TURBO_15-R-20137.doc
DOC document 437 KB Posted
- Attached to
- Overhaul Alco Turbochargers
- Solicitation number
- HSCG40-15-R-20137
About this file
Request for Proposals HSCG40-15-R-20137
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DISCREPANCY_REPORT.doc | DOC document | |
| Turbo_Overhaul_Spec_R-251-0120_(2).doc | DOC document | |
| TURBOCHARGERS_-_SF1449.pdf | ||
| BarCode_Spec_D-000-0100.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HSCG40-15-R-20137
HSCG40-15-R-20137
THIS PAGE IS LEFT OPEN FOR THE SF1449 TO BE INSERTED
NOTICE FOR FILING AGENCY PROTESTS
United States Coast Guard Ombudsman Program
It is the policy of the United States Coast Guard (USCG) to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time-consuming litigation. OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the Government Accountability Office (GAO).
Interested parties are encouraged to seek resolution of their concerns within the USCG as an Alternative Dispute Resolution (ADR) forum rather than filing a protest with the GAO or some external forum. Interested parties may seek resolution of their concerns informally or opt to file a formal agency protest with the Contracting Officer or Ombudsman.
Informal Forum with the Ombudsman. Interested parties who believe a specific USCG procurement is unfair or otherwise defective should first direct their concerns to the applicable Contracting Officer. If the Contracting Officer is unable to satisfy their concerns, interested parties are encouraged to contact the U.S. Coast Guard Ombudsman for Agency Protests. Under this informal process the agency is not required to suspend contract award performance. Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum. In order to ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, Contracting Officer, and solicitation closing date (if applicable).
Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions. If the protester’s concerns are unresolved, an Independent Review is available by the Ombudsman. The protester may file a formal agency protest to either the Contracting Officer or as an alternative to that, the Ombudsman under the OPAP program. Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined in writing to be in the best interest of the Government. The agency’s goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth in FAR 33.103(d) (2). If the protester fails to submit the required information, resolution of the protest may be delayed or the protest may be dismissed. To be timely protests must be filed within the period specified in FAR 33.103(e). Formal protests filed under the OPAP program should be submitted to:
COMMANDANT (CG-9131)
U S COAST GUARD
OMBUDSMAN PROGRAM FOR AGENCY PROTESTS
2100 2ND ST SW STOP 7112
WASHINGTON DC 20593-7112
The Ombudsman Hotline telephone number is 202.372.3695.
Table of Contents
DESCRIPTION:
PAGE
Notice for Filing Agency Protests
Standard Form 1449 (SF1449)
Table of Contents
Addendum to Standard Form 1449:
Blocks 19 – 26, Schedule of Supplies/Services
4-60
Block 15, Deliveries, Packaging and Marking
61-63
Contract Administration Data/Invoicing Requirements
64-66 Special Contract Requirements
Addendum to FAR Clause 52.212-4, Contract Terms and Conditions –
Commercial Items
68-75 FAR Clause 52.212-5, Contract Terms and Conditions Required to Implement
Statutes or Executive Orders – Commercial Items
76-83 Addendum to FAR Provision 52.212-1, Instructions to Offerors –
84-87 Commercial Items
FAR Clause 52.212-2 – Evaluation- Commercial Items 88 Addendum to FAR Clause 52.212-2 – Evaluation- Commercial Items 89-90 FAR Provision 52.212-3 – Offeror Representations and Certifications –
91-108 Commercial Items
ATTACHMENTS:
Attachment 1: Specification R-251-0120 for Overhaul Specification for Alco Turbochargers used on 210’ and 270’ WMEC Coast Guard Vessels, dated 6/1992 Attachment 2: DHS Form 700-5 Contractor Report of Government Property Attachment 3: Government Furnished Property Discrepancy Report
ADDENDUM TO STANDARD FORM 1449
THE SCHEDULE
DESCRIPTION/SPECIFICATION/WORK STATEMENT
CLINS (Contract Line Item Number) 0001 through 4007 are for the Overhaul of Turbochargers, Type 1 (Model 131, P/N 22602171-2), Type 2 (Model 165, P/N 22602128-2) and Type 3 (Model 720, P/N 22600172-4), to be performed in strict accordance with USCG SFLC Specification R-251-120, Overhaul Specification for Alco Turbochargers used on 210’ and 270’ WMEC Coast Guard Vessels.
NOTICE TO OFFERORS
***All questions regarding this solicitation MUST be submitted in writing. You may email them to Florence Harwood at Florence.m.harwood@uscg.mil. No inquiries will be answered verbally!!
Contractor’s shall not modify, change or update any part number or incorporate any notes into the solicitation. If a Contractor believes that any portion of this solicitation is incorrect, or an ambiguity exists, the Contractor shall notify the Contracting Office, in writing, prior to the date and time specified for receipt of proposals. Failure to follow this direction may render your proposal unacceptable and rejected.
IN ORDER TO BE TECHNICALLY ACCEPTABLE AND TO BE CONSIDERED FOR AN AWARD, OFFERORS ARE REQUIRED TO BE THE ORIGINAL EQUIPMENT MANUFACTURER (OEM) OR AN AUTHORIZED REPAIR FACILITY.
**SEE ADDENDUM TO 52.212-2, EVALUATION CRITERIA (PAGE 88), FOR MORE INFORMATION REGARDING THIS REQUIREMENT.
TYPE OF CONTRACT
This is a Requirements-Type Contract with one (1) Base Year and four (4) Option Years. A Requirements Type Contract is defined in FAR Clause 52.216-21 (Oct 1995). The period of performance will begin on the date of contract award and end one year afterward; each subsequent option year, if exercised, will begin one day after the end of the previous contract year and end one year thereafter.
ESTIMATED REQUIREMENTS/ QUANTITIES
The quantities shown in the attached Addendum to Blocks 19-24 of the Standard Form 1449 are estimates of the Coast Guard’s annual requirements for the base year and each corresponding option year. These estimated requirements are for information purposes only and shall not be considered as orders. However, the U.S. Coast Guard SFLC is obligated to order such quantities as may be needed to fill Coast Guard requirements for the overhaul(s) specified during the term of the contract. Except as otherwise provided for herein, the Contractor is obligated to deliver all such quantities as may be required to fulfill the requirements of each individual task order.
ORDERING/TASK ORDERS
a. Supplies and services will be ordered by the issuance of individual task orders. Refer to FAR Clause 52.216-18 Ordering, page 73.
b. Any supplies or services to be furnished under this contract shall be ordered by issuance of task orders by the following activity:
U.S. Coast Guard – Surface Forces Logistics Center WMEC Product Line (C&P1) 707 E. Ordnance Road Baltimore, MD 21226
c. All task orders issued hereunder are subject to the terms and conditions of this contract which shall control in the event of conflict with any task order.
d. The Contractor shall fill Task Orders in the same sequence in which they are received, unless otherwise instructed by the Contracting Officer.
OPTIONS
Each Option extending the term of this Contract shall be for a period of one (1) year from the effective date of each Option and shall be issued in accordance with FAR 52.217-9 (Mar 2000).
GOVERNMENT FURNISHED PROPERTY (GFP)
The Government shall provide only that property set forth below, notwithstanding any terms or conditions of the specification to the contrary. All property provided to the Contractor by the Government under this contract shall be subject to the Government Property clause of this contract. Actual quantities furnished will be determined on individual task orders.
NOTE: The Contractor’s property control system may be reviewed for approval, in accordance with Government Property requirements. Each turbocharger, upon transfer from the Government to the Contractor, shall be examined for completeness, proper type, quantity, and damage. The Contractor shall be fully and solely responsible for any damage to such material while in the contractor’s custody and until it is returned to the US Coast Guard Surface Forces Logistics Center (SFLC) and accepted by the Contracting Officer or authorized representative. Discrepancies shall be reported to the Contracting Officer on the provided Government Furnished Property Discrepancy Report (Attachment 3 to this solicitation).
GFP/ITEM VALUE/EA.
Contract Line Item Number (CLIN) 0001 – 4001, Turbocharger $61,706.47
NSN 2950-01-233-3468, Model #131 Contract Line Item Number (CLIN) 0002 – 4002, Turbocharger $67,906.15
NSN 2950-01-118-7979, Model # 165 Contract Line Item Number (CLIN) 0003 – 4003, Turbocharger $59,573.64 NSN 2950-01-363-1644, Model #720
ADDRESS FOR SHIPMENT OF GOVERNMENT FURNISHED PROPERTY
Firm Name: _________________________________________
Street Address: ______________________________________
City, State, Zip Code: _________________________________
ADDENDUM TO STANDARD FORM 1449
SUPPLIES OR SERVICES AND PRICE/COST
BASE YEAR REQUIREMENTS
CLIN 0001
NSN 2950-01-233-3468
Turbocharger, Model 131, P/N 22602171-2
EST UNIT TOTAL
DESCRIPTION
QTY PRICE PRICE
0001a Arrival Inspection/Disassembly Inspection in accordance 4 $___________ $____________ with Paragraph 3.3 of Specification R-251-0120
0001b Overhaul Turbocharger in accordance with Paragraph 4 $___________ $____________
3.4, 3.5 & 3.6 of Specification R-251-0120
(This cost shall include all mandatory parts for Model 131.)
0001c Beyond Economical Repair (BER) – Provide pricing 1 $___________ $____________ for disposal of this CLIN if asset is determined BER.
Cost shall be for open, inspect and report of BER only, and the reassembly and return to the Coast Guard or disposal at Contractor’s facility, as directed.
0001d Reassembly Report/Test Report in accordance with 1 $___NSP_____ $____NSP____
Paragraph 3.7 of Specification R-251-0120.
0001e Quality Program in accordance with paragraph 4.3
1 $___NSP_____ $____NSP____
of Specification R-251-0120.
0001f Government Property Reports
$___NSP_____ $____NSP____
Mandatory Replacement Parts, Model 131, QTY
a. Gasket, P/N 2151091501 (21510915-1)
b. O-Ring, P/N 21526718-1
c. Gasket, P/N 21536512
d. Gasket, P/N 2154432-2
e. Gasket, P/N 2154433-2
f. Gasket, P/N 2154434-1
g. Gasket, P/N 2154435-1
h. Bearing Assembly, P/N 2260164-1
i. Bearing Assembly, P/N 2260165-1
j. Shim, P/N 22610217
k. Shim, P/N 22610218
l. Shim, P/N 22610221-1
m. Oil Seal, P/N 22612117
n. Oil Seal, P/N 22612118-2
o. Installation Kit P/N 25000388-1
p. Lifting Eyebolt P/N GT1000064
Contingency Replacement Parts, Model 131, Contractor shall provide prices for individual contingency replacement parts:
QTY PRICE PRICE
a. Pipe Plug, P/N 16393723
1 $___________ $____________
b. Capscrew, Special, P/N 21512863 16 $___________ $____________
c. Capscrew, P/N 21512865
18 $___________ $____________
d. Lockwasher, P/N 2151311-1
2 $___________ $____________
e. Lockwasher, P/N 2151312-1
42 $___________ $____________
f. Lockwasher, P/N 2151313-1
43 $___________ $____________
g. Capscrew, P/N 21513510-1
12 $___________ $____________
h. Capscrew, P/N 21513513-1 4 $___________ $____________
i. Capscrew, P/N 2151352-1
2 $___________ $____________
j. Washer, P/N 2151495-1 4 $___________ $____________
k. Nut, P/N 2151697-1
21 $___________ $____________
l. Dowel, P/N 21517744-1
6 $___________ $____________
m. Flathead Screw, P/N 21529627 2 $___________ $____________
n. Plug, P/N 2153284
1 $___________ $____________
o. Plug, P/N 2153286
p. Dowel, P/N 2154765
q. Capscrew, P/N 21555893
42 $___________ $____________
r. Air Discharge Casing, P/N 22600431-1 1 $___________ $____________
s. Air Inlet Assembly, P/N 22600452-1
1 $___________ $____________
t. Gas Inlet Assembly, P/N 22600454
1 $___________ $____________
u. Rotor Assembly, P/N 22600456-1
v. Impeller P/N 2670014-1
w. Shaft assembly P/N 2260114-1
1 $___________ $____________
x. Washer Comp. P/N 22611314-1
1 $___________ $____________
y. Turbine Disc Assmy P/N 22600714-2 1 $___________ $____________
z. Turbine Blades P/N 22618137
58 $___________ $____________
aa. Blade locks P/N 22618137
ab. Air Inlet Casing, P/N 22610525-1
ac. Capscrew, P/N 22611513
6 $___________ $____________
ad. Gas Inlet Casing, P/N 2261260 (22612620) 1 $___________ $____________
ae. Basic Assembly, P/N 22612622-1
1 $___________ $____________
af. Turbine Casing, P/N 22612715-1
ag. Cover, P/N 22613016-1
ah. Cover, P/N 22613017-1
ai. Cover, P/N 22611309-1
aj. Nozzle Clamp, P/N 2261462-1
ak. Connector, P/N 2261553
al. Shroud Ring, P/N 2261611-1
am. Nozzle Ring, P/N 22616526-1
an. Diffuser Ring, P/N 22616715
ao. Cover, P/N 2402085
ap. Cover, P/N 2402086
aq. Cover, P/N 2402087
ar. Capscrew, P/N 21549661
TOTAL COST OF CONTINGENCY PARTS FOR CLIN 0001 $___________________
CLIN 0002
NSN 2950-01-118-7979
Turbocharger, Model 165, P/N 22602128-2
0002a Arrival Inspection/Disassembly Inspection in accordance 4 $___________ $____________ with Paragraph 3.3 of Specification R-251-0120.
0002b Overhaul Turbocharger in accordance with Paragraph 4 $___________ $____________
3.4, 3.5 & 3.6 of Specification R-251-0120.
(This cost shall include all mandatory parts for Model 165.)
0002c Beyond Economical Repair (BER) – Provide pricing 1 $___________ $____________
Cost shall be for open, inspect and report of BER only, and the reassembly and return to the Coast Guard or disposal at Contractor’s facility, as directed.
0002d Reassembly Report/Test Report in accordance with 1 $___NSP_____ $____NSP____
0002e Quality Program in accordance with Paragraph 4.3
1 $___NSP_____ $____NSP____
of Specification R-251-0120.
0002f Government Property Reports
Mandatory Replacement Parts, Model 165, NSN 2950-01-118-7979
a. O-Ring, P/N 21526719-1
b. Gasket Connector, P/N 2153654-1
c. Gasket, Cover Plate, P/N 2154432-2
d. O-Ring, P/N 215267260 (21526726)
e. Shim, Turbo to Support, P/N 226120213
f. Shim, Air Seal, P/N 22610223-1
g. Shim, Bearing Carrier, P/N 22610224
h. Shim, Oil Seal, P/N 22610225-1
i. Thrust Washer, Small, P/N 22611310-1
j. Thrust Washer, P/N 2261139-1
k. Bearing, P/N 2612012-1 (22612012-1)
l. Oil Seal, P/N 22612120-1
m. Oil Seal, P/N 22612121-1
n. Air Seal, P/N 2261631-1
o. Bearing Assembly TE P/N 2260162-1
p. Bearing assembly BE P/N 2260161-1
q. Installation kit P/N 25000378-1
r. Lifting Eyebolt P/N GT100064
Contingency Replacement Parts, Model 165, UNIT
TOTAL
a. Elbow, P/N 24023642
b. Pipe Plug, P/N 16393718
c. Pipe Plug, P/N 1639374
d. Tube, P/N 16394015-1
e. Dowel, P/N 21511010-1
f. Capscrew, P/N 21512863
8 $___________ $____________
g. Lockwasher, P/N 2151312-1
24 $___________ $____________
h. Lockwasher, P/N 2151313-1
41 $___________ $____________
i. Lockwasher, P/N 21513513-1
j. Capscrew, P/N 21513513-1
20 $___________ $____________
k. Stud, P/N 21513513-1
l. Washer, P/N 2151495-1
m. Nut, P/N 2151697-1
n. Guide Pin, P/N 21517741
3 $___________ $____________
o. Dowel, P/N 21517744-1
p. Capscrew, P/N 2152866
10 $___________ $____________
q. Machine Screw, P/N 21529624
r. Straight Dowel, P/N 2154765
s. Capscrew, P/N 2154961
t. Capscrew, P/N 2154962
u. Capscrew, P/N 21549629
13 $___________ $____________
v. Capscrew, P/N 21549632
w. Capscrew, P/N 21549549
x. Capscrew, P/N 21549715
y. Capscrew, P/N 21553616
z. Capscrew, P/N 21555893
aa. Blower Casing, P/N 22600723
1 $___________ $____________
ab. Gas Inlet Casing, P/N 22600437
ac. Rotor, P/N 22600540-2
ad. Rotor, P/N 22600540-2
ae. Impeller P/N 22610815
af. Shaft Assy P/N 2260111
ag. Washer P/N 22611313
ah. Inducer P/N 22610913-2
ai. Turbine Disc Assembly P/N 22616553
aj. Turbine blade P/N 22618017
ak. Blade lock P/N 2261595-1
al. Nozzle Clamp Ring, P/N 22610459-1
am. Diffuser, P/N 22610460
an. Air Nozzle, P/N 22610464-1
ao. Nozzle Ring
ap. Air Inlet Casing, P/N 22610534
1 $___________ $____________
aq. Retainer Washer, P/N 22611311-1
ar. Dowel Pin, P/N 2261221-2
as. Dowel Pin, P/N 2261222-1
at. Bearing Retainer, P/N 22612312
1 $___________ $____________
au. Bearing Retainer, P/N 2261237
av. Retainer Ring, P/N 2261238
aw. Retainer Ring, P/N 2261239
ax. Main Casing, P/N 22612710-1
ay. Cover Plate, P/N 22613011-2
az. Cover Plate, P/N 22613012-1
ba. Shroud Ring, P/N 2261614
bb. Diffuser, P/N 2261674
bc. Tube Clamp, P/N 2401298-1
bd. Tube Clamp, P/N 441079
TOTAL COST OF CONTINGENCY PARTS FOR CLIN 0002 $___________________
CLIN 0003
NSN 2950-01-363-1644
Turbocharger, Model 720, P/N 22600172-4
0003a Arrival Inspection/Disassembly Inspection in accordance 4 $___________ $____________
0003b Overhaul Turbocharger in accordance with Paragraph 4 $___________ $____________
3.4, 3.5 & 3.6 of Specification R-251-0120 .
(This cost shall include all mandatory parts for Model 720.)
0003c Beyond Economical Repair (BER) – Provide pricing 1 $___________ $____________
Cost shall be for open, inspect and report of BER only, and the reassembly and return to the Coast Guard or disposal at Contractor’s facility, as directed.
0003d Reassembly Report/Test Report in accordance with 1 $___NSP_____ $____NSP____
0003e
1 $___NSP_____ $____NSP____
of Specification R-251-0120.
0003f Government Property Reports
Mandatory Replacement Parts, Model 720, NSN 2950-01-363-1644
a. Gasket, Connector, P/N 21536511-1
b. Gasket, P/N 21548714-1
c. Shim, Diffuser, P/N 22610210-1
d. O-Ring, P/N 2261121
e. Gasket, P/N 2261175-1
f. Bearing, P/N 2261208
g. Bearing, P/N 2261209
h. Seal, Oil, P/N 2261211-1
i. Seal, Oil, P/N 2261212-1
j. Stud P/N 2153004
k. Installation kit P/N 25000374-1
l. Lifting Eyebolt P/N GT1000064
Contingency Replacement Parts, Model 720, UNIT TOTAL
a. Connector, P/N 240122823
c. Pipe Plug, P/N 1639375
d. Pipe Plug, 1639379
e. Tube, P/N 16394015-1
f. Reducer, P/N 1639462
g. Lockwasher, P/N 2151311-1
12 $___________ $____________
h. Lockwasher, P/N 2151312-1
3 $___________ $____________
i. Lockwasher, P/N 21513120
16 $___________ $____________
j. Lockwasher, P/N 2151313-1
24 $___________ $____________
k. Capscrew, P/N 21513510-1
12 $___________ $____________
l. Capscrew, P/N 21513526-1
m. Stud, P/N 21514265
12 $___________ $____________
n. Nut, P/N 2151692-1
o. Nut, P/N 2151697-1
p. Capscrew, P/N 21523520-1
q. Capscrew, P/N 21523523
16 $___________ $____________
r. Screw, P/N 21526088
s. Screw, P/N 21529623
t. Screw, P/N 21529624
5 $___________ $____________
u. Washer, Heat Shield, P/N 21553815
v. Bolt, P/N 2155891
w. Intermediate Casing, P/N 2260031-1
x. Rotor, P/N 22600547
y. Impeller P/N 2670073-1
z. Shaft P/N 2261329
aa. Thrust Collar P/N 2261295
1 $___________ $____________
ab. Turbine Disc Assy P/N 22600716-1 1 $___________ $____________
ac. Turbine Blade P/N 22616873-1
50 $___________ $____________
ad. Blade lock P/N 2261592-1
50 $___________ $____________
ae. Gas Inlet Casing/Ring, P/N 22601020-5
af. Diffuser, P/N 22610415
ag. Nozzle Ring, P/N 22610433-3
1 $___________ $____________
ah. Blower Inlet Casing, P/N 22610511 1 $___________ $____________
ai. Blower Casing, P/N 2261052-2
1 $___________ $____________
aj. Turbine Casing, P/N 2261053
ak. Oil Pipe, P/N 2261111-1
al. Lube Oil Line, P/N 2261114
am. Washer, P/N 2261131
an. Nut, Special P/N 2261143-1
ao. Capscrew, P/N 2261158
ap. Eyebolt, P/N 2261161
aq. Pin, Special, P/N 2261221-1
2 $___________ $____________
ar. Retaining Ring, P/N 226123-1 (2261231-1) 1 $___________ $____________
as. Reinforcing Ring, P/N 2261541
at. Connector, P/N 2261551
au. Heat Shield, P/N 2261602-1
av. Clamp, P/N 24018356
aw. Clamp, P/N 24018357
ax. Pipe Plug, 515576A
TOTAL COST OF CONTINGENCY PARTS FOR CLIN 0003 $___________________
OPTION YEAR 1 REQUIREMENTS
CLIN 1001
1001a Arrival Inspection/Disassembly Inspection in accordance 4 $___________ $____________
1001b Overhaul Turbocharger in accordance with Paragraph 4 $___________ $____________
1001c Beyond Economical Repair (BER) – Provide pricing 1 $___________ $____________
Cost shall be for open, inspect and report of BER only, and the reassembly and return to the Coast Guard or disposal at Contractor’s facility, as directed.
1001d Reassembly Report/Test Report in accordance with 1 $___NSP_____ $____NSP____
1001e
1 $___NSP_____ $____NSP____
of Specification R-251-0120.
1001f Government Property Reports
a. Pipe Plug, P/N 16393723
1 $___________ $____________
b. Capscrew, Special, P/N 21512863 16 $___________ $____________
c. Capscrew, P/N 21512865
18 $___________ $____________
d. Lockwasher, P/N 2151311-1
2 $___________ $____________
e. Lockwasher, P/N 2151312-1
42 $___________ $____________
f. Lockwasher, P/N 2151313-1
43 $___________ $____________
g. Capscrew, P/N 21513510-1
12 $___________ $____________
h. Capscrew, P/N 21513513-1 4 $___________ $____________
i. Capscrew, P/N 2151352-1
2 $___________ $____________
j. Washer, P/N 2151495-1
6 $___________ $____________
m. Flathead Screw, P/N 21529627
1 $___________ $____________
s. Air Inlet Assembly, P/N 22600452-1
1 $___________ $____________
t. Gas Inlet Assembly, P/N 22600454
1 $___________ $____________
u. Rotor Assembly, P/N 22600456-1
1 $___________ $____________
x. Washer Comp. P/N 22611314-1
1 $___________ $____________
y. Turbine Disc Assmy P/N 22600714-2 1 $___________ $____________
z. Turbine Blades P/N 22618137
1 $___________ $____________
ae. Basic Assembly, P/N 22612622-1
1 $___________ $____________
af. Turbine Casing, P/N 22612715-1
TOTAL COST OF CONTINGENCY PARTS FOR CLIN 1001 $___________________
CLIN 1002
NSN 2950-01-118-7979
1002a Arrival Inspection/Disassembly Inspection in accordance 4 $___________ $____________ with paragraph 3.3 of Specification R-251-0120.
1002b Overhaul Turbocharger in accordance with Paragraph 4 $___________ $____________
1002c Beyond Economical Repair (BER) – Provide pricing 1 $___________ $____________
Cost shall be for open, inspect and report of BER only, and the reassembly and return to the Coast Guard or disposal at Contractor’s facility, as directed.
1002d Reassembly Report/Test Report in accordance with 1 $___NSP_____ $____NSP____
1002e
1 $___NSP_____ $____NSP____
of Specification R-251-0120 1002f Government Property Reports
p. Bearing assembly BE P/N 2260161-1
1 $___________ $____________
ab. Gas Inlet Casing, P/N 22600437
1 $___________ $____________
aq. Retainer Washer, P/N 22611311-1
1 $___________ $____________
au. Bearing Retainer, P/N 2261237
TOTAL COST OF CONTINGENCY PARTS FOR CLIN 1002 $___________________
CLIN 1003
NSN 2950-01-363-1644
1003a Arrival Inspection/Disassembly Inspection in accordance 4 $___________ $____________ with paragraph 3.3 of Specification R-251-0120.
1003b Overhaul Turbocharger in accordance with Paragraph 4 $___________ $____________
3.4, 3.5 & 3.6 of Specification R-251-0120
1003c Beyond Economical Repair (BER) – Provide pricing 1 $___________ $____________
Cost shall be for open, inspect and report of BER only, and the reassembly and return to the Coast Guard or disposal at Contractor’s facility, as directed.
1003d Reassembly Report/Test Report in accordance with 1 $___NSP_____ $____NSP____
1003e
1 $___NSP_____ $____NSP____
of Specification R-251-0120.
1003f Government Property Reports
a. Connector, P/N 240122823
12 $___________ $____________
h. Lockwasher, P/N 2151312-1
3 $___________ $____________
i. Lockwasher, P/N 21513120
16 $___________ $____________
j. Lockwasher, P/N 2151313-1
24 $___________ $____________
k. Capscrew, P/N 21513510-1
12 $___________ $____________
l. Capscrew, P/N 21513526-1
1 $___________ $____________
ab. Turbine Disc Assy P/N 22600716-1 1 $___________ $____________
ac. Turbine Blade P/N 22616873-1
50 $___________ $____________
ad. Blade lock P/N 2261592-1
50 $___________ $____________
ae. Gas Inlet Casing/Ring, P/N 22601020-5
ah. Blower Inlet Casing, P/N 22610511 1 $___________ $____________
ai. Blower Casing, P/N 2261052-2
1 $___________ $____________
aj. Turbine Casing, P/N 2261053
2 $___________ $____________
ar. Retaining Ring, P/N 226123-1
(2261231-1) 1 $___________ $____________
as. Reinforcing Ring, P/N 2261541
TOTAL COST OF CONTINGENCY PARTS FOR CLIN 1003 $___________________
OPTION YEAR 2 REQUIREMENTS
CLIN 2001
2001a Arrival Inspection/Disassembly Inspection in accordance 4 $___________ $____________
2001b Overhaul Turbocharger in accordance with Paragraph 4 $___________ $____________
2001c Beyond Economical Repair (BER) – Provide pricing 1 $___________ $____________
Cost shall be for open, inspect and report of BER only, and the reassembly and return to the Coast Guard or disposal at Contractor’s facility, as directed.
2001d Reassembly Report/Test Report in accordance with 1 $___NSP_____ $____NSP____
2001e
1 $___NSP_____ $____NSP____
of Specification R-251-0120.
2001f Government Property Reports
a. Pipe Plug, P/N 16393723
1 $___________ $____________
b. Capscrew, Special, P/N 21512863 16 $___________ $____________
c. Capscrew, P/N 21512865
18 $___________ $____________
d. Lockwasher, P/N 2151311-1
2 $___________ $____________
e. Lockwasher, P/N 2151312-1
42 $___________ $____________
f. Lockwasher, P/N 2151313-1
43 $___________ $____________
g. Capscrew, P/N 21513510-1
12 $___________ $____________
h. Capscrew, P/N 21513513-1 4 $___________ $____________
i. Capscrew, P/N 2151352-1
2 $___________ $____________
j. Washer, P/N 2151495-1
6 $___________ $____________
m. Flathead Screw, P/N 21529627
1 $___________ $____________
s. Air Inlet Assembly, P/N 22600452-1
1 $___________ $____________
t. Gas Inlet Assembly, P/N 22600454
1 $___________ $____________
u. Rotor Assembly, P/N 22600456-1
1 $___________ $____________
x. Washer Comp. P/N 22611314-1
1 $___________ $____________
y. Turbine Disc Assmy P/N 22600714-2 1 $___________ $____________
z. Turbine Blades P/N 22618137
1 $___________ $____________
ae. Basic Assembly, P/N 22612622-1
1 $___________ $____________
af. Turbine Casing, P/N 22612715-1
TOTAL COST OF CONTINGENCY PARTS FOR CLIN 2001 $___________________
CLIN 2002
NSN 2950-01-118-7979
2002a Arrival Inspection/Disassembly Inspection in accordance 4 $___________ $____________
2002b Overhaul Turbocharger in accordance with Paragraph 4 $___________ $____________
2002c Beyond Economical Repair (BER) – Provide pricing 1 $___________ $____________
Cost shall be for open, inspect and report of BER only, and the reassembly and return to the Coast Guard or disposal at Contractor’s facility, as directed.
2002d Reassembly Report/Test Report in accordance with 1 $___NSP_____ $____NSP____
2002e
1 $___NSP_____ $____NSP____
of Specification R-251-0120.
2002f Government Property Reports
p. Bearing assembly BE P/N 2260161-1
NSN 2950-01-118-7979
Contractor shall provide prices for individual contingency replacement parts:
1 $___________ $____________
ab. Gas Inlet Casing, P/N 22600437
1 $___________ $____________
aq. Retainer Washer, P/N 22611311-1
1 $___________ $____________
au. Bearing Retainer, P/N 2261237
TOTAL COST OF CONTINGENCY PARTS FOR CLIN 2002 $___________________
CLIN 2003
NSN 2950-01-363-1644
2003a Arrival Inspection/Disassembly Inspection in accordance 4 $___________ $____________
2003b Overhaul Turbocharger in accordance with Paragraph 4 $___________ $____________
2003c Beyond Economical Repair (BER) – Provide pricing 1 $___________ $____________
Cost shall be for open, inspect and report of BER only, and the reassembly and return to the Coast Guard or disposal at Contractor’s facility, as directed.
2003d Reassembly Report/Test Report in accordance with 1 $___NSP_____ $____NSP____
2003e
1 $___NSP_____ $____NSP____
of Specification R-251-0120.
2003f Government Property Reports
NSN 2950-01-363-1644
a. Connector, P/N 240122823
12 $___________ $____________
h. Lockwasher, P/N 2151312-1
3 $___________ $____________
i. Lockwasher, P/N 21513120
16 $___________ $____________
j. Lockwasher, P/N 2151313-1
24 $___________ $____________
k. Capscrew, P/N 21513510-1
12 $___________ $____________
l. Capscrew, P/N 21513526-1
1 $___________ $____________
ab. Turbine Disc Assy P/N 22600716-1 1 $___________ $____________
ac. Turbine Blade P/N 22616873-1
50 $___________ $____________
ad. Blade lock P/N 2261592-1
50 $___________ $____________
ae. Gas Inlet Casing/Ring, P/N 22601020-5
ah. Blower Inlet Casing, P/N 22610511 1 $___________ $____________
ai. Blower Casing, P/N 2261052-2
1 $___________ $____________
aj. Turbine Casing, P/N 2261053
2 $___________ $____________
ar. Retaining Ring, P/N 226123-1
(2261231-1) 1 $___________ $____________
as. Reinforcing Ring, P/N 2261541
TOTAL COST OF CONTINGENCY PARTS FOR CLIN 2003 $___________________
OPTION YEAR 3 REQUIREMENTS
CLIN 3001
3001a Arrival Inspection/Disassembly Inspection in accordance 4 $___________ $____________
3001b Overhaul Turbocharger in accordance with Paragraph 4 $___________ $____________
3001c Beyond Economical Repair (BER) – Provide pricing 1 $___________ $____________
Cost shall be for open, inspect and report of BER only, and the reassembly and return to the Coast Guard or disposal at Contractor’s facility, as directed.
3001d Reassembly Report/Test Report in accordance with 1 $___NSP_____ $____NSP____
3001e
1 $___NSP_____ $____NSP____
of Specification R-251-0120.
3001f Government Property Reports
a. Pipe Plug, P/N 16393723
1 $___________ $____________
b. Capscrew, Special, P/N 21512863 16 $___________ $____________
c. Capscrew, P/N 21512865
18 $___________ $____________
d. Lockwasher, P/N 2151311-1
2 $___________ $____________
e. Lockwasher, P/N 2151312-1
42 $___________ $____________
f. Lockwasher, P/N 2151313-1
43 $___________ $____________
g. Capscrew, P/N 21513510-1
12 $___________ $____________
h. Capscrew, P/N 21513513-1 4 $___________ $____________
i. Capscrew, P/N 2151352-1
2 $___________ $____________
j. Washer, P/N 2151495-1
6 $___________ $____________
m. Flathead Screw, P/N 21529627
1 $___________ $____________
s. Air Inlet Assembly, P/N 22600452-1
1 $___________ $____________
t. Gas Inlet Assembly, P/N 22600454
1 $___________ $____________
u. Rotor Assembly, P/N 22600456-1
1 $___________ $____________
x. Washer Comp. P/N 22611314-1
1 $___________ $____________
y. Turbine Disc Assmy P/N 22600714-2 1 $___________ $____________
z. Turbine Blades P/N 22618137
1 $___________ $____________
ae. Basic Assembly, P/N 22612622-1
1 $___________ $____________
af. Turbine Casing, P/N 22612715-1
TOTAL COST OF CONTINGENCY PARTS FOR CLIN 3001 $___________________
CLIN 3002
NSN 2950-01-118-7979
3002a Arrival Inspection/Disassembly Inspection in accordance 4 $___________ $____________
3002b Overhaul Turbocharger in accordance with Paragraph 4 $___________ $____________
3002c Beyond Economical Repair (BER) – Provide pricing 1 $___________ $____________
Cost shall be for open, inspect and report of BER only, and the reassembly and return to the Coast Guard or disposal at Contractor’s facility, as directed.
3002d Reassembly Report/Test Report in accordance with 1 $___NSP_____ $____NSP____
3002e
1 $___NSP_____ $____NSP____
of Specification R-251-0120.
3002f Government Property Reports
p. Bearing assembly BE P/N 2260161-1
NSN 2950-01-118-7979
Contractor shall provide prices for individual contingency replacement parts:
1 $___________ $____________
ab. Gas Inlet Casing, P/N 22600437
1 $___________ $____________
aq. Retainer Washer, P/N 22611311-1
1 $___________ $____________
au. Bearing Retainer, P/N 2261237
TOTAL COST OF CONTINGENCY PARTS FOR CLIN 3002 $___________________
CLIN 3003
NSN 2950-01-363-1644
3003a Arrival Inspection/Disassembly Inspection in accordance 4 $___________ $____________
3003b Overhaul Turbocharger in accordance with Paragraph 4 $___________ $____________
3003c Beyond Economical Repair (BER) – Provide pricing 1 $___________ $____________
Cost shall be for open, inspect and report of BER only, and the reassembly and return to the Coast Guard or disposal at Contractor’s facility, as directed.
3003d Reassembly Report/Test Report in accordance with 1 $___NSP_____ $____NSP____
3003e
1 $___NSP_____ $____NSP____
of Specification R-251-0120.
3003f Government Property Reports
NSN 2950-01-363-1644
a. Connector, P/N 240122823
12 $___________ $____________
h. Lockwasher, P/N 2151312-1
3 $___________ $____________
i. Lockwasher, P/N 21513120
16 $___________ $____________
j. Lockwasher, P/N 2151313-1
24 $___________ $____________
k. Capscrew, P/N 21513510-1
12 $___________ $____________
l. Capscrew, P/N 21513526-1
1 $___________ $____________
ab. Turbine Disc Assy P/N 22600716-1 1 $___________ $____________
ac. Turbine Blade P/N 22616873-1
50 $___________ $____________
ad. Blade lock P/N 2261592-1
50 $___________ $____________
ae. Gas Inlet Casing/Ring, P/N 22601020-5
ah. Blower Inlet Casing, P/N 22610511 1 $___________ $____________
ai. Blower Casing, P/N 2261052-2
1 $___________ $____________
aj. Turbine Casing, P/N 2261053
2 $___________ $____________
ar. Retaining Ring, P/N 226123-1
(2261231-1) 1 $___________ $____________
as. Reinforcing Ring, P/N 2261541
TOTAL COST OF CONTINGENCY PARTS FOR CLIN 3003 $___________________
OPTION YEAR 4 REQUIREMENTS
CLIN 4001
4001a Arrival Inspection/Disassembly Inspection in accordance 4 $___________ $____________
4001b Overhaul Turbocharger in accordance with Paragraph 4 $___________ $____________
4001c Beyond Economical Repair (BER) – Provide pricing 1 $___________ $____________
Cost shall be for open, inspect and report of BER only, and the reassembly and return to the Coast Guard or disposal at Contractor’s facility, as directed.
4001d Reassembly Report/Test Report in accordance with 1 $___NSP_____ $____NSP____
4001e
1 $___NSP_____ $____NSP____
of Specification R-251-0120.
4001f Government Property Reports
a. Pipe Plug, P/N 16393723
1 $___________ $____________
b. Capscrew, Special, P/N 21512863 16 $___________ $____________
c. Capscrew, P/N 21512865
18 $___________ $____________
d. Lockwasher, P/N 2151311-1
2 $___________ $____________
e. Lockwasher, P/N 2151312-1
42 $___________ $____________
f. Lockwasher, P/N 2151313-1
43 $___________ $____________
g. Capscrew, P/N 21513510-1
12 $___________ $____________
h. Capscrew, P/N 21513513-1 4 $___________ $____________
i. Capscrew, P/N 2151352-1
2 $___________ $____________
j. Washer, P/N 2151495-1
6 $___________ $____________
m. Flathead Screw, P/N 21529627
1 $___________ $____________
s. Air Inlet Assembly, P/N 22600452-1
1 $___________ $____________
t. Gas Inlet Assembly, P/N 22600454
1 $___________ $____________
u. Rotor Assembly, P/N 22600456-1
1 $___________ $____________
x. Washer Comp. P/N 22611314-1
1 $___________ $____________
y. Turbine Disc Assmy P/N 22600714-2 1 $___________ $____________
z. Turbine Blades P/N 22618137
1 $___________ $____________
ae. Basic Assembly, P/N 22612622-1
1 $___________ $____________
af. Turbine Casing, P/N 22612715-1
TOTAL COST OF CONTINGENCY PARTS FOR CLIN 4001 $___________________
CLIN 4002
NSN 2950-01-118-7979
4002a Arrival Inspection/Disassembly Inspection in accordance 4 $___________ $____________
4002b Overhaul Turbocharger in accordance with Paragraph 4 $___________ $____________
4002c Beyond Economical Repair (BER) – Provide pricing 1 $___________ $____________
Cost shall be for open, inspect and report of BER only, and the reassembly and return to the Coast Guard or disposal at Contractor’s facility, as directed.
4002d Reassembly Report/Test Report in accordance with 1 $___NSP_____ $____NSP____
4002e
1 $___NSP_____ $____NSP____
of Specification R-251-0120.
4002f Government Property Reports
p. Bearing assembly BE P/N 2260161-1
NSN 2950-01-118-7979
Contractor shall provide prices for individual contingency replacement parts:
1 $___________ $____________
ab. Gas Inlet Casing, P/N 22600437
1 $___________ $____________
aq. Retainer Washer, P/N 22611311-1
1 $___________ $____________
au. Bearing Retainer, P/N 2261237
TOTAL COST OF CONTINGENCY PARTS FOR CLIN 4002 $___________________
CLIN 4003
NSN 2950-01-363-1644
4003a Arrival Inspection/Disassembly Inspection in accordance 4 $___________ $____________ with Paragraph 3.3.
4003b Overhaul Turbocharger in accordance with paragraph 4 $___________ $____________
3.4, 3.5 & 3.6 (This cost shall include all mandatory parts for Model 720.)
4003c Beyond Economical Repair (BER) – Provide pricing 1 $___________ $____________
Cost shall be for open, inspect and report of BER only, and the reassembly and return to the Coast Guard or disposal at Contractor’s facility, as directed.
4003d Reassembly Report/Test Report in accordance with 1 $___NSP_____ $____NSP____
4003e
1 $___NSP_____ $____NSP____
of Specification R-251-0120.
4003f Government Property Reports
$___NSP_____ $____NSP____
NSN 2950-01-363-1644
a. Connector, P/N 240122823
12 $___________ $____________
h. Lockwasher, P/N 2151312-1
3 $___________ $____________
i. Lockwasher, P/N 21513120
16 $___________ $____________
j. Lockwasher, P/N 2151313-1
24 $___________ $____________
k. Capscrew, P/N 21513510-1
12 $___________ $____________
l. Capscrew, P/N 21513526-1
12 $
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .