USCG_specification__CMS-1395.pdf

PDF 124 KB Posted

Attached to
CONCRETE RUBBLE REMOVAL SERVICES
Solicitation number
HSCG4213QPFC030
Issued by

About this file

USCG specification CMS-1395

View the file

Other files

File Type Posted
DOL_WD_rev 14.pdf PDF
USCG_Drawing_T-6439-CD.pdf PDF
PFC030_RFQ_solic_all_pages_and_embedded_files.doc DOC document
RFI.doc DOC document
Reference_Information_Sheet.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRAINING CENTER

CAPE MAY, NJ

FACILITIES ENGINEERING

DIVISION

USCG

TRACEN

F E

CAPE MAY, NJ

CMS-1395

SAMS No.: 5456285

MAY 2013

SPECIFICATION FOR

CONCRETE RUBBLE REMOVAL SERVICES

TRACEN CAPE MAY

CAPE MAY, NEW JERSEY

TABLE OF CONTENTS

DRAWING INDEX

DIVISION 01 – GENERAL REQUIREMENTS

SECTION 01 10 00 SUMMARY

SECTION 01 30 00 ADMINISTRATIVE REQUIREMENTS

SECTION 01 32 16 PROGRESS SCHEDULE

SECTION 01 40 00 QUALITY REQUIREMENTS

SECTION 01 50 00 TEMPORARY FACILITIES AND CONTROLS

SECTION 01 70 00 EXECUTION AND CLOSEOUT REQUIREMENTS

SECTION 01 70 10 GENERAL CLEANING

SECTION 01 74 19 WASTE MANAGEMENT & DISPOSAL

SECTION 01 90 99 FIRE PREVENTION AND LIFE SAFETY PROTECTION

DIVISION 31 – EARTH WORK………………………………………………………..40

SECTION 31 11 00 SITE CLEARING………………………………………………40

1 CMS- 1395

DRAWING INDEX

T-6439-CD REMOVAL OF CONCRETE RUBBLE SHT 1 of 1

DRAWINGS: Drawings and the accompanying specifications are the property of the Government and comprise legal documentation that pertains exclusively to this project. Drawings can only be obtained electronically by downloading the files identified with the solicitation at https://www.fbo.gov . Hard copies will not be provided.

01 10 00 - 2 CMS-1395

DIVISION 01 – GENERAL REQUIREMENTS

SECTION 01 10 00

SUMMARY

PART 1 GENERAL

1.1 CONTRACT DESCRIPTION

A. Work of the Project includes all materials, labor, equipment, services, and all operations necessary for the removal of concrete and reinforced concrete material from the Air Strip, United States Coast Guard Training Center (TRACEN) Cape May, New Jersey. Major work items include but are not limited to:

1. Removal of concrete material.

2. Removal of reinforced concrete material.

3. Removal of debris.

4. Mobilization, demobilization and clean up;

5. Supervision, materials, equipment, transportation, labor and all other incidentals necessary to complete the work.

1.2 PERIOD OF PERFORMANCE

A. The period of performance for this project is 45 calendar days after Notice to Proceed is issued.

1.3 CONTRACTOR'S USE OF SITE

A. Access to Site: Work on this contract shall be performed while the unit is in full operational status. Work shall be conducted around all government functions.

No work can begin until a progress schedule, is approved by the Coast Guard.

The following conditions must be addressed:

B. Time Restrictions for Performing Work: The Contractor will be permitted to perform services through the hours of 7:00 am and 5:00 PM Mondays through Thursdays, excluding Fridays, Saturdays, Sundays and Federal Holidays. Work performed other than in these periods of time will only be allowed after approval of the Contracting Officer’s Representative (COR) following a 48 hour (72 hours for Sundays and Mondays) advance request.

C. Access to Base: Prior to commencement of the contract, the Contractor and all sub-contractors are required to register with the USCG TRACEN Cape May Security Office. Background screenings will be performed by TRACEN Security for all employees of the Contractor and sub-contractors working on the Base. The Contractor shall contact USCG TRACEN Cape May Security Office at (609) 898-6915 for detailed requirements.

D. Training Center Regulations: The Contractor, his employees, and subcontractors shall become familiar with and obey all Training Center regulations. All personnel employed on the project shall keep within the limits of the work and avenues of ingress and egress, and shall not enter any other areas outside of the

01 10 00 - 3 CMS-1395

site of the work unless required to do so in the performance of their duties. The Contractor's equipment shall be conspicuously marked for identification.

1.4 GOVERNMENT OCCUPANCY

A. The Government will occupy the site during the entire period of performance.

B. Cooperate with Government to minimize conflict, and to facilitate Government's operations.

C. Schedule the Work to accommodate Government occupancy.

1.5 SUB-CONTRACTOR RESPONSIBILITIES

A. Sub-contractors shall comply with the conditions of the contract. All general conditions and contract requirements shall be provided to all sub-contractors by the Contractor.

1.6 SPECIFICATION CONVENTIONS

A. These specifications are written in imperative mood and streamlined form. This imperative language is directed to the Contractor, unless specifically noted otherwise. The words “shall be” are included by inference where a colon (:) is used within sentences or phrases.

1.7 USCG CONTRACT PERSONNEL DEFINITIONS

A. Contracting Officer: Assigned by the US Coast Guard to execute the contract and enforce all contract requirements. Hereon referred to as the “KO”.

B. Contract Specialist: Appointed by the Contracting Officer (KO) to administer the contract. Hereon referred to as the “KSP”.

C. Contracting Officer’s Representative: Appointed by the Contracting Officer (KO) to monitor the performance of the contract to ensure compliance with the contract requirements. Hereon referred to as the “COR”

D. Project Engineer: Assigned by the US Coast Guard to provide technical assistance to the Contracting Officer’s Representative (COR).

E. Owner: The term “Owner” shall mean Contracting Officer (KO) acting as the representative for the U.S. Government.

PART 2 PRODUCTS - Not Used

PART 3 EXECUTION - Not Used

END OF SECTION

01 30 00 - 4 CMS-1395

SECTION 01 30 00

ADMINISTRATIVE REQUIREMENTS

PART 1 GENERAL

1.1 PRE-AWARD SITE VISIT

A. Offerors/Bidders are responsible for visiting the site to field verify existing conditions and determine actual dimensions and the nature of the work required.

Failure to visit the site does not relinquish the offereor/bidder from determining the extent and scope of the work required and estimating the difficulty and cost to complete the project. Requests for equitable adjustments, in either time or money, arising from failing to field verify site conditions may be denied.

Provisions regarding the site visit requirements are outlined in FAR Clause 52.236-3 “Site Investigation and Conditions Affecting the Work”

B. During the Solicitation Phase of this Project, two Pre-Award site visits will be scheduled by the Owner. The first Pre-Award site visit will held two weeks after the release of the Solicitation. The second Pre-Award site visit will be held three weeks after the release of the Solicitation. It is the responsibility of the contractor to contact the Project Engineer, Ramy Ghaly, Facilities Engineering, Design Section, at 609-898-6316 to obtain the specific dates, as no other site visits will be scheduled.

1.2 SOLICITATION PHASE REQUESTS FOR INFORMATION

A. Offerors/Bidders shall submit all questions, in writing, to the KO. Requests for Information (RFI) shall be submitted no later than five (5) business days prior to the offer due date. RFIs will be addressed by the USCG three (3) business days prior to the due date for offers.

1.3 SITE CONDITION VERIFICATION

A. The Contractor shall verify the conditions of the existing site, equipment and facilities potentially affected by the work under this contract and photograph and/or videotape the conditions in order to document the pre-award condition.

Copies of the photos and videos shall be submitted to the Contracting Officer prior to starting work.

1.4 COORDINATION AND PROJECT CONDITIONS

A. Coordinate scheduling, submittals, and Work of various sections of this specification to ensure efficient and orderly sequence of installation of interdependent performance elements.

B. Verify utility requirements and characteristics of operating equipment are compatible with utilities. Coordinate work of various sections having interdependent responsibilities for installing, connecting to, and placing in service, operating equipment.

01 30 00 - 5 CMS-1395

C. Coordinate space requirements, supports, and installation of mechanical and electrical Work indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduit, as closely as practicable; place runs parallel with lines of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs.

D. Coordinate completion and clean-up of Work.

1.5 POST-AWARD, PROJECT KICK-OFF MEETING

A. The Contract Specialist (KSP) will provide information to the contractor post award.

B. Attendance Required: KSP, COR, and Contractor. Prime contractor is encouraged to have subcontractors also attend.

C. The agenda will be provided by the KSP or COR after the contract is awarded.

1.6 FIELD ENGINEERING (IF SPECIFIED OR REQUIRED)

A. Employ Land Surveyor registered in State of New Jersey and acceptable to COR.

B. Locate and protect survey control and reference points. Promptly notify COR of discrepancies discovered.

C. Control datum for survey that is shown on Drawings.

D. Confirm drawing dimensions and elevations.

E. Provide field engineering services. Establish elevations, lines, and levels, utilizing recognized engineering survey practices.

F. Submit copy of site drawing and certificate signed by Land Surveyor certifying elevations and locations of the Work are in conformance with Contract Documents.

G. Maintain complete and accurate log of control and survey work as Work progresses.

H. On completion of foundation walls and major site improvements, prepare certified survey illustrating dimensions, locations, angles, and elevations of and site work.

I. Protect survey control points prior to starting site work; preserve permanent reference points during performance.

J. Promptly report to COR loss or destruction of reference point or relocation required because of changes in grades or other reasons.

K. Replace dislocated survey control points based on original survey control. Make no changes without prior written notice to COR.

01 30 00 - 6 CMS-1395

1.7 PROGRESS AND TECHNICAL REVIEW MEETINGS: Either party may request a meeting to review the progress of the project and/or review or clarify the technical requirements of the specifications. Meetings generally take place at the project site.

1.8 SAFETY AND HEALTH STANDARDS: The contractor shall comply with all the requirements in the Occupational Safety and Health Act (OSHA) 29 CFR 1910 and the U.S. Army Corps of Engineers (USACE) Safety and Health Requirements Manual No.

385-1-1.

1.9 EQUIPMENT: The contractor shall supply all equipment necessary to perform all work.

1.10 RECEIPT OF MATERIALS: Shipments of equipment, materials, and supplies shall be addressed to the Contractor - not the Coast Guard. The contractor shall provide all equipment, materials and labor for off-loading. The Coast Guard will not accept shipments for the Contractor.

1.11 SPECIAL WORKING CONDITIONS: Contractor's personnel shall wear outer garments consisting of at least a tee shirt, long trousers, (down to the ankles), and shoes at all times while at the job site. They shall not communicate with recruits or the instructors.

1.12 CUTTING AND PATCHING

A. General: Execute cutting and patching to complement adjacent work, in order to fit or integrate products together using methods to avoid damage and to provide appropriate surfaces to receive patching and finishing. Restore work with new products in accordance with requirements of the contract documents.

1. Structural elements: do not cut and patch structural elements in a manner that could change their load-carrying capacity or load-deflection ratio.

2. Operational elements: do not cut and patch operating elements and related components in a manner that results in reducing their capacity to perform as intended.

3. Visual requirements: do not cut and patch in a manner that results in visual evidence of cutting and patching.

4. Before proceeding, meet at project site with COR and parties involved in cutting and patching, including mechanical and electrical trades. Review areas of potential interference and conflict. Coordinate procedures and resolve potential conflicts before proceeding.

B. Materials: Use materials identical to existing materials. For exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible. If identical materials are unavailable or cannot be used, use materials that, when installed, will match the visual and functional performance of existing materials. Verify material substitutions with the COR prior to application and installation.

C. Examination: Examine existing conditions prior to commencing work including elements subject to damage or movement during cutting and patching. Beginning of cutting and patching means acceptance of existing conditions.

D. Preparation: Provide temporary support of work to be cut.

01 30 00 - 7 CMS-1395

E. Performance: Employ skilled workers to perform cutting and patching. In general, use hand or small power tools designed for sawing and grinding, not hammering and chopping. Cut holes and slots as small as possible, neatly to size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.

F. Concrete or Masonry Core Drilling: Cut using a cutting machine, such as an abrasive saw or a diamond-core drill.

G. Mechanical And Electrical Services: Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal remaining portion of pipe or conduit to prevent entrance of moisture or other foreign matter after cutting.

H. Patch by filling, repairing, refinishing, closing up, and similar operations following performance of other work. Patch with durable seams that are as invisible as possible. Provide materials and comply with installation requirements specified in other sections of these specifications.

I. At penetrations of fire rated walls, partitions, ceiling, or floor , completely seal voids with fire rated material to full thickness of the penetrated element.

J. Restore exposed finishes of patched areas and extend finish restoration into retained adjoining areas in a manner that will eliminate evidence of patching and refinishing.

1. For continuous surfaces, refinish to nearest intersection or natural break.

2. For an assembly, refinish entire unit.

K. Where walls or partitions that are removed, extend one finished area into another, patch and repair floor and wall surfaces in the new space. Provide an even surface of uniform finish, color, texture, and appearance. Remove existing floor and wall coverings and replace with new materials, as necessary, to achieve uniform color and appearance. Where patching occurs in a painted surface, apply primer and intermediate paint coats over the patch and apply final paint coat over entire unbroken surface containing the patch. Provide additional coats until patch blends with adjacent surfaces.

L. Ceilings: Patch, repair, or rehang existing ceilings as necessary to provide an even-plane surface of uniform appearance.

1.13 SELECTIVE DEMOLITION

A. General: Quality assurance: any soiling, staining, breakage or other damage caused by the contractor shall be the sole responsibility of the contractor to clean, repair or replace to original condition all such items at no additional cost to the USCG. Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.

B. Perform demolition in such manner as to eliminate hazards to persons and property; to minimize interference with use of adjacent areas, utilities and structures or interruption of use of such utilities; and to provide free passage to and from such adjacent areas of structures.

01 30 00 - 8 CMS-1395

1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage remaining or adjoining areas. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping, to minimize disturbance of adjacent surfaces.

2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.

3. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.

4. Where walls or partitions that are demolished extend one finished area into another, patch and repair floor and wall surfaces in the new space.

5. Remove existing floor and wall coverings and replace with new materials, if necessary, to achieve uniform color and appearance.

6. Provide an even surface of uniform finish color, texture, and appearance.

7. Where patching occurs in a painted surface, apply primer and intermediate paint coats over patch and apply final paint coat over entire unbroken surface containing patch. Provide additional coats until patch blends with adjacent surfaces.

8. Provide protection from elements for areas, which may be exposed by uncovering work. Protect existing areas during cutting and patching to prevent damage.

9. Adjoining areas: avoid interference with use of adjoining areas or interruption of free passage to adjoining areas.

PART 2 PRODUCTS - Not Used

PART 3 EXECUTION- Not Used

01 32 16 - 9 CMS-1395

SECTION 01 32 16

PROGRESS SCHEDULE

PART 1 GENERAL

1.1 DESCRIPTION

A. The intention of this Section is to adequately plan and execute the Work of the Contract so that it is completed within the number of calendar days allowed, and to assist the Contracting Officer (KO) in appraising the reasonableness of the proposed schedule and in evaluating progress of the Work. Prepare and maintain the schedules and reports described in this Section.

B. Definitions:

1. "Day," as used throughout the Contract unless otherwise stated, means

"calendar day”.

1.2 QUALITY ASSURANCE

A. The schedule as submitted by the Contractor and approved by the Contracting Officer will be an integral part of the Contract and will establish interim completion dates for the various activities under Contract.

B. Should any activity not be completed within 15 days after the stated schedule date, the Contractor shall explain in writing how this portion of the project can be expedited so as to not affect the remaining portions of the Contract.

1.3 FORMAT

A. The Contractor is requested to use Microsoft Project to prepare schedules.

B. Listings: Reading from left to right, in ascending order for each activity. Identify each activity with applicable specification section number.

C. Diagram Sheet Size: 11 inches high x 17 inches wide.

D. Scale and Spacing: To allow for notations and revisions.

1.4 SCHEDULES

A. Within 10 days after date established in Notice to Proceed, submit one paper copy and one electronic copy of proposed schedule prepared in accordance with this section.

B. Graphically show by bar-chart all activities necessary to complete the Work.

C. Include, but do not necessarily limit indicated activities to:

1. Project mobilization;

2. Submittal and approval of Shop Drawings and Samples;

3. Demolition;

01 32 16 - 10 CMS-1395

4. Procurement of equipment and critical materials;

5. Fabrication of special material and equipment, and its installation and testing;

6. Final cleanup;

7. Final inspecting and testing.

D. Include time for all activities by the Contracting Officer that affect progress, required dates for completion, or both, for all and each part of the work.

1.5 SCHEDULE OF VALUES

A. This schedule shall be prepared as a detailed cost breakdown of the contract price and be submitted with the Schedule. This schedule shall include but not be limited to costs of materials, equipment, and labor for all major work categories shown on the Schedule. The Contractor shall adhere to the following guidelines when developing the Schedule of Values.

1. Format-The line items in the Schedule of Values shall be the same as that of the Schedule.

2. Bonds-Bonding costs will only be paid in a lump sum if they are broken out separately and included with the schedule of values. The Contractor shall provide evidence that he has furnished full payment to the surety.

B. Materials-To request progress payments for materials delivered to the or fabrication site, the particular category of work associated with the materials must be broken down into separate material and labor costs.

1.6 PROGRESS SCHEDULES

A. Maintain schedules to record actual start and finish dates of completed activities.

B. Indicate progress of each activity to date of revision, with projected completion date of each activity. Update diagrams to graphically depict current status of Work.

C. Identify activities modified since previous submittal, major changes in Work, and other identifiable changes.

D. Indicate changes required to maintain Date of Completion.

E. Submit sorts required to support recommended changes.

F. Prepare narrative report to define problem areas, anticipated delays, and impact on schedule. Report corrective action taken or proposed and its effect including effects of changes on schedules of separate contractors.

01 32 16 - 11 CMS-1395

01 33 00 - 12 CMS-1395

This page intentionally left blank.

01 40 00 - 13 CMS-1395

SECTION 01 40 00

QUALITY REQUIREMENTS

PART 1 GENERAL

1.1 QUALITY CONTROL AND CONTROL OF INSTALLATION

A. The Contractor shall verify, in the field, all conditions as shown in the contract documents. The Contractor shall be responsible for field measurements for all new and retrofits.

B. In the event existing conditions are notably different at time of than the documents provided. The Contractor shall notify the KO and the COR.

C. The Contractor shall consult the KO and the COR prior to making any major field adjustments. Any variation from the contract documents must be authorized by the KO.

D. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce Work of specified quality.

E. All work shall be in strict compliance with the manufacturer’s instructions.

F. When manufacturers' instructions conflict with Contract Documents, request clarification from COR before proceeding.

G. Comply with specified standards as minimum quality for the Work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.

H. Perform Work by persons qualified to produce required and specified quality.

I. Upon request, the general contractor shall provide documented experience for all sub-contractors, manufacturers and applicators utilized as part of this contract.

J. Verify field measurements are as indicated on Shop Drawings or as instructed by manufacturer.

K. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, or disfigurement.

L. Use adequate numbers of skilled work personnel who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and the methods needed for proper performance of all work covered under this specification.

M. The general contractor shall coordinate the work of all trades to insure no conflicts occur that will prevent a complete operational installation.

01 40 00 - 14 CMS-1395

N. All materials and methods of for building work shall comply with the International Building Code, latest edition. The contractor and his/her subcontractors shall be responsible to familiarize themselves with this document.

O. All materials and methods of for site work shall comply with the New Jersey Department of Transportation Standard Specifications for Road and Bridge , 2001, with revisions, hereon referred to as the NJDOT Specifications. The contractor and his/her subcontractors shall be responsible to familiarize themselves with this document.

P. Comply with the latest edition of all applicable code requirements, including:

1. NFPA 101: Life Safety Code

2. Uniform Federal Accessibility Standards

3. ASCE 7-05: “Minimum Design Loads for Buildings and Other

Structures”

4. National Electric Code (NEC)

5. ASHRAE Manual

6. Other applicable codes and industry standards

1.2 TOLERANCES

A. Monitor fabrication and installation tolerance control of products to produce acceptable Work. Do not permit tolerances to accumulate.

B. Comply with manufacturers' tolerances. When manufacturers' tolerances conflict with Contract Documents, request clarification from COR before proceeding.

C. Adjust products to appropriate dimensions; position before securing products in place.

1.3 REFERENCES

A. For products or workmanship specified by association, trade, or other consensus standards, comply with requirements of standard, except when more rigid requirements are specified or are required by applicable codes.

B. Conform to reference standard, by date of issue, current on date of Contract Documents, except where specific date is established by code.

C. Obtain copies of standards where required by product specification sections.

D. When specified reference standards conflict with Contract Documents, request clarification from COR before proceeding.

E. Contractual relationships, duties, and responsibilities of parties in Contract and those of COR shall not be altered from Contract Documents by mention or inference otherwise in Reference documents.

F. The Contracting Officer has sole authority to approve or authorize any changes to the contract, particularly those that impact money or time.

01 40 00 - 15 CMS-1395

1.4 LABELING

A. Attach label from agency approved by authority having jurisdiction for products, assemblies, and systems required to be labeled by applicable code.

B. Label Information: Include manufacturer's or fabricator's identification, approving agency identification, and the following information, as applicable, on each label.

1. Model number.

2. Serial number.

3. Performance characteristics.

1.5 TESTING AND INSPECTION SERVICES

A. Terminology

1. Factory Tests: Tests made on various products and component parts prior to shipment to the job site, including but not limited to such items as transformers, boilers, air conditioning equipment, electrical equipment, and precast concrete.

2. Field Test: Tests or analysis made at, or in the vicinity of the job site in connection with the actual .

3. Products: The term "product" includes the plural thereof and means a type or a category of manufactured goods, , installations and processed materials or those associated services whose characterization, classification or functional performance determination is specified by standards.

4. Person: The term "person" means associations, companies corporations, educational institutions, firms, government agencies at the Federal, State and local level, partnership, and societies, as well as divisions thereof, and individuals.

5. Testing Laboratory: The term "testing laboratory" means any person, as defined above, whose functions include testing, analyzing, or inspecting "products", as defined above, and/or evaluating the designs or specifications or such "products" according to the requirements of applicable standards.

6. Certified Test Reports: Certified reports, performed by a testing laboratory regularly engaged in the business, attesting that the tests were performed in accordance with the method specified, that the results reported are accurate, and that items tested either meet or fail to meet the stated minimum requirements. Those test reports include tests performed by Factory Mutual, Underwriters Laboratories, Inc., and others.

7. Certified Inspection Reports: Certified inspections reports are those signed by approval inspectors attesting that the item inspected meets the specification requirements other than any exception included in the report.

8. Manufacturer's Certificate of Conformance or Compliance: A certificate signed by an authorized manufacturer's official attesting that the material or equipment delivered meets the specification requirements.

9. Contractor's Daily Report: A report of man-hours expended work accomplished, etc., filled out on a daily basis by the Contractor's Job Superintendent and submitted to the COR.

01 40 00 - 16 CMS-1395

B. Employ the services of an independent testing agency or laboratory acceptable to The Government to perform specified testing.

1. Prior to start of Work, submit testing laboratory name, address, and telephone number, and names of full time registered Engineer or specialist and responsible officer.

2. Submit copy of report of laboratory facilities inspection made by Materials Reference Laboratory of National Bureau of Standards during most recent inspection, with memorandum of remedies of deficiencies reported by inspection.

C. The independent firm will perform tests, inspections and other services specified in individual specification sections and as required by COR.

1. Laboratory: Authorized to operate in State of New Jersey.

2. Laboratory Staff: Maintain full time registered Engineer or specialist on staff to review services.

3. Testing Equipment: Calibrated at reasonable intervals with devices of an accuracy traceable to National Bureau of Standards or accepted values of natural physical constants.

D. Testing, inspections and source quality control may occur on or off project site.

Perform off-site testing as required by COR.

E. Reports will be submitted to the Contracting Officer and COR, indicating observations and results of tests and indicating compliance or non-compliance with Contract Documents.

1. Submit final report indicating correction of Work previously reported as non-compliant.

F. Cooperate with independent firm; furnish samples of materials, design mix, equipment, tools, storage, safe access, and assistance by incidental labor as requested.

1. Notify COR and independent firm 24 hours prior to expected time for operations requiring services.

2. Make arrangements with independent firm and pay for additional samples and tests required for Contractor's use.

G. Testing and employment of testing agency or laboratory shall not relieve Contractor of obligation to perform Work in accordance with requirements of Contract Documents.

H. Re-testing or re-inspection required because of non-conformance to specified requirements shall be performed by same independent firm on instructions by

COR.

I. Testing Laboratory Responsibilities:

1. Test samples of mixes submitted by Contractor.

2. Provide qualified personnel at site. Cooperate with COR and Contractor in performance of services.

3. Perform specified sampling and testing of products in accordance with specified standards.

01 40 00 - 17 CMS-1395

4. Ascertain compliance of materials and mixes with requirements of Contract Documents.

5. Promptly notify COR and Contractor of observed irregularities or non-conformance of Work or products.

6. Perform additional tests required by COR.

7. Attend pre meetings and progress meetings, when requested.

J. Testing Laboratory Reports: After each test, promptly submit two copies of report to the Contracting Officer, and one copy to the COR, Contractor, and authority having jurisdiction. When requested by COR, provide interpretation of test results. Include the following:

1. Date issued.

2. Project title and number.

3. Name of inspector.

4. Date and time of sampling or inspection.

5. Identification of product and specifications section.

6. Location in Project.

7. Type of inspection or test.

8. Date of test.

9. Results of tests.

10. Conformance with Contract Documents.

PART 2 PRODUCTS - Not Used

PART 3 EXECUTION

A. QUALITY CONTROL REQUIREMENTS: Inspect and test all work under the contract and maintain records of the inspections and tests. Approvals, except those required for field applications, and field test, shall be obtained before delivery of materials and equipment to the site. Surveillance of the inspection system will be performed by the Contracting Officer Representative.

1. Factory Tests: Unless otherwise specified, the Contractor shall arrange for factory tests when they are required under the contract.

2. Factory Inspection: Unless otherwise specified, the Contractor shall arrange for factory inspections when required under the contract.

3. Field Inspections and Tests by the Contractor: The Contractor shall furnish all equipment, instruments, qualified personnel and facilities necessary to inspect all work and perform all tests required by the contract. All inspections and tests performed and test results received each day shall be included in the Daily Report to the Inspector.

4. Field Inspections and Tests by the Government: Field inspections and tests conducted by the Government will be made in accordance with FAR 52.246-12 entitled Inspection of .

5. Approved Testing Laboratories: All laboratory work under this contract shall be performed by a laboratory approved by the Government, whether the laboratory is employed by the Contractor, or is owned and operated by the Contractor. The basis of approval includes the following:

a. Testing Laboratories performing work not in connection with concrete, steel, or bituminous materials shall comply with

01 40 00 - 18 CMS-1395

sections 3 and 4 of ASTM E329, except that the Contracting Officer will perform the functions of paragraphs 3.4 and 3.5 therein in the absence of other Government approval.

6. Repeated Tests and Inspections: Repeat tests and inspections after corrections have been made to nonconforming materials and workmanship until tests and inspections indicate the materials, equipment, and workmanship conform to the contract requirements. The re- testing and re-inspections shall be performed at no additional cost to the Government.

3.2 EXAMINATION

A. Verify existing site conditions and substrate surfaces are acceptable for subsequent Work. Beginning new Work means acceptance of existing conditions.

B. Verify existing substrate is capable of structural support or attachment of new Work being applied or attached.

C. Examine and verify specific conditions described in individual specification sections.

D. Verify utility services are available, of correct characteristics, and in correct locations.

3.3 PREPARATION

A. Clean substrate surfaces prior to applying next material or substance.

B. Seal cracks or openings of substrate prior to applying next material or substance.

C. Apply manufacturer required or recommended substrate primer, sealer, or conditioner prior to applying new material or substance in contact or bond.

3.4 DAILY REPORTING

A. Submit the "Contractor's Daily Report" through the Contracting Officer's Authorized Representative by 10:00 AM on the first working day following the day the work was performed. The report shall be filled out and submitted by the Contractor's Job Superintendent. A sample format of an acceptable form is included at the end of this section. While the use of this sample format is not required, any other format must contain the same information as shown on the sample. DAILY REPORT FORMS WILL NOT BE SUPPLIED BY THE

COAST GUARD; AN ELECTRONIC COPY OF THE FORM WILL BE

PROVIDED UPON REQUEST.

01 40 00 - 19 CMS-1395

USCG TRAINING CENTER FACILITIES ENGINEERING (609) 898-6945

CONTRACTOR'S DAILY REPORT TO INSPECTOR

CONTRACT

NUMBER:

REPORT

NUMBER:

DATE:

CONTRACTOR:

TITLE & LOCATION:

CONTRACT COMPLETION DATE:

NUMBER OF REMAINING WORK DAYS:

WEATHER CONDITIONS: AM TEMP.

PM TEMP.

PERCENT OF COMPLETION (in fiscal terms): %

WORK FORCE INFORMATION:

TRADE NUMBER WORK-HOURS EMPLOYER WORK PERFORMED

MATERIALS DELIVERED TO THE JOB SITE:

(Record quantity per load and number of loads if applicable)

01 40 00 - 20 CMS-1395

MAJOR EQUIPMENT ON THE JOB SITE HOURS OPERATED

LOCATION & DESCRIPTION OF DEFICIENCIES:

(Materials, Equipment, Safety, and/or Workmanship)

ACTION TAKEN OR TO BE TAKEN:

REMARKS:

Signature of authorized contractors on site superintendent printed name signature date

FOR CONTRACTING OFFICER'S AUTHORIZED REPRESENTATIVES USE ONLY

01 50 00 - 21 CMS-1395

SECTION 01 50 00

TEMPORARY FACILITIES AND CONTROLS

PART 1 GENERAL

1.1 DESCRIPTION

A. This Section identifies and outlines the responsibilities of contractors performing work on the Training Center and in Coast Guard owned housing or for any tenant organization as pertaining to temporary facilities and controls.

1.2 TEMPORARY ELECTRICITY

A. Utility Outages and Shutdown: Needed power outages shall be arranged only with prior approval from COR with duration and affected areas held to a minimum.

B. Utilize The Government’s existing power service.

C. The Contractor may utilize electrical power from the nearest electrical receptacle, subject to availability. OSHA requirements will govern the use of such utility.

All equipment used shall be supplied by the Contractor. US Coast Guard does not make any guarantee against any voltage variation or service interruption.

1.3 TEMPORARY FIRE PROTECTION

A. Install and maintain temporary fire-protection facilities to protect against predictable and controllable fire loss. Comply with NFPA 10 "Standard for Portable Fire Extinguishers" and NFPA 241 "Standard for Safeguarding , Alterations and Demolition Operations."

1. Locate fire extinguishers where convenient and effective for their intended purpose, but not less than one extinguisher at each floor stairwell and one at each building opening for personnel egress.

2. Maintain unobstructed access to fire extinguishers, fire hydrants, temporary fire-protection facilities, stairways and other access routes for fighting fires.

3. Provide independent supervision of welding, flame cutting and other open flame work. Provide each fire supervisor with an appropriate fire extinguisher.

4. Provide training for all personnel on-site in the proper operation of each type of fire extinguisher provided. Provide all personnel with the proper notification procedure to summon the local fire department or emergency medical service.

5. There shall be NO SMOKING or unsupervised open flame permitted inside any structure, temporary or permanent; nor within 25 feet of combustible material or within 50 feet of flammable liquids or compressed gasses.

01 50 00 - 22 CMS-1395

1.4 FIELD OFFICES AND SHEDS

A. OFFICE AND STORAGE SHED: The Contractor shall provide his own office and storage shed or trailer, if necessary. No equipment or material storage will be provided by the Coast Guard.

1.5 TEMPORARY VENTILATION (IF REQUIRED)

A. Ventilate enclosed areas to achieve curing of materials, to dissipate humidity and to prevent accumulation of dust, fumes, vapors, or gases.

B. If needed, utilize existing ventilation equipment. Extend and supplement equipment with temporary fan units as required to maintain clean air for operations.

1.6 TELEPHONE SERVICE

A. Provide, maintain, and pay for telephone service to field office and/or cellular phone service at time of project mobilization.

1.7 FACSIMILE SERVICE (IF REQUIRED)

A. Provide, maintain and pay for facsimile service to field office at time of project mobilization.

1.8 TEMPORARY WATER SERVICE (IF REQUIIRED)

A. Water will be made available at the nearest hydrant or exterior hose bib. The contractor will be responsible for supplying all hose and adapters including a backflow preventer.

1.9 TEMPORARY SANITARY FACILITIES (IF REQUIRED)

A. Provide and maintain required facilities and enclosures. Existing facility use is not permitted. Provide facilities at time of project mobilization.

1.10 OPEN EXCAVATIONS

A. The Contractor shall not leave any open excavations at the end of each work day.

The Contractor shall either backfill the excavation or place a steel plate over the excavation. Excavations shall be completely backfilled at the end of each work week.

1.11 PROTECTION FROM WEATHER AND OPERATIONS

A. Temporary Enclosures: Protect existing facilities/equipment and new , whether in progress or newly completed, from the adverse effects of the weather and operations. Provide temporary enclosures, coverings and barriers as required to afford protection against exposure, weather and wind damage and from operations that could degrade, stain, age, or reduce the finished quality of new work or damage existing facilities and equipment.

01 50 00 - 23 CMS-1395

B. Contractor's Staging and Stockpiling: The Contractor is responsible for the protection and use of materials for the project inside or outside the facility, including his dumpster and spot a pot used on site. Should the USCG notify the Contractor of a weather emergency such as an impending Hurricane, the Contractor will need to tie-down or move these temporary facilities to higher ground. Hurricane season is from June 1 - November 30.

C. Climate Control: Where temporary heat is required during to protect work completed or to heat facilities in operation by the Coast Guard, all openings shall be made weather tight to allow the maintenance of 68 deg. F. heat minimum with the existing or temporary heating equipment or 78 deg f. maximum with existing or temporary cooling.

1. Piping: Prevent water-filled pipes or tanks from freezing for both interior and exterior systems installed or in storage.

D. Reapplication: All temporary closures or enclosures shall be made ready for immediate re-application in the event of sudden storms or man-made conditions requiring protection of existing facilities or completed .

1.12 VEHICULAR ACCESS AND PARKING

A. A lay down and parking area for Contractor’s vehicles, trailers and personnel will be designated by the COR. Obey all U.S. Coast Guard Parking Signs and traffic rules.

B. Vehicles shall not travel or park on grass. If travel or parking on grass is necessary, grass shall be restored to original condition after completion of the project at no cost to the Government.

1.13 PROGRESS CLEANING AND WASTE REMOVAL

A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in clean and orderly condition.

B. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed or remote spaces, prior to enclosing spaces.

C. Broom and vacuum clean interior areas prior to start of surface finishing, and continue cleaning to eliminate dust.

D. Collect and remove waste materials, debris, and rubbish from site periodically and dispose off-site.

E. Open free-fall chutes are not permitted. Terminate closed chutes into appropriate containers with lids.

1.14 TRAFFIC REGULATION

A. Signs, Signals, And Devices:

1. Post Mounted and Wall Mounted Traffic Control and Informational

Signs: As approved by authority having jurisdiction.

01 50 00 - 24 CMS-1395

2. Traffic Control Signals: As approved by local jurisdictions.

3. Traffic Cones and Drums, Flares and Lights: As approved by authority having jurisdiction.

B. Traffic Signs And Signals:

1. Provide signs at approaches to site and on site, at crossroads, detours, parking areas, and elsewhere as needed to direct and affected public traffic.

2. Relocate as Work progresses, to maintain effective traffic control.

C. Removal:

1. Remove equipment and devices when no longer required.

2. Repair damage caused by installation.

D. BARRICADES: Any stored debris, equipment and all areas dangerous to foot or vehicular traffic shall be barricaded by the Contractor. At night and during other times of poor visibility, barricades shall be illuminated. All barricading, including night illumination shall be maintained by the Contractor. All barricades shall be constructed in accordance with ANSI D6-1.

E. PEDESTRIAN TRAFFIC: The Contractor shall arrange his equipment and/or progression of work, so as not to interfere with the normal flow of pedestrian traffic. Where interference is unavoidable, the contractor shall provide a marked, safe, and clean route around the obstruction

1.15 BARRIERS

A. Provide barriers to prevent unauthorized entry to areas to protect existing facilities and adjacent properties from damage from operations and demolition.

B. Provide protection for plants designated to remain. Replace damaged plants.

C. Protect non-owned vehicular traffic, stored materials, site, and structures from damage.

1.16 WATER CONTROL

A. Grade site to drain. Maintain excavations free of water. Provide, operate, and maintain pumping equipment.

B. Protect site from puddling or running water. Provide water barriers as required to protect site from soil erosion.

1.17 DUST CONTROL

A. Execute Work by methods to minimize raising dust from operations.

B. Provide positive means to prevent air-borne dust from dispersing into atmosphere.

01 50 00 - 25 CMS-1395

1.18 EROSION AND SEDIMENT CONTROL

A. Plan and execute by methods to control surface drainage from cuts and fills, from borrow and waste disposal areas. Prevent erosion and sedimentation.

B. Minimize surface area of bare soil exposed at one time.

C. Provide temporary measures including berms, dikes, and drains, and other devices to prevent water flow.

D. Construct fill and waste areas by selective placement to avoid erosive surface silts or clays.

E. Periodically inspect earthwork to detect evidence of erosion and sedimentation;

promptly apply corrective measures.

F. Protect inlets and drainage areas from excessive soil or debris collection. Ensure no excessive soil loss through inlets or drainage areas.

1.19 POLLUTION CONTROL

A. Provide methods, means, and facilities to prevent contamination of soil, water, and atmosphere from discharge of noxious, toxic substances, and pollutants produced by operations.

B. Prevent hazardous materials & wastes from entering the ground, catch basins, drains, drainage areas & surface waters. Fuel and lubricate equipment in a manner that protects against spills and evaporation. Clean up all spills immediately. Surround temporary petroleum and liquid chemical storage tanks with a temporary berm of size and strength to contain the tank contents in the event of a leak or spill. Immediately notify the Contracting Officer (KO) and COR of hazardous material spills. The Contractor shall be responsible for all costs associated with cleanup of material spills both hazardous and non-hazardous.

C. Comply with pollution and environmental control requirements of authorities having jurisdiction.

1.20 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS

A. Remove temporary utilities, equipment, facilities, materials, prior to final inspection.

B. Clean and repair damage caused by installation or use of temporary work.

C. Restore existing facilities used during to original condition. Restore permanent facilities used during to specified condition.

01 50 00 - 26 CMS-1395

01 70 00 - 27 CMS-1395

SECTION 01 70 00

EXECUTION AND CLOSEOUT REQUIREMENTS

PART 1 GENERAL

1.1 CLOSEOUT PROCEDURES

A. Submit written certification to the Contracting Officer (KO) that Contract Documents have been reviewed, Work has been inspected, and that Work is complete in accordance with Contract Documents and ready for COR review.

B. Provide submittals to KO required by the contract and authorities having jurisdiction.

C. Submit final Application for Payment identifying total adjusted Contract Sum, previous payments, and sum remaining due.

1.2 FINAL CLEANING

A. Execute final cleaning prior to final project assessment.

1.3 DEMONSTRATION AND INSTRUCTIONS (IF SPECIFIED OR REQUIRED)

A. Demonstrate operation and maintenance of products to The Government's personnel.

B. Demonstrate Project equipment and provide instruction by qualified manufacturer's representative who is knowledgeable about the Project.

C. For equipment or systems requiring seasonal operation, perform demonstration for other season within 12 months.

D. Utilize operation and maintenance manuals as basis for instruction. Review contents of manual with The Government's personnel in detail to explain all aspects of operation and maintenance.

E. Demonstrate start-up, operation, control, adjustment, trouble-shooting, servicing, maintenance, and shutdown of each item of equipment at agreed time.

F. Prepare and insert additional data in operations and maintenance manuals when need for additional data becomes apparent during instruction.

G. Required instruction time for each item of equipment and system is specified in individual sections.

1.4 PROTECTING INSTALLED

A. Protect installed Work and provide special protection where specified in individual specification sections.

01 70 00 - 28 CMS-1395

B. Provide temporary and removable protection for installed products. Control activity in immediate work area to prevent damage.

C. Provide protective coverings at walls, projections, jambs, sills, and soffits of openings.

D. Protect finished floors, stairs, and other surfaces from traffic, dirt, wear, damage, or movement of heavy objects, by protecting with durable sheet materials.

E. Prohibit traffic or storage upon waterproofed or roofed surfaces. When traffic or activity is necessary, obtain recommendations for protection from waterproofing or roofing material manufacturer.

F. Prohibit traffic from landscaped areas.

1.5 PROJECT RECORD DOCUMENTS

A. Maintain on site one set of the following record documents; record actual revisions to the Work:

1. Drawings.

2. Specifications.

3. Addenda.

4. Change Orders and other modifications to the Contract.

5. Reviewed Shop Drawings, Product Data, and Samples.

6. Manufacturer's instruction for assembly, installation, and adjusting.

B. Ensure entries are complete and accurate, enabling future reference by The Government.

C. Store record documents separate from documents used for .

D. Record information concurrent with progress, not less than weekly.

E. Specifications: Legibly mark and record at each product section description of actual products installed, including the following:

1. Manufacturer's name and product model and number.

2. Product substitutions or alternates utilized.

3. Changes made by Addenda and modifications.

F. Record Drawings and Shop Drawings: Legibly mark each item to record actual including:

1. Measured depths of foundations in relation to finish floor datum.

2. Measured horizontal and vertical locations of underground utilities and appurtenances, referenced to permanent surface improvements.

3. Measured locations of internal utilities and appurtenances concealed in , referenced to visible and accessible features of the Work.

4. Field changes of dimension and detail.

5. Details not on original Contract drawings.

G. Submit documents to the KO.

01 70 00 - 29 CMS-1395

1.6 OPERATION AND MAINTENANCE DATA (IF SPECIFIED OR REQUIRED)

A. Submit data bound in 8-1/2 x 11 inch (A4) text pages, three D side ring binders with durable plastic covers.

B. Prepare binder cover with printed title "OPERATION AND MAINTENANCE INSTRUCTIONS", title of project, and subject matter of binder when multiple binders are required.

C. Internally subdivide binder contents with permanent page…

This is the start of the file's text. The full file is on GovTribe.