test C02 Bottles

1. SCOPE

1.1 Scope. This work item describes the requirements for the Contractor to weigh test fixed CO2 system cylinders.

2. APPLICABLE DOCUMENTS

Coast Guard Drawing 240 WLBB 555-001. Rev C, Fire Extinguishing System Diagram C02 Naval Ships' Technical Manual (NSTM) Chapter 555, July 2006, Volume 1, Revision 12, Surface Ship Firefighting

Coast Guard Technical Publication (TP) 3811, CO2 Fire Extinguishing System - Model 95206, Rev -

3. REQUIREMENTS

3.1 General. The Contractor shall:

3.1.1 Protective coverings. Furnish suitable protective caps for all pipe and hose connections to prevent the entry of contaminants during the performance of this work. Reinstall all protective cap coverings prior to reconnecting the system.

3.1.2 Interferences. Be aware that interferences in way of work include, but are not limited to the following:

· Valve Guards.

· System Hoses.

· Securing Brackets.

3.1.3 Bypass system. Temporarily remove or bypass system components not removed during weight testing C02 bottles, by covering, plugging, or capping all openings, pipe terminations, hose ends, inlet and outlet connections, valve flanges, and similar items to prevent entrance of any foreign material.

3.2 Weight testing. The Contractor shall:

3.2.1 Testing. Perform a weight test of the fixed C02 system bottles in accordance with NSTM Chapter 555, section 4.2.6.1, (TP) 3811 and using Coast Guard Drawing 240 WLBB 555-001 as guidance. Renew fusible links as applicable. The CO2 cylinders are installed as follows:

· Flammable Liquid Storeroom (1-0-2-K) - one 100 lb cylinder

· Main Generator Room (3-57-0-E) – twenty-two 100 lb cylinders (bottles located in passage 1-53-0-L)

· Switchboard Room (2-46-0-Q) - six 100 lb cylinders (bottles located in passage 1-53-0-L)

· Motor Generator Room (3-46-0-E) – six 100 lb cylinders (bottles located in Cargo Hold 2-36-0-A)

· Auxiliary /Emergency Diesel Generator (A/EDG) Room (03-80-0-E) - three 100 lb cylinders (bottles located in passage 03-80-1-L)

· Azipod Propulsion Unit (4-113-0-E) - four 100 lb cylinders (two each side)

· Azipod Space (4-113-0-E) – thirteen 100 lb cylinders (bottles located in Seabag Locker 2-102-2-A)

· Galley Gaylord Hood APC System & renew both fusible links.

3.1.4 Technical Representative.

3.1.4.1 The Contractor shall provide the services of a Technical Representative (Tech Rep), who is familiar with the Ansul C02 cylinder system, and authorized by the manufacturer, to do the following, on site:

· Advise on manufacturer's proprietary information pertinent to the system.

· Assist with weigh testing methods.

· Ensure compliance with manufacturer's procedures and standards during weigh testing.

3.1.5 The Tech Rep shall have a resume of demonstrated experience with the system described above, and shall provide a copy of the resume and a list of references to the COR.

3.2 Data plates. The Contractor shall affix an anodized aluminum test data plate with epoxy resin cement to C02 cylinder. The data plate shall be engraved with ¼-inch high letters, stating the following:

3.2.1 HALON & CO2 cylinders.

· Cylinder name/number(as applicable).

· Hydrostatic test pressure.

· Date of inspection and test.

· Testing facility.

4. QUALITY ASSURANCE

No additional requirements.

5. NOTES

5.1 For an illustrated view of the CO2 flooding systems arrangement, refer to Fire Extinguishing System Diagram CO2, drawing 240 WLBB 555-001. Drawings will provide layout of the individual CO2 flooding system's station, actuating manifold, slave cylinder manifold, and the CO2 distribution piping arrangement. Ansul system drawings are available in Coast Guard Technical Publication 3811. Each cylinder weighs approximately 300 lbs.

5.2 The normal operating pressure for the fixed CO2 systems is 850 pounds per square inch (psi). The systems are equipped with 100 lb CO2 cylinders, baffle-type nozzles, local and remote actuating pull boxes and pressure-actuated switches. When activated, the systems shut down the ventilation to the space served and activate local and remote audible, visual alarms. Pull boxes located near the main entrance of spaces permit activation of the system from outside the space. Colored indicator lights permit personnel to monitor system status prior to entering the compartment.

57601H_240(25March 2008)

WORK ITEM 3: Inspect and Weight Test Loose Rigging Gear

1. SCOPE

1.1 Scope. This work item describes the requirements for the Contractor to inspect and pull test loose rigging gear.

2. APPLICABLE DOCUMENTS

Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 5000_STD, 2004 Edition, Auxiliary Machinery Systems Coast Guard Technical Publication (TP) 3710, Buoy Handling System Operating Manual (BHSOM), 02 Feb 2005

3. REQUIREMENTS

3.1 Inspection and testing requirements. The Contractor shall perform the work described in the table below in accordance with Std Spec 5000_STD (see paragraph 5.1) and use TP 3710 as guidance.

NOTICE!

The Contractor shall use a certified Pull Testing Machine vise weights.

#
Task
Qty
Component or Assembly
Additional Requirements
Appendix & Para. from 5000_STD
Other
1
Service, Inspect, and Weight Test
100
5/8” Grade 7 Gripe Chains
N/A
Test Weight: Pull to 200% (+5% -0%) of 18,100 (Rated Capacity)

Submit CFR.

2
Service, Inspect, and Weight Test
100
Ratchet Binders
N/A
Pull to 200% (+5% -0%) of 18,100 (Rated Capacity)

Submit CFR.

3
Service, Inspect, and Weight Test
6
Assist Blocks
N/A
Test Weight: Pull to 200% (+5% -0%) of 30,000 (Rated Capacity)

Submit CFR.

4
Service, Inspect, and Weight Test
3
Pelican Hooks
N/A
Pull to 200% (+5% -0%) of 18,100 (Rated Capacity)

Submit CFR.

5
Fabricate and Install
209
Label Plates
N/A
Affix a metal label plate on each item listed above, engrave or stamped each label plate with the following information specific to each component tested: working load, test load, test date, test facility.

4. QUALITY ASSURANCE

No additional requirements.

5. NOTES

5.1 Paragraph number relationships. The appendix and paragraph number for each appendix and paragraph listed in 3.1 (Inspection and testing requirements) relates directly to the identical appendix and sub-paragraph number in Std Spec 5000_STD.

S16811O_30(14 Feb 2008)

WORK ITEM 4: Fabricate Enclosure for Auxiliary Generator Radiator

1. SCOPE

1.1 Scope. This work item describes the requirements for the Contractor to fabricate an enclosure for the auxiliary generator radiator.

1.2 Location. 02 Level towards stern.

2. APPLICABLE DOCUMENTS

ASTM International (ASTM) A666, 2003, Standard Specification for Austenitic Stainless Steel Sheet, Strip, Plate, and Flat Bar

ASTM International (ASTM) F593, 2002, Standard Specification for Stainless Steel Bolts, Hex Cap Screws, and Studs

3. REQUIREMENTS

3.1 General. The Contractor shall:

NOTICE!

EXISTING CONDITION: The current state of existing enclosure does not meet the cutter’s requirements in that it looks un-professional. The existing enclosure has a variety of gauges in sheet metal and hardware that is not stainless steel.

3.1.1 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the following:

· Installed Jacket Water Piping.

· Local Fan Controller.

3.1.2 Fabricate Aux Gen Radiator enclosure. Use existing enclosure as a template for the fabrication of new enclosure. Exact dimensions shall be developed by the Contractor to ensure all access openings align with existing configuration. The overall height of the new enclosure shall be approximately twelve (12) inches shorter than the existing enclosure.

3.1.2.1 Furnish all materials necessary to fabricate new enclosure. The enclosure shall be fabricated using 10 gauge stainless steel sheets conforming to ASTM A666.

NOTICE!

Typical sheets are 8’ x 4’

3.1.2.2 Ensure all seams are welded closed and ground flush where sheets do not provide sufficient coverage. Ensure all access holes or slots have a finished edge. Access holes and slots shall have a gap no less than 1/16-inch and no greater than ¼-inch.

3.1.2.3 Furnish and install stainless steel flat stock and angle to secure stainless steel sheets. Stainless steel sheets shall be uniform in thickness and width. Furnish and install 3/8-inch stainless steel hardware conforming to ASTM F593 to secure all angle and flat stock.

3.1.2.4 All edges of the entire enclosure shall have finished edges and corners that are rounded off.

4. QUALITY ASSURANCE

No additional requirements.

5. NOTES

This section is not applicable to this work item.

S25100O_30(5 Feb 2008)

WORK ITEM 5: Clean and Inspect Main Diesel Generators Air In-Takes

1. SCOPE

1.1 Scope. This work item describes the requirements for the Contractor to clean and inspect the Main Diesel Engines (Qty 3) air intake systems.

1.2 Location of work. Engine Room and spaces on the 04 deck, 03 deck, 02 deck, 01 deck, main deck and 1st platform.

2. APPLICABLE DOCUMENTS

Coast Guard Drawing 240 WLBB 251-001, Rev A, Combustion Air In-Take Diagram

3. REQUIREMENTS

3.1 General. The Contractor shall provide all the labor and materials to clean and inspect the Main Diesel Engines (3) combustion air in-take system.

3.1.1 Critical Inspection Report. The Contractor shall submit a critical inspection report (CIR) for the inspections listed in the following paragraph(s):

· 3.2 (Bore Scope Inspections).

3.1.2 Related work items. The Contractor shall perform this work item in conjunction with “Clean Exhaust Stack Piping and Spark Arrestors” which is a separate work item in this specification package.

3.1.3 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to:

· Cable Runs.

· Access Covers.

· Insulation.

· Intake Filter Housing.

· Filter Elements (4) per MDE.

3.1.4 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.

3.2 Bore scope inspection. The Contractor shall visually inspect all accessible combustion air in-let systems shown on Coast Guard Drawing 240 WLBB 251-001 using the bore scope method and submit a CIR.

3.3 Mechanical cleaning. The Contractor shall mechanically clean all interior surfaces of the combustion air in-let system to a condition free from dirt, grease, lint, impurities, and any other foreign matter. Clean the air in-let system in its entirety from the point where the air enters the system to the turbo inlet.

3.3.1 Remove all inlet filter elements. Tag each removed filter element with an identifying mark and a corresponding mark on the flange from which it is removed

3.3.2 Remove all system access covers or remove sections of inlet system as required, to completely clean all interior surfaces. Vacuum the inlet system using a brush-type vacuum attachment.

3.3.3 Vacuum and inspect dampers to ensure there are no obstructions to restrict airflow.

3.3.4 Clean, inspect, lubricate, and exercise all directional closures to ensure smooth operation.

3.3.5 If air inlets are scrubbed in place, ensure water does not damage the surrounding area and equipment.

3.4 Dry ice blast cleaning. The Contractor may use dry ice blast cleaning method in lieu of or in combination with mechanical cleaning methods when performing air inlet cleaning.

3.4.1 Provide a high pressure air compressor with after coolers, palletized dry ice, a dry ice accelerator and a variety of nozzles for the specific cleaning application.

3.4.2 Clean all interior surfaces of the combustion air inlet system to a condition free from dirt, grease, lint, impurities, and any other foreign matter using dry ice blasting method. Clean the system in its entirety from the point where the air enters the system to the turbo inlet.

3.4.3 Provide a suction blower and filter system on the outboard end of the system being cleaned to capture all the dirt and debris dislodged from the blast cleaning.

3.4.4 Any areas where the dry ice blast cleaning is ineffective shall be cleaned by conventional mechanical cleaning methods.

3.5 Installations. After completing any authorized repairs, the Contractor shall:

3.5.1 Reinstall all removed access covers joints using new gaskets and antiseize on all fasteners upon completion of all cleaning.

3.5.2 Ensure the tightness of all disturbed exhaust flanges.

4. QUALITY ASSURANCE

4.1 Operating test. The Contractor shall demonstrate proper combustion air inlet operation for the Main Diesel Engines in all modes of operation. Inspect and correct any abnormal conditions.

5. NOTES

This section is not applicable to this work item.

S25900O_30(5 Feb 2008)

WORK ITEM 6: Clean Exhaust Stack Piping and Spark Arrestors

1. SCOPE

1.1 Scope. This work item describes the requirements for the Contractor to clean exhaust stack piping and spark arrestors for the main diesel engines (Qty 3) and auxiliary diesel engine (Qty 1).

1.2 Location of work. Engine Room and Stack Space.

2. APPLICABLE DOCUMENTS

Coast Guard Drawing 240 WLBB 259-001, Rev C, Combustion Exhaust Diagram Coast Guard Drawing 240 WLBB 259-004, Rev C, Combustion Exhaust Arrangements and Details

3. REQUIREMENTS

3.1 General. The Contractor shall provide all the labor and materials to mechanically clean the exhaust stack piping and spark arrestors of the Main Diesel Engines (Qty 3) and Auxiliary Diesel Engine (Qty 1).

3.1.1 Critical Inspection Report. The Contractor shall submit a critical inspection report (CIR) for the inspections listed in the following paragraph(s):

· 3.2 (Inspections).

3.1.2 Related work items. The Contractor shall perform this work item in conjunction with “Clean and Inspect Main Diesel Generator Air In-Takes” which is a separate work item in this specification package.

3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to:

· Exhaust Lagging.

· Vent Ducting.

· Vibration Dampeners.

· Access Covers.

3.2 Bore scope inspection. The Contractor shall visually inspect all accessible exhaust stack areas and mufflers using the bore scope method and submit a CIR.

3.3 Removals. The Contractor shall refer to Coast Guard Drawing 240 WLBB 259-001 and 240 WLBB 259-004 as guidance and perform the following:

3.3.1 Remove the Main Diesel Engines, and Auxiliary Diesel Engine exhaust insulation blankets from each of the exhaust/stack joints requiring disassembly.

3.3.2 Remove and reinstall pipe hangers to facilitate cleaning of exhaust stack piping, traps, and spark arrestors as shown on Coast Guard Drawings listed above.

3.4 Cleaning. The Contractor shall clean from the MDE and ADE exhaust belly joint to the stack top to a condition free from soot, tar, dirt or any other foreign matter.

3.4.1 Gain access to the uptake piping as necessary to facilitate cleaning of the exhaust system.

3.4.2 Thoroughly sweep and mechanically clean the interior of each exhaust system from the top of the stack to the engine exhaust manifold.

3.4.3 Vacuum and clean the spark arrestors through the access holes and the carbon collectors to include piping after each.

3.4.4 Clean and remove the tar and soot deposits from the stack deck and engine room areas upon completion of the exhaust pipe cleaning.

3.4.5 Dispose of any cleaning chemicals and residue in accordance with Federal, state and local regulations.

3.5 Installations. After completing any authorized repairs, the Contractor shall:

3.5.1 Reinstall all access covers for the exhaust stack piping, in engine room using new gaskets and antiseize on all fasteners upon completion of all cleaning.

3.5.2 Ensure the tightness of all disturbed access covers prior to reinstallation of insulation blankets.

4. QUALITY ASSURANCE

4.1 Operating test. The Contractor shall demonstrate proper exhaust operation for the Main Diesel Engines and Auxiliary Engine in all modes of operations. Inspect and correct any abnormal back pressure, noise, and high temperature generated from the exhaust systems.

5. NOTES

This section is not applicable to this work item.

S59300O_30(6 Feb 2008)

WORK ITEM 7: Clean Sewage and Grey Water Piping Systems

1. SCOPE

1.1 Scope. This work item describes the requirements for the Contractor to clean the sewage and grey water piping system.

2. APPLICABLE DOCUMENTS

Coast Guard Drawing 240 WLBB 528-001, Rev B, Plumbing and Interior Deck Drains Diagram Coast Guard Drawing 240 WLBB 593-001, Rev B, Sewage System Diagram DOD-STD-2187, Aug 1987, Chemical Cleaning of Salt Water Piping Systems

ASTM International (ASTM) D1330, 2000, Standard Specification for Rubber Sheet Gaskets

3. REQUIREMENTS

3.1 General. The Contractor shall clean the sewage and grey water piping systems using Coast Guard Drawing 240 WLBB 528-001 and 240 WLBB 593-001 as guidance.

3.2 Contamination prevention. The Contractor shall take all precautions to prevent contamination of personnel and spaces in accordance with all applicable Federal, state, and local regulations.

3.3 Cleaning plan. The Contractor shall establish a plan for cleaning the designated sewage and grey water piping system, listing the step by step procedures necessary to ensure that all foreign debris is removed from the piping system.

NOTICE!

Although the Coast Guard prefers hydro-blasting as the cleaning method, the Contractor may propose chemical cleaning as an alternative, providing that the proposed chemical cleaning agent conforms to DOD-STD-2187 (where applicable), is environmentally safe, and pre-approved by the COR. Due to the fact that sewage system piping has historically been difficult to clean by hydro-blasting, chemical cleaning is usually required to successfully complete the cleaning process. Provide MSDS for all proposed Chemical Cleaning Agents.

3.3.1 Procedure requirements. Ensure that the procedure includes the following:

· Methods of cleaning.

· All safety precautions required during cleaning operations.

· List of qualified personnel who will operate machinery or handle chemicals (see paragraph 4.2 (Personnel qualification) herein).

· Locations in the sewage and grey water piping where cleaning will take place, and any additional fittings necessary.

· Sequence of each location that ensures all piping sections will be cleaned and all foreign debris removed.

3.3.2 Plan submittal. Submit the written plan to the COR for approval at least two (2) working days prior to commencing cleaning operations.

3.4 Cleaning operations. Upon approval of the plan, the Contractor shall proceed with the cleaning of all horizontal and vertical runs of the piping system, as follows:

3.4.1 Valves. Replace sewage tank valve(s) with temporary spool piece(s). Visually inspect the valve(s), and submit a CFR. Upon completion of work, reinstall the valve(s).

3.4.2 Cleaning. Do the following:

· If hydro-blast cleaning, provide a high-pressure water jetting machine which can attain suitable flow pressures to remove all calcium carbonate deposits and buildup.

· Clean out piping at no more than 25-foot intervals.

· Continue cleaning until discharge water from the piping being cleaned is free of all visible scale and deposits.

· Inspect the piping interior using a bore scope in the presence of the COR, to verify that all solid deposits have been removed. Continue the cleaning process until all solid deposits are removed from the pipe walls.

3.4.3 Waste disposal. Dispose of all cleaning fluids and debris in accordance with all applicable Federal, state, and local regulations. Remove all unused chemicals from USCG property immediately upon completion of work item.

WARNING!

Do not drain any fluids (including fresh water) into any space, bilge, or exterior location.

3.5 Gasket and fastener renewal. The Contractor shall reinstall all removed valves and fittings with new gasket material conforming to ASTM D1330.

4. QUALITY ASSURANCE

4.1 Leak test. After all system components are reinstalled, the Contractor shall test all disturbed sewage system and grey water piping for leakage, as follows:

· Plug all system openings (except the highest) and fill system with water to the point of overflow. Ensure that the water level does not go down (without adding any water) for sufficient time to inspect the entire system (no less than 15 minutes).

· Closely monitor the system for leaks. Repair all leaks detected.

· Repeat test and inspection until no leaks are detected.

4.2 Personnel qualification. The Contractor shall ensure that personnel accomplishing this work are qualified and experienced in operating the pressurized water system and handling the chemicals. For each operator/cleaning technician, submit documentation of applicable experience and training obtained within the last twelve months along with the Cleaning Plan (see 3.3.2, Plan Submittal).

5. NOTES

This section is not applicable to this work item.

S62111O_30(27 Mar 2008)

WORK ITEM 8: Inter-Compartment Noise Abatement Survey

1. SCOPE

1.1 Scope. This work item describes the requirements for the Contractor to survey living space compartments for a total of 31 spaces.

2. APPLICABLE DOCUMENTS

Coast Guard Drawing 240 WLBB 637-003, Rev B, Joiner Composite Main Deck

Coast Guard Drawing 240 WLBB 637-004, Rev B, Joiner Composite 01 Deck

Coast Guard Drawing 240 WLBB 637-003, Rev -, Joiner Composite 02 Deck

Coast Guard Drawing 240 WLBB 637-003, Rev B, Joiner Composite 03 Deck

3. REQUIREMENTS

3.1 General. The Contractor shall refer to the Coast Guard drawings listed above and perform the following:

3.1.1 Inspect all living spaces listed below from the main deck on up to the 03 deck. Inspection shall consist of all wall to ceiling joints, wall to deck joints, and all wall to wall intersections and abutment joints.

3.1.2 Identify any gaps greater than 0.075 inches, or any gaps that allow light transmission from an adjoining compartment. Submit CFR.

TABLE 1

Berthing Assignment
Compartment Number
Berths
Commanding Officer State Room
03-46-0-L
1 Person
Executive Officer State Room
03-46-4-L
1 Person
Officer State Room
03-56-2-L
2 Person
Officer State Room
03-58-1-L
2 Person
Officer State Room
03-63-2-L
2 Person
Officer State Room
03-64-1-L
2 Person
Surge Berthing
02-46-0-L
4 Person
Enlisted Berthing
02-46-1-L
2 Person
Enlisted Berthing
02-46-2-L
2 Person
Enlisted Berthing
02-46-4-L
2 Person
Chief Petty Officer State Room
02-54-2-L
2 Person
Enlisted Berthing
02-56-1-L
2 Person
Chief Petty Officer State Room
02-59-2-L
2 Person
Enlisted Berthing
02-62-3-L
2 Person
Enlisted Berthing
02-62-3-L
2 Person
Chief Petty Officer State Room
02-63-2-L
2 Person
Enlisted Berthing
02-67-2-L
2 Person
Chief Petty Officer State Room
02-68-1-L
2 Person
Enlisted Berthing
02-72-2-L
2 Person
Berthing Assignment
Compartment Number
Berths
Enlisted Berthing
02-74-1-L
2 Person
Enlisted Berthing
02-76-2-L
2 Person
Enlisted Berthing
01-46-1-L
2 Person
Enlisted Berthing
01-46-2-L
2 Person
Enlisted Berthing
01-51-1-L
2 Person
Enlisted Berthing
01-51-2-L
2 Person
Enlisted Berthing
01-55-1-L
2 Person
Enlisted Berthing
01-55-2-L
2 Person
Enlisted Berthing
01-59-1-L
2 Person
Enlisted Berthing
01-59-1-L
2 Person
Enlisted Berthing
01-64-2-L
2 Person
Enlisted Berthing
01-68-2-L
2 Person

3.2 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to:

· Bunks.

· Lockers.

· Desks.

· Ceiling Tiles.

· Crews Personal Effects.

4. QUALITY ASSURANCE

No additional requirements.

5. NOTES

This section is not applicable to this work item.

EC_51211O_30(15 Feb 2008)

WORK ITEM 9: Modify Cooling System for ICS/GCMS Space (EC No. 07-002)

1. SCOPE

1.1 Scope. This work item describes the requirements for the Contractor to modify the cooling system to provide independent cooling for the ICS/GCMS, compartment 03-72-0-C.

2. APPLICABLE DOCUMENTS

MIL-DTL-24643, Aug 2002, Cable and Cord, Electrical, Low Smoke, for Shipboard Use, Specification for

DOD-STD-2003, Dec 1990, Electric Plant Installations, Standard Methods FOR surface Ships and Submarines, Fig. Fig. 1B1 and 1B5.

Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements

Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes

Coast Guard drawing 240 WLBB 320-001, Rev H, Single Line Diagram

Coast Guard drawing 240 WLBB 320-006, Rev B, Power System Deck Plan, 02 Level

Coast Guard Drawing 240 WLBB 512-001, Rev C, HVAC Diagram

Coast Guard Drawing 240 WLBB 512-006, Rev A, HVAC Standard Details & General Instructions

Coast Guard Drawing 240 WLBB 514-001, Rev B Chilled Water System Diagram

Coast Guard Drawing 240 WLBB 514-003, Rev B Chilled Water System Arrangements & Details

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual

NAVSEA Drawing 803-1385866, Rev E, MLCA Distribution Date 18 Aug 1999, Penetration, Bulkhead and Deck

ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates

ASTM International (ASTM) F1836M, 1997, Standard Specification for Stuffing Tubes, Nylon, and Packing Assemblies

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-69, 2003, Pipe Hangers and Supports - Selection and Application

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-89, 2003, Pipe Hangers and Supports – Fabrication and Installation Practices

3. REQUIREMENTS

3.1 General. The Contractor shall refer to Coast Guard Drawings listed in section 2 as guidance. In addition the Contractor shall use existing cooling fan configuration in compartment 2-91-0-L as guidance to install cooling fan coil and associated manifold in compartment 03-72-0-C.

3.1.1…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .