Req_for_Info_resposne_12_July.docx

DOCX document 18 KB Posted

Attached to
replace casement windows and enclose skylights
Solicitation number
HSCG4216QPCV461
Issued by

View the file

Other files

File Type Posted
Requests_for_InformationHSCG4216QPCV461.doc DOC document
sf1442.pdf PDF
Req_for_Info.doc DOC document
RFQ_solic_including_embedded_docs_-_HSCG4216QPCV461(1).doc DOC document
Daily.pdf PDF
DB_NJ29.pdf PDF
Ref_Info_Sheet.doc DOC document
SOW_TOWNSEND_INLET_WINDOWS_SKYLIGHTS_(2)_-_Copy_(2).docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION

Please fax this form to (609) 898-6811 or e-mail to christopher.j.moulton@uscg.mil

REQUESTOR SECTION
From:

Date:

July 12, 2016

To:Contracting Officer
Attn: Chris Moulton
USCG Training Center Cape May, NJ e-mail: christopher.j.moulton@uscg.mil

1. Solicitation Number:

HSCG42-16-Q-PCV461

2. Location of Project:

Sea Isle City, NJ 08243

3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy) All RFIs must be received in this office not later than 5 working days prior to the closing date stated for this RFQ solicitation.

1. Is there an available specification naming manufacturer and specifics for the replacement windows. It’s very vague stating replacement windows of like kind, double pane glass.

2. . Any specifics on interior and exterior finishes.

3. Where exactly are the four (4) skylights located that are being removed.

4. Are there any official drawings and/ or specifications that are going to be made available for review..

Attachments:

Date Response Required:

By:

Title:

Requestor's FAX Number:

Requestor's Telephone Number:

TRACEN RESPONSE
To:

Date:

12 July 2016 1410

Response:

1. TRACEN: There is no window spec. Previous project provided no as-builts and there are no markings on the windows.

2. TRACEN: Drywall and paint interior side has vinyl siding roofing material is asphalt shingles. Include structural support and sheathing for roof.

3. TRACEN: Skylights are located on southwest exposure of building.

4. TRACEN: No official drawings are available at this time.

|X| This information is a clarification of the solicitation and does not change the terms or conditions in any way.

|_| This information is a proposed change to the solicitation. An amendment will be issued.

Contracting Officer:

CWO4 Moulton

Previous versions are useable REQUEST FOR INFORMATION FORM (Rev. 9-99)