Amendment_001_47257.pdf
PDF 31 KB Posted
- Attached to
- DRYDOCKING & REPAIR: MLB 47257 STA. BODEGA BAY
- Solicitation number
- HSCG40-16-Q-P30640
About this file
Amendment 001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 47257_(MLB_47)_DS_FQ3_WAB_16R0_(Repaired).pdf | ||
| 47257_(MLB_47)_DS_FQ3_WAB_16R0.pdf | ||
| HSCG4016QP30640.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 4
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable) 0001 2/24/2016
6. ISSUED BY CODE HSCG40 7. ADMINISTERED BY (If other than Item 6) CODE
COMMANDER, USCG
SURFACE FORCES LOGISTICS CENTER
1301 CLAY STREET, SUITE 807N
OAKLAND, CA 94612
8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9.A AMENDMENT OF SOLICITATION NO.
X HSCG40-16-Q-P30640
9B. DATE (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE 2/14/2016
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
DRYDOCKING & REPAIR: MLB 47257 STA. BODEGA BAY
1.) Specification package changed to add table of contents 2.) Contractor questions have been answered on the page below 3.) All other terms and conditions cited in the original solicitation/specifications remain unchanged.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS
EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243
The following contractor questions have been answered:
Question 1: Work Item D-1 General Welding, Provide
Note: 4.2 is missing what is called for under paragraph 3.3 Answer: 4.2 and 4.3 have been added.
Question 2: Work Item 13 Stand Hoses, Renew
Are we to provide adapters that are connected to -20, re usable hose ends, only?
Answer: No, you must provide all adapters and connections for all hoses listed in Table 1.
Question 3: Work Item 13: Standard Hoses, Renew
A)Are we still using the same procedures for the FC-234 & FC-355 Aeroquip Hose, which was reusable hose fittings only and no miss matching of the brands(Aeroquip hose to Aeroquip reusable hose ends only)?
B) Are we still using the FC-355 hose for the -20 size only, since they don’t make the FC-234 in -20 sizes?
Answers: A) Yes, B) Yes.
Question 4: Work Item 30: Hull Plate Renew Can we use our standard procedures for taking readings that have been accurate for the past several years?
Answer: Yes.