Amendment_001_47229.pdf

PDF 32 KB Posted

Attached to
DRYDOCKING & REPAIR: MLB 47229 STA. UMPQUA RIVER
Solicitation number
HSCG40-16-Q-P30D63
Issued by

About this file

Amendment 001

View the file

Other files

File Type Posted
47229_FY16_DD_Rev-1.pdf PDF
47229_FY16_DD_Rev-0.pdf PDF
HSCG4016QP30D63.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 4

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable) 0001 05/27/2016

6. ISSUED BY CODE HSCG40 7. ADMINISTERED BY (If other than Item 6) CODE

COMMANDER, USCG

SURFACE FORCES LOGISTICS CENTER

1301 CLAY STREET, SUITE 807N

OAKLAND, CA 94612

8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9.A AMENDMENT OF SOLICITATION NO.

X HSCG40-16-Q-P30D63

9B. DATE (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER

NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE 2/14/2016

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority).

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

DRYDOCKING & REPAIR: MLB 47229 STA. UMPQUA RIVER

1.) Specification package changed to Rev-1 2.) Contractor questions have been answered on the page below 3.) All other terms and conditions cited in the original solicitation/specifications remain unchanged.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS

EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243

The following contractor questions have been answered:

Question 1: Work Item D-16 Slandered Hoses

Are we still using the FC-355 hose for the -20 size only, since they don’t make the FC-234 in -20 size? Will there be a change request if the sizes of the hoses and lengths are incorrect?

If installed hoses do not match spec, submit CFR/CR

What does VAL stand for? VAL is for "validate" hose and note in CFR.

Is this hose being renewed? Yes, hoses are to be renewed

Are we renewing these hoses that come from the UK?

Question 2: Work Item 20 Sea Strainers- Simplex (All Sizes, Clean and Inspect, Can we just renew with in-kind- materials? Yes

Question 3: Work Item 4 & 6: Rub Rail There is no scope of work about installing the rub rails inner sealant as shown on BP#47B MLB 611-020 Rev H sheet 3 of 3 items 8 & 9. Has this been changed and only needing the outer sealant as called out for?

Are all aluminum surfaces to be sandblasted and painted under the rub-rail surfaces IAW the USCG Coatings and Color Manual?

Coast Guard Answer: Top and bottom an uniform backing.

Question 4: Work Item 5: Bulkhead Penetrations, Frame 5, Inspect Is all the insulation to be renewed from the survivor’s deck plates down to the keel inside of the Survivors Compartment?

We are to renew all of the Blkhd 5 penetrations, pipe fittings, and adapters, paragraph 3.4 contradicts what is said in the scope of work.

Coast Guard Answer: Scope of work is for fitting renewal. CR mentioned in 3.4 is for piping. Renewal of all from deck plates down.